- CN204676865U CN204676865U CN201520252538.1U CN201520252538U CN204676865U CN 204676865 U CN204676865 U CN 204676865U CN 201520252538 U CN201520252538 U CN 201520252538U CN 204676865 U CN204676865 U CN 204676865U
- Authority
- CN
- China
- Prior art keywords
- girder steel
- combined girder
- work scaffold
- steel
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of building scaffold, it relates to technical field of buildings.It comprises bridge-type horizontal truss, sizing steel work scaffold frame, outer protection net post, framework triangle joint frame, combined girder steel is oblique, combined girder steel attached wall seat, anchor bolt and combined girder steel flat-topped ridge, bridge-type horizontal truss is fixed with multiple sizing steel work scaffold frame, be fixedly connected with by framework triangle joint frame between multiple sizing steel work scaffold frame, multiple sizing steel work scaffold frame arranged outside has outer protection net post, by combined girder steel attached wall seat inside described multiple sizing steel work scaffold frames, combined girder steel is oblique, combined girder steel flat-topped ridge and anchor bolt are fixed on external wall.The utility model adopts sizing steel structure assembling, and assembling is simple, low to the technical requirements of operator, sets up reliability higher.
Description
Technical field
The utility model relates to technical field of buildings, be specifically related to a kind of building scaffold.
Background technology
In building trade, scaffold is a kind of common tool, after it is assembled by steel tube fastener, outside the building encloses to be formed and closes support body, for construction worker's construction usage.The scaffold that this craft is set up is wasted time and energy, installation and removal process is loaded down with trivial details, and danger is higher, tumble injury easily occurs in operation and injures by a crashing object, particularly along with the continuous increase of building height, the scaffold degree of difficulty that this traditional-handwork is set up and risk factor constantly increase.
Current attached lift scaffold adopts steel tube fastener to set up, and operator's labour intensity is high, sets up quality and operator's technical level has direct relation, sets up reliability low; Operation layer is wooden scaffold floor, and waste timber is not prevented fires; Protective screening is disposable Dense mesh screen, and a construction period terminates at least to change once, does not prevent fires, not environmentally.
Utility model content
For the deficiency that prior art exists, the utility model object is to provide a kind of building scaffold, adopts sizing steel structure assembling, assembling simple (not needing steel tube fastener to set up), low to the technical requirements of operator, set up reliability higher; Setting up material is all steel, can repeatedly use, and fireproof performance is good, safe, practical, attractive in appearance, compensate for the deficiency of common attached lift scaffold.
To achieve these goals, the utility model realizes by the following technical solutions: a kind of building scaffold, comprise bridge-type horizontal truss, sizing steel work scaffold frame, outer protection net post, framework triangle joint frame, combined girder steel is oblique, combined girder steel attached wall seat, anchor bolt and combined girder steel flat-topped ridge, bridge-type horizontal truss is fixed with multiple sizing steel work scaffold frame, be fixedly connected with by framework triangle joint frame between multiple sizing steel work scaffold frame, multiple sizing steel work scaffold frame arranged outside has outer protection net post, by combined girder steel attached wall seat inside described multiple sizing steel work scaffold frames, combined girder steel is oblique, combined girder steel flat-topped ridge and anchor bolt are fixed on external wall.
As preferably, described each combined girder steel attached wall seat is provided with catching device.
As preferably, described bridge-type horizontal truss adopts brace and cross bar to splice and fixes, and bears support body load.
The beneficial effects of the utility model: adopt sizing steel structure assembling, assembling simple (not needing steel tube fastener to set up), low to the technical requirements of operator, set up reliability higher; Setting up material is all steel, can repeatedly use, and fireproof performance is good, safe, practical, attractive in appearance, compensate for the deficiency of common attached lift scaffold.
Accompanying drawing explanation
The utility model is described in detail below in conjunction with the drawings and specific embodiments;
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the A portion enlarged diagram of Fig. 1.
Detailed description of the invention
The technological means realized for making the utility model, creation characteristic, reaching object and effect is easy to understand, below in conjunction with detailed description of the invention, setting forth the utility model further.
With reference to Fig. 1-2, this detailed description of the invention is by the following technical solutions: a kind of building scaffold, comprise bridge-type horizontal truss 1, sizing steel work scaffold frame 2, outer protection net post 3, framework triangle joint frame 4, combined girder steel oblique 6, combined girder steel attached wall seat 7, anchor bolt 8 and combined girder steel flat-topped ridge 9, bridge-type horizontal truss 1 is fixed with multiple sizing steel work scaffold frame 2, be fixedly connected with by framework triangle joint frame 4 between multiple sizing steel work scaffold frame 2, multiple sizing steel work scaffold frame 2 arranged outside has outer protection net post 3, by combined girder steel attached wall seat 7 inside described multiple sizing steel work scaffold frames 2, combined girder steel oblique 6, combined girder steel flat-topped ridge 9 and anchor bolt 8 are fixed on external wall 5.
It should be noted that and described each combined girder steel attached wall seat 7 is provided with catching device.
In addition, it is fixing that described bridge-type horizontal truss adopts brace and cross bar to splice, and bears support body load.
The structure that this detailed description of the invention is applicable to multiple floor height uses, and is convenient to production and transport and maintenance.Two sections, bight support body is connected into entirety by corner post by rotation angle position.Bottom adopts brace and cross bar to form bridge-type horizontal truss, bears support body load.Operation layer adopts bending steel plate brill tailfiber to be fixed on cross bar end face, simple installation.According to different structure profile, wall-attached supporting seat is designed to various ways, is respectively: standard hanging seat, combined girder steel, horizontal girder steel form, be applicable to different building structure profiles.All wall-attached supporting seats all arrange catching device, round-the-clock multiple-protection.
More than show and describe general principle of the present utility model and principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; what describe in above-described embodiment and manual just illustrates principle of the present utility model; under the prerequisite not departing from the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.
Claims (3)
1. a building scaffold, it is characterized in that, comprise bridge-type horizontal truss (1), sizing steel work scaffold frame (2), outer protection net post (3), framework triangle joint frame (4), combined girder steel tiltedly (6), combined girder steel attached wall seat (7), anchor bolt (8) and combined girder steel flat-topped ridge (9), bridge-type horizontal truss (1) is fixed with multiple sizing steel work scaffold frame (2), be fixedly connected with by framework triangle joint frame (4) between multiple sizing steel work scaffold frame (2), multiple sizing steel work scaffold frame (2) arranged outside has outer protection net post (3), described multiple sizing steel work scaffold frame (2) inner sides are by combined girder steel attached wall seat (7), combined girder steel tiltedly (6), combined girder steel flat-topped ridge (9) and anchor bolt (8) are fixed on external wall.
2. a kind of building scaffold according to claim 1, is characterized in that, described each combined girder steel attached wall seat (7) is provided with catching device.
3. a kind of building scaffold according to claim 1, is characterized in that, it is fixing that described bridge-type horizontal truss adopts brace and cross bar to splice, and bears support body load.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520252538.1U CN204676865U (en) | 2015-04-23 | 2015-04-23 | A kind of building scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520252538.1U CN204676865U (en) | 2015-04-23 | 2015-04-23 | A kind of building scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204676865U true CN204676865U (en) | 2015-09-30 |
Family
ID=54176570
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520252538.1U Expired - Fee Related CN204676865U (en) | 2015-04-23 | 2015-04-23 | A kind of building scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204676865U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108331337A (en) * | 2018-03-12 | 2018-07-27 | 上海建工建集团有限公司 | A kind of whole formwork system and its construction method for structure missing layer |
CN109372246A (en) * | 2018-12-19 | 2019-02-22 | 山东朗冠建筑工程有限公司 | Adjustable rigidity oblique pull wall-attached supporting seat, application and method |
CN110158941A (en) * | 2019-06-03 | 2019-08-23 | 李大泽 | Build aluminium alloy outrigger |
-
2015
- 2015-04-23 CN CN201520252538.1U patent/CN204676865U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108331337A (en) * | 2018-03-12 | 2018-07-27 | 上海建工建集团有限公司 | A kind of whole formwork system and its construction method for structure missing layer |
CN109372246A (en) * | 2018-12-19 | 2019-02-22 | 山东朗冠建筑工程有限公司 | Adjustable rigidity oblique pull wall-attached supporting seat, application and method |
CN110158941A (en) * | 2019-06-03 | 2019-08-23 | 李大泽 | Build aluminium alloy outrigger |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103206074B (en) | Elevator shaft template construction method, platform and support | |
CN204126230U (en) | Assembly scaffold unit | |
CN204676865U (en) | A kind of building scaffold | |
CN104420640A (en) | Heterosexual chimney construction platform | |
CN205171979U (en) | Integrated form all steel lift platform | |
CN203669395U (en) | Protective operation hanging frame for top die system | |
CN205397785U (en) | Construction elevator attaches wall interval superelevation subassembly | |
CN204001702U (en) | A kind of J-shaped wall plastic formwork | |
CN204238537U (en) | A kind of elevated hoistway operation platform | |
CN207646996U (en) | A kind of square set | |
CN205840289U (en) | A kind of suspension type vertical operating platform | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN209429487U (en) | A kind of scaffold of architectural engineering | |
CN204059909U (en) | With the horizontal truss of avoiding structure | |
CN207260537U (en) | A kind of scaffold for construction | |
CN208039787U (en) | The assembled operating platform of side operation is faced in a kind of high-altitude | |
CN202672762U (en) | Truss-type security channel for building construction | |
CN203878952U (en) | Simple telescopic scaffold | |
CN209040530U (en) | A kind of construction operation hanging cage | |
CN204002511U (en) | A kind of three-dimensional arrangement ladder | |
CN205259554U (en) | A mount for installation of light steel joist gypsum -lath furred ceiling | |
CN204959978U (en) | Show house floor roof beam and outer wall structure | |
CN206784868U (en) | A kind of construction frame | |
CN109958270A (en) | A kind of scaffold of building engineering construction | |
CN204163367U (en) | Cat ladder frame operating platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150930 Termination date: 20160423 |
|