CN201915614U - Integral electric climbing frame suitable for shear wall structure - Google Patents

Integral electric climbing frame suitable for shear wall structure Download PDF

Info

Publication number
CN201915614U
CN201915614U CN2010206819593U CN201020681959U CN201915614U CN 201915614 U CN201915614 U CN 201915614U CN 2010206819593 U CN2010206819593 U CN 2010206819593U CN 201020681959 U CN201020681959 U CN 201020681959U CN 201915614 U CN201915614 U CN 201915614U
Authority
CN
China
Prior art keywords
shear wall
bearing
climbing frame
wall structure
integral electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206819593U
Other languages
Chinese (zh)
Inventor
邓青山
张辉
陆海英
赵明
李俊香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Bureau Construction Development Co Ltd
Second Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Bureau Construction Development Co Ltd
Second Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Bureau Construction Development Co Ltd, Second Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN2010206819593U priority Critical patent/CN201915614U/en
Application granted granted Critical
Publication of CN201915614U publication Critical patent/CN201915614U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model provides an integral electric climbing frame suitable for a shear wall structure, which comprises a main framework, a lifting device, an attaching bracket and a guiding frame mounted on the attaching bracket. The main framework consists of guide rails, a framework body and bottom trusses, the framework body is fixed onto the guide rails, the bottom trusses are fixed to the middle of the framework body, the guide rails are mounted in the guiding frame, the attaching bracket consists of a shear wall support, a horizontal supporting seat and an oblique support, the horizontal support is fixed onto the shear wall supporting seat, the oblique support is disposed between the shear wall supporting seat and the horizontal support, the attaching bracket is connected with the shear wall structure via a wall penetrating bolt which penetrates through the shear wall supporting seat, the lifting device is an electric hoist, and the electric hoist is fixed onto the attaching bracket by the aid of a lifting hanger and is connected with the main framework by the aid of a lifting block disposed at the lower end of the main framework. The integral electric climbing frame has the advantages that the integral electric climbing frame saves material expense, labor expense and expenses for a tower crane and a machine team, and improves operating efficiency.

Description

A kind of integral electric climbing frame that is applicable to shear wall structure
Technical field
The utility model relates to a kind of climbing frame, especially relates to a kind of integral electric climbing frame that is applicable to shear wall structure.
Background technology
The integral electric climbing frame is lifting means with the electric block, whole external scaffolding is upwards climbed along skin or post integral body, scaffolding height is decided according to the floor height of building typical floor, generally get 4 floor heights of building typical floor and add the overall height that 1 height dimension that goes on foot the flak jacket hurdle adds body, outer climbing frame adopts double-pole scaffold, can use conventional steel tube fastener scaffold, it also can be bowl-type spigot-and-socket scaffold, set up require with conventional scaffold require identical, next step is the bottom truss of whole frame body to support body, the bottom truss is still the part of whole frame body, only all diagonal web member in each internode, and upper chord, diagonal web member all adopts two-tube, and truss two ends, bottom are seated in on the bearing support of section steel manufacture, with flower hurdle screw rod the stressed of bearing support is passed on the agent structure.
Summary of the invention
The purpose of this utility model provides a kind of economical with materials expense, saving labour cost, saving tower crane One-Shift Costs, improves the integral electric climbing frame that is applicable to shear wall structure of work efficiency.
The technical solution of the utility model is: a kind of integral electric climbing frame that is applicable to shear wall structure, comprise main frame, lifting gear, adhere to bearing and the leading truck that is installed on the steel framework, described main frame comprises guide rail, be fixed on the support body on the guide rail and be fixed on bottom truss between the support body, described guide rail is installed in the described leading truck, described steel framework comprises the shear wall bearing, be fixed on the horizontal support on the shear wall bearing, bearing diagonal between shear wall bearing and horizontal support, described steel framework is connected with shear wall structure by the through-wall bolt that passes described shear wall bearing; Described lifting gear is an electric block, and described electric block is fixed on the described steel framework by promoting hook, and is connected with described main frame by the lift block that is arranged on described main frame lower end.
Described leading truck top is provided with catching device.
Described adhere to be provided with between bearing and the described main frame to regulate shore.
Described shear wall bearing is a channel-section steel.
Advantage and the good effect that the utlity model has are:
1, economical with materials expense, climbing frame support body are set up and are no more than five floor height, according to construction speed lifting successively, set up the structure top layer from ground than double-pole scaffold always, save a large amount of steel pipe, fastener, scaffold floor and safety net;
2, save labour cost, after the climbing frame support body is set up, only need a number people just can carry out lifting support body, save a large amount of manually;
3, save the tower crane One-Shift Costs, after climbing frame is set up, utilize self jacking system to carry out lifting, than a large amount of tower crane One-Shift Costs of hanger saving to climbing frame;
4, improve work efficiency, adopt the climbing frame construction, the one deck of can constructing about four days is saved the duration, the less cost expenditure.
Description of drawings
Fig. 1 is a main TV structure schematic diagram of the present utility model;
Fig. 2 is a side-looking structural representation of the present utility model.
Among the figure:
1, guide rail 2, support body 3, bottom truss
4, leading truck 5, shear wall bearing 6, horizontal support
7, bearing diagonal 8, through-wall bolt 9, electric block
10, promote hook 11, lift block 12, catching device
13, adjusting is shored
The specific embodiment
As shown in Figure 1 and Figure 2, the utility model comprises main frame, lifting gear, adhere to bearing and be installed in leading truck on the steel framework, described main frame comprises guide rail 1, be fixed on the support body 2 on the guide rail 1 and be fixed on bottom truss 3 between the support body 2, described guide rail 1 is installed in the described leading truck 4, described steel framework comprises shear wall bearing 5, is fixed on horizontal support 6, the bearing diagonal 7 between shear wall bearing 5 and horizontal support 6 on the shear wall bearing 5, and described steel framework is connected with shear wall structure by the through-wall bolt 8 that passes described shear wall bearing 5; Described lifting gear is an electric block 9, described electric block 9 is fixed on the described steel framework by promoting hook 10, and be connected with described main frame by the lift block 11 that is arranged on described main frame lower end, described leading truck 4 tops are provided with catching device 12, described adhere to be provided with between bearing and the described main frame to regulate shore 13, described shear wall bearing 5 is a channel-section steel.
More than an embodiment of the present utility model is had been described in detail, but described content only is preferred embodiment of the present utility model, can not be considered to be used to limit practical range of the present utility model.All equalizations of doing according to the utility model application range change and improve etc., all should still belong within the patent covering scope of the present utility model.

Claims (4)

1. integral electric climbing frame that is applicable to shear wall structure, comprise main frame, lifting gear, adhere to bearing and the leading truck that is installed on the steel framework, described main frame comprises guide rail, be fixed on the support body on the guide rail and be fixed on bottom truss between the support body, described guide rail is installed in the described leading truck, it is characterized in that: described steel framework comprises the shear wall bearing, be fixed on the horizontal support on the shear wall bearing, bearing diagonal between shear wall bearing and horizontal support, described steel framework is connected with shear wall structure by the through-wall bolt that passes described shear wall bearing; Described lifting gear is an electric block, and described electric block is fixed on the described steel framework by promoting hook, and is connected with described main frame by the lift block that is arranged on described main frame lower end.
2. a kind of integral electric climbing frame that is applicable to shear wall structure according to claim 1, it is characterized in that: described leading truck top is provided with catching device.
3. a kind of integral electric climbing frame that is applicable to shear wall structure according to claim 1 is characterized in that: described adhere to be provided with between bearing and the described main frame to regulate shore.
4. a kind of integral electric climbing frame that is applicable to shear wall structure according to claim 1, it is characterized in that: described shear wall bearing is a channel-section steel.
CN2010206819593U 2010-12-27 2010-12-27 Integral electric climbing frame suitable for shear wall structure Expired - Fee Related CN201915614U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206819593U CN201915614U (en) 2010-12-27 2010-12-27 Integral electric climbing frame suitable for shear wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206819593U CN201915614U (en) 2010-12-27 2010-12-27 Integral electric climbing frame suitable for shear wall structure

Publications (1)

Publication Number Publication Date
CN201915614U true CN201915614U (en) 2011-08-03

Family

ID=44415417

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206819593U Expired - Fee Related CN201915614U (en) 2010-12-27 2010-12-27 Integral electric climbing frame suitable for shear wall structure

Country Status (1)

Country Link
CN (1) CN201915614U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102767278A (en) * 2012-08-03 2012-11-07 李明昆 Hydraulic climbing frame for consturtion of high-rise building
CN110173106A (en) * 2019-05-30 2019-08-27 广西建工大都租赁有限公司 A kind of full-automatic climbing frame supporting device of guide bracket cooperative bearing up and down
CN111559709A (en) * 2020-05-06 2020-08-21 中国建筑第八工程局有限公司 Climbing system and method of reinforcement-free self-climbing externally hung tower crane

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102767278A (en) * 2012-08-03 2012-11-07 李明昆 Hydraulic climbing frame for consturtion of high-rise building
CN110173106A (en) * 2019-05-30 2019-08-27 广西建工大都租赁有限公司 A kind of full-automatic climbing frame supporting device of guide bracket cooperative bearing up and down
CN111559709A (en) * 2020-05-06 2020-08-21 中国建筑第八工程局有限公司 Climbing system and method of reinforcement-free self-climbing externally hung tower crane

Similar Documents

Publication Publication Date Title
CN201826525U (en) Climbing shuttering system device for buildings
CN100572713C (en) The large span bidirectional string stretching girders rope accumulation gliding construction method
CN101886468B (en) Construction method of suspension type template support in high-position conjoined structure
CN102535845A (en) Construction method of bearing frame of corridor structure
CN206053274U (en) The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN206942245U (en) Prefabricated case beam tie with reinforcing bar construction frame
CN203296361U (en) Long-span steel structure cross assembling hoisting platform
CN201501750U (en) Climbing mechanism of self-climbing type tower machine
CN201334769Y (en) Attached type lifting scaffold with double guide rails
CN207268073U (en) Novel flexible formwork bearing frame
CN201915614U (en) Integral electric climbing frame suitable for shear wall structure
CN106567542A (en) Super high-rise double tower building steel structure corridor assembling method
CN202731104U (en) Novel reinforcing mesh sheet support structure
CN201818043U (en) Top-lifting type internal supporting device for concrete construction
CN204024013U (en) A kind of self-climbing lifting material platform
CN113062584A (en) Multipoint elevator shaft construction lifting platform and construction method
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN210289078U (en) Light self-climbing type shielding frame system
CN202990389U (en) Vertical double-frame guide rail attaching lift scaffold
CN202416854U (en) Table form concrete formwork device
CN201915613U (en) Integral electric climbing frame suitable for frame structure
CN206158146U (en) Novel building section of thick bamboo well construction operation platform
CN202689498U (en) Liftable scaffold for simple and easy building outer wall
CN204754150U (en) Dish -type node formula scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110803

Termination date: 20141227

EXPY Termination of patent right or utility model