CN205314519U - High altitude operation platform based on truss - Google Patents
High altitude operation platform based on truss Download PDFInfo
- Publication number
- CN205314519U CN205314519U CN201620066345.1U CN201620066345U CN205314519U CN 205314519 U CN205314519 U CN 205314519U CN 201620066345 U CN201620066345 U CN 201620066345U CN 205314519 U CN205314519 U CN 205314519U
- Authority
- CN
- China
- Prior art keywords
- truss
- altitude operation
- operation platform
- platform based
- scaffold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a high altitude operation platform based on truss, including two spaced trusss, correspond respectively on the web member of two trusss to install and support the couple, two the parallel has erect many foot handle bars between the support couple, foot handle bar upper berth is equipped with the springboard. The utility model discloses a high altitude operation platform sets up based on the truss, can utilize the simple equipments of process such as the on -the -spot commonly used steel sheet of operation, reinforcing bar, springboard to form easily the platform that ann tore open, and the swift provides large tracts of land high altitude construction the face, and the platform sets up the aspect, removes in a flexible way, do not rely on full hall scaffold and lift truck and the platform is set up, not limited by the floor construction progress, can practice thrift technical measures and drop into, improve the efficiency of construction.
Description
Technical field
This utility model relates to a kind of high-altitude operation platform, specifically a kind of high-altitude operation platform based on truss.
Background technology
Steel building compares features such as having anti-seismic performance is good, construction speed fast, steel recoverable with traditional architecture, is widely used in the last few years. In steel construction, truss can form long-span space, and for producing or exhibition offer great convenience, therefore truss structure is widely used in the engineerings such as large-scale steel structure museum and building surface in big industrial factory. But typically requiring all kinds of pipelines of installation, insulation construction or roof inner slab etc. in truss, work high above the ground is dangerous big, and conventional construction method can adopt the method such as full hall scaffold or hoistable platform.
Full hall scaffold method, connection system for guide rail density is big, sets up workload very big, and efficiency is very low, and has much relations with floor construction progress, is not suitable between specialty work compound. Lift truck method is to utilize truck crane or wheeled lift truck etc. to construct, and the method requires that equipment investment is very big, and danger coefficient is very big, and job area is only limitted to a high-altitude part, has a strong impact on construction speed.
Summary of the invention
Goal of the invention: this utility model purpose is in that for the deficiencies in the prior art, it is provided that a kind of safely and efficiently for the operating platform of high-altitude truss construction operation. Can utilize steel plate that operation field is conventional, reinforcing bar, springboard etc. through simple assemble to be formed be prone to pacify the platform torn open, and can select to set up area as required, it is simple to efficiently construct.
Technical scheme: the high-altitude operation platform based on truss described in the utility model, truss including two intervals, on the web member of two truss, correspondence is provided with support hook respectively, and described in two, between support hook, parallel shelf is provided with many scaffolds, and described scaffold is equipped with springboard.
The concrete erection process of high-altitude operation platform of the present utility model is: on the web member of two truss, correspondence sets up support hook respectively, support hook relies on the restraining forces of self gravitation and two web members to be fixed on two web members, scaffold is set up again between the support hook of two truss, and on scaffold, lay springboard, complete the erection of whole operating platform.
This utility model further preferably technical scheme is, described support hook two ends are hook formation, and hook is located on adjacent two web members of described truss.
Preferably, described scaffold is fixed in described support hook by steel wire lashing, and described springboard is fixed on described scaffold by steel wire lashing.
Preferably, described scaffold is more than two, interval 0.8 ~ 1.2m between adjacent two scaffolds.
Preferably, described support hook at least 20cm is all stretched out at the two ends of every described scaffold.
Preferably, the bottom of two truss is also erected with bed board, and the two ends of described bed board are separately fixed on the lower boom of two truss, for providing the scope of operation installing operating platform. Bed board is first set up, it is possible to other components for setting up whole operating platform provide the scope of operation between two truss.
Preferably, the lower boom 8 ~ 20cm of described truss is stretched out at the two ends of described bed board.
Preferably, towing during for convenient erection and dismounting, one of them external part of described bed board is bent upwards the formation section of upwarping, it is possible to be pulled to truss lower boom by manually or electrically mechanism.
Beneficial effect: (1) high-altitude operation platform of the present utility model is set up based on truss, can utilize steel plate that operation field is conventional, reinforcing bar, springboard etc. through simple assemble to be formed be prone to pacify the platform torn open, large area work high above the ground face and putting up platform aspect are provided efficiently, mobile flexible; And putting up platform is independent of full hall scaffold and lift truck, do not limited by ground construction progress, technical measures can be saved and put into, improve efficiency of construction;
(2) in this utility model, described support hook at least 20cm is all stretched out at the two ends of scaffold, platform with the flowable use of extension of springboard, between adjacent two platforms can cooperating, working space is farthest provided.
Accompanying drawing explanation
Fig. 1 is the structural representation of the high-altitude operation platform based on truss described in the utility model;
Fig. 2 is the structural representation of support hook described in the utility model.
Detailed description of the invention
Below by accompanying drawing, technical solutions of the utility model are described in detail, but protection domain of the present utility model is not limited to described embodiment.
Embodiment:A kind of high-altitude operation platform based on truss, including the truss at two intervals, bed board 1, support hook 2, scaffold 3 and springboard 4, as shown in Figure 1, 2:
The two ends of bed board 1 are separately fixed on the lower boom 5 of two truss, and the lower boom 8 ~ 20cm of truss is stretched out at the two ends of bed board 1, and one of them external part is bent upwards the formation section of upwarping.
Support hook 2 two ends are hook formation, hook is located on two web members 6 of truss respectively, parallel erection many between the support hook 2 of two truss (two or more than two) scaffold 3, interval 0.8 ~ 1.2m between adjacent two scaffolds 3, support hook 2 at least 20cm is all stretched out at the two ends of every scaffold 3, and scaffold 3 is laid springboard 4.
Process of specifically setting up is for a certain steel-structure factory building, and this factory roof truss is for tiltedly to put quadrangular pyramid row, the average discrepancy in elevation 3.5m of top-bottom chord, rod member length 4m, and lower edge spacing is 4m.
Bed board 1 length is 8.2m, and single weight is about 100kg, manually or electrically mechanism be pulled on truss lower boom 5 so that it is across two lower edge lattice, and reserve 10cm surplus at two ends; On the operating surface that bed board 1 provides, support hook 2 adopts the above simmering and bending reinforcing bar of Ф 20mm or other form bent member to ride upon on web member 6, relies on the effect of contraction of gravity and web member 6 to be fixed between rod member; The 1m colligation of scaffold 3 interval is in support hook 2, and length is 9m; Springboard 4 is laid on scaffold 3 and uses steel wire lashing.
Although as it has been described above, represented and described this utility model with reference to specific preferred embodiment, but it shall not be construed as the restriction to this utility model self. Under the spirit and scope premise of the present utility model defined without departing from claims, it can be made in the form and details various change.
Claims (8)
1., based on a high-altitude operation platform for truss, including the truss at two intervals, it is characterised in that on the web member of two truss, correspondence is provided with support hook respectively, described in two, between support hook, parallel shelf is provided with many scaffolds, and described scaffold is equipped with springboard.
2. the high-altitude operation platform based on truss according to claim 1, it is characterised in that described support hook two ends are hook formation, and hook is located on adjacent two web members of described truss.
3. the high-altitude operation platform based on truss according to claim 1, it is characterised in that described scaffold is fixed in described support hook by steel wire lashing, and described springboard is fixed on described scaffold by steel wire lashing.
4. the high-altitude operation platform based on truss according to claim 1, it is characterised in that interval 0.8 ~ 1.2m between scaffold described in adjacent two.
5. the high-altitude operation platform based on truss according to claim 1, it is characterised in that described support hook at least 20cm is all stretched out at the two ends of every described scaffold.
6. the high-altitude operation platform based on truss according to claim 1, it is characterised in that the bottom of two truss is also erected with bed board, the two ends of described bed board are separately fixed on the lower boom of two truss, for providing the scope of operation installing operating platform.
7. the high-altitude operation platform based on truss according to claim 6, it is characterised in that the lower boom 8 ~ 20cm of described truss is stretched out at the two ends of described bed board.
8. the high-altitude operation platform based on truss according to claim 7, it is characterised in that one of them external part of described bed board is bent upwards the formation section of upwarping.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620066345.1U CN205314519U (en) | 2016-01-21 | 2016-01-21 | High altitude operation platform based on truss |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620066345.1U CN205314519U (en) | 2016-01-21 | 2016-01-21 | High altitude operation platform based on truss |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205314519U true CN205314519U (en) | 2016-06-15 |
Family
ID=56205601
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620066345.1U Active CN205314519U (en) | 2016-01-21 | 2016-01-21 | High altitude operation platform based on truss |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205314519U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108118883A (en) * | 2016-11-29 | 2018-06-05 | 五冶集团上海有限公司 | A kind of hanging cage frame for high-altitude large volume flue babinet heat preservation construction |
CN112160576A (en) * | 2020-09-27 | 2021-01-01 | 中国建筑第二工程局有限公司 | High-altitude operation platform arranged on lower chord of truss and construction method thereof |
CN113047596A (en) * | 2021-03-26 | 2021-06-29 | 中建安装集团有限公司 | Using method of crawler-type operating platform for net rack construction |
CN114033146A (en) * | 2021-11-19 | 2022-02-11 | 中交第三航务工程局有限公司 | Method for erecting high-altitude electromechanical engineering construction platform in large-scale studio |
-
2016
- 2016-01-21 CN CN201620066345.1U patent/CN205314519U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108118883A (en) * | 2016-11-29 | 2018-06-05 | 五冶集团上海有限公司 | A kind of hanging cage frame for high-altitude large volume flue babinet heat preservation construction |
CN108118883B (en) * | 2016-11-29 | 2019-12-03 | 五冶集团上海有限公司 | A kind of hanging cage frame for high-altitude large volume flue cabinet thermal insulation construction |
CN112160576A (en) * | 2020-09-27 | 2021-01-01 | 中国建筑第二工程局有限公司 | High-altitude operation platform arranged on lower chord of truss and construction method thereof |
CN112160576B (en) * | 2020-09-27 | 2021-05-25 | 中国建筑第二工程局有限公司 | High-altitude operation platform arranged on lower chord of truss and construction method thereof |
CN113047596A (en) * | 2021-03-26 | 2021-06-29 | 中建安装集团有限公司 | Using method of crawler-type operating platform for net rack construction |
CN114033146A (en) * | 2021-11-19 | 2022-02-11 | 中交第三航务工程局有限公司 | Method for erecting high-altitude electromechanical engineering construction platform in large-scale studio |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013452B (en) | A kind of flexible suspension formula building module structure | |
CN206053274U (en) | The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose | |
CN205314519U (en) | High altitude operation platform based on truss | |
CN201826525U (en) | Climbing shuttering system device for buildings | |
WO2013185277A1 (en) | Constructing method for concrete cylinder of construction steel bar of high-rise steel structure | |
CN102146731B (en) | Supporting structure for floor formwork of steel structure building and construction method | |
CN103061500A (en) | Bowstring truss type fully-enclosed hydraulic climbing formwork system and application method for same | |
CN105298099A (en) | Modular suspension type steel tube fastener scaffold operating platform and erecting method thereof | |
CN205296869U (en) | Spatial grid structure thrustor that slides | |
CN101775896B (en) | Rigid suspended scaffold for installing pipeline of steel roof equipment | |
CN204804298U (en) | Building material hoist and mount construction scaffold | |
CN107327068A (en) | Steel construction truss string structure system roof system ceiling structure and its construction method | |
CN205134919U (en) | Modularization suspension type steel tubes clamps scaffold operation platform | |
CN205100531U (en) | Lift scaffold support body assembly | |
CN202866261U (en) | Operation hanging rack for civil construction | |
CN117005664A (en) | Electric translation type hanging basket | |
CN208648493U (en) | A kind of no scaffold installation elevator operation platform device | |
CN105625732A (en) | Supporting-free construction method of ultrahigh overhung steel-structure truss | |
CN211597658U (en) | Movable overhanging scaffold | |
CN202031308U (en) | Inverted-hanging type scaffold | |
CN213923842U (en) | Wallboard lifting device in assembled | |
CN212406038U (en) | Lower hanging construction platform module of high-altitude large-cantilever steel roof truss | |
CN103938908A (en) | Silo top slip-form lifting construction method adopting spatial horizontal supporting system | |
CN113445723A (en) | Construction platform for mounting overhanging structure curtain wall and mounting method | |
CN113550550A (en) | Overhanging unit type scaffold convenient to assemble and disassemble |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 210046 Yaojia Road, Qixia District, Nanjing, Jiangsu Province Patentee after: China Construction Installation Group Co., Ltd. Address before: 210046 Yaojia Road, Qixia District, Nanjing, Jiangsu Province Patentee before: China Construction Industrial Equipment Installation Co., Ltd. |