CN204126230U - Assembly scaffold unit - Google Patents
Assembly scaffold unit Download PDFInfo
- Publication number
- CN204126230U CN204126230U CN201420532120.1U CN201420532120U CN204126230U CN 204126230 U CN204126230 U CN 204126230U CN 201420532120 U CN201420532120 U CN 201420532120U CN 204126230 U CN204126230 U CN 204126230U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- protective screening
- vertical rod
- assembly
- floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012216 screening Methods 0.000 claims abstract description 42
- 230000001681 protective effect Effects 0.000 claims abstract description 40
- 230000013011 mating Effects 0.000 claims description 4
- 239000000203 mixture Substances 0.000 claims description 4
- 238000009434 installation Methods 0.000 abstract description 3
- 238000009417 prefabrication Methods 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 4
- 238000005457 optimization Methods 0.000 description 3
- 239000000725 suspension Substances 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000007664 blowing Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model relates to the assembly scaffold unit that a kind of building operations uses, and its structure comprises vertical rod, scaffold floor, protective screening and trivet.Wherein, vertical rod is arranged on the two ends of assembly scaffold unit inside, and direction perpendicular to the ground be arranged in parallel; Scaffold floor is horizontally disposed with, and inner side edge two ends are connected with vertical rod, and outer side edges is connected with protective screening lower frame; The vertical support of trivet is connected with horizontal brace right angle, and diagonal brace diagonal between vertical support and horizontal brace is arranged, vertical rod is fixed in vertical support, and the left and right side of horizontal brace and scaffold floor is fixed, and far-end and protective screening frame are fixed; Protective screening and scaffold floor one_to_one corresponding, facade is arranged, is provided with frame.The utility model assembly scaffold unit simple structure, can prefabrication produce, interchangeability is strong, easy for installation.
Description
Technical field
The present invention relates to a kind of building operations scaffolding structure, particularly relate to a kind of assembly scaffold.
Background technology
Scaffold is building operations, a kind of construction equipment often used in decorative engineering and maintenance works, be mainly used to provide walkway and stacking yard blowing and security protection in a small amount, common traditional scaffold uses steel tube fastener to carry out scene and sets up, setting up of this scaffold is not only wasted time and energy, Mechanization Level is low, also high to the skill set requirements setting up workman.In China, urban construction scale high speed development, national Urbanization Construction paces strengthen to be accelerated, and high-rise and super highrise building emerges in multitude.Set up steel tube fastener scaffold system high-altitude dangerous operation at high-rise and super highrise building scene, there is larger security risk.
Summary of the invention
The purpose of this utility model is the defect overcoming prior art, and provide a kind of scaffolding structure unit, this unit can be combined to assembly scaffold.
For sake of convenience, be referred to as " inner side " in a state of use by scaffold near the side of building wall, the side away from building wall is referred to as in " outside ".The utility model assembly scaffold unit, comprises vertical rod, scaffold floor, protective screening and trivet.Wherein, vertical rod is column, is arranged on the two ends of assembly scaffold unit inside, and each vertical rod direction perpendicular to the ground be arranged in parallel; Scaffold floor is square plate object, be horizontally disposed with, each constructing operation face arranges one deck, and the inner side edge two ends of scaffold floor are connected with vertical rod, the outer side edges of scaffold floor is connected with protective screening lower frame, and two, the left and right side of scaffold floor is fixed with the horizontal brace of trivet respectively; Trivet is a similar right-angled triangle component, is made up of vertical support, horizontal brace, diagonal brace.Vertical support is connected with horizontal brace right angle, and diagonal brace diagonal between vertical support and horizontal brace is arranged, vertical rod is fixed in vertical support, and far-end and the protective screening frame of horizontal brace are fixed, the setting of trivet and vertical rod one_to_one corresponding; Protective screening is square mesh thing, and facade is arranged.Protective screening is provided with frame, and it is arranged and scaffold floor one_to_one corresponding, and width and the scaffold floor of protective screening frame adapt.
Scaffold floor and two ends, protective screening left and right are provided with lateral connection for subsequent use structure, use when being assembly scaffold by assembly scaffold unit combination.The scaffold floor of adjacent Unit two is fixedly connected with scaffold floor by application lateral connection structure, protective screening is fixedly connected with protective screening.A kind of preferred scaffold floor and protective screening lateral connection are configured to bolt clamping plate.
When being an assembly scaffold by two or more assembly scaffold unit combination, adjacent cells shares a vertical rod, shares a trivet.Therefore, one independently assembly scaffold unit structure in vertical rod have two, trivet has two; In an assembly scaffold, the quantity of vertical rod and trivet is then " unit number+1 ".
The utility model assembly scaffold unit simple structure, can prefabrication produce, interchangeability is strong, easy for installation.
As optimization, the inside and outside dual-side edge of described scaffold floor arranges digital and analog hole, connects for the vertical rod adapting to job site diverse location; Protective screening upper and lower side frame corresponds to the digital and analog hole position of scaffold floor and arranges corresponding mating holes, for the connection of protective screening and scaffold floor.
As optimization, described scaffold floor inside edge is hinged with drop in leaf, in order to expand the loaded area of scaffold floor.
Further optimization, the assembly scaffold after combination, described vertical rod lower end connects horizontal truss, vertical rod compartment of terrain connection guide rail, equipped wall-attached supporting seat on guide rail, suspension centre under the lower end of guide rail is installed, more equipped Lift-on/Lift-off System composition Combined type attached lifting scaffold.
Accompanying drawing explanation
Fig. 1 is the utility model assembly scaffold block construction schematic diagram;
Fig. 2 is the utility model assembly scaffold unit composition Combined type attached lifting scaffold schematic diagram.
Parts represented by number in the figure or position are: 1-vertical rod; 2-scaffold floor; 3-protective screening; Stull in 4-trivet; 5-drop in leaf; 6-horizontal truss; 7-guide rail; 8-lower suspension centre; 21-scaffold floor lateral connection structure hole; 22-digital and analog hole; 31-protective screening lateral connection structure hole; 32-mating holes.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Figure 1 shows that the stereochemical structure of the utility model assembly scaffold unit, comprise vertical rod 1, scaffold floor 2, protective screening 3 and trivet 4.Wherein, vertical rod 1 is cylindricality, two, lays respectively at the two ends on assembly scaffold unit inside limit, and direction perpendicular to the ground be arranged in parallel; Scaffold floor 2 is rectangle plate object, is horizontally disposed with, and each constructing operation face arranges one deck, and the two ends of scaffold floor 2 inner side edge are fixedly connected with two vertical rods 1 respectively, and scaffold floor 2 outer side edges is connected with protective screening 3 lower frame; Trivet is made up of vertical support, horizontal brace, diagonal brace 4.Vertical rod 1 is fixed in vertical support, and the left and right top margin of horizontal brace and scaffold floor 2 is fixed, and far-end and protective screening 3 frame of horizontal brace are fixed, and diagonal brace 4 diagonal between vertical support and horizontal brace is arranged.Vertical support, horizontal brace, diagonal brace form similar right-angled triangle.The setting of trivet is corresponding with scaffold floor 2, is provided with a trivet at two ends, the left and right place of every block scaffold floor 2; Protective screening 3 is square, and with scaffold floor 2 one_to_one corresponding, protective screening 3 surrounding is provided with frame, and standby work of upper and lower side frame is connected with scaffold floor 2, and standby work of left and right side frame is connected with adjacent cells protective screening frame.
In scaffold floor 2, side edge section arranges digital and analog hole 22, connects for the vertical rod 1 adapting to job site diverse location; The position of corresponding scaffold floor 2 digital and analog hole 22 of protective screening 3 upper and lower side frame arranges corresponding mating holes 32, to be adapted to the connection of trivet.
Scaffold floor 2 left and right end portions is provided with lateral connection structure hole 21, and protective screening 3 left and right sides frame is provided with lateral connection structure hole 31.As shown in Figure 2, when multiple-unit is combined as assembly scaffold, bolt pair can be used scaffold floor and protective screening to be transversely linked by lateral connection structure hole 21,31, make assembly scaffold become to be integrated, keep each unit protective screening 3 to be positioned at the same side of scaffold simultaneously.
As shown in Figure 2, be hinged with drop in leaf 5 at scaffold floor 2 inner side edge, expand scaffold floor loaded area.
The utility model assembly scaffold unit in theory height is unrestricted, just when actual production, by the restriction of material therefor length, transport and installation, can only produce the product of limited level.Longitudinally combination can be connected at the scene when more multi-layered time of actual needs.The mode that scaffold unit longitudinally connects, as shown in Figure 2, bolt pair is used to be connected at protective screening mating holes 32 place by upper and lower scaffold, clamping plate are used to be fixedly connected with in vertical rod joint by upper and lower scaffold unit, and keep protective screening to be positioned at the same side of scaffold, longitudinally scaffold unit is linked into an integrated entity.
As shown in Figure 2, apply multiple the utility model assembly scaffold unit combination and become assembly scaffold, horizontal truss 6 is connected in inner side vertical rod 1 lower end, vertical rod 1 compartment of terrain connection guide rail 7, equipped wall-attached supporting seat on guide rail 7, suspension centre 8 under guide rail lower end is installed, more equipped Lift-on/Lift-off System, composition Combined type attached lifting scaffold.
Claims (7)
1. an assembly scaffold unit, is characterized in that, its structure comprises vertical rod, scaffold floor, protective screening and trivet; Wherein, vertical rod is column, is arranged on the two ends of assembly scaffold unit inside, and each vertical rod direction perpendicular to the ground be arranged in parallel; Scaffold floor is square plate object, be horizontally disposed with, each constructing operation face arranges one deck, and the inner side edge two ends of scaffold floor are connected with vertical rod, the outer side edges of scaffold floor is connected with protective screening lower frame, and two, the left and right side of scaffold floor is fixed with the horizontal brace of trivet respectively; Trivet is made up of vertical support, horizontal brace, diagonal brace, vertical support is connected with horizontal brace right angle, diagonal brace diagonal between vertical support and horizontal brace is arranged, vertical rod is fixed in vertical support, the left and right side of horizontal brace and scaffold floor is fixed, far-end and the protective screening frame of horizontal brace are fixed, the setting of trivet and vertical rod one_to_one corresponding; Protective screening is square mesh thing, and facade is arranged, protective screening is provided with frame, and protective screening is arranged and scaffold floor one_to_one corresponding, and width and the scaffold floor of protective screening frame adapt.
2. assembly scaffold unit according to claim 1, is characterized in that, the inside and outside dual-side edge of described scaffold floor arranges digital and analog hole, and the digital and analog hole position that protective screening upper and lower side frame corresponds to scaffold floor arranges corresponding mating holes.
3. assembly scaffold unit according to claim 1 and 2, is characterized in that, described scaffold floor inside edge is hinged with drop in leaf.
4. assembly scaffold unit according to claim 1, it is characterized in that, scaffold floor and two ends, protective screening left and right are provided with lateral connection for subsequent use structure, and when being assembly scaffold by assembly scaffold unit combination, the scaffold floor of adjacent Unit two is fixedly connected with scaffold floor by lateral connection structure, protective screening is fixedly connected with protective screening.
5. assembly scaffold unit according to claim 4, is characterized in that, described scaffold floor and protective screening lateral connection are configured to bolt clamping plate.
6. assembly scaffold unit according to claim 4, it is characterized in that, when being an assembly scaffold by two or more assembly scaffold unit combination, adjacent cells shares a vertical rod, and the quantity of vertical rod in an assembly scaffold is " unit number+1 ".
7. assembly scaffold unit according to claim 6, it is characterized in that, when being an assembly scaffold by two or more assembly scaffold unit combination, vertical rod lower end connects horizontal truss, vertical rod compartment of terrain is fixedly connected with guide rail, equipped wall-attached supporting seat on guide rail, more equipped Lift-on/Lift-off System composition Combined type attached lifting scaffold.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420532120.1U CN204126230U (en) | 2014-09-17 | 2014-09-17 | Assembly scaffold unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420532120.1U CN204126230U (en) | 2014-09-17 | 2014-09-17 | Assembly scaffold unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204126230U true CN204126230U (en) | 2015-01-28 |
Family
ID=52382597
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420532120.1U Active CN204126230U (en) | 2014-09-17 | 2014-09-17 | Assembly scaffold unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204126230U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105888229A (en) * | 2016-05-31 | 2016-08-24 | 中国冶集团有限公司 | All-steel attached scaffold mounting method |
CN106150056A (en) * | 2015-03-23 | 2016-11-23 | 群力发(北京)科技开发有限公司 | A kind of multifunction scaffold |
CN109025236A (en) * | 2018-09-12 | 2018-12-18 | 重庆玖和惠鼎建筑劳务有限公司 | All steel goes up and down high-building construction security protection platform |
CN110158941A (en) * | 2019-06-03 | 2019-08-23 | 李大泽 | Build aluminium alloy outrigger |
CN110700610A (en) * | 2019-09-23 | 2020-01-17 | 浙江中呈建设有限公司 | Telescopic movable scaffold capable of preventing falling objects from high altitude and using method thereof |
CN110700549A (en) * | 2019-11-02 | 2020-01-17 | 浙江宇之航科技工程有限公司 | Upper hanger for lifting scaffold |
CN112096034A (en) * | 2020-09-09 | 2020-12-18 | 厦门安科科技有限公司 | High stability structure suitable for climb frame |
CN114182932A (en) * | 2020-09-15 | 2022-03-15 | 浙江国泰工程装备技术有限公司 | Foldable scaffold of quick assembly disassembly for construction |
-
2014
- 2014-09-17 CN CN201420532120.1U patent/CN204126230U/en active Active
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106150056A (en) * | 2015-03-23 | 2016-11-23 | 群力发(北京)科技开发有限公司 | A kind of multifunction scaffold |
CN105888229A (en) * | 2016-05-31 | 2016-08-24 | 中国冶集团有限公司 | All-steel attached scaffold mounting method |
CN109025236A (en) * | 2018-09-12 | 2018-12-18 | 重庆玖和惠鼎建筑劳务有限公司 | All steel goes up and down high-building construction security protection platform |
CN109025236B (en) * | 2018-09-12 | 2020-10-16 | 重庆玖和惠鼎建筑劳务有限公司 | All-steel lifting high-rise building construction safety protection platform |
CN110158941A (en) * | 2019-06-03 | 2019-08-23 | 李大泽 | Build aluminium alloy outrigger |
CN110700610A (en) * | 2019-09-23 | 2020-01-17 | 浙江中呈建设有限公司 | Telescopic movable scaffold capable of preventing falling objects from high altitude and using method thereof |
CN110700610B (en) * | 2019-09-23 | 2022-07-29 | 浙江中呈建设有限公司 | Telescopic movable scaffold capable of preventing falling objects from high altitude and using method thereof |
CN110700549A (en) * | 2019-11-02 | 2020-01-17 | 浙江宇之航科技工程有限公司 | Upper hanger for lifting scaffold |
CN110700549B (en) * | 2019-11-02 | 2021-07-09 | 浙江宇之航科技工程有限公司 | Upper hanger for lifting scaffold |
CN112096034A (en) * | 2020-09-09 | 2020-12-18 | 厦门安科科技有限公司 | High stability structure suitable for climb frame |
CN112096034B (en) * | 2020-09-09 | 2022-01-04 | 厦门安科科技有限公司 | High stability structure suitable for climb frame |
CN114182932A (en) * | 2020-09-15 | 2022-03-15 | 浙江国泰工程装备技术有限公司 | Foldable scaffold of quick assembly disassembly for construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204126230U (en) | Assembly scaffold unit | |
CN201158933Y (en) | High-rise maintaining scaffold device with extruding structure | |
CN104695337B (en) | Self-lifting sliding and turnover construction system and construction method | |
CN104847108A (en) | Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure | |
CN206636168U (en) | Overhanging type scaffold system | |
CN205077886U (en) | Shaped steel protection canopy of encorbelmenting | |
CN204282788U (en) | Assembled fixed scaffold | |
CN107829553A (en) | A kind of elevator hoistways construction platform system | |
CN203430006U (en) | Quick disassembly and assembly cantilever bracket for building outer wall construction | |
CN203701552U (en) | Attached scaffold for lifted through worm, gear and screw rod | |
CN103276889B (en) | Full hall fastener type steel pipe scaffold anti-side shifting method | |
CN203257080U (en) | Adjustable overhang supporting device for building construction | |
CN202851007U (en) | Movable type work platform used for laneway drilling and supporting | |
CN202850471U (en) | Lifting type operation platform for elevator well | |
CN207003972U (en) | Movable construction operation platform | |
CN201991144U (en) | Hanging stool for thickness-quality control of cast-in-place concrete floor upper-layer plate-rib protecting layer and concrete plate | |
CN205259554U (en) | A mount for installation of light steel joist gypsum -lath furred ceiling | |
CN205296823U (en) | Early form removal bearing leg hand frame | |
CN205617763U (en) | Omnipotent support combined bay support element and omnipotent support combined bay | |
CN204590553U (en) | Semi-automaticly climb formula exterior wall safeguard structure | |
CN204919363U (en) | High mound pin -connected panel strength nature skeleton of anti high wind | |
CN203546896U (en) | Frame structure of makeshift house | |
CN204163367U (en) | Cat ladder frame operating platform | |
CN205206314U (en) | Stair design steel wood built -up plate | |
CN203867167U (en) | Attached lifting scaffold bottom truss |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 101113 8 Guang Li street, Tongzhou District Industrial Development Zone, Beijing Patentee after: Sunrise safety technology (Beijing) Co.,Ltd. Address before: 101113 8 Guang Li street, Tongzhou District Industrial Development Zone, Beijing Patentee before: BEIJING TOSUN TECHNOLOGY DEVELOPMENT Co.,Ltd. |
|
PP01 | Preservation of patent right | ||
PP01 | Preservation of patent right |
Effective date of registration: 20231012 Granted publication date: 20150128 |