CN105625732B CN201511025654.0A CN201511025654A CN105625732B CN 105625732 B CN105625732 B CN 105625732B CN 201511025654 A CN201511025654 A CN 201511025654A CN 105625732 B CN105625732 B CN 105625732B
Authority
CN
China
Prior art keywords
outside
girder
steel
connecting portion
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201511025654.0A
Other languages
Chinese (zh)
Other versions
CN105625732A (en
Inventor
王慧文
张岚
蔡小平
崔锡根
周燕峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou No1 Construction Group Co Ltd
Original Assignee
Changzhou No1 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou No1 Construction Group Co Ltd filed Critical Changzhou No1 Construction Group Co Ltd
Priority to CN201511025654.0A priority Critical patent/CN105625732B/en
Publication of CN105625732A publication Critical patent/CN105625732A/en
Application granted granted Critical
Publication of CN105625732B publication Critical patent/CN105625732B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention provides a kind of superelevation overhanging steel structure truss support free construction method, preset the steel corbel of overhanging steel structure truss connection and the draw ring of installation in the position set on the steel reinforced concrete structure of high-rise building agent structure, implement the hanging installation of steel structure truss after the concrete main structure of high-rise building completes construction, set steel wire rope pull bar holding structure stable;The installation first floor first is encorbelmented flooring planar structure, and upper strata overhanging steel structure truss installa-tion is successively installed by the use of the stable first floor formed floor structure of encorbelmenting as installation operation platform.The present invention need not build the mounting bracket of superelevation system and use large lifting equipment, compared to common superelevation overhanging steel structure truss installa-tion construction method, can significantly it save the duration, save construction cost, with good economic benefit, construction is greatly reduced to the ambient influnence of surrounding simultaneously, with good social benefit.

Description

Superelevation overhanging steel structure truss support free construction method
Technical field
The present invention relates to construction techniques, and in particular to a kind of superelevation overhanging steel structure truss support free construction method.
Background technology
Currently, high-rise building is increasingly common, is attractive in appearance or practical purpose, and high-rise building is in its agent structure Top high level position is often designed with outer cantilevered structure.Outer cantilevered structure generally relies on outer overhanging steel structure truss to realize, thus The installation of outer overhanging steel structure truss is a basic and important ring for the outer cantilevered structure construction of high-rise building.Super High The outer cantilevered structure of building generally has the features such as structure height is high, span of encorbelmenting outside is big, difficulty of construction is high.High-rise building The installation of outer overhanging steel structure truss, its conventional construction method is the installation branch that superelevation system is built since ground Frame, is installed using large lifting equipment.Its deficiency existed is that construction cost is high, long construction period, and when building There is the building built up around high-rise building, the construction site room for maneuver is smaller, it is impossible to carry out using large lifting equipment During construction, then the construction method of installation of common outer overhanging steel structure truss can not be applicable.
The content of the invention
The purpose of the present invention is:There is provided a kind of mounting bracket that need not build superelevation system, without being reseted using large-scale It is standby, using the high-rise building agent structure built up using the hanging superelevation overhanging steel structure truss for installing purlin frame method construction without branch Support construction method.
The technical scheme is that:The superelevation overhanging steel structure truss support free construction method of the present invention, including it is following Step:
Step one, steel corbel and suspension ring are preset:
Overhanging steel structure truss is preset at the position set on the building body steel reinforced concrete structure of high-rise building The steel corbel of connection and the draw ring of installation;Steel corbel is provided with girder connecting portion and web member connecting portion;
Step 2, first floor steel platform is installed:
1. girder and inner side web member are installed on the inside of the first floor:Inner side girder by beam body, located at the inner inner side connecting portion of beam body, Web member connecting portion, column connecting portion on the outside of beam body and the outside connecting portion composition located at beam body outer end;In each inner side master 1 eight-shaped in Chinese steel cord pull bar is fixedly installed in the beam body of beam and the joint portion of web member connecting portion and column connecting portion respectively in advance, uses Tower crane overall increases to installed height mark, and each inner side girder is connected by the girder of the steel corbel of its inner side connecting portion and relevant position Portion's bolt tentatively connects positioning;The other end of eight-shaped in Chinese steel cord pull bar is connected with the chain block being arranged on draw ring, utilized Chain block adjusts the levelness of inner side girder by eight-shaped in Chinese steel cord pull bar and coordinates the installation of inner side web member, to design requirement Eight-shaped in Chinese steel cord pull bar is fixedly connected with draw ring afterwards, and each connecting bolt is fastened;The web member of inner side web member and steel corbel connects The web member connecting portion of socket part and inner side girder is fixedly connected with bolt respectively;
2. secondary beam is installed on the inside of the first floor:After each inner side erection of main beam is finished, install interior successively between each inner side girder Side secondary beam;The two ends of each inner side secondary beam are fixedly connected with inner side girder respectively;So as to by each inner side girder and each inner side secondary beam structure Steel platform on the inside of into the first floor;
3. bed board on the inside of the first floor:In laying construction plate on steel platform on the inside of the first floor installed;
4. erection of main beam on the outside of the first floor:Installation connecting portion of the outside girder by the second beam body, on the inside of the second beam body, set The second web member connecting portion and the second column connecting portion composition on the outside of the second beam body;In the second beam body and the of each outside girder 1 eight-shaped in Chinese steel cord pull bar is fixedly installed in the joint portion of two web member connecting portions and the second column connecting portion respectively in advance, uses tower crane Installed height mark is overall increased to, each outside girder is installed to the outside connecting portion spiral shell of connecting portion and corresponding inner side girder by it Bolt tentatively connects positioning;The other end of eight-shaped in Chinese steel cord pull bar is connected with the chain block being arranged on draw ring, using pulling By eight-shaped in Chinese steel cord pull bar and draw ring after levelness to the design requirement that cucurbit passes through eight-shaped in Chinese steel cord pull bar regulation outside girder It is fixedly connected;Each connecting bolt between outside girder and inner side girder is fastened again;
5. secondary beam is installed on the outside of the first floor:After each outside erection of main beam is finished, install outer successively between each outside girder Side secondary beam;The two ends of each outside secondary beam are fixedly connected with outside girder respectively;So as to by each outside girder and each outside secondary beam structure Steel platform on the outside of into the first floor;
6. bed board on the outside of the first floor:In laying construction plate on steel platform on the outside of the first floor installed;
Step 3, builds operating platform:
The scaffold operating platform of more than two layers steel structure truss installations is built on first floor steel platform;
Step 4, two layers of steel structure truss are installed:
1. interior heel post is installed:Using scaffold operating platform, respectively with each fixation of bolt on each inner side girder of the first floor 1 root post is installed, interior heel post is used as;
