CN213923842U - Wallboard lifting device in assembled - Google Patents
Wallboard lifting device in assembled Download PDFInfo
- Publication number
- CN213923842U CN213923842U CN202022368077.8U CN202022368077U CN213923842U CN 213923842 U CN213923842 U CN 213923842U CN 202022368077 U CN202022368077 U CN 202022368077U CN 213923842 U CN213923842 U CN 213923842U
- Authority
- CN
- China
- Prior art keywords
- down tube
- rods
- pole setting
- pole
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a wallboard lifting device in assembled, including pole setting, horizontal pole and down tube, the pole setting is vertical direction and is parallel to each other, and the horizontal pole is horizontal direction and is parallel to each other, the top of pole setting and the upper end fixed connection of down tube, between pole setting and the down tube, respectively through horizontal pole fixed connection between down tube and the down tube, the upper end of pole setting is fixed with the connecting rod, the assembly pulley is installed to the intermediate position of connecting rod, fixed mounting has the hoist engine on the horizontal pole between down tube and the down tube, the hoist engine promotes the hoist through receiving and releasing the steel cable of walking around the assembly pulley. The utility model discloses the instrument is reliable, easy operation, draw materials on the spot, reduce labour and drop into, greatly reduced man-hour, can effectively control the wall body straightness that hangs down and a series of incident that appear when avoiding artifical installation.
Description
Technical Field
The utility model relates to a construction field especially relates to a wallboard lifting device in assembled.
Background
With the progress of society and the development of high-rise buildings, the requirements of living conditions of people are continuously improved, novel wall materials such as energy conservation, land conservation, waste utilization, heat preservation, heat insulation and the like are provided, and the assembled inner wall boards are used more and more widely. In the field of public buildings, due to the characteristics of high floor height, large span and the like, the assembly type inner wallboard is high in installation difficulty, and the defects exist in the traditional professional wallboard installing machine and the manual hoisting method. By using a professional wallboard installing machine, when large-area hoisting construction is carried out, the mechanical investment and the requirement of professional technicians are large, and the construction cost is obviously increased; the installation risk of large-scale hole position is great. Manual hoisting is used, so that the labor input is large and the working strength is high; the installation construction progress of the large-scale plate is slow; the wall surface verticality is not easy to control and is easy to cause safety accidents in the vertical plate process.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a wallboard lifting device in assembled, above-mentioned contradiction is solved to its aim at utmost to reduce construction cost when realizing accelerating the construction progress.
In order to achieve the above object, the utility model discloses a following technical scheme realizes: the utility model provides a wallboard lifting device in assembled, includes pole setting, horizontal pole and down tube, the pole setting is vertical direction and is parallel to each other, the horizontal pole is the horizontal direction and is parallel to each other, the top of pole setting and the upper end fixed connection of down tube, between pole setting and the down tube, respectively through horizontal pole fixed connection between down tube and the down tube, the upper end of pole setting is fixed with the connecting rod, the assembly pulley is installed to the intermediate position of connecting rod, fixed mounting has the hoist engine on the horizontal pole between down tube and the down tube, the hoist engine promotes the hoist through receiving and releasing the steel cable of walking around the assembly pulley.
Further, the winch is fixedly installed on a second cross rod at the lowest position between the inclined rod and the inclined rod.
Furthermore, the vertical rods and the diagonal rods are respectively and fixedly connected through a plurality of independent cross rods.
Furthermore, the cross rod between the vertical rod and the diagonal rod is fixedly connected through a single fastener.
Furthermore, the inclined rods are fixedly connected with each other through a plurality of double cross rods.
Furthermore, the cross rod between the diagonal rods is fixedly connected with the cross rod between the diagonal rods through double fasteners.
Further, the connecting rod is a solid cross rod.
The utility model has the advantages that: the tool is reliable, easy to operate, can use local materials, reduces labor input, greatly reduces working hours, can effectively control the wall body verticality and avoid a series of safety accidents occurring during manual installation.
Drawings
Fig. 1 is a schematic perspective view of the present invention.
Fig. 2 is a schematic top view of the present invention.
Fig. 3 is a right side view of the present invention.
Fig. 4 is a rear view of the present invention.
Fig. 5 is a schematic structural view of the pulley block of the present invention.
Wherein: 1. the device comprises a cross rod, 2, vertical rods, 3, inclined rods, 4, connecting rods, 5, pulley blocks, 6, a winch, 7 and a lifting appliance.
Detailed Description
The following describes embodiments of the present invention with reference to the drawings.
As shown in fig. 1-5, the assembled inner wall panel hoisting tool comprises upright rods 2, cross rods 1 and inclined rods 3. The upright rods 2 are vertical and parallel to each other, and the cross rods 1 are horizontal and parallel to each other. The top of pole setting 2 and the upper end fixed connection of down tube 3, between pole setting 2 and the down tube 3, respectively through horizontal pole 1 fixed connection between down tube 3 and the down tube 3. A multi-triangular stabilizing system is formed by the arranged upright rods 2, the cross rods 1 and the inclined rods 3. The upright rods 2 and the inclined rods 3 are respectively and fixedly connected through a plurality of independent cross rods 1. The cross rod 1 between the vertical rod 2 and the inclined rod 3 is fixedly connected through a single fastener. The inclined rods 3 are respectively and fixedly connected with the inclined rods 3 through a plurality of double cross rods 1. The cross rod 1 between the inclined rods 3 is fixedly connected with the cross rod 1 between the inclined rods 3 through double fasteners. The top end of the upright rod 2 can be provided with an adjustable bracket and a wood edge, so that the overall stability is improved. The length of the diagonal rod 3 needs to be supported at the joint of the beam and the plate of the building, so that the overall stability is improved.
The upper end of the upright stanchion 2 is fixed with a connecting rod 4. Specifically, in the present embodiment, the connecting rod 4 is a solid cross-bar. A pulley block 5 is arranged in the middle of the connecting rod 4, and a winch 6 is fixedly arranged on the cross rod 1 between the inclined rod 3 and the inclined rod 3. Specifically, in this embodiment, the winch 6 may be fixedly installed on the second lowest cross bar 1 between the diagonal rods 3 and the diagonal rods 3. The hoist 6 lifts the sling 7 by winding and unwinding a steel rope passing around the pulley block 5. The pulley block 5 can be assembled according to the figure 5, a winch with low power can be selected, and the manufacturing cost is saved.
In the implementation process, the two ends of the cross rod 1 between the inclined rods 3 can be selected to exceed the positions 15cm of the inclined rods 3; the two ends of the connecting rod 4 exceed the position of the diagonal rod 3 by 15 cm. Thereby effectively improving the overall stability. The cross bar 1 at the lowest end can be about 20cm away from the ground, and the top end of the upright stanchion 2 is preferably lower than the top surface of the building by about 15 cm. The top end of the upright 2 can be provided with an adjustable bracket. When the adjustable bracket is used, the adjustable bracket is jacked to the top surface of a building, and a batten or a double steel pipe can be used in the adjustable bracket. 3 length of down tube should push up to major structure, and the top of down tube 3 uses burlap and sand to wrap up, avoids destroying major structure.
Claims (7)
1. The utility model provides a wallboard lifting device in assembled which characterized in that: including pole setting, horizontal pole and down tube, the pole setting is vertical direction and is parallel to each other, the horizontal pole is the horizontal direction and is parallel to each other, the top of pole setting and the upper end fixed connection of down tube, between pole setting and the down tube, respectively through horizontal pole fixed connection between down tube and the down tube, the upper end of pole setting is fixed with the connecting rod, the assembly pulley is installed to the intermediate position of connecting rod, fixed mounting has the hoist engine on the horizontal pole between down tube and the down tube, the hoist engine promotes the hoist through receiving and releasing the steel cable of walking around the assembly pulley.
2. The fabricated interior wallboard lifting tool of claim 1, wherein: and the winch is fixedly arranged on a second cross rod at the lowest part between the inclined rods.
3. The fabricated interior wallboard lifting tool of claim 1, wherein: the upright rods and the inclined rods are respectively and fixedly connected through a plurality of independent cross rods.
4. The fabricated interior wallboard lifting tool of claim 3, wherein: the cross rod between the vertical rod and the inclined rod is fixedly connected through a single fastener.
5. The fabricated interior wallboard lifting tool of claim 1, wherein: the inclined rods are fixedly connected with each other through a plurality of double cross rods.
6. The fabricated interior wallboard lifting tool of claim 5, wherein: the cross rods between the inclined rods are fixedly connected through double fasteners.
7. The fabricated interior wallboard lifting tool of claim 1, wherein: the connecting rod is a solid cross rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022368077.8U CN213923842U (en) | 2020-10-22 | 2020-10-22 | Wallboard lifting device in assembled |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022368077.8U CN213923842U (en) | 2020-10-22 | 2020-10-22 | Wallboard lifting device in assembled |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213923842U true CN213923842U (en) | 2021-08-10 |
Family
ID=77224350
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022368077.8U Active CN213923842U (en) | 2020-10-22 | 2020-10-22 | Wallboard lifting device in assembled |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213923842U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115075579A (en) * | 2022-05-30 | 2022-09-20 | 中煤建工集团有限公司 | Simple and easy support of long-size ALC wallboard of movable |
-
2020
- 2020-10-22 CN CN202022368077.8U patent/CN213923842U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115075579A (en) * | 2022-05-30 | 2022-09-20 | 中煤建工集团有限公司 | Simple and easy support of long-size ALC wallboard of movable |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213923842U (en) | Wallboard lifting device in assembled | |
CN205348761U (en) | Basement does not have reinforced structure of no basic lift of installation on back board | |
CN113136961A (en) | Lifting structure for large-span truss and lifting method thereof | |
CN218478434U (en) | Prefabricated shear wall lifting device for building convenient to dismantle installation | |
CN219031629U (en) | Lifting equipment for indoor plate installation | |
CN216690426U (en) | Simple device matched with ALC wallboard installation | |
CN217400394U (en) | High-altitude manual hoisting profiled steel sheet construction device | |
CN215291319U (en) | Multi-point elevator shaft construction lifting platform | |
CN216866034U (en) | Large-area high-altitude grid structure aluminum grid ceiling construction device | |
CN212957184U (en) | Low-rise building assembled roof | |
CN112357743A (en) | Manufacturing method of simple hoisting tool for purlines of factory building roof | |
CN209874434U (en) | Simple and easy scaffold frame of encorbelmenting of building high latitude | |
CN217924975U (en) | Lifting device for mounting ALC (automatic level control) batten | |
CN209760840U (en) | Light partition plate installation device | |
CN215519871U (en) | Combined elevator shaft operating frame | |
CN220267143U (en) | Super high-rise corridor furred ceiling construction structures | |
CN210457366U (en) | High-rise ALC wallboard corollary equipment | |
CN221461783U (en) | Scaffold for construction equipment | |
CN219489397U (en) | Quick gallows of ALC wallboard | |
CN216109859U (en) | Safety net hanging device | |
CN219860306U (en) | Novel secondary structure ALC wallboard promotes device | |
CN215249197U (en) | Combined hoisting equipment for fixed winch reinforced by pulley block | |
CN218507446U (en) | Simple lifting device for construction of assembled plate wall | |
CN220814843U (en) | Elevator shaft operation and protection integrated construction platform | |
CN219158371U (en) | Through air shaft shaping operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PP01 | Preservation of patent right | ||
PP01 | Preservation of patent right |
Effective date of registration: 20221101 Granted publication date: 20210810 |