EP0629743A1 - Méthode de compensation des abaissements d'une foundation fixe et longitudinale d'un chemin de fer - Google Patents
Méthode de compensation des abaissements d'une foundation fixe et longitudinale d'un chemin de fer Download PDFInfo
- Publication number
- EP0629743A1 EP0629743A1 EP94108666A EP94108666A EP0629743A1 EP 0629743 A1 EP0629743 A1 EP 0629743A1 EP 94108666 A EP94108666 A EP 94108666A EP 94108666 A EP94108666 A EP 94108666A EP 0629743 A1 EP0629743 A1 EP 0629743A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- concrete
- installation
- subsidence
- injection material
- concrete slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
- E01C23/06—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
- E01C23/10—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for raising or levelling sunken paving; for filling voids under paving; for introducing material into substructure
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B1/00—Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
- E01B1/002—Ballastless track, e.g. concrete slab trackway, or with asphalt layers
- E01B1/004—Ballastless track, e.g. concrete slab trackway, or with asphalt layers with prefabricated elements embedded in fresh concrete or asphalt
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D37/00—Repair of damaged foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2204/00—Characteristics of the track and its foundations
- E01B2204/03—Injecting, mixing or spraying additives into or onto ballast or underground
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2204/00—Characteristics of the track and its foundations
- E01B2204/06—Height or lateral adjustment means or positioning means for slabs, sleepers or rails
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2204/00—Characteristics of the track and its foundations
- E01B2204/10—Making longitudinal or transverse sleepers or slabs in situ or embedding them
Definitions
- the method according to the invention provides a possibility of targeted injection into the subsurface.
- pipes or rectangular tubes are already used in the manufacturing phase Hollow plastic or metal profiles laid between the floor and the concrete slab. This precautionary installation makes it possible to counteract a possible lowering of the subsoil in a simple manner. It is not always necessary to lift the concrete belt. In many renovation cases, pressing the resulting cavity alone will suffice.
- Fig. 2 top view of a roadway
- FIG. 1 shows the schematic structure of a concrete substructure for rail vehicles.
- the subsurface (1) is leveled and compacted in the usual way.
- a film (2) is applied to this substrate. It is used as a sealing surface layer during subsequent pressing. As a result, the grout must be distributed horizontally and not only penetrate vertically into the ground via cracks in the floor.
- the concrete track (4) is produced on the film, into which the sleepers (6) are shaken in the not yet hardened state.
- the vertical connector (7) of the installed plastic pipe can be seen between the sleepers.
- the grouting openings (8) lying in the plane of the concrete carriageway surface must be closed during the manufacture of the solid carriageway in order to avoid filling with concrete.
- the length of the individual hose sections and the distance between the compression openings depends on the expected compression volume.
- the filling openings (8) with the entire pipe laid can be outside or inside the rail track (5).
- Fig. 3 shows in a section perpendicular to the threshold (6) again the structure of the subgrade (1), film (2) and concrete slab (7).
- the vertical riser pipe (7) ends in the filling opening (8).
- Fig. 4 shows the special design of the plastic hose, which allows extensive, multiple pressing of material.
- the hose is provided with a lip (11) which has a small outlet opening (12). If the substrate (1) sinks with the film (2), a gap (9) is created. The injection material (10) is pressed into the gap via the outlet opening; The hose can be rinsed after pressing. If residues of the grouting material are still in the lip (11) and harden, the thin lip can be easily blasted off the next time the grouting is carried out.
- Another embodiment uses a conventional cuff hose instead of the compression hose with lip, which is also integrated into the concrete slab. With this arrangement it is also possible to press in a targeted manner at the individual pressing openings and to protect the hose from clogging by rinsing.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Road Paving Structures (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE4319470 | 1993-06-11 | ||
DE19934319470 DE4319470C1 (de) | 1993-06-11 | 1993-06-11 | Verfahren zum Ausgleich von Setzungen unter einer endlos verlegten festen Fahrbahn |
Publications (1)
Publication Number | Publication Date |
---|---|
EP0629743A1 true EP0629743A1 (fr) | 1994-12-21 |
Family
ID=6490185
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP94108666A Withdrawn EP0629743A1 (fr) | 1993-06-11 | 1994-06-07 | Méthode de compensation des abaissements d'une foundation fixe et longitudinale d'un chemin de fer |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP0629743A1 (fr) |
DE (1) | DE4319470C1 (fr) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102012009284A1 (de) | 2012-05-11 | 2013-11-14 | Goldschmidt Thermit Railservice Gmbh | Verfahren zur Sanierung einer festen Fahrbahn / Verfestigte Schotterbahn |
CN107489075A (zh) * | 2016-06-13 | 2017-12-19 | 中国铁道科学研究院铁道建筑研究所 | 一种板式无砟轨道自密实混凝土负压灌注施工方法 |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19631430C2 (de) * | 1996-08-03 | 2000-03-23 | Zueblin Ag | Verfahren zum Einbringen von Füllmaterial unter eine feste Fahrbahn und Vorrichtung zur Durchführung des Verfahrens |
DE19848655B4 (de) * | 1998-05-12 | 2009-09-17 | Ed. Züblin Ag | Sanierung von Festen Fahrbahnen |
NL1010212C2 (nl) * | 1998-09-29 | 2000-03-30 | Pieter Faber | Werkwijze en inrichting voor het oplichten van een plaat, zoals een betonplaat. |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2305536A1 (de) * | 1973-02-05 | 1974-08-08 | Sieke Helmut | Verfahren zum heben von gleisen und von strassenbelagsstuecken, vorrichtung zum durchfuehren dieses verfahrens und gleisschwelle |
EP0409356A1 (fr) * | 1989-07-21 | 1991-01-23 | Voorbij Groep B.V. | Procédé pour la mise en place d'une fondation et fondation |
DE4203493A1 (de) * | 1992-02-07 | 1992-08-13 | Guenter Dr Ing Habil Drescher | Gruendung mit setzungsausgleich fuer bauwerke |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1914712C3 (de) * | 1969-03-22 | 1973-09-27 | Stahlwerke Peine-Salzgitter Ag, 3150 Peine | Verfahren zum Herstellen eines Eisen bahngleises |
DE3838534A1 (de) * | 1988-11-14 | 1990-05-17 | Willich F Berg Bautechnik | Verfahren und anlage zum sanieren von mit grossen betonplatten belegten flaechen |
DE3840795A1 (de) * | 1988-12-03 | 1990-06-07 | Zueblin Ag | Verfahren zur herstellung eines schotterlosen eisenbahnoberbaues sowie fertigteile und vorrichtung zur durchfuehrung des verfahrens |
DE4201108C2 (de) * | 1992-01-17 | 1997-01-09 | Zueblin Ag | Verfahren zur nachträglichen Höhenregulierung einer fugenlosen Betonfahrbahn |
-
1993
- 1993-06-11 DE DE19934319470 patent/DE4319470C1/de not_active Expired - Fee Related
-
1994
- 1994-06-07 EP EP94108666A patent/EP0629743A1/fr not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2305536A1 (de) * | 1973-02-05 | 1974-08-08 | Sieke Helmut | Verfahren zum heben von gleisen und von strassenbelagsstuecken, vorrichtung zum durchfuehren dieses verfahrens und gleisschwelle |
EP0409356A1 (fr) * | 1989-07-21 | 1991-01-23 | Voorbij Groep B.V. | Procédé pour la mise en place d'une fondation et fondation |
DE4203493A1 (de) * | 1992-02-07 | 1992-08-13 | Guenter Dr Ing Habil Drescher | Gruendung mit setzungsausgleich fuer bauwerke |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102012009284A1 (de) | 2012-05-11 | 2013-11-14 | Goldschmidt Thermit Railservice Gmbh | Verfahren zur Sanierung einer festen Fahrbahn / Verfestigte Schotterbahn |
DE102012009284B4 (de) * | 2012-05-11 | 2015-01-22 | Goldschmidt Thermit Railservice Gmbh | Verfahren zur Sanierung einer festen Fahrbahn / Verfestigte Schotterbahn |
CN107489075A (zh) * | 2016-06-13 | 2017-12-19 | 中国铁道科学研究院铁道建筑研究所 | 一种板式无砟轨道自密实混凝土负压灌注施工方法 |
Also Published As
Publication number | Publication date |
---|---|
DE4319470C1 (de) | 1994-08-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE69304625T2 (de) | Verfahren zum Einbau eines Eisenbahngleises in Beton | |
DE69924777T2 (de) | Verfahren zum Herstellen eines Gleisoberbaus | |
DE2063727A1 (de) | Verfahren zur Stabilisierung eines Schotterbettes | |
DE4439894C2 (de) | Oberbau für Eisenbahngleise | |
DE19620731A1 (de) | Feste Fahrbahn für schienengebundene Fahrzeuge auf Brücken und Verfahren zu ihrer Herstellung | |
EP1644581B1 (fr) | Procédé de réalisation d'une structure de voie conçue pour des vehicles guides sur rails, en particulier des vehicules ferroviaires | |
DE4319470C1 (de) | Verfahren zum Ausgleich von Setzungen unter einer endlos verlegten festen Fahrbahn | |
DE2233263A1 (de) | Bauverfahren fuer unterfuehrungen (eisenbahn, strasse) insbesondere fuer faelle, bei denen der verkehr auf der zu unterfuehrenden strecke nicht unterbrochen werden darf | |
DE4423542A1 (de) | Oberbau für Eisenbahn-Gleisanlagen | |
DE3833720A1 (de) | Verfahren zur herstellung eines oberbaus fuer schienenbahnen | |
DE10261641A1 (de) | Verfahren zum Herstellen einer Festen Fahrbahn und Fahrweg | |
DE4325476A1 (de) | Verfahren zur Herstellung eines Unterbaus für ein Gleis für Schienenfahrzeuge | |
AT402413B (de) | Vorrichtung zur sicherung eines strassenkanaldurchlasses | |
DE19952803C2 (de) | Oberbau für schienengebundene Fahrzeuge des öffentlichen Nahverkehrs sowie Verfahren und Vorrichtung zu seiner Herstellung | |
DE1946712A1 (de) | Isolierung fuer schienengleiche Bahnuebergaenge | |
DE19818338C1 (de) | Bahnsteigsystem und Verfahren zur Erstellung eines Bahnsteiges | |
DE69916641T2 (de) | Verbesserungen an oder in bezug auf bahnanlagen für schienenfahrzeuge | |
DE102017003251A1 (de) | Verfahren zur nachträglichen Bodenverfestigung | |
DE4204802A1 (de) | Stabilisierte fugenverfuellung zwischen strassendecke und schiene | |
DE4303190A1 (de) | Betongroßflächenplatte für die Eindeckung von Gleisanlagen | |
DE102007056408A1 (de) | System und Verfahren zum Aufbau einer Fahrbahn | |
AT413553B (de) | Gleis für schienenfahrzeuge sowie verfahren zum herstellen eines gleises | |
EP1298251A1 (fr) | Superstructure sans ballast pour voies ferrées et procédé pour sa fabrication | |
DE29515275U1 (de) | Vorrichtung zum Halten eines Fugenabstandes von im Verband verlegten Pflastersteinen und/oder Bodenplatten | |
DE19706032C2 (de) | Verfahren zur Errichtung von befestigten Trassen und Vorrichtung für dieses Verfahren |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH DE FR GB IT LI NL |
|
17P | Request for examination filed |
Effective date: 19950518 |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
17Q | First examination report despatched |
Effective date: 19970415 |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 19970920 |