2. two layers inner side erection of main beam:It is arranged in each interior heel post with corresponding on building body steel reinforced concrete structure Steel corbel between be respectively fixedly mounted with bolt respectively 1 two layers inner side girders;Simultaneously by inner side web member between the first floor and two layers Completion is installed complete;
3. two layers outside erection of main beam:1 root post is respectively fixedly mounted with bolt respectively on each outside girder of the first floor, as Outer heel post;1 two layers of outside girder is respectively fixedly mounted with bolt respectively between each outer heel post and corresponding interior heel post;
4. outside web member is installed:Between the outside girder positioned at the first floor and the outside girder positioned at two layers with bolt one by one Outside web member is fixedly mounted;
5. two level beams are installed:Secondary beam is fixedly mounted between two layers of inner side girder and two layers of outside girder;
Step 5, the three layers and three layers steel structure truss with upper strata is installed:
Using the method for such as step 4, three layers and three layers of steel construction with upper strata are gradually installed using scaffold operating platform Truss, until the whole installations of structure;
Step 6, removes and installs auxiliary equipment:
Remove first and build the scaffold operating platform on first floor steel platform;Then each eight-shaped in Chinese steel is removed one by one again Cord pull bar;The component removed is transported to ground using vertical transport tower crane.
The present invention has positive effect:(1)The superelevation overhanging steel structure truss support free construction method of the present invention, its profit Used with the high-rise building agent structure built up and purlin frame method construction, the installation without building superelevation system are installed without bracket-suspending Support, without large lifting equipment is used, compared to common superelevation overhanging steel structure truss installa-tion construction method, Neng Gou great Width saves the duration, construction cost is saved, with good economic benefit.(2)The superelevation overhanging steel structure truss of the present invention is without branch Support construction method, it has been filled up when there is the building that builds up around the high-rise building built, the construction site room for maneuver compared with It is small, it is impossible to the construction method of installation of overhanging steel structure truss outside high-rise building is carried out when being constructed using large lifting equipment Blank.(3)The superelevation overhanging steel structure truss support free construction method of the present invention, is built because it is used using the Super High built up Agent structure is built without bracket-suspending installation method, its underpart need not build the mounting bracket of the huge superelevation system of the scale of construction, simultaneously Without large lifting equipment is used, the ambient influnence of surrounding is greatly reduced so as to construct, with good social benefit.
Brief description of the drawings
Fig. 1 is the facade structures schematic diagram for the overhanging steel structure truss installed using the method for the present invention;
Fig. 2 is the planar structure schematic diagram for the overhanging steel structure truss installed using the method for the present invention;
Fig. 3 is that the facade structures schematic diagram on the inside of the overhanging steel structure truss first floor is installed using the method for the present invention;
Fig. 4 is that the facade structures schematic diagram on the outside of the overhanging steel structure truss first floor is installed using the method for the present invention;
Fig. 5 is that the facade structures schematic diagram on the inside of the overhanging steel structure truss second layer is installed using the method for the present invention;
Fig. 6 is that the facade structures schematic diagram on the outside of the overhanging steel structure truss second layer is installed using the method for the present invention.
Reference in above-mentioned accompanying drawing is as follows:
Building body steel reinforced concrete structure 1,
Steel corbel 2, girder connecting portion 21, web member connecting portion 22,
Draw ring 3,
Eight-shaped in Chinese steel cord pull bar 4,
Inner side girder 5, beam body 51, inner side connecting portion 52, web member connecting portion 53, column connecting portion 54, outside connecting portion 55,
Inner side web member 6,
Outside girder 7, the second beam body 71, installation connecting portion 72, the second web member connecting portion 73, the second column connecting portion 74,
Outside web member 8,
Column 9,
Inner side secondary beam 10, outside secondary beam 11.
Embodiment
The present invention is further detailed explanation with reference to the accompanying drawings and detailed description.
(Embodiment 1)
The superelevation overhanging steel structure truss support free construction method of the present embodiment, its technological principle is:In high-rise building Preset steel corbel and the installation of overhanging steel structure truss connection in the position set on the steel reinforced concrete structure of agent structure Draw ring, implements the hanging installation of steel structure truss after the concrete main structure of high-rise building completes construction, sets steel Cord pull bar holding structure is stable;The installation first floor first is encorbelmented flooring planar structure, and upper strata truss installa-tion utilizes shape Into stable first floor floor structure of encorbelmenting successively installed as installation operation platform.
See Fig. 1 to Fig. 6, the superelevation overhanging steel structure truss support free construction method of the present embodiment, mainly including following step Suddenly:
Step one, steel corbel and suspension ring are preset:
It is retained in the vertical transport tower crane set during high-rise building main structure construction, the present embodiment, vertical transport 50 meters of the tower crane radius of gyration at tower crane model TC7035B, overhanging steel structure truss installa-tion position, 5.32 tons of lift heavy, tower crane is adopted Overhanging steel structure trussmember vertical transport is carried out with two multiplying powers;The position set on building body steel reinforced concrete structure 1 Preset the steel corbel 2 of some overhanging steel structure truss connections and the draw ring 3 of some installations in place;Steel corbel 2 is provided with girder Connecting portion 21 and web member connecting portion 22.
Step 2, first floor steel platform is installed:
1. girder and inner side web member are installed on the inside of the first floor:As shown in figure 3, inner side girder 5 is by beam body 51, in beam body 51 The inner side connecting portion 52 at end, the web member connecting portion 53 located at the outside of beam body 51, column connecting portion 54 and located at the outer end of beam body 51 Outside connecting portion 55 constitute;Beam body 51 and the joint portion of web member connecting portion 53 and column connecting portion 54 in each inner side girder 5 1 eight-shaped in Chinese steel cord pull bar 4 is fixedly installed respectively in advance, installed height mark is overall increased to tower crane, by each inner side girder 5 by it Inner side connecting portion 52 is tentatively connected positioning with bolt with the girder connecting portion 21 of the steel corbel 2 of relevant position;By eight-shaped in Chinese steel cord The other end of pull bar 4 is connected with the chain block being arranged on draw ring 3, is adjusted using chain block by eight-shaped in Chinese steel cord pull bar 4 The levelness of section inner side girder 5 and the installation for coordinating inner side web member 6, to design requirement after by eight-shaped in Chinese steel cord pull bar 4 and draw ring 3 It is fixedly connected;Each connecting bolt is fastened;The web member connecting portion 22 and the web member of inner side girder 5 of inner side web member 6 and steel corbel 2 Connecting portion 53 is fixedly connected with bolt respectively;
2. secondary beam is installed on the inside of the first floor:After each inner side girder 5 is installed, installed successively between each inner side girder 5 Inner side secondary beam 10;The two ends of each inner side secondary beam 10 are fixedly connected with inner side girder 5 respectively;So as to by each inner side girder 5 and Ge Nei Side secondary beam 10 constitutes steel platform on the inside of the first floor;
3. bed board on the inside of the first floor:In laying construction plate on steel platform on the inside of the first floor installed;
4. erection of main beam on the outside of the first floor:As shown in figure 4, outside girder 7 is by the second beam body 71, located at the inner side of the second beam body 71 Installation connecting portion 72, the second web member connecting portion 73 and the second column connecting portion 74 located at the outside of the second beam body 71 constitute; Second beam body 71 of each outside girder 7 and the joint portion of the second web member connecting portion 73 and the second column connecting portion 74 are solid respectively in advance 1 eight-shaped in Chinese steel cord pull bar 4 is set surely, installed height mark is overall increased to tower crane, each outside girder 7 is installed into connecting portion by it 72 tentatively connect positioning with bolt with the outside connecting portion 55 of corresponding inner side girder 5;By the other end of eight-shaped in Chinese steel cord pull bar 4 It is connected with the chain block being arranged on draw ring 3, outside girder 7 is adjusted by eight-shaped in Chinese steel cord pull bar 4 using chain block Eight-shaped in Chinese steel cord pull bar 4 is fixedly connected with draw ring 3 after levelness to design requirement;Again by between outside girder 7 and inner side girder 5 Each connecting bolt fastening;
5. secondary beam is installed on the outside of the first floor:After each outside girder 7 is installed, installed successively between each outside girder 7 Outside secondary beam 11;The two ends of each outside secondary beam 11 are fixedly connected with outside girder 7 respectively;So as to by each outside girder 7 and each outer Side secondary beam 11 constitutes steel platform on the outside of the first floor;
6. bed board on the outside of the first floor:In laying construction plate on steel platform on the outside of the first floor installed;
Step 3, builds operating platform:
The scaffold operating platform of more than two layers steel structure truss installations is built on first floor steel platform;
Step 4, two layers of steel structure truss are installed(As shown in Figure 5 and Figure 6):
1. interior heel post is installed:Using scaffold operating platform, divide on the column connecting portion 54 of each inner side girder 5 of the first floor 1 root post 9 is not fixedly mounted respectively with bolt, interior heel post is used as;
2. two layers inner side erection of main beam:In each interior heel post building body steel reinforced concrete structure 1 is arranged on corresponding On steel corbel 2 between be respectively fixedly mounted with bolt respectively 1 two layers inner side girders 5;Simultaneously by inner side between the first floor and two layers The completion of web member 6 is installed complete;
3. two layers outside erection of main beam:It is each with bolt respectively on the second column connecting portion 74 of each outside girder 7 of the first floor 1 root post 9 is fixedly mounted, outer heel post is used as;It is each solid with bolt respectively between each outer heel post and corresponding interior heel post Dingan County fills 1 two layers of outside girder 7;
4. outside web member is installed:Between the outside girder 7 positioned at the first floor and the outside girder 7 positioned at two layers with bolt by One is fixedly mounted outside web member 8;
5. two level beams are installed:Secondary beam is fixedly mounted between two layers of inner side girder 5 and two layers of outside girder 7;
Step 5, the three layers and three layers steel structure truss with upper strata is installed:
Using the method for such as step 4, three layers and three layers of steel construction with upper strata are gradually installed using scaffold operating platform Truss, until the whole installations of structure;
Step 6, removes and installs auxiliary equipment:
Remove first and build the scaffold operating platform on first floor steel platform;Then each eight-shaped in Chinese steel is removed one by one again Cord pull bar 4;The component removed is transported to ground using vertical transport tower crane.
Above example is the explanation of the embodiment to the present invention, rather than limitation of the present invention, relevant technology The technical staff in field without departing from the spirit and scope of the present invention, can also make various conversion and change and obtain To corresponding equivalent technical scheme, therefore all equivalent technical schemes should be included into the patent protection model of the present invention Enclose.

Claims (1)

1. a kind of superelevation overhanging steel structure truss support free construction method, it is characterised in that:Comprise the following steps:
Step one, steel corbel and suspension ring are preset:
The connection of overhanging steel structure truss is preset at the position set on the building body steel reinforced concrete structure of high-rise building Steel corbel and the draw ring of installation;Steel corbel is provided with girder connecting portion and web member connecting portion;
Step 2, first floor steel platform is installed:
1. girder and inner side web member are installed on the inside of the first floor:Inner side girder by beam body, located at the inner inner side connecting portion of beam body, be located at Web member connecting portion, column connecting portion on the outside of beam body and the outside connecting portion composition located at beam body outer end;In each inner side girder 1 eight-shaped in Chinese steel cord pull bar is fixedly installed in beam body and the joint portion of web member connecting portion and column connecting portion respectively in advance, uses tower crane Overall increase to installed height mark, by each inner side girder by its inner side connecting portion and relevant position steel corbel girder connecting portion spiral shell Bolt tentatively connects positioning;The other end of eight-shaped in Chinese steel cord pull bar is connected with the chain block being arranged on draw ring, using pulling Cucurbit by eight-shaped in Chinese steel cord pull bar adjust inner side girder levelness and coordinate inner side web member installation, to design requirement after will Eight-shaped in Chinese steel cord pull bar is fixedly connected with draw ring, and each connecting bolt is fastened;The web member connecting portion of inner side web member and steel corbel And the web member connecting portion of inner side girder is fixedly connected with bolt respectively;
2. secondary beam is installed on the inside of the first floor:After each inner side erection of main beam is finished, between each inner side girder successively install on the inside of time Beam;The two ends of each inner side secondary beam are fixedly connected with inner side girder respectively;So as to constitute head by each inner side girder and each inner side secondary beam Layer inner side steel platform;
3. bed board on the inside of the first floor:In laying construction plate on steel platform on the inside of the first floor installed;
4. erection of main beam on the outside of the first floor:Installation connecting portion of the outside girder by the second beam body, on the inside of the second beam body, located at The second web member connecting portion and the second column connecting portion composition on the outside of two beam bodies;In the second beam body and the second abdomen of each outside girder 1 eight-shaped in Chinese steel cord pull bar is fixedly installed in the joint portion of bar connecting portion and the second column connecting portion respectively in advance, overall with tower crane Installed height mark is promoted to, by each outside girder as at the beginning of it installs connecting portion with the outside connecting portion bolt of corresponding inner side girder Step connection positioning;The other end of eight-shaped in Chinese steel cord pull bar is connected with the chain block being arranged on draw ring, chain block is utilized Eight-shaped in Chinese steel cord pull bar and draw ring are fixed after adjusting levelness to the design requirement of outside girder by eight-shaped in Chinese steel cord pull bar Connection;Each connecting bolt between outside girder and inner side girder is fastened again;
5. secondary beam is installed on the outside of the first floor:After each outside erection of main beam is finished, between each outside girder successively install on the outside of time Beam;The two ends of each outside secondary beam are fixedly connected with outside girder respectively;So as to constitute head by each outside girder and each outside secondary beam Layer outside steel platform;
6. bed board on the outside of the first floor:In laying construction plate on steel platform on the outside of the first floor installed;
Step 3, builds operating platform:
The scaffold operating platform of more than two layers steel structure truss installations is built on first floor steel platform;
Step 4, two layers of steel structure truss are installed:
1. interior heel post is installed:Using scaffold operating platform, 1 is respectively fixedly mounted with bolt respectively on each inner side girder of the first floor Root post, is used as interior heel post;
2. two layers inner side erection of main beam:In each interior heel post and the corresponding steel being arranged on building body steel reinforced concrete structure 1 two layers of inner side girder is respectively fixedly mounted between bracket with bolt respectively;Simultaneously by inner side web member completion between the first floor and two layers Install complete;
3. two layers outside erection of main beam:1 root post is respectively fixedly mounted with bolt respectively on each outside girder of the first floor, outside is used as Column;1 two layers of outside girder is respectively fixedly mounted with bolt respectively between each outer heel post and corresponding interior heel post;
4. outside web member is installed:Fixed one by one with bolt between the outside girder positioned at the first floor and the outside girder positioned at two layers Outside web member is installed;
5. two level beams are installed:Secondary beam is fixedly mounted between two layers of inner side girder and two layers of outside girder;
Step 5, the three layers and three layers steel structure truss with upper strata is installed:
Using the method for such as step 4, the three layers and three layers steel construction purlin with upper strata is gradually installed using scaffold operating platform Frame, until the whole installations of structure;
Step 6, removes and installs auxiliary equipment:
Remove first and build the scaffold operating platform on first floor steel platform;Then each eight-shaped in Chinese steel cord is removed one by one again Pull bar;The component removed is transported to ground using vertical transport tower crane.
CN201511025654.0A 2015-12-30 2015-12-30 Superelevation overhanging steel structure truss support free construction method Active CN105625732B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511025654.0A CN105625732B (en) 2015-12-30 2015-12-30 Superelevation overhanging steel structure truss support free construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511025654.0A CN105625732B (en) 2015-12-30 2015-12-30 Superelevation overhanging steel structure truss support free construction method

Publications (2)

Publication Number Publication Date
CN105625732A CN105625732A (en) 2016-06-01
CN105625732B true CN105625732B (en) 2017-09-22

Family

ID=56041038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511025654.0A Active CN105625732B (en) 2015-12-30 2015-12-30 Superelevation overhanging steel structure truss support free construction method

Country Status (1)

Country Link
CN (1) CN105625732B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106337564A (en) * 2016-08-30 2017-01-18 上海二十冶建设有限公司 Unstayed construction method for high-altitude oversized cantilever steel structure
CN110735478B (en) * 2019-10-28 2021-04-30 盐城工学院 Assembled concrete truss building structure
CN114673366A (en) * 2022-05-10 2022-06-28 陕西建工机械施工集团有限公司 Sectional steel beam high-altitude bracket-free sectional butt joint installation method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000073573A (en) * 1998-08-31 2000-03-07 Taisei Corp Constructing method for multistoried building
CN102704693A (en) * 2012-06-06 2012-10-03 绍兴县现代建筑工程有限公司 Construction method of ultra-high layer steel structure in low-temperature environment
CN102839747A (en) * 2012-09-24 2012-12-26 中国建筑第八工程局有限公司 Construction method for steel structure truss of super high-rise special structure
CN104060688B (en) * 2014-04-30 2016-06-08 浙江东南网架股份有限公司 Super high steel structure shaped steel promotes the construction method of a support system

Also Published As

Publication number Publication date
CN105625732A (en) 2016-06-01

Similar Documents

Publication Publication Date Title
CN201826525U (en) Climbing shuttering system device for buildings
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN108033367B (en) Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane
CN201367728Y (en) Derrick-less hydraulic slip form device used for reinforced concrete water tower supporting tube construction
CN106760529A (en) Roof system steel truss slipping and assembling operation platform and installation method
CN101775896B (en) Rigid suspended scaffold for installing pipeline of steel roof equipment
CN103352428A (en) Suspension bridge cable bent tower beam non-support construction method
CN207499504U (en) A kind of efficiently construction prefabricated frame is set a roof beam in place erecting device
CN102235092A (en) Layered hoisting construction process for suspended steel structure
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN108049666B (en) A kind of echelon installation method of super plane multilayer steel truss electronic workshop steel construction
CN103899093A (en) Step-by-step hoisting construction method of mega-frame steel truss beam
CN105484502A (en) Combination installation method for steel structure roofing purlins and support bars of industrial factory building
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN206319610U (en) Roof system steel truss slipping and assembling construction platform structure
CN205907812U (en) large cantilever steel frame structure with pull rod
CN106567542A (en) Super high-rise double tower building steel structure corridor assembling method
CN205314519U (en) High altitude operation platform based on truss
CN107816209B (en) The large-scale Roof Truss construction technology of installation is lifted across outer two sides
CN203947755U (en) A kind of large Steel Cantilever trussed construction high-altitude construction first floor steel truss erecting device
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN102691267A (en) High pier construction method for external whole operation platform
CN104775363A (en) Assembling method of upper tower column reinforcing steel bar segment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant