EP0207654B1 - Method for continuously manufacturing fired pellets - Google Patents
Method for continuously manufacturing fired pellets Download PDFInfo
- Publication number
- EP0207654B1 EP0207654B1 EP86304404A EP86304404A EP0207654B1 EP 0207654 B1 EP0207654 B1 EP 0207654B1 EP 86304404 A EP86304404 A EP 86304404A EP 86304404 A EP86304404 A EP 86304404A EP 0207654 B1 EP0207654 B1 EP 0207654B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- pellets
- green pellets
- zone
- iron ore
- firing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22B—PRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
- C22B1/00—Preliminary treatment of ores or scrap
- C22B1/14—Agglomerating; Briquetting; Binding; Granulating
- C22B1/24—Binding; Briquetting ; Granulating
- C22B1/2406—Binding; Briquetting ; Granulating pelletizing
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22B—PRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
- C22B1/00—Preliminary treatment of ores or scrap
- C22B1/14—Agglomerating; Briquetting; Binding; Granulating
Definitions
- the present invention relates to a method for continuously manufacturing fired pellets, which comprises the steps of adding a powdery flux to raw materials comprising an iron ore fine (including dust mainly comprising iron oxides; the same applies thereafter) to form a mixture, forming the mixture into green pellets, and firing the thus formed green pellets in an endless travelling grate type firing furnace into fired pellets.
- fired pellets As a raw material for blast furnace or direct-reduction ironmaking.
- Fired pellets are usually manufactured as follows: adding a powdery flux to raw materials comprising an iron ore fine to form a mixture, forming the mixture into green pellets, and firing the thus formed green pellets into fired pellets.
- Many studies have been made to improve the quality of the fired pellets. For example, a method for continuously manufacturing fired pellets is disclosed in Japanese Patent Provisional Publication No. 58-9,936 dated January 20, 1983, which comprises the steps of:
- the prior art 1 has the following problems:
- a method for manufacturing lumpy fired pellets in which a plurality of fired pellets are combined into a lump is disclosed in Japanese Patent Publication No. 58-53,697 dated November 30, 1983, which comprises the steps of:
- the lumpy fired pellets manufactured according to the prior art 3 in which a plurality of fired pellets are combined into a lump, are charged into a blast furnace, the lumpy fired pellets have an advantage of not impairing smooth passage of a reducing gas because the lumpy fired pellets never flow preferentially into the center portion of the blast furnace and gaps are produced between the lumpy fired pellets.
- the prior art 3 has the following problem: the fired pellets manufactured according to the prior art 3 are combined into a lump by means of fayalite having a low reducibility. The lumpy fired pellets have therefore a low reducibility.
- An object of the present invention is therefore to provide a method for economically and continuously manufacturing fired pellets at a high yield, which have a high strength and an excellent reducibility, and do not impair smooth passage of a reducing gas in the blast furnace, and wherein green pellets do not disintegrate during transferring and firing thereof.
- raw materials comprising a first iron ore fine of from 30 to 70 wt.% including an iron ore fine of from 50 to 80 wt.% having a particle size of up to 0.044 mm, and a second iron ore fine of from 70 to 30 wt.% including an iron ore fine of from 40 to 70 wt.% having a particle size of from over 0.5 mm up to 8 mm; adding a flux and water t6 said raw materials-to form a mixture; forming said mixture into green pellets having a particle size of from 3 to 12 mm; covering the surfaces of said green pellets with a powdery solid fuel in a prescribed amount; and drying, igniting and then firing said green pellets in an endless travelling grat
- the first iron ore fine comprises an iron ore fine of from 50 to 80 wt.% having a particle size of up to 0.044 mm and an iron ore fine of from 50 to 20 wt.% having a particle size of from over 0.044 mm up to 0.5 mm for the following reason.
- the iron ore fine having a particle size of up to 0.044 mm is under 50 wt.%, and the percentage of the iron ore fine having a particle size of from over 0.044 mm up to 0.5 mm is over 50 wt.%, the iron ore fine is hard to combine together when forming the green pellets. As a result, there occurs the problem of disintegration of the green pellets during transferring and firing thereof.
- the particle size of the first iron ore fine is over 0.5 mm, the iron ore fine is hard to combine together when forming the green pellets. As a result, there occurs the problem of disintegration of the green pellets during transferring and firing thereof.
- the second iron ore fine comprises an iron ore fine of from 40 to 70 wt.% having a particle size of from over 0.5 mm up to 8 mm and an iron ore fine of from 60 to 30 wt.% having a particle size of up to 0.5 mm for the following reason.
- the bulk density of the green pellets becomes higher.
- steam-bursting of the green pellets occurs, thus causing the problem of disintegration of the green pellets.
- reducibility of the fired pellets charged into a blast furnace degrades, and the cores of the fired pellets remaining unreduced cause degradation of high-temperature property under load of the fired pellets.
- the iron ore fine is hard to combine together when forming the green pellets.
- the problem of disintegration of the green pellets during transferring and firing thereof.
- much iron ore fine remaining unfired in the fired pellets causes the problem of degradation of reducibility of the fired pellets charged into a blast furnace.
- the particle size of the second iron ore fine is over 8 mm, the iron ore fine is hard to combine together when forming the green pellets, as described above, resulting in disintegration of the green pellets, and much iron ore fine remaining unfired in the fired pellets causes the problem of degradation of reducibility of the fired pellets.
- the raw materials comprise the first iron ore fine of from 30 to 70 wt.% and the second iron ore fine of from 70 to 30 wt.% for the following reason.
- the iron ore fine is hard to combine together when forming the green pellets. As a result, there occurs the problem of disintegration of the green pellets during transferring and firing thereof.
- the bulk density of the green pellets becomes higher.
- steam-bursting of the green pellets occurs, thus causing the problem of disintegration of the green pellets.
- the number of macro-pores in the fired pellets decreases, reducibility of the fired pellets charged into a blast furnace degrades, and the cores of the fired pellets remaining unreduced cause degradation of high-temperature property under load of the fired pellets.
- the surfaces of the green pellets and the surfaces of the fired pellets obtained by firing the green pellets become smooth without irregularities.
- the fired pellets having such surfaces are charged into the blast furnace, the fired pellets flow preferentially into the center portion of the blast furnace and gaps between the fired pellets decrease, so that there occurs the problem of impairing smooth passage of a reducing gas in the blast furnace.
- the powdery flux to be added to the above-mentioned raw materials comprises at least one of quick lime, slaked lime, limestone and dolomite, and the amount of addition thereof is determined on the basis of the amount of silica contained in the iron ore fine as the raw materials.
- quick lime and slaked lime have at the same time the function as a binder.
- a powdery solid fuel comprising at least one of coke breeze, coal fine, char fine and powdery petroleum coke may be added to the raw materials.
- the particle size of the green pellets is limited within the range of from 3 to 12 mm for the following reason.
- the particle size of the green pellets is under 3 mm, smooth passage of the high-temperature firing gas is impaired when firing the green pellets into the fired pellets in the endless travelling grate type firing furnace, resulting in the problem of a lower productivity of the fired pellets.
- the particle size of the fired pellets is also under 3 mm, the fired pellets with such a small particle size, if charged into the blast furnace, lead to impairing of smooth passage of the reducing gas. As a result, scaffolds and slips are produced in the blast furnace, causing the problem of unstable blast furnace operations.
- the particle size of the green pellets is over 12 mm, impact resistance of the green pellets decreases, so that, when transferring the green pellets into the endless travelling grate type firing furnace, there causes the problem of disintegration of the green pellets.
- the particle size of the fired pellets is also over 12 mm, when the fired pellets with such a large particle size are charged into the blast furnace, it takes much time for a reducing gas to penetrate up to the center portions of the fired pellets. As a result, reducibility of the fired pellets in the blast furnace decreases, and the cores of the fired pellets remaining unreduced cause the problem of degradation of high-temperature property under load of the fired pellets.
- the green pellets should preferably have a particle size of from 5 to 10 mm.
- the surfaces of the green pellets are covered with a powdery solid fuel in an amount of from 2.5 to 4.0 wt.% relative to the total amount of the raw materials and the powdery flux for the following reason.
- the covering amount of the powdery solid fuel is under 2.5 wt.% relative to the total amount of the raw materials and the powdery flux, a desired effect as described above cannot be obtained.
- the covering amount of the powdery solid fuel is over 4.0 wt.% relative to the total amount of the raw materials and the powdery flux, the temperature of the green pellets during firing in the endless travelling grate type firing furnace becomes excessively high. As a result, the structure of the fired pellets becomes excessively dense, thus causing the problem of degradation of reducibility of the fired pellets charged into the blast furnace.
- At least one of coke breeze, coal fine, char fine and powdery petroleum coke is used as the powdery solid fuel.
- the surfaces of the green pellets may be covered with a mixture of the powdery solid fuel and the powdery flux. By covering the surfaces of the green pellets with the mixture of the powdery solid fuel and the powdery flux, the fired pellets are easily combined into a large slab-shaped mass when firing the green pellets into the fired pellets.
- firing of the green pellets is carried out by the use of an endless travelling grate type firing furnace comprising a drying zone, an ignition zone following the drying zone, a firing zone following the ignition zone and an endless travelling grate passing sequentially through these zones.
- the thickness of the green pellets fed onto the inlet side of the endless travelling grate is limited within the range of from 300 to 1,500 mm for the following reason.
- a thickness of the green pellets of under 300 mm draft resistance becomes smaller when firing the green pellets into the fired pellets in the firing zone.
- the flow rate of a combustion waste gas as a firing gas sucked downwardly through the green pellets in the firing zone becomes higher. Therefore, combustion of the powdery solid fuel covering the surfaces of the green pellets comes prematurely to an end, thus causing the problem of insufficient firing of the green pellets.
- drying of the green pellets is carried out by blowing a drying gas at a temperature of from 150 to 350°C downwardly from above into the drying zone.
- the purpose of drying of the green pellets is to prevent the green pellets from bursting and disintegrating under the effect of heat shock when igniting the powdery solid fuel on the surfaces of the green pellets in the ignition zone. Therefore, it suffices to dry only the surface portions of the green pellets fed onto the endless travelling grate.
- the conventional practice to fully dry the green pellets fed onto the endless travelling grate by providing a first drying zone and a second drying zone in the endless travelling grate type firing furnace, subjecting the green pellets to the primary drying in the first drying zone, and then subjecting the green pellets to the secondary drying in the second drying zone.
- it suffices, in the present invention to dry only the surface portions of the green pellets fed onto the endless travelling grate for the following reason.
- the green pellets have a relatively small particle size and the raw materials include the iron ore fine having a particle size of from over 0.5 mm up to 8 mm in a prescribed amount. Therefore, when firing the green pellets into the fired pellets, steambursting does not occur and the green pellets never disintegrate.
- the temperature of the drying gas is limited within the range of from 150 to 350°C for the following reason.
- a temperature of the drying gas of under 150°C cannot give a desired effect of drying. If the temperature of the drying gas is over 350°C, on the other hand, steam-bursting of the green pellets occurs, thus causing the problem of disintegration of the green pellets when drying the green pellets.
- the combustion waste gas sucked in the downstream of the firing zone is adapted to be used as a drying gas. It is therefore desirable for the effective utilization of waste heat to use the combustion waste gas as the drying gas.
- Fig. 1 is a schematic process diagram illustrating an embodiment of the method of the present invention.
- the first iron ore fine and the second iron ore fine having the above- mentioned particle size distributions are stored in storage tanks 1a, 1b and 1c.
- a powdery flux is stored in a storage tank 1d, and a powdery solid fuel is stored in a storage tank 1 e.
- the first iron ore fine in a prescribed amount and the second iron ore fine in a prescribed amount discharged from the storage tanks 1a, 1b and 1c, the powdery flux in a prescribed amount discharged from the storage tank 1d and the powdery solid fuel in a prescribed amount discharged as required from the storage tank 1e are fed to a mixer 2 and are mixed in the mixer 2 rotating at prescribed revolutions to form a mixture.
- the mixture formed in the mixer 2 is fed to a first pelletizer 3 of the disk type, and water in a prescribed amount is added to the mixture in the first pelletizer 3.
- the mixture thus added with water is formed into green pellets having a particle size of from 3 to 12 mm by means of the first pelletizer 3 rotating at prescribed revolutions.
- the water content in the mixture should preferably be up to 5 wt.%.
- the green pellets formed by means of the first pelletizer 3 are sieved through a screen 4.
- the green pellets on the screen are fed to a second pelletizer 5 of the disk type, and the green pellets under the screen are fed back to the first pelletizer 3.
- Another powdery solid fuel for covering the surfaces of the green pellets is stored in a storage tank 6a and another powdery flux is stored in a storage tank 6b.
- the another powdery solid fuel in a prescribed amount discharged from the storage tank 6a and the another powdery flux in a prescribed amount discharged as required from the storage tank 6b are fed to the second pelletizer 5.
- the second pelletizer 5 rotating at prescribed revolutions, the surfaces of the green pellets fed from the first pelletizer 3 to the second pelletizer 5 are covered with the powdery solid fuel in a prescribed amount or with a mixture of the powdery solid fuel and the powdery flux in prescribed amounts.
- the first pelletizer 3 and the second pelletizer 5 are not limited to the disk type, but may be of the drum type as well.
- the green pellets, of which the surfaces are covered with the powdery solid fuel or with the mixture of the powdery solid fuel and the powdery flux as described above, are transferred through a feeder 7 to an endless travelling grate type firing furnace 8.
- the endless travelling grate type firing furnace 8 comprises a drying zone 8a, an ignition zone 8b following the drying zone 8a, a firing zone 8c following the ignition zone 8b, and an endless travelling grate 10 passing sequentially through these zones.
