CN106437130A - Inner roof external climbing type formwork construction platform for super high-rise building construction - Google Patents

Inner roof external climbing type formwork construction platform for super high-rise building construction Download PDF

Info

Publication number
CN106437130A
CN106437130A CN201610882975.0A CN201610882975A CN106437130A CN 106437130 A CN106437130 A CN 106437130A CN 201610882975 A CN201610882975 A CN 201610882975A CN 106437130 A CN106437130 A CN 106437130A
Authority
CN
China
Prior art keywords
construction
climbing
platform
wall
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610882975.0A
Other languages
Chinese (zh)
Inventor
唐际宇
林忠和
戈祥林
唐阁威
罗逸锋
张皆科
梁月利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan No6 Construction Co ltd
China Huashi Enterprises Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201610882975.0A priority Critical patent/CN106437130A/en
Publication of CN106437130A publication Critical patent/CN106437130A/en
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=58172953&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN106437130(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms

Abstract

The invention discloses an inner roof external climbing type formwork construction platform for super high-rise building construction. The inner roof external climbing type formwork construction platform comprises a hydraulic creeping formwork system arranged on the outer side of a building and located on building walls and a jacking platform system arranged on the inner side of the building and located between adjacent building walls. The jacking platform system comprises a climbing device, an operating platform arranged on the climbing device and wall-attached embedder parts installed on the building walls and used for the climbing device to climb and attach. The hydraulic creeping formwork system adopted on a building external wall and the jacking platform system adopted on the inner side of the building and located between the building walls simultaneously operate to replace a traditional integral jacking type construction platform, horizontal supporting steel beams are not needed, oil cylinder climbing can be achieved only by installing the wall-attached embedder parts on the building walls, the total height of the construction platform and a supporting frame body of the platform is decreased, and a construction difference between a vertical structure and a horizontal structure is decreased, so that the hydraulic climbing system does not influence horizontal structure construction.

Description

A kind of interior top external climbing mould bases operation platform for construction of super highrise building
Technical field
The present invention relates to construction of super highrise building field, more particularly, to a kind of climb for outside the interior top of construction of super highrise building Formula mould bases operation platform.
Background technology
In the reinforced concrete construction of the buildings such as the body of wall of skyscraper, Core Walls Structure, chimney, water tower, mostly adopt Integrally hoisting steel platform pin hand system.Cooperation Fig. 1 and Fig. 2 shown in, this system with interpolation supporting upright post (lattice column) within the walls be prop up Support, with Lift-slab machine as power, girder adopts heavy in section H profile steel, lower extension template and pin hand system.Shape on Core Walls Structure operating surface Become closing, there is the operating platform of certain bearing capacity.
But there is following defect in this overall lift cylinder platform legs hand system:
1st, because this steel platform is overall affixed, when running into structure semi-girder truss, coupling beam, necessary Cutting platform, increased Difficulty of construction, otherwise will be unable to related horizontal structure of constructing;
2nd, lattice column must be imbedded in structure it is impossible to reclaim, and causes wasting and have impact on horizontal structure of material Construction;
3rd, the construction method that Super High core tube construction generally adopts is:In advance, horizontal structure falls behind vertical vertical structure More than 10 layers of body of wall, leads to vertically and horizontal structure drop is too big, is faced with the security against fire potential problem of sternness and structure is subject to Power problem.And backform system bottom security protection is more difficult, falling object from high altitude brings for the structure construction of lower horizontal beam slab Serious potential safety hazard.
Content of the invention
The technical problem to be solved is to provide that a kind of lightweight, speed of application is fast, and landing beam is not through walls, level And vertical structure can synchronous construction the interior top external climbing mould bases operation platform for construction of super highrise building.
For realizing above-mentioned technique effect, the invention discloses a kind of interior top external climbing mould bases for construction of super highrise building Operation platform, including the hydraulic climbing die block system on the construction wall in building outside and the adjacent architectural wall located at building inner side Lifting platform system between body;Described lifting platform system includes climbing device, the operating platform on climbing device, with And it is installed on the attached wall embedded part of attachment of climbing on construction wall, for climbing device.
A kind of described interior top external climbing mould bases operation platform for construction of super highrise building is further improved by, institute State hydraulic climbing die block system include hydraulic climbing scaffold and be installed on construction wall wall face on, the attached wall of attachment of climbing for hydraulic climbing scaffold Device.
A kind of described interior top external climbing mould bases operation platform for construction of super highrise building is further improved by, institute State wall-attaching equipment to include the built-in fitting that is embedded on wall face and hang on the track that climbs on described built-in fitting, described hydraulic pressure is climbed Frame is climbed by hydraulic jacking device and climbs on track in described.
A kind of described interior top external climbing mould bases operation platform for construction of super highrise building is further improved by, institute State operating platform to prop up on described climbing device by lattice column.
A kind of described interior top external climbing mould bases operation platform for construction of super highrise building is further improved by, institute State climbing device and include hydraulic jack, first being connected with the housing of described hydraulic jack climb support and with described hydraulic pressure The push rod of jack connects second and climbs support, and described first support that climbs is attached to described attached wall with described second support that climbs On embedded part.
A kind of described interior top external climbing mould bases operation platform for construction of super highrise building is further improved by, institute The housing stating hydraulic jack is in described lattice column.
A kind of described interior top external climbing mould bases operation platform for construction of super highrise building is further improved by, institute The bottom stating operating platform is hung and is provided with secondary operating platform, and described attached operating platform is fixedly connected on described lattice column.
A kind of described interior top external climbing mould bases operation platform for construction of super highrise building is further improved by, institute The bottom stating operating platform is provided with and hangs mould.
The present invention is due to employing above technical scheme so as to have the advantages that:
By adopting hydraulic climbing die block system in external wall, and adopt lifting platform between the construction wall of building inner side System, two sets of systems operate simultaneously, replace traditional integral jacking formula operation platform, significantly reduce the entirety weight of operation platform Amount, alleviates the burden of hydraulic jacking system, more flexibly, accelerates speed of application;
It is configured with light-weighted lifting platform system, oil cylinder can adopt small-sized oil cylinder it is not necessary to arrange horizontal support girder steel, Attached wall embedded part is installed only on construction wall and just can achieve that oil cylinder climbs, and shortens total height of operation platform and its supporting frame Degree, reduces the construction gap of vertical structure and horizontal structure so that hydraulic climbing system does not interfere with applying of horizontal structure Work;
The lifting platform system of building inner side does not pass through construction wall, and platform differs only by 1 apart from the assembling reinforcement scope of operation The height of floor, reinforcing bar transmission and colligation are convenient.
Brief description
Fig. 1 and Fig. 2 is the schematic diagram of two kinds of traditional lifting platforms.
Fig. 3 is a kind of structural representation of the interior top external climbing mould bases operation platform for construction of super highrise building of the present invention Figure.
Fig. 4 shows for a kind of partial enlargement of the interior top external climbing mould bases operation platform for construction of super highrise building of the present invention It is intended to.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment the present invention is further detailed explanation.
Refering to shown in Fig. 3 and Fig. 4, a kind of interior top external climbing mould bases operation platform for construction of super highrise building of the present invention It is made up of hydraulic climbing die block system 11 and lifting platform system 12 two parts, wherein, hydraulic climbing die block system 11 is applied to outside building Construction wall, i.e. climbing formwork for construction on the wall face of external wall, and building inner side adjacent architectural body of wall between then adopt Carry out the construction of inner side body of wall and horizontal structure with lifting platform system 12, using the system of " outside creeping formwork+inner side backform ", generation For traditional integral jacking formula operation platform.
, the wall face of Core Walls Structure exterior wall is entered using hydraulic climbing die block system 11 taking core tube steel Reinforced Concrete Construction as a example The reinforcement installation of row Core Walls Structure exterior wall, model sheetinstallat and concreting etc. are constructed, and build in the adjacent of Core Walls Structure inner side of outer wall Between walling body, inner side body of wall and level (are comprised using the construction that small-sized lifting platform system 12 carries out Core Walls Structure internal structure The construction of structure).
Specifically, shown in cooperation Fig. 4, hydraulic climbing die block system 11 is mainly by hydraulic climbing scaffold 111, wall-attaching equipment 112 and hydraulic pressure Jacking apparatus 113 are constituted.Wall-attaching equipment 112 is installed on the wall face of the external wall completing of constructing, and hydraulic climbing scaffold 111 leads to Cross hydraulic jacking device 113 to be installed in wall-attaching equipment 112 and climb upwards or falls downward with wall-attaching equipment 112.Attached wall fills Put and further include built-in fitting and hang the track that climbs being installed on built-in fitting, built-in fitting is in substrustion external wall construction With regard to pre-plugged in external wall, when embedded, should strictly control burial place and embedded angle, the track that climbs passes through built-in fitting It is attached on external wall and can climb upwards or falls downward along external wall.Hydraulic jacking device is connected to hydraulic climbing scaffold 111 and climb between track, it includes jacking cylinder and is arranged on the upper and lower Commutating box up and down of jacking cylinder, and upper and lower Commutating box is used Climb track in connecting alternately up and down, jacking cylinder climbs power for offer, in the work of jacking cylinder and upper and lower interchange box Climbed upwards on the track that climbs with lower band hydrodynamic pressure climbing frame 111 to carry out external wall construction, and after external wall construction finishes, band Hydrodynamic pressure climbing frame 111 falls downward on the track that climbs, easy construction and installation reliability.This hydraulic climbing scaffold can adopt multilayer support body Structure, and carry segment template and construction tool.
Lifting platform system 12 is mainly made up of operating platform 121, climbing device 122 and attached wall embedded part.Attached wall embedded part can Using taper embedded sleeve barrel, similar with aforementioned built-in fitting, in substrustion wall construction, it is embedded in the building wall of adjacent both sides In vivo, attachment when and climbing as climbing device 122, in embedded attached wall embedded part it should be noted that attached on the construction wall of both sides Wall embedded part should be symmetrical arranged, to guarantee stationarity when climbing.Operating platform 121 is installed by lattice column 124 and is fixed on both sides Climbing device 122 on and with climbing device 122 climbing along both sides construction wall move.Lattice column 124 in both sides it Between setting horizontal brace rod and oblique connecting rod be supported reinforcing, and draw between horizontal brace rod and operating platform and set drawknot Screw rod or steel wire rope carry out drawknot reinforcing, to improve the stability of lattice column, and then improve the stability of operating platform.
Wherein, operating platform 121 adopts truss platform, and landing slab is laid in top, can be used for placing of material, is needing tower crane During construction, tower crane can be set, suitably increase vertical supporting on the climbing device being provided with below the operating platform of tower crane simultaneously, Strengthen bearing capacity.
Climbing device 122 is made up of hydraulic jack 125, first support and second support that climbs that climbs further, and first The support that climbs is connected to the housing of hydraulic jack 125, and second support that climbs is connected to the push rod of hydraulic jack 125, and first The support and second that the climbs support that climbs is connected on attached wall embedded part, and the housing of hydraulic jack 125 is arranged in lattice column 124, Push rod releases downwards the housing of hydraulic jack.When climbing, second support that climbs is fixed with attached wall embedded part, and unclamps first Climb support and attached wall embedded part, and the push rod of hydraulic jack is released downwards, acts on second and climbs on support, because second climbs Support is fixed with construction wall, pushes against the housing of hydraulic jack back up, climbs the behaviour on support body with being erected at first Make platform jacking upwards, after jacking puts in place, fix first and climb support and corresponding attached wall embedded part, unclamp and the support that climbs With attached wall embedded part, the push rod of hydraulic jack withdraws in housing, withdraws upwards together with the support that climbs of second on push rod, then Secondary fix second and climb support and attached wall embedded part, complete once climbing of operating platform.Easy and simple to handle and installation consolidates.
Further, in the bottom of operating platform 121, near both sides construction walls to be onstructed at, hang that to be provided with secondary operation flat Platform 126, and attached operating platform 126 is fixedly connected on lattice column 124, can arrange jump between two attached operating platforms 126 of both sides Plate connects, and is easy to personnel's construction and passes through.It is additionally provided with the bottom of operating platform 121 and hangs mould (in figure do not show hang mould), in behaviour Make the bottom setting outrigger platform beam of platform 121, this can outrigger platform beam be I-beam, hang mould and roll in this using hanging mould roller On the lower wing plate of I-beam, carry out model sheetinstallat construction in order to operating personnel in attached operating platform 126.
A kind of interior top external climbing mould bases operation platform for construction of super highrise building of the present invention is by adopting in external wall With hydraulic climbing die block system, and adopt lifting platform system between the construction wall of building inner side, two sets of systems operate simultaneously, generation For traditional integral jacking formula operation platform, significantly reduce the overall weight of operation platform, alleviate hydraulic jacking system Burden, more flexibly, accelerates speed of application;
Simultaneously as being configured with light-weighted lifting platform system, oil cylinder can using small-sized oil cylinder it is not necessary to setting level Support steel beam, installs attached wall embedded part only on construction wall and just can achieve that oil cylinder climbs, and shortens operation platform and its bracing frame The total height of body, reduces the construction gap of vertical structure and horizontal structure so that hydraulic climbing system does not interfere with level The construction of structure;
Further, the lifting platform system of building inner side does not pass through construction wall, and platform is apart from the assembling reinforcement scope of operation Differ only by the height of 1 floor, reinforcing bar transmission and colligation are convenient.
Above in association with drawings and Examples, the present invention is described in detail, those skilled in the art can basis Described above makes many variations example to the present invention.Thus, some details in embodiment should not constitute limitation of the invention, The present invention is by the scope being defined using appended claims as protection scope of the present invention.

Claims (8)

1. a kind of interior top external climbing mould bases operation platform for construction of super highrise building it is characterised in that:Including located at building Hydraulic climbing die block system on the construction wall in outside and the lifting platform system between the adjacent architectural body of wall of building inner side; Described lifting platform system includes climbing device, the operating platform on climbing device, and is installed on construction wall, supplies Climbing device climbs the attached wall embedded part of attachment.
2. a kind of interior top external climbing mould bases operation platform for construction of super highrise building as claimed in claim 1, its feature It is:Described hydraulic climbing die block system include hydraulic climbing scaffold and be installed on construction wall wall face on, climb for hydraulic climbing scaffold attached The wall-attaching equipment.
3. a kind of interior top external climbing mould bases operation platform for construction of super highrise building as claimed in claim 2, its feature It is:Described wall-attaching equipment includes the built-in fitting being embedded on wall face and hang on the track that climbs on described built-in fitting, institute State hydraulic climbing scaffold and climbed by hydraulic jacking device and climb on track in described.
4. a kind of interior top external climbing mould bases operation platform for construction of super highrise building as claimed in claim 1, its feature It is:Described operating platform is propped up on described climbing device by lattice column.
5. a kind of interior top external climbing mould bases operation platform for construction of super highrise building as claimed in claim 4, its feature It is:Described climbing device includes hydraulic jack, first being connected with the housing of described hydraulic jack climb support and with The push rod of described hydraulic jack connects second and climbs support, and described first support that climbs is attached to described second support that climbs On described attached wall embedded part.
6. a kind of interior top external climbing mould bases operation platform for construction of super highrise building as claimed in claim 5, its feature It is:The housing of described hydraulic jack is in described lattice column.
7. a kind of interior top external climbing mould bases operation platform for construction of super highrise building as claimed in claim 4, its feature It is:The bottom of described operating platform is hung and is provided with secondary operating platform, and described attached operating platform is fixedly connected on described lattice column.
8. a kind of interior top external climbing mould bases operation platform for construction of super highrise building as claimed in claim 7, its feature It is:The bottom of described operating platform is provided with hangs mould.
CN201610882975.0A 2016-10-10 2016-10-10 Inner roof external climbing type formwork construction platform for super high-rise building construction Pending CN106437130A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610882975.0A CN106437130A (en) 2016-10-10 2016-10-10 Inner roof external climbing type formwork construction platform for super high-rise building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610882975.0A CN106437130A (en) 2016-10-10 2016-10-10 Inner roof external climbing type formwork construction platform for super high-rise building construction

Publications (1)

Publication Number Publication Date
CN106437130A true CN106437130A (en) 2017-02-22

Family

ID=58172953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610882975.0A Pending CN106437130A (en) 2016-10-10 2016-10-10 Inner roof external climbing type formwork construction platform for super high-rise building construction

Country Status (1)

Country Link
CN (1) CN106437130A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107190975A (en) * 2017-07-14 2017-09-22 四川华西集团有限公司 Construction of super highrise building integrates form frame system
CN107299755A (en) * 2017-07-14 2017-10-27 四川华西集团有限公司 The hydraulic lifting steel platform of outer mould bases and the overall and local jacking of steel platform can be achieved
CN107355067A (en) * 2017-06-05 2017-11-17 中国建筑第八工程局有限公司 The automatic lifting purlin crane system construction operation platform of Steel Structure Installation
CN107489214A (en) * 2017-06-29 2017-12-19 深圳前海特辰科技有限公司 The vertical flat bed construction method with horizontal structure of Core Walls Structure
CN110670865A (en) * 2019-09-16 2020-01-10 广东博智林机器人有限公司 Climbing frame jacking system, building machine and climbing frame jacking control method
CN111021717A (en) * 2019-12-23 2020-04-17 湖北新远建筑科技有限公司 Climbing system for supporting formwork of engineering construction well
CN112696020A (en) * 2020-11-23 2021-04-23 邹胜斌 Building machine platform structure with inner climbing point
CN112709451A (en) * 2020-11-23 2021-04-27 邹胜斌 Building construction material conveying structure and construction method
CN112727093A (en) * 2020-12-28 2021-04-30 中材建设有限公司 Climbing construction method for constructing large-span high-rise building

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH062429A (en) * 1992-06-19 1994-01-11 Tobishima Corp Slip form device
CN2660027Y (en) * 2003-09-18 2004-12-01 山东省路桥集团有限公司 Hydraulic auto climbing appts.
CN101319560A (en) * 2008-07-08 2008-12-10 上海建工股份有限公司 Double-acting integral hydraulic automatic lifting platform system and construction method using the same
CN201826525U (en) * 2010-07-27 2011-05-11 南京道广建筑模板有限公司 Climbing shuttering system device for buildings
CN202577952U (en) * 2012-05-03 2012-12-05 中国葛洲坝集团股份有限公司 Hydraulic automatic lifting template of vertical shaft
CN104314304A (en) * 2014-10-23 2015-01-28 中建三局第一建设工程有限责任公司 Outside-steel, inside-aluminum, outside-climbing and inside-crossing comprehensive formwork system
CN206233541U (en) * 2016-10-10 2017-06-09 中国建筑第八工程局有限公司 A kind of interior top external climbing mould bases operation platform for construction of super highrise building

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH062429A (en) * 1992-06-19 1994-01-11 Tobishima Corp Slip form device
CN2660027Y (en) * 2003-09-18 2004-12-01 山东省路桥集团有限公司 Hydraulic auto climbing appts.
CN101319560A (en) * 2008-07-08 2008-12-10 上海建工股份有限公司 Double-acting integral hydraulic automatic lifting platform system and construction method using the same
CN201826525U (en) * 2010-07-27 2011-05-11 南京道广建筑模板有限公司 Climbing shuttering system device for buildings
CN202577952U (en) * 2012-05-03 2012-12-05 中国葛洲坝集团股份有限公司 Hydraulic automatic lifting template of vertical shaft
CN104314304A (en) * 2014-10-23 2015-01-28 中建三局第一建设工程有限责任公司 Outside-steel, inside-aluminum, outside-climbing and inside-crossing comprehensive formwork system
CN206233541U (en) * 2016-10-10 2017-06-09 中国建筑第八工程局有限公司 A kind of interior top external climbing mould bases operation platform for construction of super highrise building

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107355067B (en) * 2017-06-05 2019-05-10 中国建筑第八工程局有限公司 The automatic lifting purlin crane system construction operation platform of Steel Structure Installation
CN107355067A (en) * 2017-06-05 2017-11-17 中国建筑第八工程局有限公司 The automatic lifting purlin crane system construction operation platform of Steel Structure Installation
CN107489214A (en) * 2017-06-29 2017-12-19 深圳前海特辰科技有限公司 The vertical flat bed construction method with horizontal structure of Core Walls Structure
GB2574153A (en) * 2017-07-14 2019-11-27 Sichuan Huashi Group Co Ltd Integrated formwork system for super high-rise building construction
WO2019011321A1 (en) * 2017-07-14 2019-01-17 四川华西集团有限公司 Integrated formwork system for super high-rise building construction
CN107299755A (en) * 2017-07-14 2017-10-27 四川华西集团有限公司 The hydraulic lifting steel platform of outer mould bases and the overall and local jacking of steel platform can be achieved
CN107190975A (en) * 2017-07-14 2017-09-22 四川华西集团有限公司 Construction of super highrise building integrates form frame system
CN110670865A (en) * 2019-09-16 2020-01-10 广东博智林机器人有限公司 Climbing frame jacking system, building machine and climbing frame jacking control method
CN110670865B (en) * 2019-09-16 2021-11-09 广东博鼎建筑科技有限公司 Climbing frame jacking system, building machine and climbing frame jacking control method
CN111021717A (en) * 2019-12-23 2020-04-17 湖北新远建筑科技有限公司 Climbing system for supporting formwork of engineering construction well
CN112696020A (en) * 2020-11-23 2021-04-23 邹胜斌 Building machine platform structure with inner climbing point
CN112709451A (en) * 2020-11-23 2021-04-27 邹胜斌 Building construction material conveying structure and construction method
CN112727093A (en) * 2020-12-28 2021-04-30 中材建设有限公司 Climbing construction method for constructing large-span high-rise building

Similar Documents

Publication Publication Date Title
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN106400951B (en) A kind of level and vertical structure method for synchronously constructing of super high-rise building
CN103635643B (en) The construction method of nigh-level synthesis steel bar concrete cylindrical shell
CN205077845U (en) Building core section of thick bamboo well hydraulic pressure intelligence operation scaffold that climbs
CN201826525U (en) Climbing shuttering system device for buildings
CN102661039A (en) Drum frame supporting power built-in integrated jacking steel platform formwork system and construction method
CN102535845A (en) Construction method of bearing frame of corridor structure
CN104131703A (en) Method for constructing core tube wall through self-climbing formwork and adopted self-climbing formwork
CN103422668A (en) Construction method of super-thick large-slope shear wall and hydraulic self-jacking inclined creeping framework thereof
CN109252656B (en) High-rise building climbing template and assembling, pouring and lifting method
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN112458918A (en) High-pier hydraulic jacking integral steel frame platform formwork turnover construction system and construction method
CN100365237C (en) Autolifting type variable-shape diassembllable integrated lifting steel plateform system and construction method thereof
CN105347142B (en) A kind of building hoist is mounted on the threading installation method on basement roof
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN201367728Y (en) Derrick-less hydraulic slip form device used for reinforced concrete water tower supporting tube construction
CN203834928U (en) Automatic climbing formwork
CN102733608B (en) Construction method for spray head layer of granulation tower
CN203452375U (en) Hydraulic self-jacking oblique creeping formwork
CN108331336A (en) The integrated lifting steel plateform system and its construction method of floor synchronous construction
CN214195484U (en) All-steel attached lifting scaffold
CN107059654A (en) The compound overlength Hanging basket on front support of single cable plane and its installation method
CN204754150U (en) Dish -type node formula scaffold
CN104594631B (en) The construction technology of sliding form apparatus traction operation platform construction granulation tower spraying layer
CN105003074A (en) Commercial building construction system and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190301

Address after: 610000 No. 95, Second Section of Jiefang Road, Jinniu District, Chengdu City, Sichuan Province

Applicant after: CHINA HUASHI ENTERPRISES Co.,Ltd.

Applicant after: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Co.,Ltd.

Applicant after: SICHUAN NO.6 CONSTRUCTION Co.,Ltd.

Address before: 200122 Pudong New Area, Shanghai, China (Shanghai) free trade trial area 1568 Century Avenue 27

Applicant before: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Co.,Ltd.

WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170222