CN206513004U - A kind of movable hanger for being easy to roof inner slab to install - Google Patents

A kind of movable hanger for being easy to roof inner slab to install Download PDF

Info

Publication number
CN206513004U
CN206513004U CN201621485020.3U CN201621485020U CN206513004U CN 206513004 U CN206513004 U CN 206513004U CN 201621485020 U CN201621485020 U CN 201621485020U CN 206513004 U CN206513004 U CN 206513004U
Authority
CN
China
Prior art keywords
easy
purlin
roof inner
inner slab
install
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621485020.3U
Other languages
Chinese (zh)
Inventor
郭敏
潘邦建
袁海军
谭熙
杨曦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201621485020.3U priority Critical patent/CN206513004U/en
Application granted granted Critical
Publication of CN206513004U publication Critical patent/CN206513004U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model embodiment is applied to technical field of building construction, and there is provided a kind of movable hanger for being easy to roof inner slab to install.The hanger includes the support body for being easy to workmen to construct, and the top of support body is provided with extension frame, and hanging has the opening for being used for being sheathed on purlin on frame, hangs and is provided with frame for being contacted with each other with purlin, and the roller that can be rolled along purlin length direction.The utility model is located on the purlin of roofing by that will hang the opening sleeve on frame, and hang the roller that setting can be rolled along purlin length direction on frame, support body is suspended on purlin, it is easy to workmen that roof inner slab is installed on purlin, simultaneously, workmen is after the installation that a certain construction area completes roof inner slab, and length direction that can be by roller by support body along purlin is moved to next construction area and roof inner slab is installed.The hanger has the advantages that cost is low, easy to operate, turnover is flexible and efficiency of construction is high.

Description

A kind of movable hanger for being easy to roof inner slab to install
Technical field
The utility model belongs to technical field of building construction, more particularly to a kind of packaged type for being easy to roof inner slab to install Hanger.
Background technology
It is common for individual layer pressing steel plate roofing and double-layer pressing steel plate roofing in steel structural plant roof mounting structure Two kinds of forms.Consider factory building insulation, it is heat-insulated and attractive in appearance in the case of, double-layer pressing steel plate roofing structure is applied to by substantial amounts of In steel structural plant roof system engineering.The double-layer pressing steel plate roofing structure installation process includes:Pacify on the purlin of roofing Fill the processes such as inner panel (left-hand thread type bottom plate), heat insulation layer and panel.Wherein, difficult point is the installation process of inner panel.
Installed more than traditional roof inner slab installation mode using scaffold operating platform is set up, the construction party Formula has the following disadvantages:Set up that scaffold operating platform input human and material resources are excessive, cost is higher, and construction space-consuming is big, behaviour Make limited space, work of being in a financial strait, low construction efficiency, and influence in construction period other work posts to construct etc..
Utility model content
The utility model embodiment technical problem to be solved is that offer is a kind of and is easy to the removable of roof inner slab installation Dynamic formula hanger, it is intended to solve installed in the prior art using scaffold present in the form of construction work of roof inner slab cost height, The problem of operation inconvenience, living and low construction efficiency of being in a financial strait.
The utility model embodiment is achieved in that a kind of movable hanger for being easy to roof inner slab to install, including The support body for being easy to workmen to construct, the top of the support body, which is provided with extension frame, the extension frame to have, to be used to be sheathed on purlin On opening, be provided with the extension frame for being contacted with each other with purlin, and the roller that can be rolled along purlin length direction.
Further, the support body includes the underframe for being easy to workmen to construct and for hanging the ladder on purlin, It is bolted to connection between the lower end of the underframe and the ladder, it is described to hang the upper end that frame is arranged at the ladder.
Further, the locking piece that braking and locking is carried out for pair roller is installed on the roller.
Further, the frame of hanging includes two frameworks and four connecting rods being oppositely arranged, four described connecting rods It is fixedly connected between two described frameworks, and is located at four edges of the framework respectively, is connected to the framework The roller is fixed in two connecting rods of upper end.
Further, connected between the every connecting rod and the framework by nut.
Further, the extension frame also includes fix bar, and the fix bar is welded in upper between two described frameworks End middle part.
Further, the underframe includes base and fence, and the fence fixes the surrounding enclosed and be located at the base.
Compared with prior art, beneficial effect is the utility model embodiment:Movable hanger of the present utility model By the way that the opening sleeve on frame will be hung on the purlin of roofing, and hang the rolling that setting can be rolled along purlin length direction on frame Wheel so that support body can be suspended on purlin, be easy to workmen to install roof inner slab on purlin, meanwhile, workmen exists A certain construction area is completed after the installation of roof inner slab, and length direction that can be by roller by support body along purlin is moved to next Construction area is installed to roof inner slab.The hanger have cost it is low, easy to operate, turnover flexibly and efficiency of construction it is high Advantage.
Brief description of the drawings
Fig. 1 is the movable hanger schematic diagram that the utility model embodiment is provided;
Fig. 2 is the view that the movable hanger shown in Fig. 1 is hung on purlin.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only to explain The utility model, is not used to limit the utility model.
As shown in Figures 1 and 2, it is a kind of movable hanger one for being easy to roof inner slab to install of the utility model offer Preferred embodiment.The hanger includes the support body 1 for being easy to workmen to construct, and the top of support body 1 is provided with extension frame 2, hangs on frame 2 and have There is the opening for being sheathed on purlin A, hang and be provided with frame 2 for being contacted with each other with purlin A, and can be along purlin A length sides To the roller 3 of rolling, the locking piece 4 for the progress of pair roller 3 braking and locking in construction is installed on roller 3.Specifically, frame Body 1 includes the underframe 11 for being easy to workmen to construct and for hanging under the ladder 12 on purlin A, underframe 11 and ladder 12 It is fixedly connected between end by bolt 5, it is easy to disassemble with installing, conveniently it is used in turn.The upper end that frame 2 is arranged at ladder 12 is hung, Underframe 11 includes base 110 and fence 111, and fence 111 fixes the surrounding enclosed and be located at base 110.
In above-described embodiment, hanging frame 2 includes two framework 21, four connecting rods 22 and the fix bars 23 being oppositely arranged, Fix bar 23 is welded in the upper center between two frameworks 21, it is ensured that hang the stability of frame 2.Four connecting rods 22 pass through spiral shell Mother 6 is fastened between two frameworks 21, and is located at four edges of framework 21 respectively, i.e., two connecting rods 22 are connected to Upper end opposite sides between two frameworks 21, the lower end between two two frameworks 21 of connection of connecting rods 22 is with respect to two in addition Side.It is connected in two connecting rods 22 of the upper end of framework 21 and is respectively and fixedly provided with roller 3,3, roller in every connecting rod 22 is several Factually depending on the condition of construction of border, in the present embodiment, a pulley 3 is fixed at the middle part of every connecting rod 22 of the upper end of framework 21 Reach the effect of stable movement.
Framework 21, four connecting rods 22 and the fix bar 23 that above-mentioned two are oppositely arranged, which are enclosed, is set as one suitable for socket Cuboid on purlin A.When carrying out lifting construction, after two connecting rods dismounting of the lower end of framework 21, framework 21 is hung It is connected on the purlin A of roofing, then two connecting rods 22 by the connection of nut 6 is fastened on the lower end of framework 21, so that by purlin A It is locked, it is ensured that hanger is articulated in the stability on purlin A, workmen can safely stand on base 110 to roofing Inner panel is constructed, and ladder 12 plays a part of handrail with fence 111, and ladder 12 is easy to workmen to enter to underframe 11 It is interior.
The construction technology of the movable hanger of the utility model embodiment is as follows:Underframe 11 is led to ladder 12 on ground Cross bolt 5 to assemble after shaping, roof purline A positions are pulled to using rope, hung the extension frame 2 on ladder 12 by workmen Hang on the purlin A of a certain construction area, and be connected by the locking of connecting rod 22 for hanging the lower end of frame 2, while passing through locking Part 4 is locked by roller, and lays after good mobile rope of sauntering, and workmen is under ladder 12 on underframe 11.It is long according to inner panel template Degree, multiple hanger operations can be hung simultaneously, during construction, roof inner slab is pulled at roofing by personnel with rope in ground construction, several Workmen simultaneously operation of the name station on underframe 11, corresponding site on purlin A, one piece of installation are fixed on by roof inner slab After inner panel, workmen moves next construction area by roller 3 with default wire saws hanger of sauntering and roof inner slab is entered Row is installed.
In summary, the movable hanger of the utility model embodiment have cost it is low, easy to operate, turnover flexibly with And the high advantage of efficiency of construction.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Any modifications, equivalent substitutions and improvements made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (7)

1. a kind of movable hanger for being easy to roof inner slab to install, including the support body for being easy to workmen to construct, its feature exist In the top of the support body is provided with to have on extension frame, the extension frame and set on the opening for being used for being sheathed on purlin, the extension frame It is equipped with for being contacted with each other with purlin, and the roller that can be rolled along purlin length direction.
2. the movable hanger as claimed in claim 1 for being easy to roof inner slab to install, it is characterised in that the support body includes It is easy to the underframe of workmen's construction and for hanging the ladder on purlin, leads between the underframe and the lower end of the ladder Bolt is crossed to be fixedly connected, it is described to hang the upper end that frame is arranged at the ladder.
3. the movable hanger as claimed in claim 1 for being easy to roof inner slab to install, it is characterised in that pacify on the roller Equipped with the locking piece that braking and locking is carried out for pair roller.
4. being easy to the movable hanger that roof inner slab is installed as described in any one in claims 1 to 3, its feature exists In the frame of hanging includes two frameworks and four connecting rods being oppositely arranged, and four described connecting rods are fixedly connected with institute Between two frameworks stated, and it is located at four edges of the framework respectively, is connected to two connections of the framework upper end The roller is fixed on bar.
5. the movable hanger as claimed in claim 4 for being easy to roof inner slab to install, it is characterised in that the every connection Connected between bar and the framework by nut.
6. the movable hanger as claimed in claim 4 for being easy to roof inner slab to install, it is characterised in that the extension frame is also wrapped Fix bar is included, the fix bar is welded in the upper center between two described frameworks.
7. the movable hanger as claimed in claim 2 for being easy to roof inner slab to install, it is characterised in that the underframe includes Base and fence, the fence fix the surrounding enclosed and be located at the base.
CN201621485020.3U 2016-12-30 2016-12-30 A kind of movable hanger for being easy to roof inner slab to install Active CN206513004U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621485020.3U CN206513004U (en) 2016-12-30 2016-12-30 A kind of movable hanger for being easy to roof inner slab to install

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621485020.3U CN206513004U (en) 2016-12-30 2016-12-30 A kind of movable hanger for being easy to roof inner slab to install

Publications (1)

Publication Number Publication Date
CN206513004U true CN206513004U (en) 2017-09-22

Family

ID=59864219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621485020.3U Active CN206513004U (en) 2016-12-30 2016-12-30 A kind of movable hanger for being easy to roof inner slab to install

Country Status (1)

Country Link
CN (1) CN206513004U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107964915A (en) * 2017-11-24 2018-04-27 严央妃 A kind of cleaning plant on the dykes and dams of riverbank
CN108457431A (en) * 2018-02-11 2018-08-28 中国二十冶集团有限公司 The color steel installation method and mounting device of the double-deck colorful plate roof
CN108505539A (en) * 2018-04-23 2018-09-07 中国化学工程第三建设有限公司 A kind of beam outrigger platform and its erection method
CN112502421A (en) * 2020-12-23 2021-03-16 江苏省华建建设股份有限公司 Construction method of suspension type operation console for steel structure and curtain wall of outer wall of high-rise building
CN113389330A (en) * 2021-06-02 2021-09-14 中国华冶科工集团有限公司 Composite roof color plate installation device and composite roof color plate installation method
CN115949227A (en) * 2023-01-31 2023-04-11 中国二十二冶集团有限公司 Mounting method for roof color steel plate bottom plate

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107964915A (en) * 2017-11-24 2018-04-27 严央妃 A kind of cleaning plant on the dykes and dams of riverbank
CN108457431A (en) * 2018-02-11 2018-08-28 中国二十冶集团有限公司 The color steel installation method and mounting device of the double-deck colorful plate roof
CN108505539A (en) * 2018-04-23 2018-09-07 中国化学工程第三建设有限公司 A kind of beam outrigger platform and its erection method
CN112502421A (en) * 2020-12-23 2021-03-16 江苏省华建建设股份有限公司 Construction method of suspension type operation console for steel structure and curtain wall of outer wall of high-rise building
CN113389330A (en) * 2021-06-02 2021-09-14 中国华冶科工集团有限公司 Composite roof color plate installation device and composite roof color plate installation method
CN115949227A (en) * 2023-01-31 2023-04-11 中国二十二冶集团有限公司 Mounting method for roof color steel plate bottom plate

Similar Documents

Publication Publication Date Title
CN206513004U (en) A kind of movable hanger for being easy to roof inner slab to install
CN105484502B (en) A kind of industrial premises steel structural roof purlin and support bar combined installation method
CN101775896B (en) Rigid suspended scaffold for installing pipeline of steel roof equipment
CN206320918U (en) Air conditioner support for multi-storey building
CN206753085U (en) A kind of sliding platform for being used to install high-altitude wire frame steel construction
CN203255914U (en) Unit-typed curtain wall lifting device
CN107327068A (en) Steel construction truss string structure system roof system ceiling structure and its construction method
CN205100531U (en) Lift scaffold support body assembly
CN201635377U (en) Rigid suspended type scaffold provided with large-span steel roof equipment pipeline
CN211173007U (en) Novel tripod of encorbelmenting
CN209429487U (en) A kind of scaffold of architectural engineering
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN109653484B (en) Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering
CN204676865U (en) A kind of building scaffold
CN201714051U (en) High altitude operation hanging frame
CN103615103A (en) Hanging type assembled movable platform
CN203430009U (en) Construction hanging basket
CN206957175U (en) A kind of planar dimension and adjustable for height operating platform
CN205575534U (en) Lattice formula groined type support body lifting means
CN201915614U (en) Integral electric climbing frame suitable for shear wall structure
CN205444935U (en) Special -shaped steel space frame construction and installation structure of complicated large -span department
CN204059909U (en) With the horizontal truss of avoiding structure
CN210195200U (en) Hanging flower basket device of encorbelmenting of high parapet
CN203394008U (en) Suspension type hanging bracket used on plane truss
CN208604911U (en) A kind of novel suspention beam bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Engineering Group Co.,Ltd.

Address before: 518000 Guangdong city of Shenzhen province Futian District Che Kung Temple Binhe Tairan industry tipping 17 storey building No. 17A

Patentee before: China Construction Steel Structure Corp.,Ltd.