CN203669395U - Protective operation hanging frame for top die system - Google Patents
Protective operation hanging frame for top die system Download PDFInfo
- Publication number
- CN203669395U CN203669395U CN201320818657.XU CN201320818657U CN203669395U CN 203669395 U CN203669395 U CN 203669395U CN 201320818657 U CN201320818657 U CN 201320818657U CN 203669395 U CN203669395 U CN 203669395U
- Authority
- CN
- China
- Prior art keywords
- vertical rod
- hanger
- protective screening
- individual layer
- hanging frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000001681 protective effect Effects 0.000 title claims abstract description 50
- 239000002356 single layer Substances 0.000 claims abstract description 15
- 238000012216 screening Methods 0.000 claims description 46
- 239000010410 layer Substances 0.000 claims description 32
- 229910052782 aluminium Inorganic materials 0.000 claims description 20
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 claims description 19
- 230000007306 turnover Effects 0.000 claims description 12
- 239000004411 aluminium Substances 0.000 claims description 11
- 239000000725 suspension Substances 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 13
- 230000009194 climbing Effects 0.000 description 6
- 238000010586 diagram Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000004513 sizing Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Landscapes
- Ladders (AREA)
Abstract
The utility model relates to a protective operation hanging frame for a top die system. The protective operation hanging frame is characterized by comprising a plurality of single-layer hanging frame bodies which are linearly connected from top to bottom, wherein the uppermost single-layer hanging frame body is hung on the lower portion of a top die truss platform; each single-layer hanging frame body comprises vertical rods, transverse rods, a foot plank, a vertical face protective net and an inner turning plate, the lower end of each vertical rod is provided with a vertical rod connecting piece, and the upper end of each vertical rod connecting piece is telescopically and fixedly connected with the lower end of the corresponding vertical rod; the single-layer hanging frame bodies are detachably and fixedly connected; the upper ends of the four vertical rods of the lower single-layer hanging frame body of every two adjacent single-layer hanging frame bodies are telescopically and fixedly connected with the four vertical rod connecting pieces of the upper single-layer hanging frame body of the every two adjacent single-layer hanging frame bodies respectively; the upper ends of the four vertical rods of the uppermost single-layer hanging frame body are connected with the lower portion of the top die truss platform through hanging connecting pieces in a hanging mode. The protective operation hanging frame is simple in structure, convenient to use and capable of being adapted to core tube structures of different story heights during construction.
Description
Technical field
The utility model relates to a kind of Core Walls Structure construction scaffolding of outter frame inner cylinder structural construction, more specifically to a kind of fence operation hanger for top mould system.
Background technology
Protect support body in the super highrise building Core Walls Structure construction China and foreign countries of outter frame inner cylinder and generally adopt climbing frame, climbing frame has been protected the safety of super highrise building core wall structure personnel constructions, for construction provides a construction environment for sealing safely.Climbing frame generally adopts section steel manufacture, and this type climbing frame is from great; Require high to the upper and lower facade change in size of building; Same sizing climbing frame can not be used for the structure construction of different floor heights; When climbing frame climbs, need divide into groups to climb, required time is long.
Utility model content
The purpose of this utility model is to provide a kind of fence operation hanger for top mould system, and this hanging rack structure core wall structure simple, easy to use, that can adapt to different floor heights is constructed.
For achieving the above object, technical scheme provided by the utility model is:
For a fence operation hanger for top mould system, it is characterized in that: it comprises that multiple individual layer hangers linearly connect from top to bottom, are positioned at uppermost individual layer hanger and are suspended on the bottom of backform truss platform;
Described individual layer hanger comprises four vertical rods, two cross bars, a scaffold floor and a facade protective screening, and the lower end of described every vertical rod is all provided with vertical rod connector, and the upper end of vertical rod connector is fixedly connected with the lower end of vertical rod is scalable; One group between two of described four vertical rod, are fixedly connected with by a cross bar between every group of two vertical rods, and the two ends of cross bar are detachably fixedly connected with the middle part of the vertical rod connector of two vertical rod lower ends respectively, and the vertical Parallel Symmetric of two vertical rods in every group is arranged; Two groups of vertical rods connect into an entirety by a scaffold floor and a facade protective screening, two groups of vertical rod Parallel Symmetrics are arranged, the two ends of described scaffold floor are detachably fixed on respectively on two cross bars, and the two ends of described facade protective screening are detachably fixed on respectively in two vertical rods in outside;
Between described multiple individual layer hanger for being detachably fixedly connected with, in two adjacent monolayer hangers, be positioned at individual layer hanger below four vertical rods upper end respectively with four scalable being fixedly connected with of vertical rod connector that are positioned at individual layer hanger above, and facade protective screening is positioned at the same side; The upper end that is positioned at four vertical rods of uppermost individual layer hanger is all hung and is connected with the bottom of backform truss platform by suspension linkage member.
Described individual layer hanger also comprises an interior turnover panel, and on the vertical rod connector of dismountable two vertical rods that are arranged on inner side of described interior turnover panel, and the inner side that is positioned at scaffold floor is near Core Walls Structure wall.
Described vertical rod connector is T shape, and its three ends are equipped with bolt hole, and upper and lower end parts is respectively provided with multiple bolts hole; Described vertical rod and cross bar are hollow structure, and the two ends up and down of described vertical rod are all vertically evenly provided with multiple bolts hole, and the two ends of cross bar are provided with bolt hole; The upper end of described vertical rod connector is inserted in the lower end of vertical rod, and is bolted to connection; The termination at described vertical rod connector middle part is inserted in one end of cross bar, and is bolted to connection; When two adjacent monolayer hangers connect, the lower end that is positioned at the vertical rod connector on individual layer hanger is above inserted in the upper end of the vertical rod that is positioned at the hanger of individual layer below, and is bolted to connection.
Described facade protective screening comprises protective screening framework and aluminum protective screening, and described protective screening framework is made into palace lattice shape by flat leading to of aluminium, and described aluminum protective screening is fixed on protective screening framework by press strip and rivet or is welded on protective screening framework; Described protective screening framework is fixedly connected with vertical rod by bolt, and the height of protective screening framework and the height of vertical rod equate.
Described vertical rod, vertical rod connector, cross bar adopt flat logical being made of aluminium, and described scaffold floor adopts Figured aluminium plate to be made, and described scaffold floor and cross bar are bolted to connection.
The upper and lower end parts of described vertical rod connector is respectively provided with eight bolts hole, and the two ends up and down of described vertical rod are equipped with five bolts hole.
The beneficial effects of the utility model:
1, the utility model regulates and controls the height of whole hanger by the telescopic adjustment between multiple individual layer hanger package assemblies and vertical rod connector and vertical rod, to adapt to the core wall structure construction of different floors and floor height, and simple in structure, easy to use;
2, all parts that the utility model is logical all adopts aluminium section to make, and is bolted, and construction assembling is efficient and convenient, from heavy and light; Can also promote with backform truss platform Integral synchronous, reusable;
3, the utility model be a kind of simple in structure, construct rational aluminum hanger platform, from heavy and light, easy to assembly, effectively protected the safety of super highrise building core wall structure personnel constructions, for construction provides the construction environment of a safety sealing.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model.
Fig. 2 is side schematic view of the present utility model.
Fig. 3 is the partial schematic diagram at the utility model vertical rod connector place.
Fig. 4 is that scaffold floor is arranged on the floor map on cross bar.
Fig. 5 is the schematic diagram of facade protective screening.
Description of reference numerals: 1-vertical rod; 2-vertical rod connector; 3-cross bar; 4-scaffold floor; 5-facade protective screening; Turnover panel in 6-; 7-aluminum protective screening; 8-backform truss platform; 9-suspension linkage member; 10-template erecting by overhang; 11-template; 12-protective screening framework.
The specific embodiment
In order better to understand the technical solution of the utility model, below by embodiment and accompanying drawing, the utility model is further detailed.
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, a kind of fence operation hanger for top mould system, it comprises that multiple individual layer hangers linearly connect from top to bottom, are positioned at uppermost individual layer hanger and are suspended on the bottom of backform truss platform 8;
Described individual layer hanger comprises four vertical rods 1, two cross bars 3, scaffold floor 4 and a facade protective screening 5, and the lower end of described every vertical rod 1 is all provided with vertical rod connector 2, scalable being fixedly connected with in lower end of the upper end of vertical rod connector 2 and vertical rod 1; One group between two of described four vertical rod 1, between every group of two vertical rods 1, be fixedly connected with by a cross bar 3, the two ends of cross bar 3 are detachably fixedly connected with the middle part of the vertical rod connector 2 of two vertical rod 1 lower ends respectively, and the vertical Parallel Symmetric of two vertical rods 1 in every group is arranged; Two groups of vertical rods 1 connect into an entirety by a scaffold floor 4 and a facade protective screening 5, two groups of vertical rod 1 Parallel Symmetrics are arranged, the two ends of described scaffold floor 4 are detachably fixed on respectively on two cross bars 3, and the two ends of described facade protective screening 5 are detachably fixed on respectively in two vertical rods 1 in outside;
Between described multiple individual layer hanger for being detachably fixedly connected with, in two adjacent monolayer hangers, be positioned at individual layer hanger below four vertical rods 1 upper end respectively with four scalable being fixedly connected with of vertical rod connector 2 that are positioned at individual layer hanger above, and facade protective screening 5 is positioned at the same side; The upper end that is positioned at four vertical rods 1 of uppermost individual layer hanger is all hung and is connected with the bottom of backform truss platform 8 by suspension linkage member 9.
As shown in Figure 1, described individual layer hanger also comprises an interior turnover panel 6, and on the vertical rod connector 2 of dismountable two vertical rods 1 that are arranged on inner side of described interior turnover panel 6, and the inner side that is positioned at scaffold floor 4 is near Core Walls Structure wall.On the individual layer hanger of template 11 both sides, interior turnover panel 6 can be installed, to facilitate installation and the dismounting (because installation and the dismounting of template 11 need space) of template 11.The effect of described interior turnover panel 6 is mainly the gap that reduces hanger support body and Core Walls Structure between the walls, guarantees that this gap minimizes, and anti-falling stop people, pendant thing, meet security regulations requirement.
As shown in Figure 3, described vertical rod connector 2 is T shape, and its three ends are equipped with bolt hole, and upper and lower end parts is respectively provided with multiple bolts hole; Described vertical rod 1 and cross bar 3 are hollow structure, and the two ends up and down of described vertical rod 1 are all vertically evenly provided with multiple bolts hole, and the two ends of cross bar 3 are provided with bolt hole; The upper end of described vertical rod connector 2 is inserted in the lower end of vertical rod 1, and is bolted to connection; The termination at described vertical rod connector 2 middle parts is inserted in one end of cross bar 3, and is bolted to connection; When two adjacent monolayer hangers connect, the lower end that is positioned at the vertical rod connector 2 on individual layer hanger is above inserted in the upper end of the vertical rod 1 that is positioned at the hanger of individual layer below, and is bolted to connection.
As shown in Figure 5, described facade protective screening 5 comprises protective screening framework 12 and aluminum protective screening 7, described protective screening framework 12 is made into palace lattice shape by flat leading to of aluminium, and described aluminum protective screening 7 is fixed on protective screening framework 12 by press strip and rivet or is welded on protective screening framework 12; Described protective screening framework 12 is fixedly connected with vertical rod 1 by bolt, and the height of protective screening framework 12 equates with the height of vertical rod 1.
Described vertical rod 1, vertical rod connector 2, cross bar 3 adopt flat logical being made of aluminium, and described scaffold floor 4 adopts Figured aluminium plate to be made, and described scaffold floor 4 is bolted to connection with cross bar 3.
Described cross bar 3 can also be aluminum corner brace, is to be also fixedly connected with the termination at vertical rod connector 2 middle parts by bolt.
The upper and lower end parts of described vertical rod connector 2 is respectively provided with eight bolts hole, and the two ends up and down of described vertical rod 1 are equipped with five bolts hole.
Described vertical rod 1, vertical rod connector 2, cross bar 3, scaffold floor 4, facade protective screening 5, interior turnover panel 6 all can be made for aluminium section, and modularization design and processing and fabricating, from heavy and light.
Between described vertical rod 1, vertical rod connector 2, cross bar 3, scaffold floor 4, facade protective screening 5, interior turnover panel 6, be all fixed with bolts by connecting hole, form tool assembling.
Described vertical rod 1 adopts socket joint connected mode with vertical rod connector 2, insert the degree of depth of vertical rod 1 by vertical rod connector 2, allowing, both bolts hole are corresponding, are bolted, reach the telescopic adjustment between vertical rod 1 and vertical rod connector 2, finally realize the adjustable of whole hanger vertical height.
A kind of fence operation hanger integral hanging for top mould system of the present utility model is in the outside of template erecting by overhang 10 and template 11, described facade protective screening 5 is positioned at the side away from template erecting by overhang 10 and template 11, and described interior turnover panel 6 is positioned at the side near template erecting by overhang 10 and template 11.
Above embodiment is only the preferred version of the utility model; but not to restriction of the present utility model; person skilled in the relevant technique; in the situation that not departing from spirit and scope of the present utility model; can also make various conversion or modification; therefore all technical schemes that are equal to, all fall into protection domain of the present utility model.
Claims (6)
1. for a fence operation hanger for top mould system, it is characterized in that: it comprises that multiple individual layer hangers linearly connect from top to bottom, are positioned at uppermost individual layer hanger and are suspended on the bottom of backform truss platform (8);
Described individual layer hanger comprises four vertical rods (1), two cross bars (3), a scaffold floor (4) and a facade protective screening (5), the lower end of described every vertical rod (1) is all provided with vertical rod connector (2), scalable being fixedly connected with in lower end of the upper end of vertical rod connector (2) and vertical rod (1); One group between two of described four vertical rod (1), between every group two vertical rods (1), be fixedly connected with by a cross bar (3), the two ends of cross bar (3) are detachably fixedly connected with the middle part of the vertical rod connector (2) of two vertical rods (1) lower end respectively, and two vertical rods (1) in every group vertically Parallel Symmetric are arranged; Two groups of vertical rods (1) connect into an entirety by a scaffold floor (4) and a facade protective screening (5), two groups of vertical rods (1) Parallel Symmetric is arranged, it is upper that the two ends of described scaffold floor (4) are detachably fixed on respectively two cross bars (3), and the two ends of described facade protective screening (5) are detachably fixed on respectively in two vertical rods (1) in outside;
Between described multiple individual layer hanger for being detachably fixedly connected with, in two adjacent monolayer hangers, be positioned at individual layer hanger below four vertical rods (1) upper end respectively with scalable being fixedly connected with of four vertical rod connectors (2) that is positioned at individual layer hanger above, and facade protective screening (5) is positioned at the same side; The upper end that is positioned at four vertical rods (1) of uppermost individual layer hanger is all hung and is connected with the bottom of backform truss platform (8) by suspension linkage member (9).
2. a kind of fence operation hanger for top mould system according to claim 1, it is characterized in that: described individual layer hanger also comprises an interior turnover panel (6), the vertical rod connector (2) of dismountable two vertical rods (1) that are arranged on inner side of described interior turnover panel (6) is upper, and the inner side that is positioned at scaffold floor (4) is near Core Walls Structure wall.
3. a kind of fence operation hanger for top mould system according to claim 1, is characterized in that: described vertical rod connector (2) is T shape, and its three ends are equipped with bolt hole, and upper and lower end parts is respectively provided with multiple bolts hole; Described vertical rod (1) and cross bar (3) are hollow structure, and the two ends up and down of described vertical rod (1) are all vertically evenly provided with multiple bolts hole, and the two ends of cross bar (3) are provided with bolt hole; The upper end of described vertical rod connector (2) is inserted in the lower end of vertical rod (1), and is bolted to connection; The termination at described vertical rod connector (2) middle part is inserted in one end of cross bar (3), and is bolted to connection; When two adjacent monolayer hangers connect, the lower end that is positioned at the vertical rod connector (2) on individual layer hanger is above inserted in the upper end of the vertical rod (1) that is positioned at the hanger of individual layer below, and is bolted to connection.
4. a kind of fence operation hanger for top mould system according to claim 3, it is characterized in that: described facade protective screening (5) comprises protective screening framework (12) and aluminum protective screening (7), described protective screening framework (12) is by the flat logical palace lattice shape that is made into of aluminium, and described aluminum protective screening (7) is fixed on protective screening framework (12) above or is welded on protective screening framework (12) by press strip and rivet; Described protective screening framework (12) is fixedly connected with vertical rod (1) by bolt, and the height of protective screening framework (12) equates with the height of vertical rod (1).
5. a kind of fence operation hanger for top mould system according to claim 3, it is characterized in that: described vertical rod (1), vertical rod connector (2), cross bar (3) adopt flat logical being made of aluminium, described scaffold floor (4) adopts Figured aluminium plate to be made, and described scaffold floor (4) is bolted to connection with cross bar (3).
6. a kind of fence operation hanger for top mould system according to claim 3, is characterized in that: the upper and lower end parts of described vertical rod connector (2) is respectively provided with eight bolts hole, and the two ends up and down of described vertical rod (1) are equipped with five bolts hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320818657.XU CN203669395U (en) | 2013-12-13 | 2013-12-13 | Protective operation hanging frame for top die system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320818657.XU CN203669395U (en) | 2013-12-13 | 2013-12-13 | Protective operation hanging frame for top die system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203669395U true CN203669395U (en) | 2014-06-25 |
Family
ID=50965710
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320818657.XU Expired - Fee Related CN203669395U (en) | 2013-12-13 | 2013-12-13 | Protective operation hanging frame for top die system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203669395U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105822067A (en) * | 2016-04-08 | 2016-08-03 | 中国建筑第八工程局有限公司 | Conflict avoidance method for high-rise or super-high-rise hanger and self-climbing tower crane support beam |
CN109853929A (en) * | 2019-03-07 | 2019-06-07 | 中国长江三峡集团有限公司 | One kind sliding laterally portable construction hanging basket and application method |
CN113463900A (en) * | 2021-07-02 | 2021-10-01 | 中建三局第三建设工程有限责任公司 | Multifunctional slidable hanging rack for staircase and construction method thereof |
CN113738139A (en) * | 2021-08-26 | 2021-12-03 | 中建八局西南建设工程有限公司 | Corridor embedded-hanging type turnover vertical face protection tool and construction method thereof |
-
2013
- 2013-12-13 CN CN201320818657.XU patent/CN203669395U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105822067A (en) * | 2016-04-08 | 2016-08-03 | 中国建筑第八工程局有限公司 | Conflict avoidance method for high-rise or super-high-rise hanger and self-climbing tower crane support beam |
CN105822067B (en) * | 2016-04-08 | 2017-11-10 | 中国建筑第八工程局有限公司 | High-rise, Super High hanger with from climbing tower crane support beam conflict avoiding method |
CN109853929A (en) * | 2019-03-07 | 2019-06-07 | 中国长江三峡集团有限公司 | One kind sliding laterally portable construction hanging basket and application method |
CN113463900A (en) * | 2021-07-02 | 2021-10-01 | 中建三局第三建设工程有限责任公司 | Multifunctional slidable hanging rack for staircase and construction method thereof |
CN113738139A (en) * | 2021-08-26 | 2021-12-03 | 中建八局西南建设工程有限公司 | Corridor embedded-hanging type turnover vertical face protection tool and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203669395U (en) | Protective operation hanging frame for top die system | |
CN203531344U (en) | Tool type scaffold | |
CN204475593U (en) | Support structure installed by a kind of curtain wall | |
CN203729564U (en) | Attached lifting scaffold | |
CN219528334U (en) | Scaffold for building construction | |
CN209429487U (en) | A kind of scaffold of architectural engineering | |
CN112065013A (en) | Outer wall scaffold reinforcing mechanism for construction | |
CN201148726Y (en) | Independent hanging scaffold super large operating platform | |
CN204059909U (en) | With the horizontal truss of avoiding structure | |
CN211923467U (en) | Lower lifting point truss structure of attached lifting scaffold | |
CN210067397U (en) | Intelligent integrated all-steel attached lifting scaffold | |
CN205330195U (en) | Safety device of outer wall scaffold | |
CN210798251U (en) | But scaffold of automatically regulated height | |
CN203977833U (en) | A kind of wall-attached builder's jack | |
CN102587633B (en) | Space truss type attached lifting scaffold | |
CN210086782U (en) | All-aluminum alloy climbing frame | |
CN103195231A (en) | Integral outer frame | |
CN207003972U (en) | A kind of portable construction operation platform | |
CN206873494U (en) | A kind of operating platform for narrow space on the outside of barricade | |
CN204370784U (en) | A kind of tool-type construction elevator discharging platform | |
CN203394010U (en) | Scaffold structure for building | |
CN207063473U (en) | A kind of means for fastening scaffolding | |
CN212406014U (en) | Multifunctional scaffold for road and bridge construction | |
CN214834676U (en) | Assembled aluminum alloy climbs a stair | |
CN202299365U (en) | Vertical main framework structure of attached elevating scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140625 |