CN108457431A - The color steel installation method and mounting device of the double-deck colorful plate roof - Google Patents

The color steel installation method and mounting device of the double-deck colorful plate roof Download PDF

Info

Publication number
CN108457431A
CN108457431A CN201810140136.0A CN201810140136A CN108457431A CN 108457431 A CN108457431 A CN 108457431A CN 201810140136 A CN201810140136 A CN 201810140136A CN 108457431 A CN108457431 A CN 108457431A
Authority
CN
China
Prior art keywords
guardrail
hook
frame
main body
chassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810140136.0A
Other languages
Chinese (zh)
Other versions
CN108457431B (en
Inventor
郎海洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei 20 Smelting Construction Co Ltd
China MCC20 Group Corp Ltd
Original Assignee
Hebei 20 Smelting Construction Co Ltd
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei 20 Smelting Construction Co Ltd, China MCC20 Group Corp Ltd filed Critical Hebei 20 Smelting Construction Co Ltd
Priority to CN201810140136.0A priority Critical patent/CN108457431B/en
Publication of CN108457431A publication Critical patent/CN108457431A/en
Application granted granted Critical
Publication of CN108457431B publication Critical patent/CN108457431B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D15/00Apparatus or tools for roof working
    • E04D15/04Apparatus or tools for roof working for roof coverings comprising slabs, sheets or flexible material

Abstract

The present invention provides a kind of the color steel installation method and mounting device of the double-deck colorful plate roof, the color steel installation method of the double-deck colorful plate roof is:A, cage main body is made;B, link is fixedly installed in the middle part of the horizontal sides of rear guardrail, link is vertically arranged, and hook is provided at the top of link, and the structure of hook uses portal structures;C, the bottom of hook is provided with two groups of anti-skidding bar assemblies being connected between two pendant frames;D, will hook, link and cage main body assembly and connection it is good after, hook is hooked on roof purline, high-altitude application personnel progress roofing bottom plate installation, after installing at one, high-altitude application personnel can carry out the movement of cage main body with hand moveable hook;E, for roofing bottom plate after installation is complete, roofing top plate is hoisted to setting by ground handling operator by roof pulley blocks, carries out the installation of roofing top plate in cage main body by high-altitude application personnel station.

Description

The color steel installation method and mounting device of the double-deck colorful plate roof
Technical field
The present invention relates to a kind of color steel mounting techniques of the double-deck colorful plate roof, more particularly, to a kind of double-deck colorful plate roof Color steel installation method and mounting device.
Background technology
Most industry now, production are steel-structure factory building with workshop, and factory roof structure is color steel plate structure, part workshop Colored steel structure design be the double-deck colored steel, that is, include roofing bottom plate and roofing top plate, pacify between roofing bottom plate and roofing top plate Glaze cotton insulating layer, when constructing roofing colored steel, installing needs first to install roofing bottom plate after roof purline constructs roofing again Top plate, conventional installation methods are using scaffold is driven a vehicle or set up in workshop, but the installation speed of this construction method is slower And operating expenses is higher.
Invention content
An object of the present invention is just to provide a kind of color steel installation method of the double-deck colorful plate roof, existing to solve The problem that speed of application present in the color steel installation method of the double-deck colorful plate roof is slow and operating expenses is high.
The second object of the present invention is just to provide a kind of color steel mounting device of the double-deck colorful plate roof, existing to solve Complexity of constructing present in the color steel mounting device of the double-deck colorful plate roof problem low with safety coefficient.
What an object of the present invention was realized in:
A kind of color steel installation method of bilayer colorful plate roof, includes the following steps:
A, cage main body is made:Using round steel or reinforcement welding cage main body, the cage main body include chassis, preceding guardrail, after Guardrail, left guardrail and right guardrail;The chassis is rectangle chassis, the chassis level setting, the preceding guardrail, the rear shield Column, the left guardrail and the right guardrail are vertically arranged in the edge on the chassis;The preceding guardrail and the rear guardrail It is oppositely arranged, and the bottom end of the preceding guardrail and the bottom end of the rear guardrail are arranged at two broadsides of the chassis outer edge Place;The left guardrail is oppositely arranged with the right guardrail, and the bottom end of the left guardrail and the bottom end of the right guardrail are respectively provided with In two long edge positions of the chassis outer edge;It is equipped with color steel on the chassis;
B, link is fixedly installed in the middle part of the horizontal sides of guardrail in the rear, the link is vertically arranged, in the company It connects and is provided with hook at the top of frame, the structure of the hook uses portal structures, and the hook includes two parallel and with respect to setting The top frame that the pendant frame and connection set are arranged between two pendant frame tops, the pendant frame are vertically arranged, the top frame water Flat to be arranged, the horizontal distance between two pendant frame medial surfaces is equal or slightly larger than the width of roof purline top surface;It is described Pendant frame is bar-shaped frame made of being surrounded by four steel pipes with the top frame;
C, the bottom of the hook is provided with two groups of anti-skidding bar assemblies being connected between two pendant frames, every group of antiskid bar group Part includes antiskid bar, the first location nut and the second location nut that connection is arranged between two pendant frames, described One end of antiskid bar is provided with pole cap, and the other end is provided with external screw thread, the bar of first location nut and the antiskid bar The cooperation installation of cap end, second location nut and the male end of the antiskid bar are connected, antiskid bar group described in two groups Part be separately positioned on it is described hook bottom both sides, and first location nut and second location nut with it is corresponding The bottom of the pendant frame is fixedly connected;
D, by it is described hook, the link and the cage main body assembly and connection it is good after, hook is hooked on roof purline On, high-altitude application personnel's wear safety belt is stood on the color steel of cage main body, and the other end of safety belt is fixed on roofing purlin On item, high-altitude application personnel carry out roofing bottom plate installation, after installing at one, high-altitude application personnel can use hand moveable hook with Carry out the movement of cage main body;
E, for roofing bottom plate after installation is complete, roofing top plate is hoisted to setting by ground handling operator by roof pulley blocks, by High-altitude application personnel station carries out the installation of roofing top plate in cage main body.
In step c, the vertical distance between the bottom end of the top frame of the top of antiskid bar and the hook is slightly larger than roofing The height of purlin.
Vertical distance between the bottom end of the top frame of the top of antiskid bar and the hook is bigger than the height of roof purline 10mm。
In step d, high-altitude application personnel moveable hook with carry out cage main body it is mobile when with the use of conversion hang Frame.
The color steel that the present invention realizes the double-deck colorful plate roof by color steel installation method is installed, and working at height personnel can Can not be mounted directly roofing bottom plate by driving and scaffold after the completion of roof purline installation is fixed, high-altitude is made when operation Roofing bottom plate installation exercise can be completed in industry personnel station in cage main body, is led to by ground handling operator when installing roofing top plate It crosses roof pulley blocks and is hoisted to the installation that setting is carried out roofing top plate by high-altitude application personnel again, mounting device of the invention exists Preferable effect is achieved in the roofing colored steel installation of Practical Project, the intervention of the method can accelerate speed of application, save construction Cost.
The second object of the present invention is to what is be achieved:
A kind of color steel mounting device of bilayer colorful plate roof, including cage main body, link and hook;
The cage main body includes chassis, preceding guardrail, rear guardrail, left guardrail and right guardrail;The chassis is rectangle chassis, The chassis level setting, the preceding guardrail, the rear guardrail, the left guardrail and the right guardrail are vertically arranged in described The edge on chassis;The preceding guardrail is oppositely arranged with the rear guardrail, and the bottom end of the preceding guardrail and the rear guardrail Bottom end is arranged at two broadsides of the chassis outer edge;The left guardrail is oppositely arranged with the right guardrail, and described The bottom end of left guardrail and the bottom end of the right guardrail are arranged at two long edge positions of the chassis outer edge;On the chassis It is equipped with color steel;
The middle part of the horizontal sides of guardrail in the rear is fixedly installed in the link, and the link is vertically arranged, the hook It is arranged at the top of the link, the structure of the hook uses portal structures, and the hook includes two parallel and opposite The top frame that the pendant frame of setting and connection are arranged between two pendant frame tops, the pendant frame are vertically arranged, the top frame Horizontally disposed, the horizontal distance between two pendant frame medial surfaces is equal or slightly larger than the width of roof purline top surface;Institute It is bar-shaped frame made of being surrounded by four steel pipes that pendant frame, which is stated, with the top frame;
The bottom of the hook is provided with two groups of anti-skidding bar assemblies being connected between two pendant frames.
Every group of anti-skidding bar assembly includes antiskid bar, the first location nut that connection is arranged between two pendant frames One end of second location nut, the antiskid bar is provided with pole cap, the other end is provided with external screw thread, the first positioning spiral shell Female stem cap end cooperation with the antiskid bar is installed, and second location nut and the male end cooperation of the antiskid bar connect It connects, anti-skidding bar assembly described in two groups is separately positioned on the both sides of the hook bottom, and first location nut and described the Two location nuts are fixedly connected with the bottom of the corresponding pendant frame.
Vertical distance between the bottom end of the top frame of the top of antiskid bar and the hook is slightly larger than the height of roof purline.
Vertical distance between the bottom end of the top frame of the top of antiskid bar and the hook is bigger than the height of roof purline 10mm。
In being provided with positioned at the side of the hook mating with the cage main body for coordinating high-altitude application for roof purline Personnel move the conversion hanger of cage main body.
Apparatus of the present invention making is simple, installation speed is fast and construction cost is relatively low, is primarily adapted for height is higher, space is larger The installation of steel structural roof doubling plate especially solves the problems, such as double-deck roofing colored steel bottom plate bilayer difficult to install, of the invention The construction method of colored steel improves the construction operation speed of operating personnel, compensates for higher steel-structure factory building bilayer roof boarding bottom plate Installation in need to by indoor driving and set up operation uniform velocity present in the construction method of scaffold slowly and construction cost height The problem of, construction time and installation cost have been saved compared to Normal practice, has accelerated speed of application.
Description of the drawings
Fig. 1 is the structural schematic diagram of the mounting device of the present invention.
Fig. 2 is the left view of Fig. 1.
Fig. 3 is the structural schematic diagram on the chassis of cage main body.
Fig. 4 is the structural schematic diagram of the conversion hanger of the present invention.
Fig. 5 is the side view of Fig. 4.
Fig. 6 is the structural schematic diagram for the bottom plate for converting hanger.
In figure:1, cage main body;11, chassis;12, preceding guardrail;13, rear guardrail;14, left guardrail;15, right guardrail;16, color Steel plate;17, supporting rod;18, reinforce cross bar;2, link;3, it links up with;31, pendant frame;32, top frame;4, anti-skidding bar assembly;51、 Bottom plate;52, link is assisted;53, auxiliary hook.
Specific implementation mode
Embodiment 1:
As shown in Fig. 1 ~ Fig. 6, a kind of color steel installation method of bilayer colorful plate roof includes the following steps:
A, cage main body 1 is made:Using round steel or reinforcement welding cage main body 1, cage main body 1 include chassis 11, preceding guardrail 12, Guardrail 13, left guardrail 14 and right guardrail 15 afterwards;Chassis 11 is rectangle chassis 11, and chassis 11 is horizontally disposed, preceding guardrail 12, rear guardrail 13, left guardrail 14 and right guardrail 15 are vertically arranged in the edge on chassis 11.Preceding guardrail 12 is oppositely arranged with rear guardrail 13, and The bottom end of preceding guardrail 12 and the bottom end of rear guardrail 13 are arranged at two broadsides of 11 outer edge of chassis;Left guardrail 14 and right shield Column 15 is oppositely arranged, and the bottom end of left guardrail 14 and the bottom end of right guardrail 15 are arranged at two long sides of 11 outer edge of chassis Place.Color steel 16 is equipped on chassis 11.In the present embodiment, preceding guardrail, rear guardrail, left guardrail and right guardrail are by justifying Steel surrounds the rectangle frame being welded, and a diameter of 6mm of round steel is horizontally disposed in left guardrail 14 and right guardrail 15 to have reinforcement Cross bar 18, preceding guardrail, rear guardrail, left guardrail and right guardrail height be equal, height is 700mm, left guardrail and right shield The length on column is 1 meter;Chassis 11 includes the supporting rod 17 for surrounding the rectangle bottom frame being welded by steel pipe He being arranged in bottom frame, Supporting rod 17 includes the transverse support bar being horizontally installed in bottom frame and the vertical supporting bar being disposed longitudinally in bottom frame, is laterally propped up Strut and vertical supporting bar are to vertical, and transverse support bar is parallel with the long side of bottom frame, and vertical supporting bar is parallel with the broadside of bottom frame, To cross weld at fenestral fabric, supporting rod 17 is all made of round steel for transverse support bar and vertical supporting bar, in the present embodiment, The outer diameter of steel pipe is 25mm, and thickness 2.5mm, steel pipe is using coating steel pipe;A diameter of 6mm of supporting rod 17.
B, link 2 is fixedly installed in the middle part of the horizontal sides of rear guardrail 13, link 2 is vertically arranged.In this implementation In example, link 2 is H-shaped structure, and link 2 includes two parallel and montants for being vertically arranged and is horizontally set on two montants Between cross bar, the bottom end of wherein one montant of link 2 is fixedly connected by welding with the rectangle frame on chassis 11, The bottom end of another montant is fixedly connected by welding with the supporting rod on chassis 11, i.e. the throwing of link 2 in the horizontal plane Shadow and the projection of rear guardrail in the horizontal plane are perpendicular, and link 2 is arranged at the 1/2 of 11 broadside of chassis.In link 2 Top is provided with hook 3, and the structure for linking up with 3 uses portal structures, hook 3 to include two pendant frames 31 that are parallel and being oppositely arranged And the top frame 32 that connection is arranged between two 31 tops of pendant frame, projection and connection of one of pendant frame 31 in horizontal plane The projection of frame 2 in the horizontal plane overlaps, and another pendant frame 31 is flat in the projection and the projection of link 2 in the horizontal plane of horizontal plane Row.Pendant frame 31 is vertically arranged, and top frame 32 is horizontally disposed, and the horizontal distance between two 31 medial surfaces of pendant frame is equal to or bigger Width in roof purline top surface.Pendant frame 31 is bar-shaped frame made of being surrounded by four steel pipes with top frame 32.In this implementation In example, the outer diameter of the steel pipe of pendant frame 31 is 25mm, thickness 2.5mm.The top one of bottom end and the link 2 of hook 3 at Type makes.
C, the bottom of hook 3 is provided with two groups of anti-skidding bar assemblies 4 being connected between two pendant frames 31, every group anti-skidding Bar assembly 4 includes antiskid bar, the first location nut and the second location nut that connection is arranged between two pendant frames 31, is prevented One end of slide bar is provided with pole cap, and the other end is provided with external screw thread, the axial length of rod segment where external screw thread be 20mm ~ The male end of the stem cap end cooperation installation of 30mm, the first location nut and antiskid bar, the second location nut and antiskid bar coordinates Connection.External diameter of a circle where the outer edge of first location nut is external where more than the outer edge of the second location nut Diameter of a circle, the vertical distance between the top of antiskid bar and the bottom end of the top frame 32 of hook 3 are bigger than the height of roof purline 10mm.It is also welded with lever in the stem cap end of antiskid bar, can avoid the overturning and shaking of cage main body in the construction process.Two groups Anti-skidding bar assembly 4 be separately positioned on hook 3 bottoms both sides, and the first location nut and the second location nut with corresponding side The bottom for hanging frame 31 is fixedly connected;With group the first location nut center and the center of the second location nut between line with The bottom surface of top frame 32 is parallel and vertical with the medial surface of pendant frame 31.The bottom end of the top of antiskid bar and the top frame 32 of hook 3 it Between vertical distance be slightly larger than roof purline height.The lower section for linking up with 3 anti-skidding bar assemblies 4 is provided with auxiliary in parallel Anti-skidding bar assembly, auxiliary anti-slipping bar assembly are also two groups, and every group of auxiliary anti-slipping bar assembly includes that connection is arranged in two pendants Auxiliary anti-slipping bar, the first location nut and the second location nut, one end of auxiliary anti-slipping bar between frame 31 are provided with pole cap, The other end is provided with external screw thread, and the stem cap end cooperation of the first location nut and antiskid bar is installed, the second location nut and antiskid bar Male end be connected.Two groups of auxiliary anti-slipping bar assemblies are separately positioned on the both sides of 3 bottoms of hook, and the first location nut And the second location nut is fixedly connected with the bottom of corresponding pendant frame 31.
D, will hook 3, link 2 and 1 assembly and connection of cage main body it is good after, hook 3 is hooked on roof purline, height Do-nothing operation personnel's wear safety belt is stood on the color steel 16 of cage main body 1, and the other end of safety belt is fixed on roof purline On, high-altitude application personnel carry out roofing bottom plate installation, after installing at one, high-altitude application personnel can use hand moveable hook 3 with Carry out the movement of cage main body 1.The sum of weight of hook 3, link 2 and cage main body 1 is equal to or less than 25kg, is conducive to operation Movement of the personnel to cage main body.High-altitude application personnel moveable hook 3 with carry out cage main body 1 it is mobile when with the use of turn Change hanger.Conversion hanger include bottom plate 51, auxiliary link 52 and auxiliary hook 53, auxiliary link 52 and auxiliary hook 53 and Hook 3 in step a ~ step c is identical as the structure of link 2 and manufacturing process, converts the height of the auxiliary link 52 of hanger Height of the degree less than link 2.That is the auxiliary link 52 of conversion hanger is fixed at the side of bottom plate 51, assists link 52 are vertically arranged, and auxiliary hook 53 is arranged at the top of auxiliary link 52, and the structure of auxiliary hook 53 uses portal structures, auxiliary It includes two parallel and pendant frames for being oppositely arranged and the top frame that connection is arranged between two pendant frame tops, side to help hook 53 It hangs frame to be vertically arranged, top frame is horizontally disposed, and the horizontal distance between two pendant frame medial surfaces is equal or slightly larger than roof purline The width of top surface;Pendant frame is bar-shaped frame made of being surrounded by four steel pipes with top frame.Bottom plate 51 is located in cage main body 1, And positioned at the top on chassis 11, i.e. the bottom end of the bottom plate 51 of conversion hanger is higher than the top on the chassis 11 of cage main body 1, with convenient Working at height personnel stand on hanger, smoothly can move cage main body from roof purline.It is mobile cage master to convert hanger effect When body 1, working at height personnel can stand on the bottom plate 51 of conversion hanger, be drawn to facilitate the movement of cage main body 1 and cross over The components such as item, working at height personnel need not be upper to mobile cage main body 1 at the top of roof purline again, accelerate speed of application and high-altitude The safety of operating personnel.
E, for roofing bottom plate after installation is complete, roofing top plate is hoisted to operation by ground handling operator by roof pulley blocks Point is carried out the installation of roofing top plate by high-altitude application personnel station in cage main body 1.
Embodiment 2:
As shown in Fig. 1 ~ Fig. 6, a kind of color steel mounting device of bilayer colorful plate roof, including cage main body 1, link 2 and extension Hook 3.
Cage main body 1 includes chassis 11, preceding guardrail 12, rear guardrail 13, left guardrail 14 and right guardrail 15;Chassis 11 is Rectangle chassis 11, chassis 11 is horizontally disposed, and preceding guardrail 12, rear guardrail 13, left guardrail 14 and right guardrail 15 are vertically arranged in bottom The edge of disk 11;Preceding guardrail 12 is oppositely arranged with rear guardrail 13, and the bottom end of preceding guardrail 12 and the bottom end of rear guardrail 13 are all provided with It sets at two broadsides of 11 outer edge of chassis;Left guardrail 14 is oppositely arranged with right guardrail 15, and the bottom end of left guardrail 14 and the right side The bottom end of guardrail 15 is arranged at two long edge positions of 11 outer edge of chassis;Color steel 16 is equipped on chassis 11;
Link 2 is fixed at the middle part of the horizontal sides of rear guardrail 13, and link 2 is vertically arranged, and hook 3 is arranged in link 2 top, the structure for linking up with 3 use portal structures, and it includes that two parallel and the pendant frame 31 being oppositely arranged and connection are set to link up with 3 The top frame 32 between two 31 tops of pendant frame is set, pendant frame 31 is vertically arranged, and top frame 32 is horizontally disposed, two pendant frames 31 Horizontal distance between medial surface is equal or slightly larger than the width of roof purline top surface;Pendant frame 31 is by four with top frame 32 Bar-shaped frame made of steel pipe surrounds;
The bottom of hook 3 is provided with two groups of anti-skidding bar assemblies 4 being connected between two pendant frames 31.
Every group of anti-skidding bar assembly 4 includes antiskid bar, the first location nut that connection is arranged between two pendant frames 31 With the second location nut, one end of antiskid bar is provided with pole cap, and the other end is provided with external screw thread, the first location nut with it is anti-skidding The male end of the stem cap end cooperation installation of bar, the second location nut and antiskid bar is connected, and two groups of anti-skidding bar assemblies 4 are distinguished It is arranged in the both sides for linking up with 3 bottoms, and the first location nut and the second location nut are solid with the bottom of corresponding pendant frame 31 Fixed connection.
Vertical distance between the top of antiskid bar and the bottom end of the top frame 32 of hook 3 is slightly larger than the height of roof purline.
Vertical distance between the top of antiskid bar and the bottom end of the top frame 32 of hook 3 is bigger than the height of roof purline 10mm。
In being provided with positioned at the side of the hook 3 mating with cage main body 1 for coordinating high-altitude application people for roof purline The conversion hanger of member's movement cage main body 1.

Claims (9)

1. a kind of color steel installation method of bilayer colorful plate roof, which is characterized in that include the following steps:
A, cage main body is made:Using round steel or reinforcement welding cage main body, the cage main body include chassis, preceding guardrail, after Guardrail, left guardrail and right guardrail;The chassis is rectangle chassis, the chassis level setting, the preceding guardrail, the rear shield Column, the left guardrail and the right guardrail are vertically arranged in the edge on the chassis;The preceding guardrail and the rear guardrail It is oppositely arranged, and the bottom end of the preceding guardrail and the bottom end of the rear guardrail are arranged at two broadsides of the chassis outer edge Place;The left guardrail is oppositely arranged with the right guardrail, and the bottom end of the left guardrail and the bottom end of the right guardrail are respectively provided with In two long edge positions of the chassis outer edge;It is equipped with color steel on the chassis;
B, link is fixedly installed in the middle part of the horizontal sides of guardrail in the rear, the link is vertically arranged, in the company It connects and is provided with hook at the top of frame, the structure of the hook uses portal structures, and the hook includes two parallel and with respect to setting The top frame that the pendant frame and connection set are arranged between two pendant frame tops, the pendant frame are vertically arranged, the top frame water Flat to be arranged, the horizontal distance between two pendant frame medial surfaces is equal or slightly larger than the width of roof purline top surface;It is described Pendant frame is bar-shaped frame made of being surrounded by four steel pipes with the top frame;
C, the bottom of the hook is provided with two groups of anti-skidding bar assemblies being connected between two pendant frames, every group of antiskid bar group Part includes antiskid bar, the first location nut and the second location nut that connection is arranged between two pendant frames, described One end of antiskid bar is provided with pole cap, and the other end is provided with external screw thread, the bar of first location nut and the antiskid bar The cooperation installation of cap end, second location nut and the male end of the antiskid bar are connected, antiskid bar group described in two groups Part be separately positioned on it is described hook bottom both sides, and first location nut and second location nut with it is corresponding The bottom of the pendant frame is fixedly connected;
D, by it is described hook, the link and the cage main body assembly and connection it is good after, hook is hooked on roof purline On, high-altitude application personnel's wear safety belt is stood on the color steel of cage main body, and the other end of safety belt is fixed on roofing purlin On item, high-altitude application personnel carry out roofing bottom plate installation, after installing at one, high-altitude application personnel can use hand moveable hook with The movement of cage main body is carried out to carry out the installation of next place's bottom plate;
E, for roofing bottom plate after installation is complete, roofing top plate is hoisted to setting by ground handling operator by roof pulley blocks, by High-altitude application personnel station carries out the installation of roofing top plate in cage main body.
2. the color steel installation method of bilayer colorful plate roof according to claim 1, which is characterized in that in step c, prevent Vertical distance between the bottom end of the top frame of the top of slide bar and the hook is slightly larger than the height of roof purline.
3. the color steel installation method of bilayer colorful plate roof according to claim 2, which is characterized in that the top of antiskid bar Vertical distance between the bottom end of the top frame of the hook is bigger 10mm than the height of roof purline.
4. the color steel installation method of bilayer colorful plate roof according to claim 1, which is characterized in that high in step d Do-nothing operation personnel moveable hook with carry out cage main body it is mobile when with the use of conversion hanger.
5. a kind of color steel mounting device of bilayer colorful plate roof, it is characterized in that be, including cage main body, link and extension Hook;
The cage main body includes chassis, preceding guardrail, rear guardrail, left guardrail and right guardrail;The chassis is rectangle chassis, The chassis level setting, the preceding guardrail, the rear guardrail, the left guardrail and the right guardrail are vertically arranged in described The edge on chassis;The preceding guardrail is oppositely arranged with the rear guardrail, and the bottom end of the preceding guardrail and the rear guardrail Bottom end is arranged at two broadsides of the chassis outer edge;The left guardrail is oppositely arranged with the right guardrail, and described The bottom end of left guardrail and the bottom end of the right guardrail are arranged at two long edge positions of the chassis outer edge;On the chassis It is equipped with color steel;
The middle part of the horizontal sides of guardrail in the rear is fixedly installed in the link, and the link is vertically arranged, the hook It is arranged at the top of the link, the structure of the hook uses portal structures, and the hook includes two parallel and opposite The top frame that the pendant frame of setting and connection are arranged between two pendant frame tops, the pendant frame are vertically arranged, the top frame Horizontally disposed, the horizontal distance between two pendant frame medial surfaces is equal or slightly larger than the width of roof purline top surface;Institute It is bar-shaped frame made of being surrounded by four steel pipes that pendant frame, which is stated, with the top frame;
The bottom of the hook is provided with two groups of anti-skidding bar assemblies being connected between two pendant frames.
6. the color steel mounting device of bilayer colorful plate roof according to claim 5, which is characterized in that every group of antiskid bar group Part includes antiskid bar, the first location nut and the second location nut that connection is arranged between two pendant frames, described One end of antiskid bar is provided with pole cap, and the other end is provided with external screw thread, the bar of first location nut and the antiskid bar The cooperation installation of cap end, second location nut and the male end of the antiskid bar are connected, antiskid bar group described in two groups Part be separately positioned on it is described hook bottom both sides, and first location nut and second location nut with it is corresponding The bottom of the pendant frame is fixedly connected.
7. the color steel mounting device of bilayer colorful plate roof according to claim 5, which is characterized in that the top of antiskid bar Vertical distance between the bottom end of the top frame of the hook is slightly larger than the height of roof purline.
8. the color steel mounting device of bilayer colorful plate roof according to claim 7, which is characterized in that the top of antiskid bar Vertical distance between the bottom end of the top frame of the hook is bigger 10mm than the height of roof purline.
9. the color steel mounting device of bilayer colorful plate roof according to claim 5, which is characterized in that in roof purline It is provided with positioned at the side of the hook mating with the cage main body for coordinating high-altitude application personnel to move turning for cage main body Change hanger.
CN201810140136.0A 2018-02-11 2018-02-11 Color steel plate mounting method and device for double-layer color plate roof Active CN108457431B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810140136.0A CN108457431B (en) 2018-02-11 2018-02-11 Color steel plate mounting method and device for double-layer color plate roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810140136.0A CN108457431B (en) 2018-02-11 2018-02-11 Color steel plate mounting method and device for double-layer color plate roof

Publications (2)

Publication Number Publication Date
CN108457431A true CN108457431A (en) 2018-08-28
CN108457431B CN108457431B (en) 2019-12-06

Family

ID=63238782

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810140136.0A Active CN108457431B (en) 2018-02-11 2018-02-11 Color steel plate mounting method and device for double-layer color plate roof

Country Status (1)

Country Link
CN (1) CN108457431B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109179276A (en) * 2018-09-26 2019-01-11 国家电网公司 Substation's hanging cage for high-altitude operation
CN113389330A (en) * 2021-06-02 2021-09-14 中国华冶科工集团有限公司 Composite roof color plate installation device and composite roof color plate installation method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204040435U (en) * 2014-03-31 2014-12-24 中国建筑第八工程局有限公司 High-altitude steel structure welding Hanging Basket
CN204081433U (en) * 2014-10-15 2015-01-07 四川省第六建筑有限公司 Steel structural roof liner profiled sheet construction Special-purpose hanger basket support
CN105735624A (en) * 2016-02-17 2016-07-06 浙江远大钢构实业有限公司 Cage for installing roof ceiling sheet
CN105986664A (en) * 2016-07-20 2016-10-05 中国建筑局(集团)有限公司 Hanging basket and roof reverse-hanging plate work platform including same
CN106906908A (en) * 2017-03-28 2017-06-30 上海四季阳光集装箱科技有限公司 Colored steel room construction method of installation
CN206513004U (en) * 2016-12-30 2017-09-22 中建钢构有限公司 A kind of movable hanger for being easy to roof inner slab to install
CN107366393A (en) * 2017-07-17 2017-11-21 中国三冶集团有限公司 A kind of food stuff refrigerated storage roofing colored steel Alley Oop formula hanging method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204040435U (en) * 2014-03-31 2014-12-24 中国建筑第八工程局有限公司 High-altitude steel structure welding Hanging Basket
CN204081433U (en) * 2014-10-15 2015-01-07 四川省第六建筑有限公司 Steel structural roof liner profiled sheet construction Special-purpose hanger basket support
CN105735624A (en) * 2016-02-17 2016-07-06 浙江远大钢构实业有限公司 Cage for installing roof ceiling sheet
CN105986664A (en) * 2016-07-20 2016-10-05 中国建筑局(集团)有限公司 Hanging basket and roof reverse-hanging plate work platform including same
CN206513004U (en) * 2016-12-30 2017-09-22 中建钢构有限公司 A kind of movable hanger for being easy to roof inner slab to install
CN106906908A (en) * 2017-03-28 2017-06-30 上海四季阳光集装箱科技有限公司 Colored steel room construction method of installation
CN107366393A (en) * 2017-07-17 2017-11-21 中国三冶集团有限公司 A kind of food stuff refrigerated storage roofing colored steel Alley Oop formula hanging method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109179276A (en) * 2018-09-26 2019-01-11 国家电网公司 Substation's hanging cage for high-altitude operation
CN109179276B (en) * 2018-09-26 2024-02-06 国家电网公司 Overhead operation hanging cage for transformer substation
CN113389330A (en) * 2021-06-02 2021-09-14 中国华冶科工集团有限公司 Composite roof color plate installation device and composite roof color plate installation method

Also Published As

Publication number Publication date
CN108457431B (en) 2019-12-06

Similar Documents

Publication Publication Date Title
CN201221193Y (en) High altitude packway ceiling construction operating platform
CN110409837B (en) Large-span double-layer steel reticulated shell roof unit-by-unit hoisting construction method
CN105401714A (en) Attachment type lifting scaffold and lifting method
WO2020052291A1 (en) Construction elevator wall-attaching frame mounting platform attached to steel platform formwork and method therefor
CN108457431A (en) The color steel installation method and mounting device of the double-deck colorful plate roof
CN108532968A (en) A kind of assembled support device of steel bar truss floor support plate composite floor system
CN205875666U (en) A platform suspends in midair that is used for building eaves oral area position to be under construction
CN104973517A (en) Electric gantry platform for installing sintering machine head equipment and application method thereof
CN207700708U (en) A kind of shellring shape ceiling mounted tracks of unit glass curtain wall
CN105752897A (en) Variable span hanging basket suspension mechanism
CN211114737U (en) A construction operation platform in elevator well for tower crane promotes
CN207142270U (en) One kind oxidation production system
CN114215366B (en) Lifting construction method for dense hanging points of large-span arched roof
CN205575534U (en) Lattice formula groined type support body lifting means
CN204662922U (en) For the movable integral type scaffold of box-structure
CN211775944U (en) Support arrangement for quicken installation of taking one's place of PC wall body
CN209942078U (en) Large-span even strides factory building roof boarding installation dolly
CN210562935U (en) Low-cost light gauge steel mounting structure for furred ceiling
CN204174848U (en) A kind of precast reinforced skeleton of sets of brackets on top of the columns of building in the style of the ancients
CN110424749A (en) The rail mounted that high construction is connect for pier shaft reinforcing bar connects high rack device and its meets Gao Fangfa
CN220747596U (en) Suspension type mobile platform for steel structure installation
CN202170231U (en) Mobile pulling bar
CN110805189A (en) Method for mounting steel structure of daylighting roof
CN220351520U (en) Slidable sliding rail device capable of being used for crane beam rail
CN206256382U (en) It is a kind of to suspend purlin car in midair for the triangle that Wavelike steel webplate is installed

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant