DE10314926A1 - Method and straightening aid for setting up the position of a precast concrete slab and precast concrete slab - Google Patents
Method and straightening aid for setting up the position of a precast concrete slab and precast concrete slab Download PDFInfo
- Publication number
- DE10314926A1 DE10314926A1 DE10314926A DE10314926A DE10314926A1 DE 10314926 A1 DE10314926 A1 DE 10314926A1 DE 10314926 A DE10314926 A DE 10314926A DE 10314926 A DE10314926 A DE 10314926A DE 10314926 A1 DE10314926 A1 DE 10314926A1
- Authority
- DE
- Germany
- Prior art keywords
- precast
- slab
- straightening aid
- straightening
- precast plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B1/00—Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
- E01B1/002—Ballastless track, e.g. concrete slab trackway, or with asphalt layers
- E01B1/004—Ballastless track, e.g. concrete slab trackway, or with asphalt layers with prefabricated elements embedded in fresh concrete or asphalt
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B1/00—Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2204/00—Characteristics of the track and its foundations
- E01B2204/06—Height or lateral adjustment means or positioning means for slabs, sleepers or rails
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Road Paving Structures (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
Description
Die vorliegende Erfindung betrifft ein Verfahren zum Einrichten der Lage einer Betonfertigteilplatte, insbesondere für eine Feste Fahrbahn für Hochgeschwindigkeitsverkehrsmittel, wobei die Fertigteilplatte von einem Unterbau aus einer aushärtbaren Untergußmasse und einer Tragschicht des Untergrundes getragen wird und die Fertigteilplatte vor dem Einbringen der Untergußmasse mit mehreren Vertikalspindeln als Teil von Richthilfen in eine vorbestimmte Lage gebracht wird, sowie eine Richthilfe zum Einrichten von Fertigteilplatten, insbesondere für Feste Fahrbahnen mit einer Vertikalspindel zum Abstützen der Fertigteilplatte auf einer Tragschicht und einem Halter zum Verbinden der Vertikalspindel mit der Fertigteilplatte sowie eine Fertigteilplatte, insbesondere für Feste Fahrbahnen, mit einer Richthilfe, welche eine Vertikalspindel zum Abstützen der Fertigteilplatte auf einer Tragschicht und einem Halter zum Verbinden der Vertikalspindel mit der Fertigteilplatte aufweist.The The present invention relates to a method for setting up the Location of a precast concrete slab, especially for a slab track for high-speed means of transport, the prefabricated panel from a substructure made of a hardenable casting compound and a base layer of the subsurface is carried and the precast slab before the pouring compound is introduced with several vertical spindles as part of a guide in a predetermined Position is brought, as well as a guide for setting up precast panels, especially for Solid roadways with a vertical spindle to support the Precast plate on a base layer and a holder for connection the vertical spindle with the precast plate and a precast plate, especially for Solid roadways, with a straightening aid, which is a vertical spindle to support the precast slab on a base course and a holder for Connect the vertical spindle with the precast plate.
Bekannt ist das Einrichten der Lage von Betonfertigteilplatten für Feste Fahrbahnen im Hochgeschwindigkeitsschienenverkehr mittels Spindeln, welche in verlorenen Spindelhülsen, die in dem Fertigteil eingebaut sind, laufen. Mit den Spindeln wird die Fertigteilplatte und damit die Lage des auf der Fertigteilplatte angeordneten Gleises in eine vorbestimmte Lage gebracht. Mit den Spindeln wird die Höhe normal zur Plattenoberfläche, entsprechend der Achse der Spindel eingestellt. Je nach Plattengröße und Plattenstabilität werden beispielsweise vier oder sechs Spindeln verwendet. Zum seitlichen Richten der Platte wird die auf den Spindeln stehende Platte quer zu Spindelachse verschoben. Hierfür sind unter der Spindel Stahlplatten angebracht, auf welchen sich die Enden der Spindel bewegen sollen. Auf die Spindeln wirken hierbei hohe seitliche Biegemomente. Erst bei Überschreitung der statischen Reibung zwischen den Enden der Spindel und der Stahlunterlage läßt sich die Fertigteilplatte auf der Stahlunterlage verschieben. Eine exakte Einrichtung der Fertigteilplatte ist hierdurch nur unter hohem Aufwand möglich. Darüber hinaus ist es häufig erforderlich ein stabiles Widerlager im Bereich der Tragschicht zu schaffen, um die Fertigteilplatte dagegen verspannen und hierdurch verschieben zu können. Je nach Anordnung der Spindeln ist die Auflagerung der Spindel auf der Stahlunterlage nur schwer zugänglich und erschweren hierdurch unter anderem das Untergießen der Platte, wenn die Auflagerung frei von der Untergußmasse bleiben soll.Known is setting up the position of precast concrete slabs for parties Roadways in high-speed rail traffic using spindles, which in lost spindle sleeves, which are built into the finished part, run. With the spindles Precast panel and thus the position of the on the precast panel arranged track brought into a predetermined position. With the Spindles the height normal to the surface of the board, adjusted according to the axis of the spindle. Depending on the plate size and plate stability for example four or six spindles are used. For side straightening the plate is the plate standing on the spindles transverse to the spindle axis postponed. For this are Steel plates are attached under the spindle, on which the Ends of the spindle. This affects the spindles high lateral bending moments. Only when the static friction is exceeded between the ends of the spindle and the steel base move the precast plate on the steel base. An exact one This means that setting up the precast slab is very difficult possible. About that addition, it is common required a stable abutment in the area of the base course create to brace the precast panel against it and thereby to be able to move. ever after the arrangement of the spindles, the bearing of the spindle is open the steel base is difficult to access and thereby complicate among other things the pouring the plate if the bedding remains free of the casting compound should.
Aufgabe der vorliegenden Erfindung ist es daher die oben genannten Nachteile zu vermeiden und hierfür ein Verfahren, eine Richthilfe und eine entsprechende Fertigteilplatte zu schaffen.task the present invention is therefore the above disadvantages to avoid and for this a process, a straightening aid and a corresponding precast panel to accomplish.
Die Aufgabe wird gelöst mit einem Verfahren, einer Richthilfe und einer Fertigteilplatte mit den Merkmalen der unabhängigen Ansprüche.The Task is solved with a process, a straightening aid and a precast panel with the characteristics of independent Expectations.
Bei dem erfindungsgemäßen Verfahren zum Einrichten der Lage einer Betonfertigteilplatte, insbesondere für eine Feste Fahrbahn für den Hochgeschwindigkeitsschienenverkehr, wird die Fertigteilplatte von einem Unterbau aus einer aushärtbaren Untergußmasse und einer Tragschicht des Untergrundes getragen. Vor dem Einbringen der Untergußmasse wird die Fertigteilplatte mit mehreren Vertikalspindeln als Teil von Richthilfen in eine vorbestimmte Lage gebracht. Erfindungsgemäß werden wenigstens zwei der Vertikalspindeln auf jeweils einem in Längs- oder Querrichtung der Fertigteilplatte verschiebbaren Lagerblock auf der Tragschicht abgestützt. Durch die Lagerung der Vertikalspindeln auf dem verschiebbaren Lagerbock wird sichergestellt, daß eine Verspannung der Spindeln weitgehend vermieden wird, wodurch ein sehr exaktes Positionieren und Einrichten der Fertigteilplatte erfolgen kann. Das Einrichten geschieht lediglich durch das Verschieben des Lagerbocks, auf welchem sich das Ende der Vertikalspindel abstützt. Der Lagerbock ist dabei fest auf der Tragschicht angeordnet und bewirkt durch die Verschiebung der Lagerstelle der Vertikalspindel auf dem Lagerbock ein gezieltes und vorherbestimmbares Bewegen der Fertigteilplatte. Besonders vorteilhaft ist es dabei, wenn mehrere Lagerstellen gemeinsam, d. h. synchron verstellt werden, um auch hier eine Verspannung weitgehend zu vermeiden.at the inventive method for setting up the position of a precast concrete slab, in particular for one Slab track for high-speed rail traffic, becomes the precast slab from a substructure made of a hardenable casting compound and a base layer of the substrate. Before insertion the casting compound the precast plate with several vertical spindles as part brought into a predetermined position by straightening aids. According to the invention, at least two of the vertical spindles on one each in the longitudinal or transverse direction of the Precast slab supported bearing block supported on the base layer. By the storage of the vertical spindles on the sliding bearing block it is ensured that a Tensioning of the spindles is largely avoided, creating a the precast slab is positioned and set up very precisely can. The setup is done only by moving the Bearing block on which the end of the vertical spindle is supported. The Bearing block is firmly arranged and effected on the base layer by moving the bearing of the vertical spindle on the Bearing block a targeted and predetermined movement of the precast slab. It is particularly advantageous if several bearing points together, d. H. can be adjusted synchronously in order to largely avoid tension to avoid.
Vorteilhafterweise ist die Vertikalspindel so gelagert, daß sie auf dem Lagerbock beim Einrichten geschwenkt werden kann. Auch hierdurch wird eine Verspannung der Spindel in Bezug auf den Lagerbock vermieden und ein sehr exaktes Einrichten der Fertigteilplatte ermöglicht.advantageously, the vertical spindle is mounted so that it is on the pedestal Setup can be pivoted. This also causes tension the spindle in relation to the bearing block avoided and a very precise one Setting up the precast slab allows.
Als besonders vorteilhaft hat sich herausgestellt, wenn die Fertigteilplatte mittels zwei diagonal zueinander an der Fertigteilplatte angeordneten Vertikalspindeln grobgerichtet und dabei an einer dritten Vertikalspindel abgestützt wird. Das Gewicht der Platte wird dabei im wesentlichen auf die zwei diagonal zueinander stehenden Spindeln aufgelagert. Die zwei Spindeln, welche vorteilhafterweise diagonal an den Plattenecken angeordnet sind, ermöglichen zusammen mit einer dritten Vertikalspindel, auf welcher sich die Platte abstützen kann, eine statisch definierte Auflagerung der Fertigteilplatte, wodurch es zu keinen unkontrollierten Spannungen und daraus resultierenden Reaktionen kommt. Die drei Vertikalspindeln bewirken somit eine Dreipunktlagerung, welche nach dem Grobrichten an der vierten Ecke der Platte mittels einer weiteren Vertikalspindel abgestützt und gesichert wird.As has turned out to be particularly advantageous if the prefabricated panel by means of two diagonally arranged on the precast plate Vertical spindles roughly aligned and on a third vertical spindle supported becomes. The weight of the plate is essentially on the two diagonally positioned spindles. The two Spindles, which advantageously diagonally on the plate corners are arranged to allow together with a third vertical spindle on which the Support the plate can, a statically defined support of the precast slab, causing no uncontrolled tensions and resulting Reactions coming. The three vertical spindles thus cause one Three-point storage, which after the rough straightening at the fourth corner the plate is supported and secured by means of a further vertical spindle becomes.
Nach dem Grobrichten erfolgt das Feinrichten der Fertigteilplatte auf das vorbestimmte Sollmaß. Hierfür werden mindestens vier Vertikalspindeln ver wendet, von welchen jeweils zwei vorzugsweise diagonal zueinander an der Fertigteilplatte angeordnet sind. Zwei diagonal gegenüberliegende Richthilfen werden dabei vorteilhafterweise insbesondere bezüglich der seitlichen Einrichtung der Platte gemeinsam bzw. synchron bedient, um Verspannungen weitgehend ausschließen zu können. Beim Grob- oder Feinrichten auftretende Verdrehungen der Platten, welche zu Längsbewegungen der Platte führen können, werden durch eine Längsrichtung, in welcher der Lagerbock verschiebbar ist, ausgeglichen.After the rough straightening, the fine straightening follows ten of the precast slab to the predetermined target size. For this purpose, at least four vertical spindles are used, two of which are preferably arranged diagonally to one another on the precast plate. Two diagonally opposite straightening aids are advantageously operated jointly or synchronously, in particular with regard to the lateral arrangement of the plate, in order to be able to largely rule out tension. Rotations of the plates which occur during rough or fine straightening and which can lead to longitudinal movements of the plate are compensated for by a longitudinal direction in which the bearing block can be displaced.
Wird die Richthilfe an der Unterseite oder der Längsaußenseite der Fertigteilplatte angeordnet, so wird die Zugänglichkeit und Bedienbarkeit der Richthilfe verbessert. Darüber hinaus kann die Richthilfe nach dem Untergießen der Fertigteilplatte komplett entfernt und für eine weitere Fertigteilplatte verwendet werden. Verlorene Spindelhülsen werden hierbei nicht eingesetzt.Becomes the leveling aid on the underside or the longitudinal outside of the precast slab arranged, so the accessibility and usability of the straightening aid improved. In addition, the guide can follow the pouring the precast panel completely removed and for another precast panel be used. Lost spindle sleeves are not used here.
Um zu vermeiden, daß die Richthilfe bzw. die Befestigungsstelle der Richthilfe an der Fertigteilplatte beim Untergießen der Fertigteilplatte verschmutzt wird, wird vorteilhafterweise vorgesehen, daß die Richthilfe bzw. die Befestigungsstelle gegenüber der Untergußmasse abgedichtet werden. Das Ausbauen der Richthilfe und ggf. das erneute Einbauen einer Richthilfe in einem Sanierungsfall der Fertigteilplatte wird hierdurch erleichtert und verringert insbesondere die Kosten einer Sanierung der Fertigteilplatte, falls diese ausgetauscht oder erneut eingerichtet werden muß.Around to avoid the Straightening aid or the attachment point of the straightening aid on the precast panel when pouring the precast plate is soiled, it is advantageously provided that the guide or the attachment point is sealed off from the casting compound become. Removing the straightening aid and, if necessary, reinstalling it a guide in a renovation of the precast slab this facilitates and in particular reduces the cost of one Refurbishment of the precast slab if it is replaced or renewed must be set up.
Die erfindungsgemäße Richthilfe dient zum Einrichten von Fertigteilplatte, insbesondere für Feste Fahrbahnen für den Hochgeschwindigkeitsschienenverkehr. Sie weist eine Vertikalspindel zum Abstützen der Fertigteilplatte auf einer Tragschicht und einen Halter zum Verbinden der Vertikalspindel mit der Fertigteilplatte auf. Erfindungsgemäß ist die Vertikalspindel auf einem in Längs- und/oder Querrichtung der Fertigteilplatte verschiebbaren Lagerbock abgestützt. Durch die Abstützung der Vertikalspindel auf dem verschiebba ren Lagerbock entstehen durch das Einrichten der Fertigteilplatte in der Vertikalspindel kaum Spannungen. Die Auflagestelle der Vertikalspindel wird mit Hilfe der Verschiebungen in Längs- und/oder Querrichtung des Lagerbocks so positioniert, daß die Spindel im wesentlichen nur vertikal belastet wird. Außerdem wird die Einrichtung der Lage der Fertigteilplatte durch eine Verstellung des Lagerbockes sehr genau, zwingungs- und ruckfrei ermöglicht. Verstellungen um beispielsweise mehr als ± 12 mm quer zur Fertigteilplatte sind hierdurch ohne weiteres möglich.The Straightening aid according to the invention is used to set up prefabricated panels, especially for parties Roadways for high-speed rail transport. It has a vertical spindle to support the precast slab on a base course and a holder for Connect the vertical spindle to the precast plate. According to the invention Vertical spindle on a in longitudinal and / or transverse direction of the precast slab supported bearing block. By the support the vertical spindle on the movable bearing block is created by the Setting up the precast plate in the vertical spindle hardly any tension. The position of the vertical spindle is determined using the displacements in longitudinal and / or transverse direction of the bearing block positioned so that the spindle is loaded essentially only vertically. In addition, the facility the position of the precast slab by adjusting the pedestal very accurate, without constraints and jerks. For example more than ± 12 mm across the precast slab are easily possible.
Besonders vorteilhaft ist es, wenn die Vertikalspindel über ein Kugelgelenk mit dem Lagerbock verbunden ist. Die Verbindung kann vorteilhafterweise durch eine Verankerung erfolgen, welche ein Abheben der Vertikalspindel von dem Lagerbock verhindert. Durch das Kugelgelenk sind die Neigungsdifferenzen zwischen der Platte und dem Auflager ausgleichbar. Üblicherweise ist eine Bewegungstoleranz von bis zu 20% ausreichend, je nach Konstruktion kann aber durchaus auch eine höhere Bewegung erlaubt werden. Das Kugelgelenk erlaubt Bewegungen in Quer- und Längsrichtung der Platte, so daß Unebenheiten in der Plattenauflage zwingungsfrei ausgeglichen werden können.Especially It is advantageous if the vertical spindle has a ball joint with the Bearing block is connected. The connection can advantageously through an anchoring, which is a lifting of the vertical spindle prevented by the bearing block. The difference in inclination is due to the ball joint compensable between the plate and the support. Usually a movement tolerance of up to 20% is sufficient, depending on the design but also a higher one Movement are allowed. The ball joint allows movements in transverse and longitudinal direction the plate so that bumps can be compensated for without constraint in the plate support.
Weist der Lagerbock einen quer zur Fertigteilplatte verschiebbaren Führungsschlitten auf, auf welchem die Vertikalspindel angeordnet ist, so ist die Verschiebung des Lagerbocks in Querrichtung sehr einfach durchzuführen. Das Einrichten der Fertigteilplatte erfolgt durch Verschieben des Führungsschlittens in Bezug auf die Basis des Lagerbocks, welche auf der Tragschicht fest aufliegt.has the bearing block has a guide slide that can be moved transversely to the precast slab on which the vertical spindle is arranged is the displacement of the bearing block in the transverse direction very easy to carry out. The The precast plate is set up by moving the guide carriage in terms of the base of the pedestal, which is on the base course lies firmly.
Zum Verschieben des Führungsschlittens ist in einer besonders vorteilhaften Ausführung der Erfindung eine Horizontalspindel zugeordnet. Mit Hilfe dieser Horizontalspindel kann die Auflage der Vertikalspindel zwingungs- und ruckfrei und dadurch sehr exakt verschoben werden.To the Moving the guide carriage is a horizontal spindle in a particularly advantageous embodiment of the invention assigned. With the help of this horizontal spindle the support can the vertical spindle free of jerks and jerks and therefore very precise be moved.
Beim Einrichten der Fertigteilplatte erfolgt unter Umständen eine Bewegung der Fertigteilplatte in Längsrichtung. Um die Bewegung ausgleichen zu können, ist es vorteilhaft, wenn der Lagerbock in Längsrichtung der Fertigteilplatte verschiebbar auf der Tragschicht gelagert ist. Eine besonders einfache Ausführung dieser Verschiebbarkeit in Längsrichtung wird dadurch erzielt, daß der Führungsschlitten auf einem Auflageprofil angeordnet ist. Der Führungsschlitten, welcher insbesondere für die Querbewegung der Fertigteilplatte verantwortlich ist, bewegt sich somit auf dem Auflageprofil, welches seinerseits wieder fest auf der Tragschicht befestigt ist. Die Relativbewegung zwischen dem Auflageprofil und dem Querführungsschlitten gleicht wiederum Verspannungen der Vertikalspindel aus. Das Auflageprofil erlaubt beispielsweise eine Bewegung in Längsrichtung von etwa ± 10 mm und umgreift vorteilhafterweise den Führungsschlitten in seitlicher Richtung, so daß eine Stabilisierung gegeben ist.At the Under certain circumstances, the precast panel is set up Movement of the precast slab in the longitudinal direction. About the movement to be able to compensate it is advantageous if the bearing block in the longitudinal direction of the precast plate is slidably mounted on the base layer. A particularly simple version of this Movability in the longitudinal direction becomes achieved in that the guide carriage is arranged on a support profile. The guide carriage, which in particular for the Transverse movement of the precast slab is responsible, moves thus on the support profile, which in turn is firmly on the base layer is attached. The relative movement between the Support profile and the cross slide in turn compensates for tension in the vertical spindle. The support profile allows, for example, a movement in the longitudinal direction of approximately ± 10 mm and advantageously encompasses the guide carriage in the lateral Direction so that a Stabilization is given.
Die Fertigteilplatte ist mit mehreren Richthilfen ausgestattet. Die an den Ecken der Fertigteilplatte angeordneten Richthilfen zum Einrichten der Fertigteilplatte sind dabei vorteilhafterweise auf dem soeben beschriebenen verschiebbaren Lagerbock aufgelagert. Insbesondere die weiteren Richthilfen, welche beispielsweise in Längsrichtung der Fertigteilplatte etwa in der Mitte der Fertigteilplatte angeordnet sind, benötigen nicht unbedingt den verschiebbaren Lagerbock, da sie lediglich zum Abstützen der Fertigteilplatte gegen Durchbiegung nach dem Einrichten der Fertigteilplatte eingesetzt werden. Für diese mittigen Richthilfen, aber auch für die Richthilfen an den Ecken der Fertigteilplatte mit dem verschiebbaren Lagerbock ist es besonders vorteilhaft und erfinderisch, wenn der Halter eine unter oder seitlich der Fertigteilplatte in eine Vertiefung oder ein Anbauteil der Fertigteilplatte eingreifende Kralle ist. Die Richthilfe wird dabei insbesondere seitlich an der Fertigteilplatte angeordnet und greift mit dem Halter unter die Fertigteilplatte bzw. in die Vertiefung der Fertigteilplatte zum Übertragen der Spindelkräfte auf die Fertigteilplatte. Alternativ kann an der Fertigteilplatte ein Anbauteil angeordnet sein, in welches die Kralle der Richthilfe eingreift und ebenso die Kräfte aus den Vertikal- und/oder Horizontalspindeln auf die Fertigteilplatte überträgt.The precast plate is equipped with several straightening aids. The straightening aids arranged at the corners of the precast plate for setting up the precast plate are advantageously supported on the displaceable bearing block just described. In particular, the further straightening aids, which are arranged, for example, in the longitudinal direction of the prefabricated panel approximately in the middle of the prefabricated panel are do not necessarily need the movable bearing block, since they are only used to support the precast plate against deflection after setting up the precast plate. For these central straightening aids, but also for the straightening aids at the corners of the precast plate with the sliding bearing block, it is particularly advantageous and inventive if the holder is a claw engaging under or to the side of the precast plate in a recess or an add-on part of the precast plate. The straightening aid is in particular arranged laterally on the precast plate and engages with the holder under the precast plate or in the recess of the precast plate for transmitting the spindle forces to the precast plate. Alternatively, an attachment can be arranged on the precast plate, in which the claw of the straightening aid engages and also transmits the forces from the vertical and / or horizontal spindles to the precast plate.
Durch das seitliche Anbauen der Richthilfe an die Fertigteilplatte wird eine außerordentlich einfache Montage und Demontage der Richthilfe sowie Einrichtung der Fertigteilplatte ermöglicht. Die Richthilfe kann nach dem Untergießen der Fertigteilplatte von der Fertigteilplatte entfernt und für das Einrichten einer weiteren Fertigteilplatte komplett verwendet werden. Verlorene Spindelhülsen wie beim Stand der Technik sind nicht erforderlich. Insbesondere bei Verwendung des verschiebbaren Lagerbocks bewirkt die Kralle, daß die Lasten aus der vertikalen Spindel immer ausschließlich durch Druck in den Untergrund abgeleitet werden. Dies ist auch dann der Fall, wenn über das seitliche Richten seitliche Richtkräfte sowie Haltekräfte der Platte, insbesondere in großen Überhöhungen der Streckenführung der Festen Fahrbahn aufgenommen werden müssen.By the lateral attachment of the straightening aid to the precast plate an extraordinary easy assembly and disassembly of the straightening aid and set-up of the precast slab. The leveling aid can be poured in after pouring in the precast plate the precast panel removed and for setting up another Precast plate can be used completely. Lost spindle sleeves like are not required in the prior art. Especially at Use of the sliding bracket causes the claw to carry the loads always derived from the vertical spindle solely by pressure into the subsurface become. This is also the case if lateral judging is carried out via lateral judging straightening forces as well as holding forces the plate, especially in large cantilevers route the slab track must be included.
Zur Ableitung des Stützmomentes der Richthilfe gegenüber der Fertigteilplatte ist oberhalb der Unterkante, beispielsweise etwa 15 cm über der Unterkante der Platte, eine Abstützung an dem Halter angeordnet, welche die aus der seitlichen Anordnung der Spindel auftretenden Momente im Lastangriff des Hakens als Druck in die Fertigteilplatte einleitet.to Deriving the support torque towards the guide the precast slab is above the bottom edge, for example about 15 cm above the lower edge of the plate, a support arranged on the holder, which arise from the lateral arrangement of the spindle Moments in the load attack of the hook as pressure in the precast plate initiates.
Um ein längsseitiges Abkippen des Hakens beim Einrichten der Platte in Längsneigungen zu vermeiden, ist vorgesehen, daß die Richthilfe zwei voneinander beabstandete Halter und Abstützungen aufweist. Diese beispielsweise 6 cm voneinander beabstandeten Halter und Abstützungen stabilisieren die Richthilfe ausreichend, um sicher zu stellen, daß auch bei einer extremen Längsneigung der Platte die Richthilfe am Kippen gehindert ist.Around a long sided Tilting the hook when setting up the plate in longitudinal inclinations To avoid, it is intended that the straightening aid two from each other spaced brackets and supports having. This holder, for example, 6 cm apart and supports stabilize the straightening aid sufficiently to ensure that too with an extreme pitch the plate is prevented from tilting.
Für eine besonders einfach Handhabung der Richthilfe ist es vorteilhaft, wenn die einzelnen Teile der Richthilfe, d. h. Halter, Abstützung, Vertikal- und ggf. Horizontalspindel sowie Auflageprofil verliergeschützt miteinander verbunden sind. Die Richthilfe kann dadurch bequem von einer Fertigteilplatte zur nächsten transportiert oder auch zwischengelagert werden, ohne daß einzelne Teile der Richthilfe verlorengehen.For a special one easy handling of the straightening aid, it is advantageous if the individual Parts of the guide, d. H. Bracket, support, vertical and, if necessary, horizontal spindle as well as support profile protected against loss are interconnected. The straightening aid can thus be conveniently one precast slab to the next transported or temporarily stored without individual Parts of the straightening aid are lost.
Eine erfindungsgemäße Fertigteilplatte, insbesondere für Feste Fahrbahnen, mit einer Richthilfe, welche eine Vertikalspindel zum Abstützen der Fertigteilplatte auf einer Tragschicht und einen Halter zum Verbinden der Vertikalspindel mit der Fertigteilplatte aufweist, hat eine Vertiefung oder ein Anbauteil, welches) mit dem als Kralle ausgebildeten Halter der Richthilfe zusammenwirkt. Die Kralle der Richthilfe greift dabei in die Vertiefung oder das Anbauteil, welches beispielsweise an der Seite der Fertigteilplatte angeordnet ist, ein und hebt die Fertigteilplatte beim Einrichten in die Soll-Lage an. Die Kralle wird dabei in die Vertiefung oder an das Anbauteil gesetzt, wenn die Richthilfe verwendet wird und von der Vertiefung oder dem Anbauteil wieder gelöst, wenn die Fertigteilplatte eingerichtet und fixiert ist.A precast panel according to the invention, especially for Solid roadways, with a straightening aid, which is a vertical spindle to support the precast slab on a base course and a holder for Connecting the vertical spindle to the precast plate, has a recess or an attachment, which) with the as a claw trained holder of the alignment aid cooperates. The claw of the Straightening aid engages in the recess or the attachment, which is arranged, for example, on the side of the precast slab, and lifts the precast slab into the desired position during setup on. The claw is in the recess or on the attachment set when the straightening aid is used and by the recess or detach the attachment, when the precast panel is set up and fixed.
Ist die Vertiefung oder das Anbauteil an der Unterseite oder der Längsaußenseite der Fertigteilplatte angeordnet, so ist die Montage und Demontage der Richthilfe besonders einfach durchzuführen.is the recess or the attachment on the underside or the longitudinal outside the precast plate arranged, so is the assembly and disassembly the straightening aid is particularly easy to carry out.
Als Anbauteil, welches an der Längsaußenseite der Fertigteilplatte angeordnet ist, ist beispielsweise ein Schraubanker, ein Kugelanker, oder sogar ein oder mehrere aus der Fertigteilplatte hervorstehender Bewehrungsstäbe vorteilhaft. Die Richthilfe wird in jedem Falle kraft bzw. formschlüssig mit der Fertigteilplatte verbunden. Die Aussparungen bzw. Vertiefungen in der Fertigteilplatte oder die Anbauteile können unter der Platte oder auch seitlich angeordnet sein. Sie können darüber hinaus beispielsweise mit Stahleinlagen verstärkt sein, um zu verhindern, daß der Beton der Fertigteilplatte ausbricht.As Attachment, which on the longitudinal outside the precast plate is arranged, for example a screw anchor, a ball anchor, or even one or more from the precast slab protruding reinforcing bars advantageous. The straightening aid is in any case with force or positive connected to the precast slab. The recesses or depressions in the precast plate or the attachments can under the plate or also be arranged laterally. You can also use, for example Steel inserts reinforced to prevent the Concrete of the precast slab breaks out.
Weitere Vorteile der Erfindung sind in den nachfolgen Ausführungsbeispielen beschrieben. Es zeigt:Further Advantages of the invention are in the following exemplary embodiments described. It shows:
In
Die
Richthilfe
An
dem Halter
Um
eine Verschiebung des Lagerbocks in Längsrichtung der Fertigteilplatte
Eine
Verstärkung
Ein
weiterer Unterschied zum Ausführungsbeispiel
der
Die vorliegende Erfindung ist nicht auf die dargestellten Ausführungsbeispiele beschränkt. Abwandlungen im Sinne der Patentansprüche fallen unter die geschützte Erfindung. Insbesondere die Kontaktstelle zwischen der Richthilfe und der Fertigteilplatte kann auch anders als in den Ausführungsbeispielen dargestellt ausgebildet sein.The present invention is not based on the illustrated embodiments limited. Modifications within the meaning of the claims fall under the protected invention. In particular the contact point between the straightening aid and the prefabricated panel can also be different than in the exemplary embodiments be shown.
Claims (22)
Priority Applications (8)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10314926A DE10314926A1 (en) | 2003-04-01 | 2003-04-01 | Method and straightening aid for setting up the position of a precast concrete slab and precast concrete slab |
CNB2004800093551A CN100547161C (en) | 2003-04-01 | 2004-03-27 | The bearing calibration of concrete prefabricated structural board and position thereof and adjuster |
DE502004007614T DE502004007614D1 (en) | 2003-04-01 | 2004-03-27 | METHOD AND FIELD AID FOR SETTING THE POSITION OF A PRECAST CONCRETE PARTICLE AND CONCRETE PREPARED PART |
PCT/EP2004/003279 WO2004088040A1 (en) | 2003-04-01 | 2004-03-27 | Method and adjusting means for adjusting the position of a precast concrete slab and a corresponding precast concrete slab |
KR1020057017338A KR101057160B1 (en) | 2003-04-01 | 2004-03-27 | Method for adjusting the position of precast concrete slab, adjusting device, and corresponding precast concrete slab |
EP04723898A EP1608813B1 (en) | 2003-04-01 | 2004-03-27 | Method and adjusting means for adjusting the position of a precast concrete slab and a corresponding precast concrete slab |
ES04723898T ES2308167T3 (en) | 2003-04-01 | 2004-03-27 | PROCEDURE AND ADJUSTMENT ASSISTANCE TO ADJUST THE POSITION OF A PREFABRICATED CONCRETE PLATE, AND PREFABRICATED CORD CONCRETE PLATE. |
AT04723898T ATE401453T1 (en) | 2003-04-01 | 2004-03-27 | METHOD AND DIRECTIONAL AID FOR SETTING UP THE POSITION OF A PRECAST CONCRETE Slab AND PRECAST CONCRETE Slab |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10314926A DE10314926A1 (en) | 2003-04-01 | 2003-04-01 | Method and straightening aid for setting up the position of a precast concrete slab and precast concrete slab |
Publications (1)
Publication Number | Publication Date |
---|---|
DE10314926A1 true DE10314926A1 (en) | 2004-10-14 |
Family
ID=32980932
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE10314926A Withdrawn DE10314926A1 (en) | 2003-04-01 | 2003-04-01 | Method and straightening aid for setting up the position of a precast concrete slab and precast concrete slab |
DE502004007614T Expired - Lifetime DE502004007614D1 (en) | 2003-04-01 | 2004-03-27 | METHOD AND FIELD AID FOR SETTING THE POSITION OF A PRECAST CONCRETE PARTICLE AND CONCRETE PREPARED PART |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE502004007614T Expired - Lifetime DE502004007614D1 (en) | 2003-04-01 | 2004-03-27 | METHOD AND FIELD AID FOR SETTING THE POSITION OF A PRECAST CONCRETE PARTICLE AND CONCRETE PREPARED PART |
Country Status (7)
Country | Link |
---|---|
EP (1) | EP1608813B1 (en) |
KR (1) | KR101057160B1 (en) |
CN (1) | CN100547161C (en) |
AT (1) | ATE401453T1 (en) |
DE (2) | DE10314926A1 (en) |
ES (1) | ES2308167T3 (en) |
WO (1) | WO2004088040A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101798788A (en) * | 2010-03-08 | 2010-08-11 | 江苏鼎泰工程材料有限公司 | Fine tuning claw U-shaped isolating protective buckle special for grouting of high-speed railway II-type slab |
AT18005U1 (en) * | 2022-05-05 | 2023-10-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Device for moving an infrastructure component prepositioned on a floor, in particular a track support plate, into a target arrangement, combination, system and method |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101824783B (en) * | 2010-05-13 | 2011-12-07 | 四川省成都普什机电技术研究有限公司 | Track slab adjusting device |
CN104295107A (en) * | 2014-10-13 | 2015-01-21 | 深圳万科前田建筑技术有限公司 | Precast concrete member position adjustment device and method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19948003A1 (en) * | 1999-10-06 | 2001-04-12 | Boegl Max Bauunternehmung Gmbh | Precast reinforced concrete slab |
DE10004346C2 (en) * | 1999-01-27 | 2001-11-29 | Betonwerk Rethwisch Gmbh | Trouble-free slab track, procedures and sleepers therefor |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3824132A1 (en) * | 1988-07-15 | 1990-01-18 | Kunz Alfred & Co | Method for joining a track grid to a superstructure forming a solid travel way for railways |
DE19733909B4 (en) * | 1997-08-05 | 2006-07-06 | Max Bögl Bauunternehmung GmbH & Co. KG | Prefabricated reinforced concrete precast slab and process for its production |
DE20002774U1 (en) * | 2000-02-16 | 2000-04-06 | Wsg Walter Spannbeton Gmbh Gue | Device for anchoring sleepers |
-
2003
- 2003-04-01 DE DE10314926A patent/DE10314926A1/en not_active Withdrawn
-
2004
- 2004-03-27 DE DE502004007614T patent/DE502004007614D1/en not_active Expired - Lifetime
- 2004-03-27 AT AT04723898T patent/ATE401453T1/en active
- 2004-03-27 EP EP04723898A patent/EP1608813B1/en not_active Expired - Lifetime
- 2004-03-27 KR KR1020057017338A patent/KR101057160B1/en not_active IP Right Cessation
- 2004-03-27 WO PCT/EP2004/003279 patent/WO2004088040A1/en active IP Right Grant
- 2004-03-27 ES ES04723898T patent/ES2308167T3/en not_active Expired - Lifetime
- 2004-03-27 CN CNB2004800093551A patent/CN100547161C/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10004346C2 (en) * | 1999-01-27 | 2001-11-29 | Betonwerk Rethwisch Gmbh | Trouble-free slab track, procedures and sleepers therefor |
DE19948003A1 (en) * | 1999-10-06 | 2001-04-12 | Boegl Max Bauunternehmung Gmbh | Precast reinforced concrete slab |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101798788A (en) * | 2010-03-08 | 2010-08-11 | 江苏鼎泰工程材料有限公司 | Fine tuning claw U-shaped isolating protective buckle special for grouting of high-speed railway II-type slab |
CN101798788B (en) * | 2010-03-08 | 2012-05-30 | 江苏鼎泰工程材料有限公司 | Fine tuning claw U-shaped isolating protective buckle special for grouting of high-speed railway II-type slab |
AT18005U1 (en) * | 2022-05-05 | 2023-10-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Device for moving an infrastructure component prepositioned on a floor, in particular a track support plate, into a target arrangement, combination, system and method |
Also Published As
Publication number | Publication date |
---|---|
CN1771368A (en) | 2006-05-10 |
KR101057160B1 (en) | 2011-08-17 |
ES2308167T3 (en) | 2008-12-01 |
EP1608813A1 (en) | 2005-12-28 |
EP1608813B1 (en) | 2008-07-16 |
CN100547161C (en) | 2009-10-07 |
DE502004007614D1 (en) | 2008-08-28 |
ATE401453T1 (en) | 2008-08-15 |
KR20050113229A (en) | 2005-12-01 |
WO2004088040A1 (en) | 2004-10-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1763611B1 (en) | Girder of a guideway for a track-bound vehicle | |
DE102007020816B3 (en) | Formwork element for floor construction has load transfer elements, one brought to first profile element to project into field bounded directly by second profile element | |
AT517231B1 (en) | Method for producing a roadway slab for a bridge | |
EP0894898B1 (en) | Construction method for a railway track and device for adjusting the height of the rails as well as for their temporary support | |
WO2013030723A1 (en) | Lifting and alignment system | |
DE10066016B4 (en) | Formwork arrangement, in particular for the production of a concrete slab for a fixed railroad track | |
DE10314926A1 (en) | Method and straightening aid for setting up the position of a precast concrete slab and precast concrete slab | |
DE102011050340B4 (en) | Edge formwork element | |
DE3910286A1 (en) | Device for anchoring structural elements on a load-bearing anchorage base | |
DE202019102034U1 (en) | Alignment device for aligning rails in track construction | |
DE4205192A1 (en) | PLATFORM | |
EP0627307B1 (en) | Substructure for a rotary web printing machine and method of installing a rotary web printing machine on such a substructure | |
CH715209A2 (en) | Track body transition unit between a ballast track section and a ballastless track section. | |
DE60114252T2 (en) | Fixing construction and installation procedure | |
DE19639576C2 (en) | Fixing the column of a jib crane | |
EP1061176B1 (en) | Process for equalisation of the vertical displacements of structural track elements of a fixed railway track | |
EP1293606B1 (en) | Daywork shuttering device | |
DE4324329A1 (en) | Track section-adjusting apparatus | |
DE10343628B4 (en) | Device for lifting and aligning track grids | |
AT402210B (en) | TRACK BODY | |
EP0905319A2 (en) | Railway track and its construction method | |
DE19920146B4 (en) | Storage of a rail for rail vehicles | |
DE102017206405B4 (en) | Guide member for guiding a movement of a movable part of a machine | |
AT513575B1 (en) | Device for fastening a frame element of a machine | |
DE102006047875B3 (en) | Crane track for supporting overhead rail in rail clamp, has filling openings arranged on left and right sides of rail and penetrate in vertical direction of track for guiding filling material in adjustment layer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OM8 | Search report available as to paragraph 43 lit. 1 sentence 1 patent law | ||
8181 | Inventor (new situation) |
Inventor name: ABLINGER, PETER, LAMBACH, AT Inventor name: HILLER, UDO, 92331 PARSBERG, DE |
|
8139 | Disposal/non-payment of the annual fee |