CN206233541U - A kind of interior top external climbing mould bases operation platform for construction of super highrise building - Google Patents

A kind of interior top external climbing mould bases operation platform for construction of super highrise building Download PDF

Info

Publication number
CN206233541U
CN206233541U CN201621108786.XU CN201621108786U CN206233541U CN 206233541 U CN206233541 U CN 206233541U CN 201621108786 U CN201621108786 U CN 201621108786U CN 206233541 U CN206233541 U CN 206233541U
Authority
CN
China
Prior art keywords
construction
climbing
wall
platform
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621108786.XU
Other languages
Chinese (zh)
Inventor
唐际宇
林忠和
戈祥林
唐阁威
罗逸锋
张皆科
梁月利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan No.6 Construction Co., Ltd.
China Construction Eighth Engineering Division Co Ltd
China Huashi Enterprises Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201621108786.XU priority Critical patent/CN206233541U/en
Application granted granted Critical
Publication of CN206233541U publication Critical patent/CN206233541U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of interior top external climbing mould bases operation platform for construction of super highrise building, including the lifting platform system between the hydraulic climbing die block system on the construction wall on the outside of building and the adjacent architectural wall on the inside of building;The lifting platform system include climbing device, the operating platform on climbing device, and be installed on construction wall, the attached wall embedded part of attachment of being climbed for climbing device.The utility model uses hydraulic climbing die block system by external wall, and lifting platform system is used between the construction wall on the inside of building, two systems are operated simultaneously, instead of traditional integral jacking formula operation platform, horizontal support girder steel need not be set, attached wall embedded part is installed only on construction wall just can realize that oil cylinder climbs, shorten the total height of operation platform and its supporting frame, reduce the construction gap of vertical structure and horizontal structure so that hydraulic climbing system does not interfere with the construction of horizontal structure.

Description

A kind of interior top external climbing mould bases operation platform for construction of super highrise building
Technical field
The utility model is related to construction of super highrise building field, more particularly to a kind of interior top for construction of super highrise building External climbing mould bases operation platform.
Background technology
In the reinforced concrete construction of the buildings such as wall, Core Walls Structure, chimney, water tower in skyscraper, use mostly Integrally hoisting steel platform pin hand system.Coordinate shown in Fig. 1 and Fig. 2, the system is branch with interpolation supporting upright post (lattice column) within the walls Support, with Lift-slab machine as power, girder uses heavy in section H profile steel, lower extension template and pin hand system.The shape on Core Walls Structure operating surface Into closing, the operating platform with certain bearing capacity.
But there is following defect in the overall lift cylinder platform legs hand system:
1st, because the steel platform is overall affixed, when structure semi-girder truss, coupling beam is run into, necessary Cutting platform, increased Difficulty of construction, otherwise will be unable to the related horizontal structure of construction;
2nd, lattice column must be imbedded in structure, it is impossible to reclaimed, and caused the waste of material and be have impact on horizontal structure Construction;
3rd, the Super High core tube construction generally construction method that uses for:In advance, horizontal structure falls behind vertical vertical structure More than 10 layers of wall, causes vertical and horizontal structure drop too big, and the security against fire potential problem and structure for being faced with sternness are received Power problem.And the protection of top module system bottom safety is more difficult, falling object from high altitude brings for the structure construction of lower horizontal beam slab Serious potential safety hazard.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of lightweight, speed of application soon, and landing beam is not through walls, Level and vertical structure can synchronous construction the interior top external climbing mould bases operation platform for construction of super highrise building.
To realize above-mentioned technique effect, the utility model discloses a kind of interior top external climbing for construction of super highrise building Mould bases operation platform, including hydraulic climbing die block system on the construction wall on the outside of building and adjacent on the inside of building are built Lifting platform system between walling body;The lifting platform system includes that climbing device, the operation on climbing device are put down Platform, and be installed on construction wall, the attached wall embedded part of attachment of being climbed for climbing device.
A kind of interior top external climbing mould bases operation platform for construction of super highrise building is further improved, institute State hydraulic climbing die block system including hydraulic climbing scaffold and be installed on the wall face of construction wall, the attached wall of attachment of being climbed for hydraulic climbing scaffold Device.
A kind of interior top external climbing mould bases operation platform for construction of super highrise building is further improved, institute Stating wall-attaching equipment includes the built-in fitting being embedded on wall face and the track that climbs hanging on the built-in fitting, and the hydraulic pressure is climbed Frame is climbed by hydraulic jacking device and is climbed on track in described.
A kind of interior top external climbing mould bases operation platform for construction of super highrise building is further improved, institute Operating platform is stated to be propped up on the climbing device by lattice column.
A kind of interior top external climbing mould bases operation platform for construction of super highrise building is further improved, institute Climbing device is stated including hydraulic jack, first be connected with the housing of the hydraulic jack climb support and with the hydraulic pressure The push rod connection second of jack is climbed support, and described first support that climbs is attached to the attached wall with described second support that climbs On embedded part.
A kind of interior top external climbing mould bases operation platform for construction of super highrise building is further improved, institute The housing for stating hydraulic jack is located in the lattice column.
A kind of interior top external climbing mould bases operation platform for construction of super highrise building is further improved, institute The bottom for stating operating platform is hung and is provided with secondary operating platform, and the attached operating platform is fixedly connected on the lattice column.
A kind of interior top external climbing mould bases operation platform for construction of super highrise building is further improved, institute The bottom for stating operating platform is provided with and hangs mould.
The utility model makes it have following beneficial effect as a result of above technical scheme:
Hydraulic climbing die block system is used by external wall, and use lifting platform between construction wall on the inside of building System, two systems are operated simultaneously, instead of traditional integral jacking formula operation platform, significantly reduce the entirety weight of operation platform Amount, alleviates the burden of hydraulic jacking system, more flexibly, accelerates speed of application;
Light-weighted lifting platform system is configured with, oil cylinder can use small-sized oil cylinder, it is not necessary to set horizontal support girder steel, Attached wall embedded part is installed only on construction wall just can realize that oil cylinder climbs, and shorten total height of operation platform and its supporting frame Degree, reduces the construction gap of vertical structure and horizontal structure so that hydraulic climbing system does not interfere with applying for horizontal structure Work;
Lifting platform system on the inside of building does not pass through construction wall, and platform differs only by 1 apart from the assembling reinforcement scope of operation The height of floor, reinforcing bar transmission and colligation are convenient.
Brief description of the drawings
Fig. 1 and Fig. 2 are two kinds of schematic diagrames of traditional lifting platform.
Fig. 3 shows for a kind of structure of interior top external climbing mould bases operation platform for construction of super highrise building of the utility model It is intended to.
Fig. 4 is put for a kind of part of interior top external climbing mould bases operation platform for construction of super highrise building of the utility model Big schematic diagram.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment is described in further detail to the utility model.
Refering to shown in Fig. 3 and Fig. 4, a kind of interior top external climbing mould bases for construction of super highrise building of the utility model is constructed Platform is made up of hydraulic climbing die block system 11 and the two parts of lifting platform system 12, wherein, hydraulic climbing die block system 11 is applied to building Climbing formwork for construction on the wall face of the construction wall in outside, i.e. external wall, and between adjacent architectural wall on the inside of building The construction of inner side wall and horizontal structure is then carried out using lifting platform system 12, is using " outside creeping formwork+inner side backform " System, instead of traditional integral jacking formula operation platform.
By taking core tube steel Reinforced Concrete Construction as an example, entered using hydraulic climbing die block system 11 on the wall face of Core Walls Structure exterior wall The construction such as the reinforcement installation of row Core Walls Structure exterior wall, model sheetinstallat and concreting, and built in the adjacent of Core Walls Structure inner side of outer wall The construction of Core Walls Structure internal structure is carried out (comprising inner side wall and level using small-sized lifting platform system 12 between walling body The construction of structure).
Specifically, coordinate shown in Fig. 4, hydraulic climbing die block system 11 is main by hydraulic climbing scaffold 111, wall-attaching equipment 112 and hydraulic pressure Jacking apparatus 113 are constituted.Wall-attaching equipment 112 is installed on the wall face of the external wall of completion of having constructed, and hydraulic climbing scaffold 111 leads to Hydraulic jacking device 113 is crossed to be installed in wall-attaching equipment 112 and climbed upwards or falls downward with wall-attaching equipment 112.Attached wall is filled Put and further include built-in fitting and hang the track that climbs being installed on built-in fitting, built-in fitting is in substrustion external wall construction With regard to pre-plugged in external wall, burial place and embedded angle should be strictly controlled when embedded, the track that climbs passes through built-in fitting It is attached on external wall and can be upwards climbed or falls downward along external wall.Hydraulic jacking device is connected to hydraulic climbing scaffold Between 111 and the track that climbs, it includes jacking cylinder and is arranged on the upper and lower Commutating box up and down of jacking cylinder, and upper and lower Commutating box is used Climbed track in connection alternately up and down, jacking cylinder climbs power for offer, in jacking cylinder and the work of upper and lower interchange box With lower band hydrodynamic pressure climbing frame 111 in climbing to carry out external wall construction upwards on the track that climbs, and after external wall construction is finished, band Hydrodynamic pressure climbing frame 111 is in falls downward on the track that climbs, easy construction and installation reliability.The hydraulic climbing scaffold can use multilayer support body Structure, and carry segment template and construction tool.
Lifting platform system 12 is mainly made up of operating platform 121, climbing device 122 and attached wall embedded part.Attached wall embedded part can It is similar with foregoing built-in fitting using taper embedded sleeve barrel, in substrustion wall construction, it is embedded in the building wall of adjacent both sides In vivo, attachment when and being climbed as climbing device 122, should be noted that attached on the construction wall of both sides in embedded attached wall embedded part Wall embedded part should be symmetrical arranged, stationarity during ensuring to climb.Operating platform 121 is installed by lattice column 124 and is fixed on both sides Climbing device 122 on and with climbing device 122 climb along both sides construction wall move.Both sides lattice column 124 it Between horizontal brace rod and oblique connecting rod be set be supported reinforcings, and drawing sets drawknot between horizontal brace rod and operating platform Screw rod or steel wire rope carry out drawknot reinforcing, to improve the stability of lattice column, and then improve the stability of operating platform.
Wherein, operating platform 121 uses truss platform, top laying landing slab to can be used for placing of material, needing tower crane During construction, tower crane can be set, while appropriate on the climbing device being provided with below the operating platform of tower crane increase vertical supporting, Enhancing bearing capacity.
Climbing device 122 further climbs support by hydraulic jack 125, first and second support that climbs is constituted, and first The support that climbs is connected to the housing of hydraulic jack 125, and second support that climbs is connected to the push rod of hydraulic jack 125, first Climb support and second support that climbs be connected on attached wall embedded part, the housing of hydraulic jack 125 is arranged in lattice column 124, Push rod releases downwards the housing of hydraulic jack.When climbing, second support that climbs is fixed with attached wall embedded part, and unclamp first Climb support and attached wall embedded part, and the push rod of hydraulic jack is released downwards, acts on second and climb on support, climbs due to second Support is fixed with construction wall, the housing of hydraulic jack is pushed against back up, with being erected at the first behaviour climbed on support body Make the upward jacking of platform, after jacking in place, fix first and climb support and corresponding attached wall embedded part, unclamp the and the support that climbs With attached wall embedded part, the push rod of hydraulic jack withdrawn in housing, is withdrawn upwards together with the support that climbs of second on push rod, then It is secondary to fix second and climb support and attached wall embedded part, complete once climbing for operating platform.Easy to operate and installation is consolidated.
Further, in the bottom of operating platform 121, at the construction wall to be onstructed of both sides, hang that to be provided with secondary operation flat Platform 126, and attached operating platform 126 is fixedly connected on lattice column 124, be can be set between two attached operating platforms 126 of both sides and jumped Plate is connected, and is easy to personnel to construct and current.It is additionally provided with the bottom of operating platform 121 and hangs mould (do not shown in figure and hang mould), in behaviour The bottom for making platform 121 sets outrigger platform beam, this can outrigger platform beam be I-beam, hang mould and rolled in this using hanging mould roller On the lower wing plate of I-beam, model sheetinstallat construction is carried out in attached operating platform 126 in order to operating personnel.
A kind of interior top external climbing mould bases operation platform for construction of super highrise building of the utility model is by outer in building Wall uses hydraulic climbing die block system, and uses lifting platform system, the same luck of two systems between construction wall on the inside of building Make, instead of traditional integral jacking formula operation platform, significantly reduce the overall weight of operation platform, alleviate hydraulic lifting system The burden of system, more flexibly, accelerates speed of application;
Simultaneously as being configured with light-weighted lifting platform system, oil cylinder can use small-sized oil cylinder, it is not necessary to set level Support steel beam, installation attached wall embedded part just can realize that oil cylinder climbs, and shortens operation platform and its support frame only on construction wall The total height of body, reduces the construction gap of vertical structure and horizontal structure so that hydraulic climbing system does not interfere with level The construction of structure;
Further, the lifting platform system on the inside of building does not pass through construction wall, and platform is apart from the assembling reinforcement scope of operation 1 height of floor is differed only by, reinforcing bar transmission and colligation are convenient.
The utility model is described in detail above in association with drawings and Examples, those skilled in the art can Many variations example is made to the utility model according to the above description.Thus, some of embodiment details should not be constituted to this reality With new restriction, the scope that the utility model will be defined using appended claims is used as protection domain of the present utility model.

Claims (8)

1. a kind of interior top external climbing mould bases operation platform for construction of super highrise building, it is characterised in that:Including located at building Lifting platform system between hydraulic climbing die block system on the construction wall in outside and the adjacent architectural wall on the inside of building; The lifting platform system includes climbing device, the operating platform on climbing device, and is installed on construction wall, supplies Climbing device climbs the attached wall embedded part of attachment.
2. a kind of interior top external climbing mould bases operation platform for construction of super highrise building as claimed in claim 1, its feature It is:The hydraulic climbing die block system include hydraulic climbing scaffold and be installed on the wall face of construction wall, climbed for hydraulic climbing scaffold it is attached The wall-attaching equipment.
3. a kind of interior top external climbing mould bases operation platform for construction of super highrise building as claimed in claim 2, its feature It is:The wall-attaching equipment includes the built-in fitting being embedded on wall face and the track that climbs hanging on the built-in fitting, institute State hydraulic climbing scaffold and climbed by hydraulic jacking device and climbed on track in described.
4. a kind of interior top external climbing mould bases operation platform for construction of super highrise building as claimed in claim 1, its feature It is:The operating platform is propped up on the climbing device by lattice column.
5. a kind of interior top external climbing mould bases operation platform for construction of super highrise building as claimed in claim 4, its feature It is:The climbing device include hydraulic jack, first be connected with the housing of the hydraulic jack climb support and with The push rod connection second of the hydraulic jack is climbed support, and described first support that climbs is attached to described second support that climbs On the attached wall embedded part.
6. a kind of interior top external climbing mould bases operation platform for construction of super highrise building as claimed in claim 5, its feature It is:The housing of the hydraulic jack is in the lattice column.
7. a kind of interior top external climbing mould bases operation platform for construction of super highrise building as claimed in claim 4, its feature It is:The bottom of the operating platform is hung and is provided with secondary operating platform, and the secondary operating platform is fixedly connected on the lattice column.
8. a kind of interior top external climbing mould bases operation platform for construction of super highrise building as claimed in claim 7, its feature It is:The bottom of the operating platform is provided with hangs mould.
CN201621108786.XU 2016-10-10 2016-10-10 A kind of interior top external climbing mould bases operation platform for construction of super highrise building Active CN206233541U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621108786.XU CN206233541U (en) 2016-10-10 2016-10-10 A kind of interior top external climbing mould bases operation platform for construction of super highrise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621108786.XU CN206233541U (en) 2016-10-10 2016-10-10 A kind of interior top external climbing mould bases operation platform for construction of super highrise building

Publications (1)

Publication Number Publication Date
CN206233541U true CN206233541U (en) 2017-06-09

Family

ID=58982078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621108786.XU Active CN206233541U (en) 2016-10-10 2016-10-10 A kind of interior top external climbing mould bases operation platform for construction of super highrise building

Country Status (1)

Country Link
CN (1) CN206233541U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437130A (en) * 2016-10-10 2017-02-22 中国建筑第八工程局有限公司 Inner roof external climbing type formwork construction platform for super high-rise building construction
CN108678400A (en) * 2018-06-11 2018-10-19 中建局集团建设发展有限公司 Automatic climbing brooder system in extremely frigid zones building structure and its construction method
CN108729664A (en) * 2018-07-03 2018-11-02 中国建筑第八工程局有限公司 The lifting platform jacking method for integrating template type attachment device and lattice column
WO2019011319A1 (en) * 2017-07-14 2019-01-17 四川华西集团有限公司 Hydraulic steel jacking platform capable of achieving integral and local jacking of external formwork and steel platform
CN109838098A (en) * 2019-01-15 2019-06-04 上海建工一建集团有限公司 Distributing platform system for the construction of Super High tube structure

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437130A (en) * 2016-10-10 2017-02-22 中国建筑第八工程局有限公司 Inner roof external climbing type formwork construction platform for super high-rise building construction
WO2019011319A1 (en) * 2017-07-14 2019-01-17 四川华西集团有限公司 Hydraulic steel jacking platform capable of achieving integral and local jacking of external formwork and steel platform
CN108678400A (en) * 2018-06-11 2018-10-19 中建局集团建设发展有限公司 Automatic climbing brooder system in extremely frigid zones building structure and its construction method
CN108678400B (en) * 2018-06-11 2023-12-01 中建一局集团建设发展有限公司 Automatic climbing greenhouse system on building structure in alpine region and construction method thereof
CN108729664A (en) * 2018-07-03 2018-11-02 中国建筑第八工程局有限公司 The lifting platform jacking method for integrating template type attachment device and lattice column
CN108729664B (en) * 2018-07-03 2023-08-08 中国建筑第八工程局有限公司 Integrated template type connecting device for jacking platform and jacking method of lattice column
CN109838098A (en) * 2019-01-15 2019-06-04 上海建工一建集团有限公司 Distributing platform system for the construction of Super High tube structure
CN109838098B (en) * 2019-01-15 2024-02-13 上海建工一建集团有限公司 Material distribution platform system for super high-rise barrel structure construction

Similar Documents

Publication Publication Date Title
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN106400951B (en) A kind of level and vertical structure method for synchronously constructing of super high-rise building
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN103635643B (en) The construction method of nigh-level synthesis steel bar concrete cylindrical shell
CN201826525U (en) Climbing shuttering system device for buildings
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN1028556C (en) Building construction system
CN104131703A (en) Method for constructing core tube wall through self-climbing formwork and adopted self-climbing formwork
CN100365237C (en) Autolifting type variable-shape diassembllable integrated lifting steel plateform system and construction method thereof
CN102661039A (en) Drum frame supporting power built-in integrated jacking steel platform formwork system and construction method
CN103422668A (en) Construction method of super-thick large-slope shear wall and hydraulic self-jacking inclined creeping framework thereof
CN209323962U (en) A kind of hybrid power system steel platform mould bases climbs system
CN201367728Y (en) Derrick-less hydraulic slip form device used for reinforced concrete water tower supporting tube construction
CN108331336A (en) The integrated lifting steel plateform system and its construction method of floor synchronous construction
CN109184190A (en) It climbs and carries integrated beam type hydraulic climbing platform and its installation method
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN102733608B (en) Construction method for spray head layer of granulation tower
CN217175692U (en) Intelligent hydraulic lifting formwork system for super high-rise core tube construction
CN203834928U (en) Automatic climbing formwork
CN115538792A (en) Residential building machine installation construction method and structure
CN109252656B (en) High-rise building climbing template and assembling, pouring and lifting method
CN105347142B (en) A kind of building hoist is mounted on the threading installation method on basement roof
CN203452375U (en) Hydraulic self-jacking oblique creeping formwork
CN113896124A (en) Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform, installation process and climbing method thereof
CN203547125U (en) Column type overall steel platform hydraulic creeping formwork

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Ding Yunbo

Inventor after: Zhang Jieke

Inventor after: Liang Yueli

Inventor after: Tang Jiyu

Inventor after: Ren Yufeng

Inventor after: Xue Qing

Inventor after: Liu Dong

Inventor after: Lin Zhonghe

Inventor after: Ge Xianglin

Inventor after: Tang Gewei

Inventor after: Luo Yifeng

Inventor before: Tang Jiyu

Inventor before: Lin Zhonghe

Inventor before: Ge Xianglin

Inventor before: Tang Gewei

Inventor before: Luo Yifeng

Inventor before: Zhang Jieke

Inventor before: Liang Yueli

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190124

Address after: 610000 No. 95, Second Section of Jiefang Road, Jinniu District, Chengdu City, Sichuan Province

Co-patentee after: China Construction Eighth Engineering Division Co., Ltd.

Patentee after: China Huashi Enterprises Co., Ltd.

Co-patentee after: Sichuan No.6 Construction Co., Ltd.

Address before: 200122 Pudong New Area, Shanghai, China (Shanghai) free trade trial area 1568 Century Avenue 27

Patentee before: China Construction Eighth Engineering Division Co., Ltd.