- Reference numerals 9a and 9b indicate a pair of pulleys for causing the endless travelling grate 10 to travel.
- the drying zone 8a is provided with a drying oven 11 having a drying gas blowing port directed downwardly. The drying oven 11 blows a drying gas at a temperature of from 150 to 350°C downwardly from above into the drying zone 8a to dry the green pellets in this zone.
- the ignition zone 8b is provided with an ignition oven 12 having an ignition gas blowing port directed downwardly for igniting the powdery solid fuel on the surfaces of the green pellets.
- the ignition oven 12 blows an igniting gas upwardly from below into the ignition zone 8b to ignite the powdery solid fuel on the surfaces of the green pellets in this zone.
- Fig. 1, 13 are a plurality of first wind boxes provided below the endless travelling grate 10 travelling in the upstream of the endless travelling grate type firing furnace 8
- 14 are a plurality of second wind boxes provided below the endless travelling grate 10 travelling in the downstream of the endless travelling grate type firing furnace 8.
- the drying gas blown into the drying zone 8a, the ignition gas blown into the ignition zone 8b, and part of the combustion waste gas produced by combustion of the powdery solid fuel on the surfaces of the green pellets in the firing zone 8c are sucked by a first blower 16 through the plurality of first wind boxes 13 and a dust collector 15, and released to open air.
- the remaining part of the combustion waste gas produced by combustion of the powdery solid fuel on the surfaces of the green pellets in the firing zone 8c is sucked by a second blower 17 through the plurality of second wind boxes 14, and blown into the drying oven 11 of the drying zone 8a as the drying gas.
- Fig. 1 18 is a crusher arranged near the downstream end of the endless travelling grate 10.
- the crusher 18 crushes a large slab-shaped mass of the fired pellets discharged from the downstream end of the endless travelling grate 10.
- Fig. 1,19 is a storage tank arranged near the upstream end of the endless travelling grate 10. A hearth layer ore to be fed onto the endless travelling grate 10 is stored in the storage tank 19.
- the green pellets of which the surfaces are covered with the powdery solid fuel or with the mixture of the powdery solid fuel and the powdery flux, are fed with a thickness of from 300 to 1,500 mm onto the hearth layer ore on the endless travelling grate 10, and are caused to travel, on the endless travelling grate 10, sequentially through the drying zone 8a, the ignition zone 8b and the firing zone 8c in this order.
- the drying gas at a temperature of from 150 to 350°C is blown downwardly from above through the drying oven 11 into the drying zone 8a to dry the green pellets in this zone.
- a high temperature combustion waste gas produced for example through combustion of a fuel such as a coke oven gas is blown as the ignition gas downwardly from above through the ignition oven 12 into the ignition zone 8b to ignite the powdery solid fuel on the surfaces of the green pellets in this zone.
- the high temperature combustion waste gas produced by combustion of the powdery solid fuel on the surfaces of the green pellets is sucked by the first blower 16 and the second blower 17 downwardly through the green pellets in the firing zone 8c to heat the green pellets in this zone to a firing temperature, thereby firing the green pellets into the fired pellets.
- the firing step as described above in the firing zone 8c at least one of calcium ferrite and slag excellent in reducibility is formed on the surface portions of the fired pellets, which combines the fired pellets into a large slab-shaped mass.
- the thus formed large slab-shaped mass of the fired pellets is discharged from the downstream end of the endless travelling grate 10, crushed by means of the crusher 18, and sieved through a screen not shown. Pieces of the fired pellets under the screen having a particle size of under 3 mm are transferred to a storage tank for storing a return ore.
- Figs. 2(A) and 2(B) are schematic views of the fired pellets manufactured according to the method of the present invention.
- Fig. 2(A) illustrates lumpy fired pellets in which a plurality of fired pellets are combined into a lump by at least one of calcium ferrite and slag formed on the surfaces of the fired pellets, obtained by crushing the large stab-shaped mass by means of the crusher 18.
- Fig. 2(B) illustrates the individual fired pellets, obtained by crushing the large slab-shaped mass by means of the crusher 18.
- the fired pellets manufactured according to the method of the present invention have an irregular shape not only in the form of a lump but also in the form of a single pellet. When charged into a blast furnace, therefore, the fired pellets do not flow preferentially into the center portion of the blast furnace, and in addition, smooth passage of a reducing gas is not impaired because gaps are produced between the fired pellets.
- the fired pellets manufactured according to the method of the present invention have an irregular shape as described above because of an irregular shape of the green pellets formed from the raw materials comprising the first iron ore fine including an iron ore fine of from 50 to 80 wt.% having a particle size of up to 0.044 mm and the second iron ore fine including an iron ore fine of from 40 to 70 wt.% having a particle size of from over 0.5 mm up to 8 mm.
- the fired pellets manufactured according to the method of the present invention have an excellent reducibility.
- the lumpy fired pellets manufactured according to the method of the present invention in which a plurality of fired pellets are combined into a lump, even if integrating under the impact during transferring, are only separated into individual fired pellets as shown in Fig. 2(B). Therefore, disintegration of the lumpy fired pellets as mentioned above never impairs satisfactory use as the fired pellets.
- Fig. 3 is a microphotograph (five magnifications) showing the structure of the lumpy fired pellets manufactured according to the method of the present invention in which a plurality of fired pellets are combined into a lump
- Fig. 4 is a microphotograph (five magnifications) showing the structure of the conventional sinter
- Fig. 5 is a microphotograph (five magnifications) showing the structure of the fired pellet manufactured according to the conventional method, using the raw materials including an iron ore of over 80 wt.% having a particle size of up to 0.044 mm. As shown in Fig.
- the lumpy fired pellets manufactured according to the method of the present invention are higher in porosity and comprise the smaller individual fired pellets as compared with the conventional sinter shown in Fig. 4 and the conventional fired pellet shown in Fig. 5, and contain smaller melted structure portions (white portions) and smaller portions with unreduced iron ore fine (portions marked by "O") as compared with the conventional sinter shown in Fig. 4. Therefore, the lumpy fired pellets manufactured according to the method of the present invention have a higher reducibility in the blast furnace than the conventional sinter and the conventional fired pellet.
- Raw materials comprising a first iron ore fine in an amount of 40 wt.% having a particle size distribution as shown in Table 1 and a chemical composition as shown in Table 2, and a second iron ore fine in an amount of 60 wt.% having a particle size distribution as shown in Table 3 and a chemical composition as shown in Table 4 were used.
- the mixture formed in the mixer 2 was fed to the first pelletizer 3, and water was added to the mixture in the first pelletizer 3.
- the mixture thus added with water was formed into green pellets having a particle size distribution as shown in Table 6 and having a water content of 8 wt.% by the first pelletizer 3 rotating at prescribed revolutions.
- the thus formed green pellets were fed to the second pelletizer 5, and coke breeze having a particle size distribution as shown in Table 5 stored in the storage tank 6a and quick lime fine having a particle size distribution as shown in Table 5 stored in the storage tank 6b were fed to the second pelletizer 5.
- the amount of fed coke breeze was 2.7 wt.% relative to the total amount of the raw materials, the quick lime fine and the coke breeze composing the green pellets, and the amount of fed quick lime fine 3.3 wt.% relative to the above-mentioned total amount.
- the surfaces of the green pellets in the second pelletizer 5 were -covered with a mixture of the coke breeze and the quick lime fine by means of the second pelletizer 5 rotating at prescribed revolutions.
- Table 7 shows conditions of the first pelletizer 3 and the second pelletizer 5.
- Hearth layer ore stored in the storage tank 19 was fed with a thickness of 50 mm onto the endless travelling grate 10 at the inlet side thereof. Then, the green pellets, of which the surfaces were covered with the mixture of quick lime fine and coke breeze, were fed with a thickness of 400 mm onto the hearth layer ore on the endless travelling grate 10 on the inlet side thereof. The green pellets were caused to travel, on the endless travelling grate 10, sequentially through the drying zone 8a, the ignition zone 8b and the firing zone 8c in this order.
- a drying gas at a temperature of about 250°C was blown downwardly from above into the drying zone 8a to dry the green pellets travelling through this zone. Then, a combustion waste gas at a temperature of about 1,100°C obtained by combustion of coke oven gas was blown, as an ignition gas, downwardly from above into the ignition zone 8b to ignite coke breeze on the surfaces of the green pellets travelling through this zone.
- the travelling periods of time of the green pellets through the drying zone 8a, the ignition zone 8b and the firing zone 8c were 3 minutes, 1 minute and 18 minutes, respectively.
- part of the above- mentioned firing gas was sucked by the second blower 17 through the plurality of wind boxes 14, and blown into the drying zone 8a as the drying gas.
- the reduction index was measured by a method specified in JIS (Japanese Industrial Standards), which comprises: reducing the fired pellets in an amount of 500g charged into an experimental electric furnace by means of a reducing gas comprising 30 vol.% CO and 70 vol. % N 2 at a temperature of 900°C for 180 minutes, and measuring the reduction index of the fired pellets.
- JIS Japanese Industrial Standards
- the shatter index was measured by a method specified in JIS, which comprises: dropping the fired pellets in an amount of 20 Kg four times from a height of 2 m onto an iron plate, sieving the thus dropped fired pellets through a 5-mm mesh screen, and measuring the ratio of particles on the screen.
- the reduction degradation index was measured by a method specified by the Ironmaking Committee of the Iron and Steel Institute of Japan, which comprises: reducing the fired pellets in an amount of 500g charged into an experimental electric furnace by means of a reducing gas comprising 30 vol.% CO and 70 vol.% N 2 at a temperature of 550°C for 30 minutes, receiving the thus reduced fired pellets in a drum, rotating the drum by 900 revolutions, sieving the fired pellets taken out from the drum through a 3-mm mesh screen, and measuring the ratio of particles under the screen.
- the swelling index was measured by a method specified in JIS, which comprises: reducing three fired pellets by means of a reducing gas comprising 30 vol.% CO and 70 vol.% N 2 at a temperature of 900°C for 60 minutes, and measuring the ratio of change in volume of the fired pellets between before reduction and after reduction.
- the mixture formed in the mixer 2 was fed to the first pelletizer 3, and water was added to the mixture in the first pelletizer 3.
- the mixture thus added with water was formed into green pellets having a water
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Materials Engineering (AREA)
- Mechanical Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Manufacture And Refinement Of Metals (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP138996/85 | 1985-06-27 | ||
JP60138996A JPS6237325A (ja) | 1985-06-27 | 1985-06-27 | 焼成塊成鉱およびその製造方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0207654A1 EP0207654A1 (en) | 1987-01-07 |
EP0207654B1 true EP0207654B1 (en) | 1988-12-28 |
Family
ID=15235043
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP86304404A Expired EP0207654B1 (en) | 1985-06-27 | 1986-06-10 | Method for continuously manufacturing fired pellets |
Country Status (9)
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003012153A1 (en) * | 2001-08-02 | 2003-02-13 | Commonwealth Scientific And Industrial Research Organisation | Iron ore briquetting |
Families Citing this family (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62290841A (ja) * | 1986-06-10 | 1987-12-17 | Nippon Kokan Kk <Nkk> | 含クロム銑の製造方法 |
IN167132B (enrdf_load_stackoverflow) * | 1986-12-15 | 1990-09-01 | Nippon Kokan Kk | |
JPH0796689B2 (ja) * | 1989-06-20 | 1995-10-18 | 日本鋼管株式会社 | 非焼成ペレットの製造方法 |
JPH089739B2 (ja) * | 1989-08-23 | 1996-01-31 | 日本鋼管株式会社 | 焼成塊成鉱の製造方法 |
NL9301053A (nl) * | 1993-06-17 | 1995-01-16 | Hoogovens Groep Bv | Werkwijze voor het vervaardigen van gebrande ijzerertspellets. |
AT412401B (de) * | 2003-07-16 | 2005-02-25 | Voest Alpine Ind Anlagen | Verfahren zur herstellung von erz mit einem feinanteil enthaltenden grün-agglomeraten |
WO2013140809A1 (ja) * | 2012-03-22 | 2013-09-26 | Jfeスチール株式会社 | 焼結鉱用原料粉の調整方法および焼結鉱用原料粉 |
WO2013140810A1 (ja) * | 2012-03-22 | 2013-09-26 | Jfeスチール株式会社 | 焼結鉱用原料粉の調整方法および焼結鉱用原料粉 |
EA028098B1 (ru) * | 2013-03-08 | 2017-10-31 | Оутотек (Финлэнд) Ой | Устройство для переработки мелкозернистых фракций окатышей и/или кусковой руды и/или упрочненных окатышей |
KR101723444B1 (ko) | 2014-12-22 | 2017-04-05 | 주식회사 포스코 | 소성 펠렛 및 이의 제조 방법 |
KR20160076255A (ko) | 2014-12-22 | 2016-06-30 | 주식회사 포스코 | 소성 펠렛 제조 방법 |
CN108699623B (zh) | 2016-03-04 | 2022-05-10 | 杰富意钢铁株式会社 | 烧结矿的制造方法 |
CN111235385B (zh) * | 2020-03-24 | 2024-10-15 | 河北鑫达钢铁集团有限公司 | 一种利用干法除尘灰生产球团的工艺和装置 |
CN111850291B (zh) * | 2020-07-07 | 2022-02-18 | 鞍钢股份有限公司 | 一种烧结固体燃料的预处理方法及烧结混合料制备方法 |
BR102021004299B1 (pt) * | 2021-03-08 | 2023-05-16 | Vale S.A | Processo de produção de pelotas queimadas em um forno de pelotização |
WO2023233871A1 (ja) | 2022-06-03 | 2023-12-07 | Jfeスチール株式会社 | 焼結用造粒原料の製造方法および焼結鉱の製造方法 |
WO2024028922A1 (ja) | 2022-08-01 | 2024-02-08 | Jfeスチール株式会社 | 還元用焼成ペレットとその製造方法 |
WO2024028920A1 (ja) | 2022-08-01 | 2024-02-08 | Jfeスチール株式会社 | 還元用非焼成ペレットとその製造方法 |
JP7626240B2 (ja) * | 2022-09-02 | 2025-02-04 | Jfeスチール株式会社 | 鉄鉱石ペレットの製造方法 |
CN116121533B (zh) * | 2022-12-07 | 2025-08-29 | 中冶长天国际工程有限责任公司 | 一种铁矿粉复合造块上料方法及系统 |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3027251A (en) * | 1958-12-23 | 1962-03-27 | Metallgesellschaft Ag | Method of processing sulphidic concentrates |
FR1335860A (fr) * | 1962-10-10 | 1963-08-23 | Metallgesellschaft Ag | Procédé pour faire fonctionner des fours destinés à la fabrication de l'acier |
LU46948A1 (enrdf_load_stackoverflow) * | 1963-09-18 | 1964-11-14 | ||
FR1462309A (fr) * | 1964-10-09 | 1966-04-15 | Metallgesellschaft Ag | Procédé pour la préparation d'éponge de fer |
GB1139373A (en) * | 1967-02-02 | 1969-01-08 | Mcdowell Wellman Eng Co | System for producing carbonized and prereduced iron ore pellets |
AU435114B2 (en) * | 1968-02-09 | 1973-04-27 | Fuji Iron & Steel Company Limited | Sintering material from iron-containing dry dust and preparing method thereof |
GB1364150A (en) * | 1972-09-26 | 1974-08-21 | Wienert F O | Pellets and their production |
CA1005220A (en) * | 1974-02-25 | 1977-02-15 | National Research Council Of Canada | Method for producing ball agglomerated particulate material |
JPS52119403A (en) * | 1976-03-03 | 1977-10-06 | Kobe Steel Ltd | Sintered pellets of iron ore and its production method |
JPS5527607A (en) * | 1978-08-18 | 1980-02-27 | Toshiba Corp | Semiconductor device manufacturing method |
JPS604891B2 (ja) * | 1979-10-09 | 1985-02-07 | 株式会社神戸製鋼所 | 粗粒鉱石含有ペレツト |
CA1186153A (en) * | 1981-04-23 | 1985-04-30 | Michio Nakayama | Method and apparatus for manufacturing non-fired iron- bearing pellet |
JPS57200529A (en) * | 1981-06-02 | 1982-12-08 | Nippon Steel Corp | Preparation of sintered ore having iron ore fine powder highly compounded therein |
JPS589936A (ja) * | 1981-07-10 | 1983-01-20 | Nippon Kokan Kk <Nkk> | 塊成鉱製造法 |
JPS5853697A (ja) * | 1981-09-24 | 1983-03-30 | Hayashi Kakoki Seisakusho:Kk | 遠心ポンプの漏液防止装置 |
JPS6017811A (ja) * | 1983-07-09 | 1985-01-29 | 住友電気工業株式会社 | 連結押出機による発泡体の押出方法 |
JPS61106728A (ja) * | 1984-10-31 | 1986-05-24 | Nippon Kokan Kk <Nkk> | 塊成鉱及びその製造方法 |
-
1985
- 1985-06-27 JP JP60138996A patent/JPS6237325A/ja active Granted
-
1986
- 1986-06-04 US US06/870,730 patent/US4723995A/en not_active Expired - Lifetime
- 1986-06-05 AU AU58391/86A patent/AU584429B2/en not_active Expired
- 1986-06-05 CA CA000510905A patent/CA1259493A/en not_active Expired
- 1986-06-05 IN IN437/MAS/86A patent/IN167409B/en unknown
- 1986-06-10 DE DE8686304404T patent/DE3661543D1/de not_active Expired
- 1986-06-10 EP EP86304404A patent/EP0207654B1/en not_active Expired
- 1986-06-20 KR KR8604947A patent/KR900006102B1/ko not_active Expired
- 1986-06-26 BR BR8602965A patent/BR8602965A/pt not_active IP Right Cessation
Non-Patent Citations (3)
Title |
---|
PATENTS ABSTRACTS OF JAPAN, vol. 7, no. 139 (C-171)[1284], 17th June 1983; & JP-A-58 52 447 (SUMITOMO KINZOKU KOGYO K.K.) 28-03-1983 * |
PATENTS ABSTRACTS OF JAPAN, vol. 7, no. 77 (C-159)[1222], 30th March 1983; & JP-A-58 9937 (NIPPON KOKAN K.K.) 20-01-1983 * |
PATENTS ABSTRACTS OF JAPAN, vol. 8, no. 241 (C-250)[1678], 6th November 1984; & JP-A-59 123 728 (KOBE SEIKOSHO K.K.) 17-07-1984 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003012153A1 (en) * | 2001-08-02 | 2003-02-13 | Commonwealth Scientific And Industrial Research Organisation | Iron ore briquetting |
WO2003012152A1 (en) * | 2001-08-02 | 2003-02-13 | Commonwealth Scientific And Industrial Research Organisation | Iron ore briquetting |
WO2003012154A1 (en) * | 2001-08-02 | 2003-02-13 | Commonwealth Scientific And Industrial Research Organisation | Iron ore briquetting |
Also Published As
Publication number | Publication date |
---|---|
BR8602965A (pt) | 1987-02-17 |
AU5839186A (en) | 1987-01-08 |
JPH024658B2 (enrdf_load_stackoverflow) | 1990-01-30 |
IN167409B (enrdf_load_stackoverflow) | 1990-10-20 |
JPS6237325A (ja) | 1987-02-18 |
CA1259493A (en) | 1989-09-19 |
EP0207654A1 (en) | 1987-01-07 |
AU584429B2 (en) | 1989-05-25 |
DE3661543D1 (en) | 1989-02-02 |
KR870000439A (ko) | 1987-02-18 |
KR900006102B1 (en) | 1990-08-22 |
US4723995A (en) | 1988-02-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0207654B1 (en) | Method for continuously manufacturing fired pellets | |
KR101068600B1 (ko) | 철광석의 단광 방법 | |
CA1246343A (en) | Agglomerated ores and a producing method therefor | |
US4504306A (en) | Method of producing agglomerates | |
AU2017388174B2 (en) | Sintered ore manufacturing method | |
CA1149617A (en) | Porous iron ore pellets and process for manufacturing same | |
US4846884A (en) | Process for producing cold-bonded iron ore for use in a blast furnace | |
CA2560085C (en) | Layered agglomerated iron ore pellets and balls | |
KR101526451B1 (ko) | 소결광 제조 방법 | |
US4518428A (en) | Agglomerates containing olivine | |
EP0053139B1 (en) | Agglomerates, a process for producing thereof and use thereof | |
JP2001262241A (ja) | 含炭焼結鉱の製造方法 | |
JP6885386B2 (ja) | 炭材内装粒子の製造方法および炭材内装焼結鉱の製造方法 | |
JPH08199250A (ja) | 焼結鉱の製造方法 | |
JP7227053B2 (ja) | 焼結鉱の製造方法 | |
KR0118997B1 (ko) | 소결광 제조방법 및 장치 | |
JPS6221055B2 (enrdf_load_stackoverflow) | ||
JP6992734B2 (ja) | 炭材内装粒子の製造方法および炭材内装焼結鉱の製造方法 | |
JPS63149336A (ja) | 焼成塊成鉱の製造方法 | |
JPH0633151A (ja) | 焼成塊成鉱の製造方法 | |
JP6809446B2 (ja) | 炭材内装粒子の製造方法および炭材内装焼結鉱の製造方法 | |
JPS6383205A (ja) | 高炉操業方法 | |
JPS60114526A (ja) | 焼結鉱製造法 | |
WO1982002061A1 (en) | The manufacture of a product to be sintered from fine-grain ironoxide material | |
KR20010058082A (ko) | 분소성백운석을 이용한 소결광 제조방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): BE DE FR GB SE |
|
17P | Request for examination filed |
Effective date: 19870107 |
|
17Q | First examination report despatched |
Effective date: 19880321 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): BE DE FR GB SE |
|
REF | Corresponds to: |
Ref document number: 3661543 Country of ref document: DE Date of ref document: 19890202 |
|
ET | Fr: translation filed | ||
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
EAL | Se: european patent in force in sweden |
Ref document number: 86304404.6 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 19980601 Year of fee payment: 13 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 19980609 Year of fee payment: 13 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 19980616 Year of fee payment: 13 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 19980622 Year of fee payment: 13 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 19980813 Year of fee payment: 13 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19990610 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY Effective date: 19990629 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY Effective date: 19990630 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19990630 |
|
BERE | Be: lapsed |
Owner name: NIPPON KOKAN K.K. Effective date: 19990630 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 19990610 |
|
EUG | Se: european patent has lapsed |
Ref document number: 86304404.6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20000503 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |