Prior art keywords
column
horizontal support
channel steel
white pine
platform according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310540604.0A
Other languages
Chinese (zh)
Other versions
CN103615103B (en
Inventor
张庆泉
杨颜江
钱振
许贤
姚广秋
孙彦清
顾洪亮
管飞
胡坤
施蓉
孙威
王进
胡学军
阙波
王道海
夏策峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Gold Mantis Construction Decoration Co Ltd
Original Assignee
Suzhou Gold Mantis Construction Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Gold Mantis Construction Decoration Co Ltd filed Critical Suzhou Gold Mantis Construction Decoration Co Ltd
Priority to CN201310540604.0A priority Critical patent/CN103615103B/en
Publication of CN103615103A publication Critical patent/CN103615103A/en
Application granted granted Critical
Publication of CN103615103B publication Critical patent/CN103615103B/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

本发明公开了一种吊挂式组装活动平台,它包括立柱(1)、水平支座(2)、白松板(8)、等边角铁(9)、竖向槽钢(10),所述水平支座(2)一端向外水平焊接在立柱(1)下部,立柱(1)上端背面焊接有槽钢挂钩(4);所述等边角铁(9)横向固定在竖向槽钢(10)上形成网状的钢架基层,立柱(1)通过槽钢挂钩(4)挂接在钢架基层的等边角铁(9)上;所述白松板(8)安放在水平支座(2)上;白松板(8)两侧,在水平支座(2)上横向安装有紧固白松板(8)的拉杆(5),通过M6热镀锌螺栓(7)固定。本发明成本低、拆装便捷,劳动量投入少、可重复使用,充分利用资源。

Figure 201310540604

The invention discloses a hanging type assembled movable platform, which comprises a column (1), a horizontal support (2), a white pine board (8), an equilateral angle iron (9), and a vertical channel steel (10). One end of the horizontal support (2) is welded horizontally to the lower part of the column (1) outward, and a channel steel hook (4) is welded on the back of the upper end of the column (1); the equilateral angle iron (9) is horizontally fixed on the vertical channel steel (10) forms a networked steel frame base, and the column (1) is hung on the equilateral angle iron (9) of the steel frame base through the channel steel hook (4); the white pine board (8) is placed on the horizontal support On the seat (2); on both sides of the white pine board (8), a pull bar (5) for fastening the white pine board (8) is horizontally installed on the horizontal support (2), fixed by M6 hot-dip galvanized bolts (7). The invention has the advantages of low cost, convenient disassembly and assembly, less labor input, reusability and full utilization of resources.

Figure 201310540604

Description

吊挂式组装活动平台Hanging assembly activity platform

技术领域 technical field

本发明涉及一种吊挂式组装活动平台。 The invention relates to a hanging type assembled movable platform.

背景技术 Background technique

目前,对于建筑工程立面施工搭设的钢管架等传统型脚手架,由于本身搭设复杂,人力、物力投入较大,又随着现今建筑高度不断的增加,高层、超高层建筑逐渐增加多,对于传统型脚手架的搭设提出了挑战。 At present, for the traditional scaffolding such as steel pipe frames erected on the facade of construction projects, due to the complexity of the erection itself, the investment in manpower and material resources is relatively large, and with the continuous increase in the height of today's buildings, high-rise and super high-rise buildings are gradually increasing. The erection of type scaffolding presented challenges.

现有技术存在以下弊端: There are following drawbacks in prior art:

1、传统型脚手架,搭设复杂,搭设及拆除工作量较大,耗时耗力,增加工程成本。 1. The traditional scaffolding is complicated to erect, and the workload of erecting and dismantling is relatively large, which is time-consuming and labor-intensive, which increases the project cost.

2、传统型脚手架搭设使用材料较多,材料周转较麻烦,钢材的生锈等损耗,造成社会不可再生资源的浪费及环境污染。 2. The traditional scaffolding uses more materials, the turnover of materials is more troublesome, and the loss of steel materials such as rust causes the waste of non-renewable resources in society and environmental pollution.

3、传统型脚手架搭设随着高度的增加,搭设难度加大,安全系数降低。 3. As the height of traditional scaffolding increases, the difficulty of erection increases and the safety factor decreases.

发明内容 Contents of the invention

本发明的目的是:提供一种吊挂式组装活动平台,它的构件之间通过螺栓做活动连接,组装式的特点在使用中平台的移位、周转运输、吊运较为便捷,在内部作业安全性较高。 The purpose of the present invention is to provide a hanging assembled movable platform, whose components are connected by bolts. The characteristics of the assembled type make the displacement, turnover transportation and hoisting of the platform more convenient during use, and the internal operation Higher security.

本发明的技术方案是:一种吊挂式组装活动平台,它包括立柱、水平支座、白松板、等边角铁、竖向槽钢,所述水平支座一端向外水平焊接在立柱下部,立柱上端背面焊接有槽钢挂钩;所述等边角铁横向固定在竖向槽钢上形成网状的钢架基层,立柱通过槽钢挂钩挂接在钢架基层的等边角铁上;所述白松板安放在水平支座上;白松板两侧,在水平支座上横向安装有紧固白松板的拉杆,通过M6热镀锌螺栓固定。 The technical solution of the present invention is: a hanging type assembled movable platform, which includes a column, a horizontal support, a white pine board, an equilateral angle iron, and a vertical channel steel, and one end of the horizontal support is horizontally welded to the lower part of the column , the back of the upper end of the column is welded with a channel steel hook; the equilateral angle iron is horizontally fixed on the vertical channel steel to form a netted steel frame base, and the column is hooked on the equilateral angle iron of the steel frame base through the channel steel hook; The white pine board is placed on the horizontal support; on both sides of the white pine board, tie rods for fastening the white pine board are horizontally installed on the horizontal support, and are fixed by M6 hot-dip galvanized bolts.

下面对以上技术方案进行进一步说明: The above technical scheme is further described below:

所述槽钢挂钩为倒置的U型,U型挂钩一面固定在立柱上,另一面通过焊接扁铁延长,并在端部设置有螺孔。 The channel steel hook is an inverted U shape, one side of the U-shaped hook is fixed on the column, the other side is extended by welding a flat iron, and a screw hole is arranged at the end.

所述槽钢挂钩的螺孔中串接有M8热镀锌螺栓,通过M8热镀锌螺栓与立柱固定。 M8 hot-dip galvanized bolts are connected in series in the screw holes of the channel steel hook, and are fixed to the column by M8 hot-dip galvanized bolts.

所述水平支座下方固定有角铁斜撑,角铁斜撑一端焊接在立柱上,一端焊接在水平支座的端部,形成直角三角架的斜撑结构。 An angle iron brace is fixed below the horizontal support, and one end of the angle iron brace is welded to the column, and the other end is welded to the end of the horizontal support to form a brace structure of a right-angled tripod.

所述每组白松板下方含有四个水平支座。 There are four horizontal supports under each group of white pine boards.

所述水平支座的白松板为并列排列的两块。 The white pine boards of the horizontal support are two pieces arranged side by side.

所述白松板为40*300*4000mm。 The white pine board is 40*300*4000mm.

所述两端的水平支座长度L:100mm≤L≤200mm。 The length L of the horizontal support at both ends: 100mm≤L≤200mm.

所述钢架基层上下两根横向等边角铁为立柱吊挂的两个支点。 The upper and lower horizontal equilateral angle irons on the base of the steel frame are the two fulcrums for hanging the columns.

本发明的优点是:本发明的吊挂式组装活动平台,它构件之间通过螺栓做活动连接,组装式的特点在使用中平台的移位、周转运输、吊运较为便捷;材料运用极少,制作、安装、拆除简单,人力及物力成本投入低;平台使用不受施工高度影响,投入成本及使用操作都一样;由于吊挂式组装活动平台充分运用施工地形特点,搭设于饰面基层钢架和土建结构墙体之间的空间内,在内部作业安全性较高。 The advantages of the present invention are: the suspension-type assembled movable platform of the present invention, its components are flexibly connected by bolts, and the characteristics of the assembled type make the displacement, turnover transportation and hoisting of the platform more convenient during use; the materials are rarely used , easy to manufacture, install, and dismantle, low cost of manpower and material resources; the use of the platform is not affected by the construction height, and the input cost and operation are the same; due to the full use of the characteristics of the construction terrain, the suspended assembly movable platform is erected on the decorative base steel In the space between the frame and the civil structure wall, the internal operation safety is higher.

附图说明 Description of drawings

下面结合附图和实施例对本发明进行进一步描述: The present invention is further described below in conjunction with accompanying drawing and embodiment:

图1是本发明实施例的基本支架结构示意图; Fig. 1 is the schematic diagram of the basic support structure of the embodiment of the present invention;

图2是本发明实施例的拉杆结构分解示意图; Fig. 2 is an exploded schematic view of the tie rod structure of the embodiment of the present invention;

图3 是本发明实施例的槽钢挂钩结构示意图; Fig. 3 is the structural representation of the channel steel hook of the embodiment of the present invention;

图4 是本发明实施例的安装分解图; Fig. 4 is the installation exploded view of the embodiment of the present invention;

其中:1 槽钢立柱;2水平支座;3角铁斜撑;4 槽钢挂钩;5 拉杆;6 M8热镀锌螺栓;7 M6热镀锌螺栓;8 白松板;9等边角铁;10竖向槽钢。     Among them: 1 channel steel column; 2 horizontal support; 3 angle iron diagonal brace; 4 channel steel hook; 5 tie rod; 6 M8 hot-dip galvanized bolts; 7 M6 hot-dip galvanized bolts; 10 vertical channel steel. 

具体实施方式 Detailed ways

实施例:如图1所示:一种吊挂式组装活动平台,它包括立柱1、水平支座2、角铁斜撑3、槽钢挂钩4、拉杆5、M8热镀锌螺栓6、M6热镀锌螺栓7、白松板8、等边角铁9、竖向槽钢10。立柱1为10#热镀锌槽钢立柱;水平支座2为5#热镀锌等边角铁水平支座;角铁斜撑3为5#热镀锌等边角铁斜撑;槽钢挂钩4为6.3#热镀锌槽钢挂钩;拉杆5为20*40mm热镀锌方管;白松板8为40*300*4000mm;等边角铁9为5#热镀锌角铁。以上钢材均必须要求为热镀锌钢材,达到国标要求,各构件之间的焊口处按照要求防锈处理。  Embodiment: As shown in Figure 1: a hanging type assembled movable platform, which includes a column 1, a horizontal support 2, an angle iron brace 3, a channel steel hook 4, a pull rod 5, M8 hot-dip galvanized bolts 6, M6 Hot-dip galvanized bolt 7, white pine board 8, equilateral angle iron 9, vertical channel steel 10. Column 1 is a 10# hot-dip galvanized channel steel column; horizontal support 2 is a 5# hot-dip galvanized equilateral angle iron horizontal support; angle iron brace 3 is a 5# hot-dip galvanized equilateral angle iron brace; channel steel Hook 4 is 6.3# hot-dip galvanized channel steel hook; tie rod 5 is 20*40mm hot-dip galvanized square tube; white pine board 8 is 40*300*4000mm; equilateral angle iron 9 is 5# hot-dip galvanized angle iron. All the above steels must be hot-dip galvanized steels, which meet the requirements of the national standard, and the welds between the components are treated according to the requirements for anti-rust treatment. the

如图4所示,等边角铁9横向固定在竖向槽钢10上形成网状的钢架基层。水平支座2一端向外水平焊接在立柱1下部,水平支座2下方固定有角铁斜撑3,角铁斜撑3一端焊接在立柱1上,一端焊接在水平支座2的端部,形成直角三角架的斜撑结构。角铁斜撑3分别与水平支座2形成30°和60°角。 As shown in FIG. 4 , the equilateral angle irons 9 are horizontally fixed on the vertical channel steel 10 to form a netted steel frame base. One end of the horizontal support 2 is horizontally welded outward to the lower part of the column 1, and an angle iron diagonal brace 3 is fixed below the horizontal support 2. One end of the angle iron diagonal brace 3 is welded on the column 1, and the other end is welded on the end of the horizontal support 2. A diagonal bracing structure forming a right-angled tripod. Angle iron braces 3 form angles of 30° and 60° with the horizontal support 2 respectively.

如图3所示,立柱1上端背面焊接有槽钢挂钩4;槽钢挂钩4为倒置的U型,U型挂钩一面固定在立柱上,另一面通过焊接断面5*30mm扁铁焊接延长,并在端部设置有螺孔,焊接要求挂钩四边均需与槽钢立柱满焊,槽钢挂钩4的螺孔中串接有M8热镀锌螺栓6,通过M8热镀锌螺栓6与立柱1固定。槽钢挂钩4加长一侧侧翼是为满足打孔后穿过M8热镀锌螺栓6能与立柱1上的孔对穿,防止挂钩脱落。立柱1通过槽钢挂钩4挂接在钢架基层的等边角铁9上,立柱1依靠钢架基层上下两根横向等边角铁9提供两个支点。 As shown in Figure 3, a channel steel hook 4 is welded on the back of the upper end of the column 1; the channel steel hook 4 is an inverted U shape, one side of the U-shaped hook is fixed on the column, and the other side is extended by welding a 5*30mm flat iron of the welding section, and There are screw holes at the end. Welding requires that the four sides of the hook must be fully welded with the channel steel column. The screw holes of the channel steel hook 4 are connected in series with M8 hot-dip galvanized bolts 6, which are fixed to the column 1 through M8 hot-dip galvanized bolts 6. . Channel steel hook 4 prolongs one side flank and is to pass M8 hot-dip galvanized bolt 6 after punching and can pass through with the hole on the column 1, prevents hook from coming off. The column 1 is hooked on the equilateral angle iron 9 of the steel frame base through the channel steel hook 4, and the column 1 provides two fulcrums by relying on two horizontal equilateral angle irons 9 on the upper and lower sides of the steel frame base.

如图2、图4所示,白松板8安放在水平支座2上;白松板8两侧,在水平支座2上横向安装有紧固白松板8的拉杆5,通过M6热镀锌螺栓7固定,多个独立的金属支架的水平支座2通过拉杆5连接成一个整体性的钢架支撑系统,水平支座2之间连接通过打孔后由M6热镀锌螺栓7做活动连接,便于拆卸、组装。拉杆5之间的距离保证两块40*300*4000mm白松板8并排放下并紧固的卡在两拉杆之间。水平支座2的白松板8为并列排列的两块;每组白松板8下方含有四个水平支座2:水平支座2之间的距离≤1200mm,4米长白松板8下面需安放4个支架。白松板8厚度不小于40mm,两端头处挑出水平支座2长度L:100mm≤L≤200mm。 As shown in Figure 2 and Figure 4, the white pine board 8 is placed on the horizontal support 2; on both sides of the white pine board 8, a tie rod 5 for fastening the white pine board 8 is installed horizontally on the horizontal support 2, and the M6 hot-dip galvanized bolts 7 is fixed, and the horizontal support 2 of multiple independent metal supports is connected into an integral steel frame support system through the tie rod 5, and the connection between the horizontal support 2 is connected by M6 hot-dip galvanized bolt 7 after drilling, Easy to disassemble and assemble. The distance between the pull rods 5 ensures that two 40*300*4000mm white pine boards 8 are arranged side by side and fastened between the two pull rods. The white pine boards 8 of the horizontal support 2 are two pieces arranged side by side; each group of white pine boards 8 contains four horizontal supports 2: the distance between the horizontal supports 2 is ≤ 1200mm, and 4 meters long white pine boards 8 need to be placed under 4 bracket. The thickness of the white pine board 8 is not less than 40mm, and the length L of the horizontal support 2 at both ends: 100mm≤L≤200mm.

本实施例安装于墙面装饰面层基层钢架内侧,即墙面装饰面层基层钢架与土建结构墙体之间的空间内。主要依靠钢架基层上下两根横向等边角铁9提供两个支点。吊挂式组装活动平台为立面施工用操作平台。 This embodiment is installed inside the base steel frame of the wall decoration surface layer, that is, in the space between the base steel frame of the wall decoration surface layer and the civil structure wall. Mainly rely on the upper and lower two horizontal equilateral angle irons 9 of the steel frame base to provide two fulcrums. The suspended assembly movable platform is an operation platform for facade construction.

应当指出,对于经充分说明的本发明来说,还可具有多种变换及改型的实施方案,并不局限于上述具体实施例。上述实施例仅仅作为本发明的说明,而不是对本发明的限制。总之,本发明的保护范围应包括那些对于本领域普通技术人员来说显而易见的变换或替代以及改型。 It should be noted that the present invention, which has been fully described, is capable of many alternative and modified embodiments and is not limited to the specific examples described above. The above-mentioned embodiments are only used as illustrations of the present invention, rather than limiting the present invention. In a word, the protection scope of the present invention shall include those transformations, substitutions and modifications obvious to those skilled in the art.

Claims (10)

1.一种吊挂式组装活动平台,其特征在于:它包括立柱(1)、水平支座(2)、白松板(8)、等边角铁(9)、竖向槽钢(10),所述水平支座(2)一端向外水平焊接在立柱(1)下部,立柱(1)上端背面焊接有槽钢挂钩(4);所述等边角铁(9)横向固定在竖向槽钢(10)上形成网状的钢架基层,立柱(1)通过槽钢挂钩(4)挂接在钢架基层的等边角铁(9)上;所述白松板(8)安放在水平支座(2)上;白松板(8)两侧,在水平支座(2)上横向安装有紧固白松板(8)的拉杆(5),通过M6热镀锌螺栓(7)固定。 1. A hanging assembled activity platform, characterized in that it includes a column (1), a horizontal support (2), a white pine board (8), an equilateral angle iron (9), and a vertical channel steel (10) , one end of the horizontal support (2) is welded horizontally to the lower part of the column (1) outward, and a channel steel hook (4) is welded on the back of the upper end of the column (1); the equilateral angle iron (9) is horizontally fixed on the vertical The channel steel (10) forms a net-like steel frame base, and the column (1) is hung on the equilateral angle iron (9) of the steel frame base through the channel steel hook (4); the white pine board (8) is placed on On the horizontal support (2); on both sides of the white pine board (8), a pull rod (5) for fastening the white pine board (8) is horizontally installed on the horizontal support (2), fixed by M6 hot-dip galvanized bolts (7) . 2.根据权利要求1所述的吊挂式组装活动平台,其特征在于:所述槽钢挂钩(4)为倒置的U型,U型挂钩一面固定在立柱上,另一面通过焊接扁铁延长,并在端部设置有螺孔。 2. The hanging-type assembly activity platform according to claim 1, characterized in that: the channel steel hook (4) is an inverted U shape, one side of the U-shaped hook is fixed on the column, and the other side is extended by welding a flat iron , and a screw hole is provided at the end. 3.根据权利要求2所述的吊挂式组装活动平台,其特征在于:所述槽钢挂钩(4)的螺孔中串接有M8热镀锌螺栓(6),通过M8热镀锌螺栓(6)与立柱(1)固定。 3. The hanging-type assembled movable platform according to claim 2, characterized in that: M8 hot-dip galvanized bolts (6) are connected in series in the screw holes of the channel steel hook (4), through which the M8 hot-dip galvanized bolts (6) is fixed with the column (1). 4.根据权利要求1所述的吊挂式组装活动平台,其特征在于:所述水平支座(2)下方固定有角铁斜撑(3),角铁斜撑(3)一端焊接在立柱(1)上,一端焊接在水平支座(2)的端部,形成直角三角架的斜撑结构。 4. The suspended assembly movable platform according to claim 1, characterized in that: an angle iron brace (3) is fixed under the horizontal support (2), and one end of the angle iron brace (3) is welded to the column (1), one end is welded to the end of the horizontal support (2), forming a diagonal brace structure of a right-angled tripod. 5.根据权利要求1所述的吊挂式组装活动平台,其特征在于:所述每组白松板(8)下方含有四个水平支座(2)。 5. The suspended assembled activity platform according to claim 1, characterized in that: there are four horizontal supports (2) under each group of white pine boards (8). 6.根据权利要求1所述的吊挂式组装活动平台,其特征在于:所述水平支座(2)的白松板(8)为并列排列的两块。 6. The suspended assembly movable platform according to claim 1, characterized in that: the white pine boards (8) of the horizontal support (2) are two pieces arranged side by side. 7.根据权利要求1所述的吊挂式组装活动平台,其特征在于:所述白松板(8)为40*300*4000mm。 7. The suspended assembled activity platform according to claim 1, characterized in that: the white pine board (8) is 40*300*4000mm. 8.根据权利要求5所述的吊挂式组装活动平台,其特征在于:所述两端的水平支座(2)长度L:100mm≤L≤200mm。 8. The suspended assembly activity platform according to claim 5, characterized in that: the length L of the horizontal supports (2) at both ends: 100mm≤L≤200mm. 9.根据权利要求1所述的吊挂式组装活动平台,其特征在于:所述拉杆(5)为20*40mm热镀锌方管。 9. The suspended assembly movable platform according to claim 1, characterized in that: the tie rod (5) is a 20*40mm hot-dip galvanized square tube. 10.根据权利要求1所述的吊挂式组装活动平台,其特征在于:所述钢架基层上下两根横向等边角铁(9)为立柱(1)吊挂的两个支点。 10. The suspended assembled movable platform according to claim 1, characterized in that: the upper and lower horizontal equilateral angle irons (9) of the base of the steel frame are the two fulcrums for hanging the column (1).
CN201310540604.0A 2013-11-06 2013-11-06 Suspension type assembling movable platform Withdrawn - After Issue CN103615103B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310540604.0A CN103615103B (en) 2013-11-06 2013-11-06 Suspension type assembling movable platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310540604.0A CN103615103B (en) 2013-11-06 2013-11-06 Suspension type assembling movable platform

Publications (2)

Publication Number Publication Date
CN103615103A true CN103615103A (en) 2014-03-05
CN103615103B CN103615103B (en) 2015-11-25

Family

ID=50165818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310540604.0A Withdrawn - After Issue CN103615103B (en) 2013-11-06 2013-11-06 Suspension type assembling movable platform

Country Status (1)

Country Link
CN (1) CN103615103B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264955A (en) * 2014-09-18 2015-01-07 中建三局第二建设工程有限责任公司 Overhead movable L-shaped bottoming bracket operating platform
CN106401157A (en) * 2016-11-09 2017-02-15 北京城建集团有限责任公司 Movable operation platform and high-altitude construction method
CN110565928A (en) * 2019-07-26 2019-12-13 江苏兴厦建设工程集团有限公司 Fast-assembling, quick detach formula scaffold frame for construction of building outer wall
CN110700549A (en) * 2019-11-02 2020-01-17 浙江宇之航科技工程有限公司 Upper hanger for lifting scaffold

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0868195A (en) * 1994-08-29 1996-03-12 Shimizu Corp Method for supporting lift-type load receiving stage, lift-type load receiving stage apparatus, and lifting method for lift-type load receiving stage apparatus
US20060163001A1 (en) * 2005-01-24 2006-07-27 Pozell Charles A Wall hanging scaffold
CN201155204Y (en) * 2008-01-31 2008-11-26 中建一局集团建设发展有限公司 Tool Assembly Platform
CN201835512U (en) * 2010-10-29 2011-05-18 北京韬盛科技发展有限公司 Turning folding scaffold unit
CN203783106U (en) * 2013-11-06 2014-08-20 苏州金螳螂建筑装饰股份有限公司 Hanging assembling moving platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0868195A (en) * 1994-08-29 1996-03-12 Shimizu Corp Method for supporting lift-type load receiving stage, lift-type load receiving stage apparatus, and lifting method for lift-type load receiving stage apparatus
US20060163001A1 (en) * 2005-01-24 2006-07-27 Pozell Charles A Wall hanging scaffold
CN201155204Y (en) * 2008-01-31 2008-11-26 中建一局集团建设发展有限公司 Tool Assembly Platform
CN201835512U (en) * 2010-10-29 2011-05-18 北京韬盛科技发展有限公司 Turning folding scaffold unit
CN203783106U (en) * 2013-11-06 2014-08-20 苏州金螳螂建筑装饰股份有限公司 Hanging assembling moving platform

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264955A (en) * 2014-09-18 2015-01-07 中建三局第二建设工程有限责任公司 Overhead movable L-shaped bottoming bracket operating platform
CN106401157A (en) * 2016-11-09 2017-02-15 北京城建集团有限责任公司 Movable operation platform and high-altitude construction method
CN110565928A (en) * 2019-07-26 2019-12-13 江苏兴厦建设工程集团有限公司 Fast-assembling, quick detach formula scaffold frame for construction of building outer wall
CN110700549A (en) * 2019-11-02 2020-01-17 浙江宇之航科技工程有限公司 Upper hanger for lifting scaffold
CN110700549B (en) * 2019-11-02 2021-07-09 浙江宇之航科技工程有限公司 A hanger for lifting scaffolding

Also Published As

Publication number Publication date
CN103615103B (en) 2015-11-25

Similar Documents

Publication Publication Date Title
WO2016077943A1 (en) Building supporting unit and building supporting structure employing same
CN101787796A (en) Suspended formwork bracing system for steel structure concrete floor slab construction
CN103615103B (en) Suspension type assembling movable platform
CN204001650U (en) Overhanging scaffold for building
CN108086674A (en) A kind of roof boarding hangs the construction method of mould and roof boarding
CN207245138U (en) Boat scaffold adjustable in pitch
CN204456810U (en) A kind of gaily decorated basket pull bar suspension scaffold
CN206530078U (en) A kind of support meanss
CN110439360A (en) A prefabricated light steel fence and its installation method
CN109518950B (en) Support-free tool-based template system applied to assembled cast-in-place section and use method thereof
CN204343642U (en) Builder's jack corner support frame
CN206376507U (en) Prefabrication outrigger
CN206477497U (en) A kind of trussing for exempting to support steel form
CN204920452U (en) Hang dress formula building site and enclose fender system
CN203783106U (en) Hanging assembling moving platform
CN204664623U (en) A kind of vertical pump line fixing device
CN108412231A (en) Assembled is bolted reinforcing steel processing shed and its assemble method entirely
CN207620504U (en) A kind of Fabricated railing
CN104948004B (en) A kind of site safety manages revolving enclosure wall
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN205617772U (en) Gallows structure under lifting foot hand rack special use
CN203729852U (en) Assembled building site gate
CN211646721U (en) A steel structure special-shaped column frame support structure
CN209053525U (en) Tool, Combined type steel sizing security fences
CN204343647U (en) A kind of the shaped steel suspension scaffolding bracing frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20151125

Effective date of abandoning: 20251211

AV01 Patent right actively abandoned

Granted publication date: 20151125

Effective date of abandoning: 20251211

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned