CN204475593U - Support structure installed by a kind of curtain wall - Google Patents

Support structure installed by a kind of curtain wall Download PDF

Info

Publication number
CN204475593U
CN204475593U CN201420807227.2U CN201420807227U CN204475593U CN 204475593 U CN204475593 U CN 204475593U CN 201420807227 U CN201420807227 U CN 201420807227U CN 204475593 U CN204475593 U CN 204475593U
Authority
CN
China
Prior art keywords
curtain wall
fixed
mobile jib
adjustable support
agent structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420807227.2U
Other languages
Chinese (zh)
Inventor
肖申君
唐奕伦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Architectural Design and Research Institute Co Ltd
Original Assignee
East China Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Architectural Design and Research Institute Co Ltd filed Critical East China Architectural Design and Research Institute Co Ltd
Priority to CN201420807227.2U priority Critical patent/CN204475593U/en
Application granted granted Critical
Publication of CN204475593U publication Critical patent/CN204475593U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

Support structure installed by a kind of curtain wall that the utility model belongs to Building Curtain Wall Structures field, technical scheme is: horizontal adjustable support bar is vertically fixed on internal layer curtain wall agent structure keel, described horizontal adjustable support bar is made up of mobile jib and secondary bar, one end of described secondary bar inserts formation drawing and pulling type combination in mobile jib and mutual bolt is fixed, and the other end and the outer curtain wall agent structure keel of described secondary bar are fixed; One end of described mobile jib is inserted by described secondary bar, and the other end is fixed by root fixed head and described internal layer curtain wall agent structure keel.The beneficial effects of the utility model are: by the scalability of horizontal adjustable support bar, regulate its brachium, thus meet the installation requirement of different ectonexine curtain wall spacing.Meanwhile, the horizontal adjustable support bar in the utility model also doublely can do the supporting member of scaffold.

Description

Support structure installed by a kind of curtain wall
Technical field
The utility model belongs to building engineering field, particularly relates to a kind of curtain wall construction.
Background technology
Double-layer curtain wall is also known as passage of heat curtain wall, type of respiration curtain wall, ventilation type curtain wall, energy-saving curtain wall etc.Formed by internal layer curtain wall and outer combined curtain wall, form the air cushioning layer between an indoor and outdoor between the two.Generally, be made up of keel frame in outer curtain wall agent structure, outer unit plates of curtain wall is arranged in outer curtain wall agent structure.When same building thing there being the width of different air cushioning layers, namely when the spacing between internal layer curtain wall and outer curtain wall is for change, need the connector customizing many different sizes and length, connect internal layer curtain wall and outer curtain wall, the efficiency of engineering batch production cannot be improved.In addition, outer curtain wall often overlaps from bottom to top, and needs to set up full hall scaffold construction and installation.When central city building operations, often need integer support protective screening, traditional method adopts full hall scaffold to hang protective screening outward, and when building operations is complete, needs to remove whole protective equipment, waste time and energy.
Utility model content
The technical problem that the utility model solves is to provide a kind of curtain wall and installs support structure, it can use standardized structural element to connect the connection of different ectonexine curtain wall spacing, meanwhile, setting up of scaffold can be reduced in the process of installing again, facilitate workman to construct and security protection.
The technical solution of the utility model is: horizontal adjustable support bar is vertically fixed on internal layer curtain wall agent structure keel, described horizontal adjustable support bar is made up of mobile jib and secondary bar, one end of described secondary bar inserts formation drawing and pulling type combination in mobile jib and mutual bolt is fixed, and the other end and the outer curtain wall agent structure keel of described secondary bar are fixed; One end of described mobile jib is inserted by described secondary bar, and the other end is fixed by root fixed head and described internal layer curtain wall agent structure keel.
Certainly, in such scheme, mobile jib insert in secondary bar formed drawing and pulling type combination and mutual bolt fix also can solve the utility model solve technical problem.Namely another kind of technical scheme is: horizontal adjustable support bar is vertically fixed on internal layer curtain wall agent structure keel, described horizontal adjustable support bar is made up of mobile jib and secondary bar, one end of described mobile jib is inserted in secondary bar and is formed drawing and pulling type combination and mutual bolt is fixed, the other end of described mobile jib with fixed by root fixed head and described internal layer curtain wall agent structure keel; One end of described secondary bar is inserted by described mobile jib, and the other end and outer curtain wall agent structure keel are fixed.
Root fixed head can adopt existing any technology such as pre-buried iron plate or threaded rod to fix according to building actual conditions.Adopt drawing and pulling type due to mobile jib and secondary bar and fix, so can determine pull distance flexibly according to building demand, i.e. the mobile jib of the uniform length of available batch production and secondary bar realize the connection of the different spacing of ectonexine curtain wall.The connection of horizontal adjustable support bar and outer curtain wall agent structure can adopt any connected mode of the prior art, as bolt, welding etc.
In common buildings engineering; multiple horizontal adjustable support bar is adopted to be arranged in internal layer curtain wall agent structure; form array; when the length of horizontal adjustable support bar meets the length of the construction space of constructor; and bearing capacity is when meeting working load; can two adjustable support bar lateral separations or between the upper and lower every between can set up simple and easy construction station plate or temporary construction ladder; can provide support constructor's erect position; also can the safety rope of construction worker be locked on it, play the protective effect to workman.By the enforcement of this technology, can reduce setting up and dismounting after constructing of scaffold in a large number, the installation for outer curtain wall provides mode of operation quickly and easily.
The beneficial effects of the utility model are: by the scalability of horizontal adjustable support bar, regulate its brachium, thus meet the installation requirement of different ectonexine curtain wall spacing.Meanwhile, the horizontal adjustable support bar in the utility model also doublely can do the supporting member of scaffold.
Accompanying drawing explanation
Below in conjunction with accompanying drawing and specific implementation method, the utility model will be further described.
Fig. 1 is the elevational schematic view of horizontal adjustable support bar.
Fig. 2 is the arranged in arrays schematic diagram of horizontal adjustable support bar.
Detailed description of the invention
The utility model adopts a kind of combined mounting structure part, as shown in Figure 1: respectively by horizontal adjustable support bar, outer curtain wall agent structure keel 4, the components such as connecting bolt, root fixed head 3 form jointly, root fixed head 3 adopts pre-buried iron plate and internal layer curtain wall agent structure keel to fix, certainly, also other existing modes such as threaded rod can be able to be adopted to fix according to building actual conditions.In Fig. 1, horizontal adjustable support bar and root fixed head 3 adopt and are welded and fixed.Horizontal adjustable support bar divides mobile jib 1 and secondary bar 2 two parts, and mobile jib 1 and secondary bar 2 adopt bolt to fix, and drawing and pulling type combines, can according to building demand determination pull distance.The other end of secondary bar is a U-type groove mouth, notch with secondary bar 2 for prefabrication welding manner is connected.U-type groove mouth and outer curtain wall agent structure keel 4 adopt bolt to fix.Herein, the connection of secondary bar and outer curtain wall agent structure keel is only a kind of and illustrates, existing any technology can be adopted to complete.Be only a kind of signal in figure, also can insert the combination of secondary bar drawing and pulling type by mobile jib.
As shown in Figure 2, horizontal adjustable support bar with square matrix arranged in form in external wall agent structure, when the length of horizontal adjustable support bar and bearing capacity meet the requirement of constructing operation face and working load, simple and easy construction station plate can be built between the horizontal adjustable support bar of same layer, also oblique construction ladder can be built by staggered floor, constructability personnel construct, and have the effect of scaffold concurrently simultaneously.The safety rope lock of construction worker also can be temporarily fixed on horizontal adjustable support bar, plays the protective effect to workman.
Above a kind of scheme that the utility model is implemented to provide is introduced in detail, for one of ordinary skill in the art, according to the thought of the utility model embodiment, all will change in specific embodiments and applications.In sum, this description should not be construed as restriction of the present utility model, and all any changes made according to the utility model design philosophy are all within protection domain of the present utility model.

Claims (2)

1. support structure installed by a curtain wall, it is characterized in that: horizontal adjustable support bar is vertically fixed on internal layer curtain wall agent structure keel, described horizontal adjustable support bar is made up of mobile jib and secondary bar, one end of described secondary bar inserts formation drawing and pulling type combination in mobile jib and mutual bolt is fixed, and the other end and the outer curtain wall agent structure keel of described secondary bar are fixed; One end of described mobile jib is inserted by described secondary bar, and the other end is fixed by root fixed head and described internal layer curtain wall agent structure keel.
2. support structure installed by a curtain wall, it is characterized in that: horizontal adjustable support bar is vertically fixed on internal layer curtain wall agent structure keel, described horizontal adjustable support bar is made up of mobile jib and secondary bar, one end of described mobile jib is inserted in secondary bar and is formed drawing and pulling type combination and mutual bolt is fixed, the other end of described mobile jib with fixed by root fixed head and described internal layer curtain wall agent structure keel; One end of described secondary bar is inserted by described mobile jib, and the other end and outer curtain wall agent structure keel are fixed.
CN201420807227.2U 2014-12-19 2014-12-19 Support structure installed by a kind of curtain wall Expired - Fee Related CN204475593U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420807227.2U CN204475593U (en) 2014-12-19 2014-12-19 Support structure installed by a kind of curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420807227.2U CN204475593U (en) 2014-12-19 2014-12-19 Support structure installed by a kind of curtain wall

Publications (1)

Publication Number Publication Date
CN204475593U true CN204475593U (en) 2015-07-15

Family

ID=53631395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420807227.2U Expired - Fee Related CN204475593U (en) 2014-12-19 2014-12-19 Support structure installed by a kind of curtain wall

Country Status (1)

Country Link
CN (1) CN204475593U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107740510A (en) * 2017-11-15 2018-02-27 林莉 Assembled for skyscraper fills wall and assembly method
CN108775099A (en) * 2018-07-28 2018-11-09 江苏广源幕墙工程有限公司 A kind of glass curtain wall mounting structure
CN110274747A (en) * 2019-06-14 2019-09-24 浙江大学 A kind of gallery type double-layer curtain wall model in wind tunnel device of adjustable volume
WO2019196007A1 (en) * 2018-04-10 2019-10-17 侯志峰 Suspended rhombic aluminum veneer shading curtain wall for textile enterprise exhibition hall
CN112854563A (en) * 2021-01-18 2021-05-28 沈正伟 Open type double-layer curtain wall system and using method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107740510A (en) * 2017-11-15 2018-02-27 林莉 Assembled for skyscraper fills wall and assembly method
WO2019196007A1 (en) * 2018-04-10 2019-10-17 侯志峰 Suspended rhombic aluminum veneer shading curtain wall for textile enterprise exhibition hall
CN108775099A (en) * 2018-07-28 2018-11-09 江苏广源幕墙工程有限公司 A kind of glass curtain wall mounting structure
CN110274747A (en) * 2019-06-14 2019-09-24 浙江大学 A kind of gallery type double-layer curtain wall model in wind tunnel device of adjustable volume
CN112854563A (en) * 2021-01-18 2021-05-28 沈正伟 Open type double-layer curtain wall system and using method thereof

Similar Documents

Publication Publication Date Title
CN204475593U (en) Support structure installed by a kind of curtain wall
CN204126230U (en) Assembly scaffold unit
CN106869368A (en) A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure
CN206174138U (en) Joint construction suitable for steel house room externally -hanging wallboard and major structure
CN104878867B (en) Integral structure of ceiling joist and double-deck operation platform and preparation method thereof
CN202913713U (en) Combined adjustable safety protective barrier
CN105256896B (en) It is a kind of to be used for Side fascia and the metal connecting piece of agent structure
CN202483154U (en) High bearing capacity suspending scaffold
CN105064551B (en) Removable board wall system
CN108104335B (en) Assembled flexible dry hanging system of curtain wall
CN213087282U (en) Unit type heat preservation and decoration integrated plate outer wall system of stone panel
CN206941913U (en) Hanging structure on the outside of a kind of large span type unitized curtain wall
CN205875655U (en) Scaffold
CN203430006U (en) Quick disassembly and assembly cantilever bracket for building outer wall construction
CN210195200U (en) Hanging flower basket device of encorbelmenting of high parapet
CN203891442U (en) High-rise elevator shaft template supporting platform
CN103993729A (en) High rise elevator shaft formwork erecting platform
CN205316651U (en) Outer quick -witted suspension support structure of firm air conditioner
CN204356973U (en) Two Snap-type keel overhung construction
CN219219401U (en) Temporary protection device for deformation joint in staggered floor construction of tower
CN204876206U (en) Portable wallboard system
CN214884506U (en) Three-net built-in composite heat insulation system
CN203867167U (en) Attached lifting scaffold bottom truss
CN203654698U (en) Attached lifting scaffold structure provided with double guide rails
CN203558672U (en) Connecting structure for reinforced concrete wall and construction elevator attachment rack

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150715

Termination date: 20181219

CF01 Termination of patent right due to non-payment of annual fee