CN113062584A - Multipoint elevator shaft construction lifting platform and construction method - Google Patents

Multipoint elevator shaft construction lifting platform and construction method Download PDF

Info

Publication number
CN113062584A
CN113062584A CN202110437807.1A CN202110437807A CN113062584A CN 113062584 A CN113062584 A CN 113062584A CN 202110437807 A CN202110437807 A CN 202110437807A CN 113062584 A CN113062584 A CN 113062584A
Authority
CN
China
Prior art keywords
elevator shaft
platform
construction
truss
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110437807.1A
Other languages
Chinese (zh)
Inventor
观开剑
孙清臣
叶文杰
李家盛
陈荣朗
胡俊
俞旺新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202110437807.1A priority Critical patent/CN113062584A/en
Publication of CN113062584A publication Critical patent/CN113062584A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/005Lift shafts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Types And Forms Of Lifts (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明公开了一种多点位电梯井施工提升平台及施工方法,该提升平台包括已施工墙体,在已施工墙体上对称地安装有两组以上的附墙支座,在每组附墙支座上安装有爬架导轨,在已施工墙体的上部安装有电动葫芦,且电动葫芦的挂钩与爬架导轨下端连接,在爬架导轨的顶部之间固定连接有主桁架,在主桁架上垂直地固定有一组次桁架,组成桁架平台,在桁架平台的下方通过钢丝绳分别悬挂有电梯井操作平台和电梯井模板组件。本发明通过布设桁架平台、电梯井操作平台和电动葫芦提升系统,形成多点位整体提升系统,施工过程中可以通过电动葫芦自动爬升,提高了电梯井的施工效率,节约了人工,缩短了施工时间。The invention discloses a multi-point elevator shaft construction hoisting platform and a construction method. The hoisting platform comprises a constructed wall, and two or more sets of wall-attaching supports are symmetrically installed on the constructed wall. A climbing frame guide rail is installed on the wall support, an electric hoist is installed on the upper part of the constructed wall, and the hook of the electric hoist is connected with the lower end of the climbing frame guide rail, and a main truss is fixedly connected between the top of the climbing frame guide rail. A group of secondary trusses are vertically fixed on the truss to form a truss platform. Below the truss platform, an elevator shaft operating platform and an elevator shaft formwork assembly are respectively suspended through wire ropes. The invention forms a multi-point integral lifting system by arranging a truss platform, an elevator shaft operating platform and an electric hoist lifting system, and the electric hoist can automatically climb during the construction process, which improves the construction efficiency of the elevator shaft, saves labor, and shortens construction. time.

Description

Multipoint elevator shaft construction lifting platform and construction method
Technical Field
The invention relates to a construction lifting platform and a construction method for a multi-point elevator shaft, and belongs to the technical field of building construction.
Background
The construction operation platform of the elevator shaft at the position of the existing super high-rise core tube is mainly constructed in a mode of erecting a scaffold, and the scaffold is erected to a construction layer from the bottom; the method comprises the following steps that a template is required to be laid at the upper end of a scaffold, so that workers can conveniently step on the template to carry out construction, the template at the upper end of the scaffold is required to be dismantled by the workers every time one layer of concrete is poured, then the scaffold is heightened to a construction layer, and the template is laid again; the I-steel stress layer that encorbelments needs to be done because the steel pipe strength problem of scaffold frame at every certain floor, needs the fixed steel of encorbelmenting of embedded steel bar, and manpower and materials are wasted to this kind of operating means, greatly reduced the efficiency of construction, prolonged construction cycle.
In addition, after the traditional formwork around the elevator shaft is manually dismantled, the formwork needs to be manually transferred to an upper construction layer, a reinforcing back edge and the like, or the whole elevator shaft is hoisted by using a tower crane, so that the process is dangerous, and the formwork and the reinforcing member are easy to fall off and fall down to hurt people; the work of demolising of later stage scaffold frame and steel of encorbelmenting in the super high-rise elevator shaft is very dangerous, and these dismouting work need consume a large amount of manual works simultaneously, and the work progress benefit is low, is unfavorable for project construction cost's control.
Disclosure of Invention
The invention aims to provide a multi-point elevator shaft construction lifting platform and a construction method, which have the advantages of high construction efficiency, low cost and convenience in operation, and overcome the defects in the prior art.
In order to achieve the purpose, the invention adopts the following technical scheme: the utility model provides a multiple spot position elevartor shaft construction lift platform, including the wall body of having constructed, install more than two sets of wall supports that attach on the wall body of having constructed symmetrically, install on every group attaches the wall support and climb a guide rail, install electric block on the upper portion of the wall body of having constructed, and electric block's couple is connected with climbing a guide rail lower extreme, fixedly connected with main truss between the top of climbing a guide rail, be fixed with a set of secondary truss perpendicularly on main truss, constitute the truss platform, it has elevartor shaft operation platform and elevator shaft template subassembly to hang respectively through wire rope in the below of truss platform.
Furthermore, each main truss is fixedly connected with more than two climbing frame guide rails.
Furthermore, a small platform for operation of the upper person is fixedly arranged on the climbing frame guide rail.
Furthermore, the elevator shaft template assembly consists of a template, a back ridge and a wall-penetrating bolt.
Meanwhile, the invention also provides a multipoint elevator shaft construction method based on the multipoint elevator shaft construction lifting platform, which comprises the following steps:
the method comprises the following steps: firstly, more than two groups of wall-attached supports are symmetrically arranged on a constructed wall body, a climbing frame guide rail is arranged on each group of wall-attached supports, an electric hoist is arranged on the upper part of the constructed wall body, and a hook of the electric hoist is connected with the lower end of the climbing frame guide rail;
step two: a main truss is fixedly connected between the tops of the climbing frame guide rails, and a group of secondary trusses are vertically fixed on the main truss to form a truss platform;
step three: respectively suspending an elevator shaft operating platform and an elevator shaft template assembly below the truss platform through steel wire ropes;
step four: a worker stands on the elevator shaft operating platform to assemble and fix the elevator shaft template component, and then the elevator shaft concrete is poured;
step five: after the elevator shaft concrete reaches the designed strength, firstly removing wall penetrating bolts on the elevator shaft formwork assembly, then removing connecting bolts between the wall attaching support and the climbing frame guide rails, finally starting all electric hoists and simultaneously lifting all the climbing frame guide rails, further driving the truss platform to be integrally lifted to the upper construction floor, and then fixedly connecting the wall attaching support and the climbing frame guide rails;
step six: and repeating the first step to the fifth step until the construction of the elevator shaft of all the floors is completed.
In the method, the elevator shaft operating platform can be used as a material transportation platform at the same time.
Due to the adoption of the technical scheme, the invention has the following advantages:
firstly, a multi-point integral lifting system is formed by arranging a truss platform, an elevator shaft operating platform and an electric hoist lifting system, and the elevator shaft can automatically climb through the electric hoist in the construction process, so that the construction efficiency of the elevator shaft is improved, the labor is saved, and the construction time is shortened;
the elevator shaft operating platform is produced industrially, so that the edge sealing performance and the stability are better, the safety and the reliability are higher, and the construction safety is ensured;
the elevator shaft operating platform can also be used as a material transporting platform, materials can be placed above the platform and integrally lifted along with the truss platform, and the transporting way and efficiency of the materials are increased;
fifthly, the elevator shaft template component can be fixed with the truss platform through the steel wire rope and integrally lifted along with the truss platform, so that manpower transportation is saved, and production benefits are improved.
Drawings
FIG. 1 is a top view of a schematic of the structure of the present invention;
fig. 2 is a sectional view a-a of fig. 1.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The embodiment of the invention comprises the following steps: referring to fig. 1 and 2, a multi-point elevator shaft construction lifting platform and a construction method thereof include a constructed wall 1, more than two sets of wall-attached supports 2 are symmetrically installed on the constructed wall 1, a climbing frame guide rail 6 is installed on each set of wall-attached supports 2, an electric hoist 11 is installed on the upper portion of the constructed wall 1, a hook of the electric hoist 11 is connected with the lower end of the climbing frame guide rail 6, a main truss 3 is fixedly connected between the tops of the climbing frame guide rails 6, a set of secondary trusses 4 are vertically fixed on the main truss 3 to form a truss platform, and an elevator shaft operating platform 9 and an elevator shaft formwork assembly 8 are respectively suspended below the truss platform through a steel wire rope 7. Each main truss 3 is fixedly connected with more than two climbing frame guide rails 6, so that the main trusses 3 can obtain enough supporting strength. The climbing frame guide rail 6 is fixedly provided with a small platform 10 for operation of a person, so that manual operation is facilitated. The elevator shaft formwork assembly 8 consists of a formwork, a back ridge and a wall-penetrating bolt.
When the multipoint elevator shaft construction lifting platform is adopted for elevator shaft construction, the following steps can be adopted:
the method comprises the following steps: firstly, more than two groups of wall-attached supports 2 are symmetrically arranged on a constructed wall body 1, a climbing frame guide rail 6 is arranged on each group of wall-attached supports 2, an electric hoist 11 is arranged on the upper part of the constructed wall body 1, and a hook of the electric hoist 11 is connected with the lower end of the climbing frame guide rail 6;
step two: a main truss 3 is fixedly connected between the tops of the climbing frame guide rails 6, and a group of secondary trusses 4 are vertically fixed on the main truss 3 to form a truss platform;
step three: an elevator shaft operating platform 9 and an elevator shaft template assembly 8 are respectively suspended below the truss platform through steel wire ropes 7; the elevator shaft operating platform 9 can be used as a material transportation platform at the same time;
step four: a worker stands on the elevator shaft operating platform 9 to assemble and fix the elevator shaft template assembly 8, and then the elevator shaft concrete is poured;
step five: after the elevator shaft concrete reaches the designed strength, firstly removing the wall penetrating bolts on the elevator shaft formwork assembly 8, then removing the connecting bolts between the wall attaching support 2 and the climbing frame guide rails 6, finally starting all the electric hoists 11 and simultaneously lifting all the climbing frame guide rails 6 so as to drive the truss platform to be integrally lifted to the previous construction floor, and then fixedly connecting the wall attaching support 2 and the climbing frame guide rails 6;
step six: and repeating the first step to the fifth step until the construction of the elevator shaft of all the floors is completed.

Claims (6)

1. The utility model provides a multiple spot position elevartor shaft construction lift platform, includes construction wall body (1), its characterized in that: install attaching wall support (2) more than two sets of symmetrically on the wall body (1) of having constructed, it climbs a guide rail (6) to install on every group attaches wall support (2), install electronic calabash (11) on the upper portion of wall body (1) of having constructed, and the couple of electronic calabash (11) is connected with climbing a guide rail (6) lower extreme, fixedly connected with main truss (3) between the top of climbing a guide rail (6), be fixed with a set of secondary truss (4) perpendicularly on main truss (3), constitute the truss platform, it has elevartor shaft operation platform (9) and elevartor shaft template component (8) to hang respectively through wire rope (7) in the below of truss platform.
2. The multi-point elevator shaft construction hoist platform of claim 1, characterized in that: each main truss (3) is fixedly connected with more than two climbing frame guide rails (6).
3. The multi-point elevator shaft construction lifting platform and the construction method according to claim 1, characterized in that: and a small upper operating platform (10) is fixedly arranged on the climbing frame guide rail (6).
4. The multi-point elevator shaft construction hoist platform of claim 1, characterized in that: the elevator shaft formwork component (8) consists of a formwork, a back ridge and a wall-penetrating bolt.
5. A multipoint elevator shaft construction method based on the multipoint elevator shaft construction lifting platform of any one of claims 1-4, characterized by comprising the following steps:
the method comprises the following steps: firstly, more than two groups of wall-attached supports (2) are symmetrically arranged on a constructed wall body (1), a climbing frame guide rail (6) is arranged on each group of wall-attached supports (2), meanwhile, an electric hoist (11) is arranged on the upper part of the constructed wall body (1), and a hook of the electric hoist (11) is connected with the lower end of the climbing frame guide rail (6);
step two: a main truss (3) is fixedly connected between the tops of the climbing frame guide rails (6), and a group of secondary trusses (4) are vertically fixed on the main truss (3) to form a truss platform;
step three: an elevator shaft operating platform (9) and an elevator shaft template assembly (8) are respectively suspended below the truss platform through a steel wire rope (7);
step four: a worker stands on an elevator shaft operating platform (9) to assemble and fix an elevator shaft template assembly (8), and then pouring elevator shaft concrete;
step five: after the elevator shaft concrete reaches the designed strength, firstly removing wall penetrating bolts on the elevator shaft formwork assembly (8), then removing connecting bolts between the wall attaching support (2) and the climbing frame guide rails (6), finally starting all electric hoists (11) and simultaneously lifting all the climbing frame guide rails (6), further driving the truss platform to be integrally lifted to the previous construction floor, and then fixedly connecting the wall attaching support (2) and the climbing frame guide rails (6);
step six: and repeating the first step to the fifth step until the construction of the elevator shaft of all the floors is completed.
6. The multi-point elevator shaft construction method according to claim 5, characterized in that: the elevator shaft operating platform (9) can be used as a material transport platform at the same time.
CN202110437807.1A 2021-04-22 2021-04-22 Multipoint elevator shaft construction lifting platform and construction method Pending CN113062584A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110437807.1A CN113062584A (en) 2021-04-22 2021-04-22 Multipoint elevator shaft construction lifting platform and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110437807.1A CN113062584A (en) 2021-04-22 2021-04-22 Multipoint elevator shaft construction lifting platform and construction method

Publications (1)

Publication Number Publication Date
CN113062584A true CN113062584A (en) 2021-07-02

Family

ID=76567666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110437807.1A Pending CN113062584A (en) 2021-04-22 2021-04-22 Multipoint elevator shaft construction lifting platform and construction method

Country Status (1)

Country Link
CN (1) CN113062584A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114525921A (en) * 2022-01-06 2022-05-24 中建三局第三建设工程有限责任公司 Climbing type elevator shaft operation platform
CN115324328A (en) * 2022-08-09 2022-11-11 中国建筑第四工程局有限公司 Construction method for moving jacking upright post in high altitude for jacking mould

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104847108A (en) * 2015-03-06 2015-08-19 中国建筑第八工程局有限公司 Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure
CN106013776A (en) * 2016-07-01 2016-10-12 绍兴文理学院 Hydraulic climbing type elevator shaft finalization operation platform and construction method
CN209742359U (en) * 2019-03-12 2019-12-06 河北亿安工程技术股份有限公司 Formwork hanging lifting frame for elevator shaft construction
CN215291319U (en) * 2021-04-22 2021-12-24 中国建筑第四工程局有限公司 Multi-point elevator shaft construction lifting platform

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104847108A (en) * 2015-03-06 2015-08-19 中国建筑第八工程局有限公司 Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure
CN106013776A (en) * 2016-07-01 2016-10-12 绍兴文理学院 Hydraulic climbing type elevator shaft finalization operation platform and construction method
CN209742359U (en) * 2019-03-12 2019-12-06 河北亿安工程技术股份有限公司 Formwork hanging lifting frame for elevator shaft construction
CN215291319U (en) * 2021-04-22 2021-12-24 中国建筑第四工程局有限公司 Multi-point elevator shaft construction lifting platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114525921A (en) * 2022-01-06 2022-05-24 中建三局第三建设工程有限责任公司 Climbing type elevator shaft operation platform
CN115324328A (en) * 2022-08-09 2022-11-11 中国建筑第四工程局有限公司 Construction method for moving jacking upright post in high altitude for jacking mould
CN115324328B (en) * 2022-08-09 2023-12-08 中国建筑第四工程局有限公司 Construction method for moving jacking upright column in high air aiming at top die

Similar Documents

Publication Publication Date Title
CN102864936B (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
CN105201195B (en) One kind can lift supporting leg type elevator hoistway construction platform and construction method
CN104032967B (en) Prefabricated assembled frame structure component construction method for hanging
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN111809528B (en) A pier column vertical cage platform channel construction method and cage platform channel device
CN104847102A (en) Wall attaching method and device of attached self-lifting scaffold on retraction section of building outer wall
CN112482317A (en) Door slot second-stage concrete self-climbing slip form pouring system and construction method
CN113062584A (en) Multipoint elevator shaft construction lifting platform and construction method
CN213836318U (en) Bridge floor wet joint hangs mould structure
CN210460016U (en) Integrated form single power lift material platform
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN107268971B (en) A double self-elevating external climbing frame of a super high-rise building and its application method
CN111764623B (en) Hanging construction platform module and construction method of high altitude large cantilever steel roof frame
CN201635390U (en) Automatic formwork supporting machine for high-rise building elevator shaft construction
CN210857952U (en) Novel attached lifting scaffold
CN108277994A (en) On across the high ferro safe guarding shed quick method for dismounting of operation line
CN219031629U (en) Lifting equipment for indoor plate installation
CN214885625U (en) Multi-point prefabricated part mounting platform
CN208152583U (en) A kind of high-building construction ancillary equipment
CN110552495A (en) assembled building combined tool type outer protective frame system and construction method thereof
CN215331380U (en) Rail type suspension platform
CN216810895U (en) An elevator shaft operation platform
CN117188760A (en) Upper suspension and lower bearing combined concrete formwork supporting structure and construction method
CN209924407U (en) Combined working platform for steel structure high-altitude installation
CN117005664A (en) Electric translation type hanging basket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210702

RJ01 Rejection of invention patent application after publication