CN206233541U - A kind of interior top external climbing mould bases operation platform for construction of super highrise building - Google Patents
A kind of interior top external climbing mould bases operation platform for construction of super highrise building Download PDFInfo
- Publication number
- CN206233541U CN206233541U CN201621108786.XU CN201621108786U CN206233541U CN 206233541 U CN206233541 U CN 206233541U CN 201621108786 U CN201621108786 U CN 201621108786U CN 206233541 U CN206233541 U CN 206233541U
- Authority
- CN
- China
- Prior art keywords
- construction
- climbing
- wall
- platform
- operation platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621108786.XU CN206233541U (en) | 2016-10-10 | 2016-10-10 | A kind of interior top external climbing mould bases operation platform for construction of super highrise building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621108786.XU CN206233541U (en) | 2016-10-10 | 2016-10-10 | A kind of interior top external climbing mould bases operation platform for construction of super highrise building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206233541U true CN206233541U (en) | 2017-06-09 |
Family
ID=58982078
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621108786.XU Active CN206233541U (en) | 2016-10-10 | 2016-10-10 | A kind of interior top external climbing mould bases operation platform for construction of super highrise building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206233541U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106437130A (en) * | 2016-10-10 | 2017-02-22 | 中国建筑第八工程局有限公司 | Inner roof external climbing type formwork construction platform for super high-rise building construction |
CN108678400A (en) * | 2018-06-11 | 2018-10-19 | 中建局集团建设发展有限公司 | Automatic climbing brooder system in extremely frigid zones building structure and its construction method |
CN108729664A (en) * | 2018-07-03 | 2018-11-02 | 中国建筑第八工程局有限公司 | The lifting platform jacking method for integrating template type attachment device and lattice column |
WO2019011319A1 (en) * | 2017-07-14 | 2019-01-17 | 四川华西集团有限公司 | Hydraulic steel jacking platform capable of achieving integral and local jacking of external formwork and steel platform |
CN109838098A (en) * | 2019-01-15 | 2019-06-04 | 上海建工一建集团有限公司 | Distributing platform system for the construction of Super High tube structure |
-
2016
- 2016-10-10 CN CN201621108786.XU patent/CN206233541U/en active Active
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106437130A (en) * | 2016-10-10 | 2017-02-22 | 中国建筑第八工程局有限公司 | Inner roof external climbing type formwork construction platform for super high-rise building construction |
WO2019011319A1 (en) * | 2017-07-14 | 2019-01-17 | 四川华西集团有限公司 | Hydraulic steel jacking platform capable of achieving integral and local jacking of external formwork and steel platform |
CN108678400A (en) * | 2018-06-11 | 2018-10-19 | 中建局集团建设发展有限公司 | Automatic climbing brooder system in extremely frigid zones building structure and its construction method |
CN108678400B (en) * | 2018-06-11 | 2023-12-01 | 中建一局集团建设发展有限公司 | Automatic climbing greenhouse system on building structure in alpine region and construction method thereof |
CN108729664A (en) * | 2018-07-03 | 2018-11-02 | 中国建筑第八工程局有限公司 | The lifting platform jacking method for integrating template type attachment device and lattice column |
CN108729664B (en) * | 2018-07-03 | 2023-08-08 | 中国建筑第八工程局有限公司 | Integrated template type connecting device for jacking platform and jacking method of lattice column |
CN109838098A (en) * | 2019-01-15 | 2019-06-04 | 上海建工一建集团有限公司 | Distributing platform system for the construction of Super High tube structure |
CN109838098B (en) * | 2019-01-15 | 2024-02-13 | 上海建工一建集团有限公司 | Material distribution platform system for super high-rise barrel structure construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
CN106400951B (en) | A kind of level and vertical structure method for synchronously constructing of super high-rise building | |
CN206233541U (en) | A kind of interior top external climbing mould bases operation platform for construction of super highrise building | |
CN103635643B (en) | The construction method of nigh-level synthesis steel bar concrete cylindrical shell | |
CN201826525U (en) | Climbing shuttering system device for buildings | |
CN201158933Y (en) | High-rise maintaining scaffold device with extruding structure | |
CN1028556C (en) | house building system | |
CN104131703A (en) | Method for constructing core tube wall through self-climbing formwork and adopted self-climbing formwork | |
CN102661039A (en) | Drum frame supporting power built-in integrated jacking steel platform formwork system and construction method | |
CN103422668A (en) | Construction method of super-thick large-slope shear wall and hydraulic self-jacking inclined creeping framework thereof | |
CN209482679U (en) | Tub brace type integral steel platform suitable for sloping core construction | |
CN108331336A (en) | The integrated lifting steel plateform system and its construction method of floor synchronous construction | |
CN201367728Y (en) | Derrick-less hydraulic slip form device used for reinforced concrete water tower supporting tube construction | |
CN109184190A (en) | It climbs and carries integrated beam type hydraulic climbing platform and its installation method | |
CN204781927U (en) | Elevartor shaft formwork and elevartor shaft concrete placement operation platform | |
CN203834928U (en) | Automatic climbing formwork | |
CN217175692U (en) | Intelligent hydraulic lifting formwork system for super high-rise core tube construction | |
CN102733608A (en) | Construction method for spray head layer of granulation tower | |
CN109252656B (en) | High-rise building climbing template and assembling, pouring and lifting method | |
CN105347142B (en) | A kind of building hoist is mounted on the threading installation method on basement roof | |
CN100365237C (en) | Autolifting type variable-shape diassembllable integrated lifting steel plateform system and construction method thereof | |
CN115538792A (en) | Residential building machine installation construction method and structure | |
CN203452375U (en) | Hydraulic self-jacking oblique creeping formwork | |
CN203547125U (en) | Column type overall steel platform hydraulic creeping formwork | |
CN113896124A (en) | Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform, installation process and climbing method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Ding Yunbo Inventor after: Zhang Jieke Inventor after: Liang Yueli Inventor after: Tang Jiyu Inventor after: Ren Yufeng Inventor after: Xue Qing Inventor after: Liu Dong Inventor after: Lin Zhonghe Inventor after: Ge Xianglin Inventor after: Tang Gewei Inventor after: Luo Yifeng Inventor before: Tang Jiyu Inventor before: Lin Zhonghe Inventor before: Ge Xianglin Inventor before: Tang Gewei Inventor before: Luo Yifeng Inventor before: Zhang Jieke Inventor before: Liang Yueli |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190124 Address after: 610000 No. 95, Second Section of Jiefang Road, Jinniu District, Chengdu City, Sichuan Province Co-patentee after: China Construction Eighth Engineering Division Co., Ltd. Patentee after: China Huashi Enterprises Co., Ltd. Co-patentee after: Sichuan No.6 Construction Co., Ltd. Address before: 200122 Pudong New Area, Shanghai, China (Shanghai) free trade trial area 1568 Century Avenue 27 Patentee before: China Construction Eighth Engineering Division Co., Ltd. |