CN109653484B - An installation structure of an external hanging basket for a roof super-high-air curtain wall project - Google Patents
An installation structure of an external hanging basket for a roof super-high-air curtain wall project Download PDFInfo
- Publication number
- CN109653484B CN109653484B CN201811435360.9A CN201811435360A CN109653484B CN 109653484 B CN109653484 B CN 109653484B CN 201811435360 A CN201811435360 A CN 201811435360A CN 109653484 B CN109653484 B CN 109653484B
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- external hanging
- steel structure
- basket
- truss system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/34—Mobile scaffolds; Scaffolds with mobile platforms characterised by supporting structures provided on the roofs
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
本发明公开了一种屋面超高临空幕墙工程外挂吊篮安装结构,混凝土结构梁、钢结构桁架体系、钢结构加固方钢、外挂吊篮操作架体、外挂吊篮操作平台和外挂吊篮蓝筐,所述混凝土结构梁上方纵向设置有钢结构桁架体系。本发明的有益效果是:本发明的幕墙工程外挂吊篮安装的施工方法,直接将外挂吊篮的水平支架安放在钢结构桁架上,在满足幕墙工程的使用要求的前提下,取消了外挂吊篮的竖向支架、降低了外挂吊篮竖向失稳的隐患、减少了外挂吊篮对屋面空间的占用、节约了施工时间、提高了施工效率;本发明与传统施工工艺相比,无需设置竖向的支架,有效的节约了屋面的施工空间,便于进行多专业的穿插施工;本发明具有良好的社会效益,适合推广使用。
The invention discloses an installation structure for an external hanging basket of a roof super-high-air curtain wall project, a concrete structure beam, a steel structure truss system, a steel structure reinforced square steel, an external hanging hanging basket operating frame, an external hanging hanging basket operating platform and an external hanging hanging basket In the blue basket, a steel structure truss system is longitudinally arranged above the concrete structural beam. The beneficial effects of the present invention are as follows: the construction method for installing the external hanging basket of the curtain wall project of the present invention directly places the horizontal support of the external hanging basket on the steel structure truss, and cancels the external hanging hanging on the premise that the use requirements of the curtain wall project are met. The vertical support of the basket reduces the hidden danger of vertical instability of the external hanging basket, reduces the occupation of the roof space by the external hanging basket, saves the construction time, and improves the construction efficiency; compared with the traditional construction technology, the present invention does not need to set The vertical support effectively saves the construction space of the roof and facilitates multi-professional interspersed construction; the invention has good social benefits and is suitable for popularization and use.
Description
技术领域technical field
本发明涉及一种安装结构,具体为一种屋面超高临空幕墙工程外挂吊篮安装结构,属于外挂吊篮安装结构应用技术领域。The invention relates to an installation structure, in particular to an installation structure of an external hanging basket for a roof super-high-air curtain wall project, and belongs to the technical field of the application of the hanging hanging basket installation structure.
背景技术Background technique
当今建筑领域中竞争越来越激烈,为满足不同的建筑风格的需要,不同结构的屋面不断推出,屋面构架的高度越来越高,多数屋面构架在设计过程中沿着屋面结构外侧一圈设置多层钢结构桁架,然后在钢结构桁架的外侧施工玻璃幕墙等外立面构造,从而将屋面以一种更加大气、美观的形象对外进行展示。The competition in today's construction field is becoming more and more fierce. In order to meet the needs of different architectural styles, roofs of different structures are continuously introduced, and the height of the roof frame is getting higher and higher. Most roof frames are set along the outer side of the roof structure during the design process. Multi-layer steel structure truss, and then construct glass curtain wall and other facade structures on the outside of the steel structure truss, so as to display the roof in a more atmospheric and beautiful image.
在屋面幕墙工程的施工过程中通常需要架设外挂吊篮进行配合施工,现有的外挂吊篮安拆工艺,通常是将吊篮的前后支架(竖向)架设在屋面结构板上,然后在后支架处配置配重块,竖向支架的上端采用铰接的连接方式架设一道水平支架,水平支架的一端伸出结构外立面,通过钢丝绳与吊篮篮筐相连,从而形成外挂吊篮作业体系。此种工艺在使用过程中受到竖向支架的稳定性能的制约,致使吊篮架设高度不能过大,从而导致幕墙构造高出屋面一定高度后,外挂吊篮施工体系存在较大的安全隐患。同时,由于外挂吊篮设置在屋面结构板上,占用了大量的屋面空间,给屋面工程的构造施工带来极大的不便,造成现场施工工期的延长。In the construction process of the roof curtain wall project, it is usually necessary to set up an external hanging basket for construction. The existing installation and dismantling process of the external hanging basket is usually to erect the front and rear brackets (vertically) of the hanging basket on the roof structural plate, and then install the hanging basket at the back. A counterweight is arranged at the bracket, and a horizontal bracket is erected on the upper end of the vertical bracket in a hinged connection mode. This process is restricted by the stable performance of the vertical support during use, so that the height of the hanging basket cannot be too large, resulting in a large safety hazard in the construction system of the external hanging basket after the curtain wall structure is higher than a certain height of the roof. At the same time, since the external hanging baskets are arranged on the roof structural panels, they occupy a large amount of roof space, which brings great inconvenience to the structural construction of the roof engineering and prolongs the construction period on site.
发明内容SUMMARY OF THE INVENTION
本发明的目的就在于为了解决现有的外挂吊篮安拆工艺在使用过程中受到竖向支架的稳定性能的制约,致使吊篮架设高度不能过大,从而导致幕墙构造高出屋面一定高度后,外挂吊篮施工体系存在较大的安全隐患,同时,由于外挂吊篮设置在屋面结构板上,占用了大量的屋面空间,给屋面工程的构造施工带来极大的不便,造成现场施工工期的延长的问题,而提出一种屋面超高临空幕墙工程外挂吊篮安装结构。The purpose of the present invention is to solve the problem that the existing hanging basket installation and dismantling process is restricted by the stability of the vertical support during use, so that the erection height of the hanging basket cannot be too large, so that the curtain wall structure is higher than the roof after a certain height. , the construction system of the external hanging basket has a large safety hazard. At the same time, because the external hanging basket is set on the roof structure board, it takes up a lot of roof space, which brings great inconvenience to the structural construction of the roof project and causes the on-site construction period. To solve the problem of prolongation, an external hanging basket installation structure is proposed for the roof super-high-air curtain wall project.
本发明的目的可以通过以下技术方案实现:一种屋面超高临空幕墙工程外挂吊篮安装结构,包括混凝土结构梁、钢结构桁架体系、钢结构加固方钢、外挂吊篮操作架体、外挂吊篮操作平台和外挂吊篮蓝筐,所述混凝土结构梁上方纵向设置有钢结构桁架体系,根据施工图纸和外挂吊篮使用过程中的荷载参数进行荷载效应组合,通过计算得出幕墙施工过程中外挂吊篮传递到原结构上的荷载效应,并与原结构的设计承载能力进行对比,明确钢结构桁架体系是否能够满足吊篮的承载需求,以及局部可能存在的超载区域进行辨识;根据荷载效应计算结果,对原结构的钢架体系采用方钢加固,且所述钢结构桁架体系顶部水平设置有外挂吊篮中梁,所述钢结构桁架体系顶部两端均纵向设置有钢结构加固方钢,且所述钢结构桁架体系上方设置有外挂吊篮操作架体,所述外挂吊篮操作架体上方设置有外挂吊篮操作平台;The purpose of the present invention can be achieved through the following technical solutions: an external hanging basket installation structure for a super-high overhead curtain wall project on the roof, including a concrete structure beam, a steel structure truss system, a steel structure reinforced square steel, an external hanging hanging basket operating frame, an external hanging The hanging basket operating platform and the external hanging basket blue basket, the steel structure truss system is longitudinally arranged above the concrete structural beam, and the load effect combination is carried out according to the construction drawings and the load parameters during the use of the external hanging basket, and the curtain wall construction process is obtained through calculation. The load effect transferred from the hanging baskets to the original structure is compared with the designed bearing capacity of the original structure to determine whether the steel structure truss system can meet the bearing requirements of the hanging baskets, and the possible overloaded areas in the local area are identified; according to the load As a result of the effect calculation, the steel frame system of the original structure is reinforced with square steel, and the top of the steel structure truss system is horizontally provided with an external hanging basket middle beam, and both ends of the top of the steel structure truss system are longitudinally provided with steel structure reinforcement squares. steel, and an external hanging basket operating frame is arranged above the steel structure truss system, and an external hanging basket operating platform is arranged above the external hanging basket operating frame;
所述外挂吊篮中梁两端下方均设置有钢结构水平系杆,且所述外挂吊篮中梁通过链条连接外挂吊篮蓝筐。Steel structure horizontal tie rods are arranged under both ends of the middle beam of the external hanging basket, and the middle beam of the external hanging basket is connected to the blue basket of the external hanging basket through a chain.
本发明的进一步技术改进方案在于:所述钢结构桁架体系为中空结构,且所述钢结构桁架体系内部纵向设置有折叠状的施工人员上下跑道。A further technical improvement scheme of the present invention is that: the steel structure truss system is a hollow structure, and a folding runway for construction workers is longitudinally arranged inside the steel structure truss system.
本发明的进一步技术改进方案在于:所述钢结构桁架体系中部等间距水平设置有若干个横梁,且钢结构桁架体系自上而下的第三个横梁上搭设有镀锌薄铁皮。A further technical improvement scheme of the present invention is that several beams are arranged horizontally at equal intervals in the middle of the steel structure truss system, and a galvanized thin iron sheet is placed on the third beam from top to bottom of the steel structure truss system.
本发明的进一步技术改进方案在于:所述外挂吊篮中梁通过两个钢结构水平系杆分别与外挂吊篮操作平台两端上方连接,且两个钢结构水平系杆上均套设有U型卡环,两个所述U型卡环均通过螺母分别与外挂吊篮操作平台两端上方固定连接,保证外挂吊篮中梁余钢结构桁架体系连接更加牢固,且安装或拆卸更加方便、快捷。A further technical improvement scheme of the present invention is that: the middle beam of the external hanging basket is respectively connected with the upper parts of the two ends of the operating platform of the external hanging basket through two steel structure horizontal tie rods, and the two steel structure horizontal tie rods are sleeved with U The two U-shaped snap rings are fixedly connected to the upper ends of the two ends of the hanging basket operating platform respectively through nuts, so as to ensure that the connection of the steel structure truss system in the middle beam of the external hanging basket is more firm, and the installation or disassembly is more convenient and fast.
本发明的进一步技术改进方案在于:所述U型卡环两端上方均贯穿外挂吊篮中梁,且U型卡环两端上方与外挂吊篮中梁的连接处套设有U型卡环垫片,且所述U型卡环垫片与U型卡环两端上方的连接处均套接有螺母。A further technical improvement scheme of the present invention is that: both ends of the U-shaped snap ring penetrate through the middle beam of the external hanging basket, and a U-shaped snap ring is sleeved at the connection between the upper part of the two ends of the U-shaped snap ring and the middle beam of the external hanging basket A gasket is provided, and a nut is sleeved at the connection between the U-shaped snap ring gasket and the upper part of both ends of the U-shaped snap ring.
本发明的进一步技术改进方案在于:所述施工人员上下跑道两端边缘处与钢结构桁架体系抱箍连接,通过施工人员上下跑道方便人员在钢结构桁架体系上活动进行施工工作,施工人员上下跑道与钢结构桁架体系进行抱箍连接,确保跑道的稳定性和安全性。A further technical improvement scheme of the present invention is: the edges of the two ends of the upper and lower runways of the construction personnel are connected with the steel structure truss system hoop, and the construction personnel can move on and off the runway to facilitate the construction work on the steel structure truss system. Hoop connection with the steel structure truss system to ensure the stability and safety of the runway.
本发明的进一步技术改进方案在于:所述镀锌薄铁皮两侧均设置有防护栏杆,且所述防护栏杆的高度不小于1.5m,通过防护栏杆保证工作人员施工时的安全性,根据钢架体系加固深化设计图纸,进行现场施工,施工完成后,对加固体系进行检测,检测合格后进行后续施工,在镀锌薄铁皮上搭设外挂吊篮的操作平台。A further technical improvement scheme of the present invention is that: both sides of the galvanized thin iron sheet are provided with protective railings, and the height of the protective railings is not less than 1.5m, and the safety of the workers during construction is ensured by the protective railings. The system reinforcement will deepen the design drawings, and carry out on-site construction. After the construction is completed, the reinforcement system will be tested. After the test is qualified, the follow-up construction will be carried out, and the operation platform of the external hanging basket will be set up on the galvanized thin iron sheet.
本发明的进一步技术改进方案在于:所述外挂吊篮蓝筐的高度低于外挂吊篮中梁的高度。A further technical improvement scheme of the present invention is that: the height of the blue basket of the external hanging basket is lower than the height of the middle beam of the external hanging basket.
与现有技术相比,本发明的有益效果是:本发明的幕墙工程外挂吊篮安装的施工方法,直接将外挂吊篮的水平支架安放在钢结构桁架上,在满足幕墙工程的使用要求的前提下,取消了外挂吊篮的竖向支架、降低了外挂吊篮竖向失稳的隐患、减少了外挂吊篮对屋面空间的占用、节约了施工时间、提高了施工效率;本发明与传统施工工艺相比,无需设置竖向的支架,有效的节约了屋面的施工空间,便于进行多专业的穿插施工;本发明具有良好的社会效益,适合推广使用。Compared with the prior art, the beneficial effects of the present invention are as follows: the construction method for the installation of the external hanging basket of the curtain wall project of the present invention directly places the horizontal support of the external hanging basket on the steel structure truss, and meets the use requirements of the curtain wall project. Under the premise, the vertical support of the external hanging basket is cancelled, the hidden danger of vertical instability of the external hanging basket is reduced, the occupation of the roof space by the external hanging basket is reduced, the construction time is saved, and the construction efficiency is improved; Compared with the construction technology, there is no need to set vertical brackets, which effectively saves the construction space of the roof and facilitates multi-professional interspersed construction; the invention has good social benefits and is suitable for popularization and use.
附图说明Description of drawings
为了便于本领域技术人员理解,下面结合附图对本发明作进一步的说明。In order to facilitate the understanding of those skilled in the art, the present invention will be further described below with reference to the accompanying drawings.
图1为本发明的剖面结构示意图。FIG. 1 is a schematic cross-sectional structure diagram of the present invention.
图2为本发明的外挂吊篮中梁与钢结构桁架体系连接节点示意图。FIG. 2 is a schematic diagram of the connection node between the middle beam of the external hanging basket and the steel structure truss system of the present invention.
图中:1、混凝土结构梁;2、钢结构桁架体系;3、施工人员上下跑道;4、镀锌薄铁皮;5、钢结构加固方钢;6、外挂吊篮操作架体;7、外挂吊篮操作平台;8、外挂吊篮中梁;9、钢结构水平系杆;10、外挂吊篮篮筐;11、U型卡环垫片;12、U型卡环。In the picture: 1. Concrete structural beam; 2. Steel structure truss system; 3. Construction personnel on and off the runway; 4. Galvanized thin iron sheet; 5. Steel structure reinforced square steel; 6. External hanging basket operating frame; 7. External hanging Gondola operation platform; 8. Middle beam of external gondola; 9. Horizontal tie rod of steel structure; 10. Basket of external gondola; 11. U-shaped retaining ring gasket; 12. U-shaped retaining ring.
具体实施方式Detailed ways
下面将结合实施例对本发明的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。The technical solutions of the present invention will be clearly and completely described below with reference to the embodiments. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
请参阅图1-2所示,一种屋面超高临空幕墙工程外挂吊篮安装结构,包括混凝土结构梁1、钢结构桁架体系2、钢结构加固方钢5、外挂吊篮操作架体6、外挂吊篮操作平台7和外挂吊篮蓝筐10,混凝土结构梁1上方纵向设置有钢结构桁架体系2,根据施工图纸和外挂吊篮使用过程中的荷载参数进行荷载效应组合,通过计算得出幕墙施工过程中外挂吊篮传递到原结构上的荷载效应,并与原结构的设计承载能力进行对比,明确钢结构桁架体系2是否能够满足吊篮的承载需求,以及局部可能存在的超载区域进行辨识;根据荷载效应计算结果,对原结构的钢架体系采用方钢5加固,且钢结构桁架体系2顶部水平设置有外挂吊篮中梁8,钢结构桁架体系2顶部两端均纵向设置有钢结构加固方钢5,且钢结构桁架体系2上方设置有外挂吊篮操作架体6,外挂吊篮操作架体6上方设置有外挂吊篮操作平台7;Please refer to Figure 1-2 for an installation structure of an external hanging basket for a roof super-high air curtain wall project, including a concrete
外挂吊篮中梁8两端下方均设置有钢结构水平系杆9,且外挂吊篮中梁8通过链条连接外挂吊篮蓝筐10。Steel structure
本发明的进一步技术改进方案在于:钢结构桁架体系2为中空结构,且钢结构桁架体系2内部纵向设置有折叠状的施工人员上下跑道3。A further technical improvement scheme of the present invention is that: the steel
本发明的进一步技术改进方案在于:钢结构桁架体系2中部等间距水平设置有若干个横梁,且钢结构桁架体系2自上而下的第三个横梁上搭设有镀锌薄铁皮4。A further technical improvement scheme of the present invention is that several beams are arranged horizontally at equal intervals in the middle of the steel
本发明的进一步技术改进方案在于:外挂吊篮中梁8通过两个钢结构水平系杆9分别与外挂吊篮操作平台7两端上方连接,且两个钢结构水平系杆9上均套设有U型卡环12,两个U型卡环12均通过螺母分别与外挂吊篮操作平台7两端上方固定连接,保证外挂吊篮中梁8余钢结构桁架体系2连接更加牢固,且安装或拆卸更加方便、快捷。A further technical improvement scheme of the present invention is that: the
请参阅图2所示,外挂吊篮中梁8设置在钢结构桁架体系2上方,U型卡环12两端上方均贯穿外挂吊篮中梁8,且U型卡环12两端上方与外挂吊篮中梁8的连接处套设有U型卡环垫片11,且U型卡环垫片11与U型卡环12两端上方的连接处均套接有螺母,根据外挂吊篮安拆方案进行外挂吊篮施工体系中各构件的施工安装;外挂吊篮安装完成后,对外挂吊篮设备进行整体检测,检测合格后出具检测报告,然后再进行外挂吊篮使用告知、报备使用;Please refer to FIG. 2 , the
外挂吊篮使用过程中,需要定期对吊篮进行监控,除了吊篮的常规检查,尤其需要对吊篮水平支架与钢结构桁架系杆的连接螺栓进行定期巡查;幕墙安装完成后,进行外挂吊篮拆除,完成幕墙工程外挂吊篮安拆的施工;外挂吊篮拆除完成后,对钢结构加固平台上搭设的吊篮操作平台进行拆除,加固平台可以根据现场情况予以保留,作为后期幕墙检修和维保的作业面。During the use of the external hanging basket, it is necessary to regularly monitor the hanging basket. In addition to the routine inspection of the hanging basket, it is especially necessary to regularly inspect the connecting bolts between the horizontal support of the hanging basket and the tie rod of the steel structure truss; after the installation of the curtain wall, the external hanging hanging Basket removal to complete the installation and dismantling of the external hanging basket of the curtain wall project; after the external hanging basket removal is completed, the hanging basket operating platform erected on the steel structure reinforcement platform shall be removed. Maintenance work surface.
作为本发明的一种技术优化方案,施工人员上下跑道3两端边缘处与钢结构桁架体系2抱箍连接,通过施工人员上下跑道3方便人员在钢结构桁架体系2上活动进行施工工作,施工人员上下跑道3与钢结构桁架体系2进行抱箍连接,确保跑道的稳定性和安全性。As a technical optimization scheme of the present invention, the edges of the two ends of the upper and
作为本发明的一种技术优化方案,镀锌薄铁皮4两侧均设置有防护栏杆,且防护栏杆的高度不小于1.5m,通过防护栏杆保证工作人员施工时的安全性,根据钢架体系加固深化设计,进行现场施工,施工完成后,对加固体系进行检测,检测合格后进行后续施工,在镀锌薄铁皮4上搭设外挂吊篮的操作平台7。As a technical optimization scheme of the present invention, protective railings are provided on both sides of the galvanized
作为本发明的一种技术优化方案,外挂吊篮蓝筐10的高度低于外挂吊篮中梁8的高度。As a technical optimization solution of the present invention, the height of the
该安装结构的安装方法具体包括以下步骤:The installation method of the installation structure specifically includes the following steps:
步骤一:外挂吊篮对原结构的荷载效应计算;Step 1: Calculate the load effect of the external hanging basket on the original structure;
步骤二:在原结构的钢结构桁架体系2加固搭设外挂吊篮操作平台7;Step 2: Reinforce and erect an external hanging
步骤三:搭设施工人员上下跑道3;Step 3: Set up the construction workers to get on and off the
步骤四:搭设钢结构桁架体系2的加固平台;Step 4: erect the reinforcement platform of the steel
步骤五:原结构的钢架体系加固施工;Step 5: Reinforce the steel frame system of the original structure;
步骤六:搭设外挂吊篮操作平台7;Step 6: Set up an external hanging
步骤七:安装屋面支撑系统;Step 7: Install the roof support system;
步骤八:组装悬挂机构;Step 8: Assemble the suspension mechanism;
步骤九:安装钢丝绳、安全锁等构件;Step 9: Install wire ropes, safety locks and other components;
步骤十:试运行,验收,投入使用。Step 10: Trial operation, acceptance, and putting into use.
工作原理:本发明在使用时,首先,检查本发明各组件使用时的安全性,然后,对外挂吊篮的受力体系进行验算,确认外挂吊篮对原结构体系的荷载效应,其次,在原结构的钢结构桁架体系2上搭设加固外挂吊篮操作平台7,根据外挂吊篮的荷载效应进行原结构的钢结构桁架体系2的加固施工,然后,在钢结构加固外挂吊篮操作平台7上搭设外挂吊篮操作架体6,固定外挂吊篮的外挂吊篮中梁8、搭设外挂吊篮、外挂吊篮检测、外挂吊篮过程中监控,最后,屋面幕墙施工完成后进行外挂吊篮的拆除、吊篮操作平台拆除。Working principle: when the present invention is in use, firstly, check the safety of each component of the present invention when using it, and then check and calculate the force system of the external hanging basket to confirm the load effect of the external hanging basket on the original structural system. On the steel
由于该安装结构直接将外挂吊篮的外挂吊篮中梁8即水平支架安放在钢结构桁架体系2上,在满足幕墙工程的使用要求的前提下,取消了外挂吊篮的竖向支架、降低了外挂吊篮竖向失稳的隐患、减少了外挂吊篮对屋面空间的占用、节约了施工时间、提高了施工效率;幕墙工程外挂吊篮安装的施工方法,与传统施工工艺相比,无需设置竖向的支架,有效的节约了屋面的施工空间,便于进行多专业的穿插施工。Because the installation structure directly places the
以上公开的本发明优选实施例只是用于帮助阐述本发明。优选实施例并没有详尽叙述所有的细节,也不限制该发明仅为的具体实施方式。显然,根据本说明书的内容,可作很多的修改和变化。本说明书选取并具体描述这些实施例,是为了更好地解释本发明的原理和实际应用,从而使所属技术领域技术人员能很好地理解和利用本发明。本发明仅受权利要求书及其全部范围和等效物的限制。The above-disclosed preferred embodiments of the present invention are provided only to help illustrate the present invention. The preferred embodiments do not exhaust all the details and do not limit the invention to specific embodiments only. Obviously, many modifications and variations are possible in light of the contents of this specification. These embodiments are selected and described in this specification in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can well understand and utilize the present invention. The present invention is to be limited only by the claims and their full scope and equivalents.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201811435360.9A CN109653484B (en) | 2018-11-28 | 2018-11-28 | An installation structure of an external hanging basket for a roof super-high-air curtain wall project |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201811435360.9A CN109653484B (en) | 2018-11-28 | 2018-11-28 | An installation structure of an external hanging basket for a roof super-high-air curtain wall project |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN109653484A CN109653484A (en) | 2019-04-19 |
| CN109653484B true CN109653484B (en) | 2020-12-08 |
Family
ID=66111835
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201811435360.9A Active CN109653484B (en) | 2018-11-28 | 2018-11-28 | An installation structure of an external hanging basket for a roof super-high-air curtain wall project |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109653484B (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112962948B (en) * | 2021-02-09 | 2022-07-26 | 北京城建六建设集团有限公司 | Hanging basket suspension mechanism fixing structure without counter weight and construction method thereof |
| CN113756558A (en) * | 2021-09-30 | 2021-12-07 | 北京建工集团有限责任公司 | High-rise assembled steel structure system externally hung hanging basket installation structure and construction method thereof |
| CN114673338A (en) * | 2022-01-24 | 2022-06-28 | 微中子(西安)建筑技术有限公司 | Intelligent construction platform and installation method of intelligent construction platform |
| CN116065801A (en) * | 2023-02-28 | 2023-05-05 | 中建二局装饰工程有限公司 | Hanging basket device and installation method suitable for curtain wall construction |
| CN119641073A (en) * | 2024-12-05 | 2025-03-18 | 上海宝冶集团有限公司 | Method for installing anchor ear type special-shaped hanging basket on truss steel structure based on large-gradient roof pipe |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202202558U (en) * | 2011-07-13 | 2012-04-25 | 浙江中成建工集团有限公司 | Beam riding yard hanging basket suspension mechanism mounted on high-rise roof truss beam |
| CN205036065U (en) * | 2015-08-24 | 2016-02-17 | 中国建筑第八工程局有限公司 | A adhere to formula and do not have a counter weight hanging flower basket for outer wall construction |
| CN206554487U (en) * | 2017-02-22 | 2017-10-13 | 中建八局第四建设有限公司 | A kind of roofing hanging basket |
| CN208072925U (en) * | 2018-04-11 | 2018-11-09 | 太原市第一建筑工程集团有限公司 | A kind of roof framework hanging basket dedicated support system |
-
2018
- 2018-11-28 CN CN201811435360.9A patent/CN109653484B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202202558U (en) * | 2011-07-13 | 2012-04-25 | 浙江中成建工集团有限公司 | Beam riding yard hanging basket suspension mechanism mounted on high-rise roof truss beam |
| CN205036065U (en) * | 2015-08-24 | 2016-02-17 | 中国建筑第八工程局有限公司 | A adhere to formula and do not have a counter weight hanging flower basket for outer wall construction |
| CN206554487U (en) * | 2017-02-22 | 2017-10-13 | 中建八局第四建设有限公司 | A kind of roofing hanging basket |
| CN208072925U (en) * | 2018-04-11 | 2018-11-09 | 太原市第一建筑工程集团有限公司 | A kind of roof framework hanging basket dedicated support system |
Non-Patent Citations (1)
| Title |
|---|
| "北京电视中心综合业务楼超高层钢结构施工安全防护技术";齐明等;《建筑技术》;20050215;第36卷(第2期);第100-104页 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN109653484A (en) | 2019-04-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109653484B (en) | An installation structure of an external hanging basket for a roof super-high-air curtain wall project | |
| CN107100358A (en) | Cantilever bracket, frame body and construction method for non-unloading industrialized safety protection | |
| CN102345393A (en) | High-altitude bulk process of bolt ball net frame | |
| CN206513004U (en) | A kind of movable hanger for being easy to roof inner slab to install | |
| CN104453197A (en) | High-altitude large-cantilever concrete structure structural steel supporting platform | |
| CN101775896B (en) | Rigid suspended scaffold for installing pipeline of steel roof equipment | |
| CN107419893A (en) | A kind of elevator steel platform and preparation method thereof | |
| CN109184061A (en) | It cornices outside space structure ceiling system structure and construction method | |
| CN207934424U (en) | A kind of aerial construction platform device overhanging special-shaped curtain wall based on steel construction | |
| CN113550550A (en) | Overhanging unit type scaffold convenient to assemble and disassemble | |
| CN209353770U (en) | High-altitude suspension formwork protective shed | |
| CN208563924U (en) | A kind of assembled combination operation frame | |
| CN101255764A (en) | High-altitude pouring steel column inner concrete operation platform frame | |
| CN205171979U (en) | Integrated form all steel lift platform | |
| CN206616876U (en) | One kind is encorbelmented protective platform system | |
| CN108952136A (en) | Removable monoblock type lifting protection frame body peace tears method open | |
| CN117027352A (en) | Large-span high altitude vestibule curtain wall construction operation platform | |
| CN207296361U (en) | A kind of regularization assembled overhanging protection canopy | |
| CN218668459U (en) | Bottom device for erecting hanging basket on inclined roof | |
| CN111997345B (en) | Lifting scaffold hangs hoist system upside down | |
| CN204876514U (en) | Outer hanging scaffold system of assembled house | |
| CN211736308U (en) | Self-sliding hanging frame device for mounting steel structure factory building roof inner plate | |
| CN114033189A (en) | Large-area high-altitude grid structure aluminum grid ceiling construction device and construction method | |
| CN201695592U (en) | An inverted color steel tile quick installation platform | |
| CN212027058U (en) | Building movable hanging flower basket |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 230000 building 3, 262 Heping Road, Yaohai District, Hefei City, Anhui Province Patentee after: No 6 Construction Co.,Ltd. of China Construction Fourth Engineering Bureau Address before: 21 / F and 22 / F, Zhongjian building, northeast corner, intersection of Tongling Road and Heping Road, Yaohai District, Hefei City, Anhui Province, 230011 Patentee before: CHINA CONSTRUCTION 4TH ENGINEERING BUREAU, 6TH Co.,Ltd. |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: An External Hanging Basket Installation Structure for Roof Ultra High Sky Curtain Wall Engineering Effective date of registration: 20231128 Granted publication date: 20201208 Pledgee: China Construction Bank Co.,Ltd. Hefei Chengdong sub branch Pledgor: No 6 Construction Co.,Ltd. of China Construction Fourth Engineering Bureau Registration number: Y2023980067820 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20201208 Pledgee: China Construction Bank Co.,Ltd. Hefei Chengdong sub branch Pledgor: No 6 Construction Co.,Ltd. of China Construction Fourth Engineering Bureau Registration number: Y2023980067820 |
