CN206158146U - Novel building section of thick bamboo well construction operation platform - Google Patents

Novel building section of thick bamboo well construction operation platform Download PDF

Info

Publication number
CN206158146U
CN206158146U CN201621212673.4U CN201621212673U CN206158146U CN 206158146 U CN206158146 U CN 206158146U CN 201621212673 U CN201621212673 U CN 201621212673U CN 206158146 U CN206158146 U CN 206158146U
Authority
CN
China
Prior art keywords
montant
well construction
overlap joint
cylinder well
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621212673.4U
Other languages
Chinese (zh)
Inventor
朱超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201621212673.4U priority Critical patent/CN206158146U/en
Application granted granted Critical
Publication of CN206158146U publication Critical patent/CN206158146U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a novel building section of thick bamboo well construction operation platform, including the whole section of thick bamboo well construction platform who is horizontal structure, section of thick bamboo well construction platform lower surface is provided with bearing structure, its characterized in that, bearing structure is including tripod subassembly two sets of at least and that the column pitch sets up, every group tripod subassembly includes a montant that sets up along section of thick bamboo well construction platform's the section of thick bamboo well open sides place vertical downward connection in one side, still include a down tube, upper end of sway rod connects the lower surface in section of thick bamboo well construction platform and the relative one side of montant, down tube lower extreme and montant fixed connection, still include an overlap joint bracing piece, setting of overlap joint bracing piece level and the lower part of connection at down tube and montant, the overlap joint bracing piece has one section and outwards surpasss the montant lateral surface and be used for the overlap joint to support the overlap joint section at section of thick bamboo well open sides's lower surface. The utility model has the advantages of simple structure, convenient construction, low cost can reduce manpower resources and consume and improve the efficiency of construction.

Description

A kind of novel building cylinder well construction operating platform
Technical field
The utility model belongs to architectural engineering cylinder well formwork for placing and supports field, and in particular to a kind of novel building cylinder well is applied Work operating platform.
Background technology
In modern architecture, building is typically provided with elevator as passing in and out instrument up and down.Elevator setting is in the elevator of building In well, elevator, in construction, is a vertical tubular structure, and its correspondence can arrange elevator door and hold per floor position Mouthful.In addition ventilating system can be typically set on modern times high-rise building, one can be usually arranged in ventilating system vertically through whole The ventilating shaft of floor, ventilating shaft correspondence also can arrange bypass opening per floor position in side.
When the cylinder well construction of elevator and ventilating shaft class is built, usually steel pipe feet hand is set up vertically upward from ground Frame, it is highly contour with construction layer, or the climb operation frame set up temporarily using steel pipe.But this existing mode exist with Lower defect:1st, to set up material consumption more for steel pipe, fastener etc.;2nd, per layer is intended to set up, and operative's narrow space, wastes people Work.3 elevator shear wall formwork steel pipes need secondary transhipment to recycle, it is impossible to be directly promoted to work layer, waste of manpower with platform And expend the time.
Therefore there is complex structure, relatively costly in above-mentioned existing building cylinder well construction platform structure, waste of human resource and The inferior defect of low construction efficiency.
Utility model content
For above-mentioned the deficiencies in the prior art, technical problem to be solved in the utility model is:How a kind of knot is provided Structure is simple, and convenient construction is with low cost, can reduce the novel building cylinder well construction that human resources expend and improve efficiency of construction Operating platform.
In order to solve above-mentioned technical problem, the utility model employs following technical scheme:
A kind of novel building cylinder well construction operating platform, including integrally the cylinder well in horizontal tabular or frame structure is applied Work platform, cylinder well construction plateau levels shape and cylinder well water plane section are matched and can dropped into a well, cylinder well construction platform Lower surface is provided with supporting construction, it is characterised in that the supporting construction includes at least two groups spaced tripods arranged side by side Component, every group of tripod component connects straight down including a cylinder well lateral opening side along cylinder well construction platform and sets The montant put, highly higher than individual layer building height and less than two floors height, also including a brace, jib head is connected to montant The lower surface of cylinder well construction platform and montant opposite side, brace lower end is fixedly connected with montant, also supports including an overlap joint Bar, overlaps the bottom that support bar is horizontally disposed with and is connected to brace and montant, and there is overlap joint support bar one section outwards to exceed montant Lateral surface and for overlap joint be supported on a lap segment for the lower surface of well lateral opening.
So, when this operating platform is used, cylinder well construction platform is that tripod component on the lower is supported, tripod The overlap joint support bar outer end lap segment overlap joint of component lower end is supported and is stuck on a well aperture position lower surface, it is ensured that support It is reliable and stable, and simple structure, set up with low cost.When the construction of individual layer building is finished to be needed to shift upwards, need to only remove and take Section is connect, then whole operation platform next level can be integrally lifted up, then reinstalls overlap joint support bar and shape Can realize supporting again into lap segment.Therefore reduce human resources and expend and improve efficiency of construction.
As optimization, also it is horizontally arranged between the montant of each group tripod component and is welded to each other fixed reinforcement Bar.Preferably to improve the globality between each tripod component, integrated support intensity is improved.
Used as optimization, the montant, brace and overlap joint support bar are channel-section steel and obtain.So, convenient construction and low cost It is honest and clean.
Used as optimization, the both sides of the cylinder well construction platform have also set up hanger.Enter when so conveniently moving up Row is applied and hung.
Used as optimization, the cylinder well construction platform upper surface has four positioning fixed straight up along rectangular arrangement Steel bar column.It is so convenient to overlap steel pipe scaffold platform again above cylinder well construction platform, positioning security is improved, to realize cutting Power wall formwork is used.
As optimization, install by bolt between the overlap joint support bar and brace and montant and realize detachable fixation even Connect.
So, overlap joint support bar is first disassembled when conveniently moving up to be moved up, and is reinstalled after moving into place Support bar is overlapped well, is installed and used and is moved up and be very convenient quick.
As the another optimization installation method of overlap joint support bar, inner the turning by horizontally set of the overlap joint support bar Axle is rotatably mounted and is connected on brace, and one piece of postive stop baffle is additionally provided with montant, and postive stop baffle is used to limit overlap joint The maximum angle that the outer end lap segment of strut is rotated up is level.
So, when device is integrally moved up, without the need for dismounting overlap joint support bar, boom hoisting directly up, lifting are only needed During, lap segment outer end is received to rotate down to form resigning after resistance, and enters into the operating position of next level, then Complete to reinstall by again is rotated to level lap segment outer end, it is very easy to use quick.Improve mobile installation effectiveness.
Further, every group of tripod component also includes a back-moving spring, back-moving spring one end and montant or brace phase To fixation, the other end and overlap joint support bar are fixed and the elastic force for applying to rotate up to lap segment outer end.
So, when moving up, after moving to next level operating position, lap segment outer end can by back-moving spring to Outer top automatically resets, and resets without the need for operative, further increases efficiency.
In sum, the utility model has simple structure, and convenient construction is with low cost, can reduce human resources consumption Take and improve the advantage of efficiency of construction.
Description of the drawings
Fig. 1 is the structural representation of the utility model specific embodiment side-looking direction.
Fig. 2 is the top view of independent this device in Fig. 1.
Fig. 3 is the front view of independent this device in Fig. 1.
Fig. 4 is the structural representation for overlapping the another mounting means of support bar.
Specific embodiment
Below in conjunction with the accompanying drawings the utility model is described in further detail with preferred embodiment.
Embodiment, as Figure 1-3, a kind of novel building cylinder well construction operating platform, including overall is in horizontal plate The cylinder well construction platform 1 of shape or frame structure, the flat shape of cylinder well construction platform 1 and cylinder well water plane section are matched and can fallen Enter in cylinder well, the lower surface of cylinder well construction platform 1 is provided with supporting construction, the supporting construction is spaced side by side including at least two groups The tripod component of setting, every group of tripod component includes that a cylinder well lateral opening side along cylinder well construction platform is erected The montant 2 of straight connect setting downwards, the height of montant 2 higher than individual layer building height and less than two floors height, also including a brace 3, the upper end of brace 3 is connected to the lower surface of a well construction platform 1 and the opposite side of montant 2, and the lower end of brace 3 and montant 2 are fixed and connected Connect, also including an overlap joint support bar 4, overlap the bottom that support bar 4 is horizontally disposed with and is connected to brace 3 and montant 2, overlap joint There is strut 4 one section to be outwards supported on a lap segment for the lower surface of well lateral opening beyond the lateral surface of montant 2 and for overlap joint.
So, when this operating platform is used, cylinder well construction platform is that tripod component on the lower is supported, tripod The overlap joint support bar outer end lap segment overlap joint of component lower end is supported and is stuck on a well aperture position lower surface, it is ensured that support It is reliable and stable, and simple structure, set up with low cost.When the construction of individual layer building is finished to be needed to shift upwards, need to only remove and take Section is connect, then whole operation platform next level can be integrally lifted up, then reinstalls overlap joint support bar and shape Can realize supporting again into lap segment.Therefore reduce human resources and expend and improve efficiency of construction.
In present embodiment, also it is horizontally arranged between the montant of each group tripod component and is welded to each other fixed adding Strong bar 5.Preferably to improve the globality between each tripod component, integrated support intensity is improved.
In present embodiment, the montant 2, brace 3 and overlap joint support bar 4 are channel-section steel and obtain.So, convenient construction and It is with low cost.
In present embodiment, the both sides of the cylinder well construction platform 1 have also set up hanger 6.It is so convenient to move upwards Carry out applying when dynamic hanging.
In present embodiment, the upper surface of cylinder well construction platform 1 is fixed straight up with four along rectangular arrangement Spacer bar post 7.It is so convenient to overlap steel pipe scaffold platform 8 again above cylinder well construction platform, positioning security is improved, To realize that shear wall formwork is used.During enforcement, it is fixed that steel pipe scaffold platform 8 is plugged into by the main steel pipe lower end of four supports of four sides On the steel bar column 7 of position, positioning is realized.
In present embodiment, the installation of bolt 9 is leaned on to realize between the overlap joint support bar and brace and montant detachable It is fixedly connected.
So, overlap joint support bar is first disassembled when conveniently moving up to be moved up, and is reinstalled after moving into place Support bar is overlapped well, is installed and used and is moved up and be very convenient quick.
During enforcement, as the another optimization mounting means of overlap joint support bar referring to Fig. 4, overlap joint support bar 4 the inner is leaned on The rotating shaft 10 of horizontally set is rotatably mounted and is connected on brace 3, and one piece of postive stop baffle 11 is additionally provided with montant 2, spacing Baffle plate 11 is level for limiting the maximum angle that the outer end lap segment for overlapping support bar 4 is rotated up.During enforcement, postive stop baffle 11 and bracing piece can be same component.
So, when device is integrally moved up, without the need for dismounting overlap joint support bar, boom hoisting directly up, lifting are only needed During, lap segment outer end is received to rotate down to form resigning after resistance, and enters into the operating position of next level, then Complete to reinstall by again is rotated to level lap segment outer end, it is very easy to use quick.Improve mobile installation effectiveness. Wherein, every group of tripod component also includes a back-moving spring 12, and the one end of back-moving spring 12 and montant or brace are relatively fixed, separately One end and overlap joint support bar 4 are fixed and the elastic force for applying to rotate up to lap segment outer end.So, when moving up, move After moving next level operating position, lap segment outer end can outwards top automatically resets by back-moving spring, without the need for workman behaviour Reset, further increase efficiency.

Claims (8)

1. a kind of novel building cylinder well construction operating platform, including the overall cylinder well construction in horizontal tabular or frame structure Platform, cylinder well construction plateau levels shape and cylinder well water plane section are matched and can dropped into a well, under cylinder well construction platform Surface is provided with supporting construction, it is characterised in that the supporting construction includes at least two groups spaced tripod groups arranged side by side Part, every group of tripod component includes a cylinder well lateral opening side along cylinder well construction platform connect setting straight down Montant, montant highly higher than individual layer building height and less than two floors height, also including a brace, jib head is connected to cylinder The lower surface of well construction platform and montant opposite side, brace lower end is fixedly connected with montant, also including an overlap joint support bar, Overlap joint support bar is horizontally disposed and is connected to the bottom of brace and montant, and overlap joint support bar has one section outwards beyond montant outside Face and for overlap joint be supported on a lap segment for the lower surface of well lateral opening.
2. novel building cylinder well construction operating platform as claimed in claim 1, it is characterised in that each group tripod component Montant between be also horizontally arranged with and be welded to each other fixed bracing piece.
3. novel building cylinder well construction operating platform as claimed in claim 1, it is characterised in that the montant, brace and take Connect support bar and be channel-section steel and obtain.
4. novel building cylinder well construction operating platform as claimed in claim 1, it is characterised in that the cylinder well construction platform Both sides have also set up hanger.
5. novel building cylinder well construction operating platform as claimed in claim 1, it is characterised in that on the cylinder well construction platform Surface has four spacer bar posts fixed straight up along rectangular arrangement.
6. novel building cylinder well construction operating platform as claimed in claim 1, it is characterised in that the overlap joint support bar and tiltedly Install by bolt between bar and montant and realize detachable being fixedly connected.
7. novel building cylinder well construction operating platform as claimed in claim 1, it is characterised in that the overlap joint support bar is inner Rotating shaft by horizontally set is rotatably mounted and is connected on brace, and one piece of postive stop baffle, postive stop baffle are additionally provided with montant The maximum angle rotated up for the outer end lap segment for limiting overlap joint support bar is level.
8. novel building cylinder well construction operating platform as claimed in claim 7, it is characterised in that every group of tripod component is also wrapped A back-moving spring is included, back-moving spring one end and montant or brace are relatively fixed, the other end and overlap joint support bar are fixed and be used for The elastic force for applying to rotate up to lap segment outer end.
CN201621212673.4U 2016-11-10 2016-11-10 Novel building section of thick bamboo well construction operation platform Active CN206158146U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621212673.4U CN206158146U (en) 2016-11-10 2016-11-10 Novel building section of thick bamboo well construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621212673.4U CN206158146U (en) 2016-11-10 2016-11-10 Novel building section of thick bamboo well construction operation platform

Publications (1)

Publication Number Publication Date
CN206158146U true CN206158146U (en) 2017-05-10

Family

ID=58659625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621212673.4U Active CN206158146U (en) 2016-11-10 2016-11-10 Novel building section of thick bamboo well construction operation platform

Country Status (1)

Country Link
CN (1) CN206158146U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589552A (en) * 2018-06-11 2018-09-28 交通运输部科学研究院 A kind of collapsible suspension apparatus
CN112609954A (en) * 2020-12-25 2021-04-06 中国建筑第二工程局有限公司 Novel automatic climbing system in elevator shaft and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589552A (en) * 2018-06-11 2018-09-28 交通运输部科学研究院 A kind of collapsible suspension apparatus
CN108589552B (en) * 2018-06-11 2023-07-21 交通运输部科学研究院 A folding suspension device
CN112609954A (en) * 2020-12-25 2021-04-06 中国建筑第二工程局有限公司 Novel automatic climbing system in elevator shaft and construction method thereof
CN112609954B (en) * 2020-12-25 2022-04-12 中国建筑第二工程局有限公司 Novel automatic climbing system in elevator shaft and construction method thereof

Similar Documents

Publication Publication Date Title
CN209686836U (en) Frame body for attached lifting scaffolding
CN209942196U (en) Cantilever support system for large-volume concrete structure
CN206158146U (en) Novel building section of thick bamboo well construction operation platform
CN207144428U (en) A kind of easy-to-dismount building scaffold
CN204626930U (en) Integrated lifting frame operating platform
CN110453836A (en) inclined glass curtain wall mounting system and mounting method
CN107687263B (en) Suspension type protection frame, protection structure and double protection method
CN211172563U (en) Inclined glass curtain wall mounting system
CN204876577U (en) Building construction system
CN106760468A (en) The suspension platform that a kind of construction site uses
CN201915614U (en) Integral electric climbing frame suitable for shear wall structure
CN208856718U (en) A kind of saddle climbing type workbench
CN109083399B (en) Adjustable embedded type lifting support device for steel structure building
CN202000647U (en) Base device for lifting scaffold in elevator shaft
JP2004232366A (en) Hanging scaffold
CN214302757U (en) A construction platform for building
CN204715720U (en) The attachment supporting arrangement of the attachment type raise scaffold outside the building section of receipts within the walls
CN105113509A (en) Tool type foundation pit suspended step ladder
CN204357138U (en) Simple steel structure hoisting frame
CN204081433U (en) Steel structural roof liner profiled sheet construction Special-purpose hanger basket support
CN204876514U (en) Outer hanging scaffold system of assembled house
CN103643790B (en) It is applicable to the self-crawling type operating platform of colossal column
CN209653548U (en) A kind of horizontal protective device of modularization for construction
CN210685313U (en) Safe convenient house steel connection structure
CN208310163U (en) A kind of regularization elevator activity lifting bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant