CN107829553A - A kind of elevator hoistways construction platform system - Google Patents

A kind of elevator hoistways construction platform system Download PDF

Info

Publication number
CN107829553A
CN107829553A CN201710958126.3A CN201710958126A CN107829553A CN 107829553 A CN107829553 A CN 107829553A CN 201710958126 A CN201710958126 A CN 201710958126A CN 107829553 A CN107829553 A CN 107829553A
Authority
CN
China
Prior art keywords
channel
section steel
steel
section
elevator hoistways
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710958126.3A
Other languages
Chinese (zh)
Inventor
张德成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201710958126.3A priority Critical patent/CN107829553A/en
Publication of CN107829553A publication Critical patent/CN107829553A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • E04G3/246Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons following the inside contour of a building
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/22Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by roofs or ceilings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/004Storage and transport racks for scaffolding components
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention discloses a kind of elevator hoistways construction platform system, belong to technical field of building construction.The present invention includes support body skeleton, and the second channel-section steel is horizontal positioned;The first channel-section steel is connected with second channel-section steel vertical direction;Tilted between the first channel-section steel on the second channel-section steel and vertical direction in horizontal direction and be connected with the 3rd channel-section steel;Two are fixedly installed on second channel-section steel and hangs idol;Platform, which is additionally provided with, on second channel-section steel completely spreads bridging piece;Platform, which is completely spread, is provided with two the 4th parallel channel-section steels in bridging piece;Vertical connection between 4th channel-section steel and the second channel-section steel;Two the 4th parallel channel-section steel vertical direction are provided with bridging piece;Adjustable fixed card slot is made up of round steel, double nut, backing plate and wedge type block;Round steel is tilted and is fixedly connected on backing plate;Double nut is cased with round steel;Wedge type block is installed on backing plate.The present invention is rational in infrastructure, disclosure satisfy that the security needs of job site high-altitude drilling, and can meet that different height drills, and reduces construction cost.

Description

A kind of elevator hoistways construction platform system
Technical field
The present invention relates to technical field of building construction, more specifically to a kind of elevator hoistways construction platform system.
Background technology
Skyscraper is more and more extensive at present, and elevator hoistways depth is inevitable more and more deeper so that the operation shape in the region Into new major hazard source, during main structure construction, hoistway inwall wall formwork is one of problem all the time.Tens meters There is no landing slab in hundreds of meters of high elevator hoistways from bottom to top even, worker gets up not only inconvenient uneasy in construction Entirely.In reinforcing bar colligation installation, because of the limitation of job position, it can only often ensure the quality of outer wall and look after less than inwall Quality.Model sheetinstallat operation is even taken the method lifted again after pre-assembly semi-finished product, subsequently added with the accumulation of experience Gu measure is still essential, although process is improved, the security incident thus brought is not reduced.Build For engineering premised on keeping the safety in production, high efficiency, the management of high quality are extremely urgent.
The content of the invention
1st, to solve the problems, such as
The problem of existing for prior art and deficiency, the invention provides a kind of elevator hoistways construction platform system, knot Structure is reasonable, easy for installation, disclosure satisfy that the security needs of job site high-altitude drilling, and can meet that different height drills, drop Low construction cost.
2nd, technical scheme
To reach above-mentioned purpose, technical scheme provided by the invention is:
A kind of elevator hoistways construction platform system of the present invention, including support body skeleton, described support body skeleton include second Channel-section steel, the first channel-section steel and the 3rd channel-section steel;The second described channel-section steel is horizontal positioned;It is connected with the second described channel-section steel vertical direction First channel-section steel;Tilted between the first channel-section steel on the second channel-section steel and vertical direction in described horizontal direction and be connected with the 3rd groove Steel;Between described the first channel-section steel and the 3rd channel-section steel two steel pipes are connected with horizontal direction;The steel pipe of described top and Steel pipe is connected with vertically between two channel-section steels;Two, which are fixedly installed, on the second described channel-section steel hangs idol;On the second described channel-section steel It is additionally provided with platform and completely spreads bridging piece;Described platform completely spreads bridging piece and is made up of the second channel-section steel, the 4th channel-section steel and bridging piece;Described is flat Platform completely spreads bridging piece side of outer Thursday and is connected in sequence by the second channel-section steel;Described platform completely spread be provided with bridging piece two it is parallel 4th channel-section steel;Vertical connection between the 4th described channel-section steel and the second channel-section steel;Two described the 4th parallel channel-section steel Vertical Squares To being provided with bridging piece;The lower end of the first described channel-section steel has been bolted adjustable fixed card slot;Described is adjustable solid Determine neck to be made up of round steel, double nut, backing plate and wedge type block;Described round steel is tilted and is fixedly connected on backing plate;Described circle Double nut is cased with steel;Wedge type block is installed on described backing plate.
Further, described adjustable fixed card slot, which is stretched into floor, is more than or equal to 500mm.
Further, described double nut is M12 double nuts.
Further, what described platform completely spread bridging piece is shaped as rectangle.
Further, described double nut is threadedly coupled with round steel.
Further, described two are hung and leave distance between idol.
Further, the size of the first described channel-section steel is 200 × 73 × 7, is 20#a channel-section steels, the size of the second channel-section steel is 180 × 68 × 7, it is 18#a channel-section steels.
Further, the size of the 3rd described channel-section steel is 140 × 58 × 6, is 14#a channel-section steels, the size of the 4th channel-section steel is 160 × 63 × 6.5, it is 16#a channel-section steels.
Further, described steel pipe is the steel pipes of Φ 50 × 3.5.
Further, described round steel is the round steel of Φ 22.
3rd, beneficial effect
Compared to prior art, beneficial effects of the present invention are:
(1) a kind of elevator hoistways construction platform system of the invention, convenient material drawing, make simply, it is practical;Bore in high-altitude Hole aids in without other staff, speeds up the work.
(2) a kind of elevator hoistways construction platform system of the invention, it is not only rational in infrastructure, it is easy for installation, it disclosure satisfy that and apply The security needs of work scene high-altitude drilling, and can meet that different height drills, reduce construction cost.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the structural representation that platform completely spreads bridging piece in the present invention;
Fig. 3 is the structural representation that fixed card slot is can adjust in the present invention.
In figure:1st, the first channel-section steel;2nd, the second channel-section steel;3rd, the 3rd channel-section steel;4th, steel pipe;5th, it can adjust fixed card slot;6th, idol is hung; 7th, the 4th channel-section steel;8th, bridging piece;9th, round steel;10th, double nut;11st, backing plate;12nd, wedge type block.
Embodiment
The present invention is further described below with reference to specific embodiments and the drawings:
Embodiment 1
As Figure 1-3, a kind of elevator hoistways construction platform system of the present embodiment, including support body skeleton, above-mentioned frame Body skeleton includes the second channel-section steel 2, the first channel-section steel 1 and the 3rd channel-section steel 3, the second horizontal positioned, above-mentioned groove of the second above-mentioned channel-section steel 2 It is connected with the first channel-section steel 1 in the vertical direction of steel 2, the second channel-section steel 2 in above-mentioned horizontal direction and the first groove in vertical direction Being tilted between steel 1 and be connected with the 3rd channel-section steel 3, the size of the first above-mentioned channel-section steel 1 is 200 × 73 × 7, is 20#a channel-section steels, second The size of channel-section steel 2 is 180 × 68 × 7, is 18#a channel-section steels, the size of the 3rd channel-section steel 3 is 140 × 58 × 6, is 14#a channel-section steels.On Two steel pipes 4, the steel pipe 4 and second of above-mentioned top are connected between the first channel-section steel 1 stated and the 3rd channel-section steel 3 in horizontal direction Steel pipe 4 is connected between channel-section steel 2 vertically, steel pipe 4 is the steel pipes of Φ 50 × 3.5.Two are fixedly installed on the second above-mentioned channel-section steel 2 Hang even 6, above-mentioned two hang even 6 between leave a certain distance.
A kind of elevator hoistways construction platform system of the present embodiment, platform is additionally provided with the second above-mentioned channel-section steel 2 and is completely spread Bridging piece, above-mentioned platform completely spread bridging piece and are made up of the second channel-section steel 2, the 4th channel-section steel 7 and bridging piece 8, and platform completely spreads being shaped as bridging piece Rectangle.Above-mentioned platform completely spreads bridging piece side of outer Thursday and is connected in sequence by the second channel-section steel 2, and above-mentioned platform, which is completely spread in bridging piece, pacifies Equipped with two the 4th parallel channel-section steels 7, the size of the 4th above-mentioned channel-section steel 7 is 160 × 63 × 6.5, is 16#a channel-section steels, above-mentioned Vertical connection between 4th channel-section steel 7 and the second channel-section steel 2, above-mentioned two parallel vertical direction of the 4th channel-section steel 7 are provided with bridging piece 8, form Safety operation platform.
A kind of elevator hoistways construction platform system of the present embodiment, the lower end of the first above-mentioned channel-section steel 1 are bolted There is adjustable fixed card slot 5, above-mentioned adjustable fixed card slot 5 is made up of round steel 9, double nut 10, backing plate 11 and wedge type block 12, Above-mentioned round steel is the round steel of Φ 22, and above-mentioned round steel 9 is tilted and is fixedly connected on backing plate 11, and double spiral shells are cased with above-mentioned round steel 9 Mother 10, double nut 10 is M12 double nuts, and double nut 10 is threadedly coupled with round steel 9, and wedge type block is provided with above-mentioned backing plate 11 12.Above-mentioned adjustable fixed card slot 5, which is stretched into floor, is more than or equal to 500mm, is to increase safety coefficient, combinations of the above Turn into elevator hoistways construction platform system afterwards, original hoistway cavity part is become into interim security platform.
A kind of elevator hoistways construction platform system of the present invention, original hoistway cavity part is become into interim security platform, Worker can not only increase operating efficiency, strengthen quality, even more ensured the people of workmen normally in the region job Body safety.The invention was both easy, quick, positive effect and cost are cheap safe and reliable, not only increases operating efficiency, strengthens Quality, has even more ensured the personal safety of workmen, plays practical, feasible effect.
Schematically the present invention and embodiments thereof are described above, this describes no restricted, institute in accompanying drawing What is shown is also one of embodiments of the present invention, and actual structure is not limited thereto.So if common skill of this area Art personnel are enlightened by it, without departing from the spirit of the invention, without designing and the technical scheme for creativeness Similar frame mode and embodiment, protection scope of the present invention all should be belonged to.

Claims (10)

  1. A kind of 1. elevator hoistways construction platform system, it is characterised in that:Including support body skeleton, described support body skeleton includes second Channel-section steel (2), the first channel-section steel (1) and the 3rd channel-section steel (3);Described the second channel-section steel (2) is horizontal positioned;Described the second channel-section steel (2) The first channel-section steel (1) is connected with vertical direction;The second channel-section steel (2) in described horizontal direction and the first groove in vertical direction Tilted between steel (1) and be connected with the 3rd channel-section steel (3);Connect between described the first channel-section steel (1) and the 3rd channel-section steel (3) in horizontal direction It is connected to two steel pipes (4);Steel pipe (4) is connected with vertically between the steel pipe (4) and the second channel-section steel (2) of described top;Described Two are fixedly installed on second channel-section steel (2) and hangs idol (6);Platform, which is additionally provided with, on described the second channel-section steel (2) completely spreads bridging piece;Institute The platform stated completely spreads bridging piece and is made up of the second channel-section steel (2), the 4th channel-section steel (7) and bridging piece (8);Described platform completely spreads bridging piece periphery Four sides are connected in sequence by the second channel-section steel (2);Described platform, which is completely spread, is provided with two the 4th parallel channel-section steels in bridging piece (7);Vertical connection between the 4th described channel-section steel (7) and the second channel-section steel (2);Two described the 4th parallel channel-section steels (7) hang down Nogata is to being provided with bridging piece (8);The lower end of described the first channel-section steel (1) has been bolted adjustable fixed card slot (5);Institute The adjustable fixed card slot (5) stated is made up of round steel (9), double nut (10), backing plate (11) and wedge type block (12);Described round steel (9) tilt and be fixedly connected on backing plate (11);Double nut (10) is cased with described round steel (9);Pacify on described backing plate (11) Equipped with wedge type block (12).
  2. A kind of 2. elevator hoistways construction platform system according to claim 1, it is characterised in that:Described adjustable fixation Neck (5), which is stretched into floor, is more than or equal to 500mm.
  3. A kind of 3. elevator hoistways construction platform system according to claim 1, it is characterised in that:Described double nut (10) For M12 double nuts.
  4. A kind of 4. elevator hoistways construction platform system according to claim 1, it is characterised in that:Described platform, which is completely spread, to be chosen Plate is shaped as rectangle.
  5. A kind of 5. elevator hoistways construction platform system according to claim 3, it is characterised in that:Described double nut (10) It is threadedly coupled with round steel (9).
  6. A kind of 6. elevator hoistways construction platform system according to claim 1, it is characterised in that:Described two hang idol (6) distance is left between.
  7. A kind of 7. elevator hoistways construction platform system according to claim 1, it is characterised in that:The first described channel-section steel (1) size is 200 × 73 × 7, is 20#a channel-section steels, the size of the second channel-section steel (2) is 180 × 68 × 7, is 18#a channel-section steels.
  8. A kind of 8. elevator hoistways construction platform system according to claim 1, it is characterised in that:The 3rd described channel-section steel (3) size is 140 × 58 × 6, is 14#a channel-section steels, the size of the 4th channel-section steel (7) is 160 × 63 × 6.5, is 16#a channel-section steels.
  9. A kind of 9. elevator hoistways construction platform system according to claim 1, it is characterised in that:Described steel pipe (4) is The steel pipes of Φ 50 × 3.5.
  10. A kind of 10. elevator hoistways construction platform system according to claim 1, it is characterised in that:Described round steel (9) is The round steel of Φ 22.
CN201710958126.3A 2017-10-16 2017-10-16 A kind of elevator hoistways construction platform system Pending CN107829553A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710958126.3A CN107829553A (en) 2017-10-16 2017-10-16 A kind of elevator hoistways construction platform system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710958126.3A CN107829553A (en) 2017-10-16 2017-10-16 A kind of elevator hoistways construction platform system

Publications (1)

Publication Number Publication Date
CN107829553A true CN107829553A (en) 2018-03-23

Family

ID=61648095

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710958126.3A Pending CN107829553A (en) 2017-10-16 2017-10-16 A kind of elevator hoistways construction platform system

Country Status (1)

Country Link
CN (1) CN107829553A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306777A (en) * 2019-06-25 2019-10-08 王萍 A kind of construction method applied to lifting platform for elevator hoistway in architectural engineering
CN114000695A (en) * 2021-10-18 2022-02-01 西安安德固模架工程有限公司 Scaffold for supporting multilayer concrete structure and mounting method thereof

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110024231A1 (en) * 2009-07-30 2011-02-03 Wurth Steven P Foldable hoistway work deck
CN202370234U (en) * 2011-11-14 2012-08-08 舜元建设(集团)有限公司 Tool type elevator hoistway construction platform
CN202391112U (en) * 2011-12-31 2012-08-22 河南省第一建筑工程集团有限责任公司 Pull rod hinging device for profile steel overhang framework platform
CN202882376U (en) * 2012-11-12 2013-04-17 江苏省苏中建设集团股份有限公司 Elevator shaft template support platform
CN203334646U (en) * 2013-05-30 2013-12-11 江苏省苏中建设集团股份有限公司沈阳分公司 Operating platform of elevator shaft formwork supports
CN204186856U (en) * 2014-10-16 2015-03-04 浙江华纬弹簧有限公司 A kind of leaf spring
CN204326489U (en) * 2014-12-01 2015-05-13 江苏邗建集团有限公司 Construction of lift well operating platform
CN204850399U (en) * 2015-07-24 2015-12-09 中建八局第四建设有限公司 Well operation platform
CN205777428U (en) * 2016-05-18 2016-12-07 湖北仁泰韬盛科技发展有限公司 Elevator is from climbing platforms
CN206189834U (en) * 2016-09-22 2017-05-24 中建海峡建设发展有限公司 Double -deck integrally lift up formula operation platform of elevartor shaft
CN206513383U (en) * 2016-12-28 2017-09-22 中铁第四勘察设计院集团有限公司 A kind of attachment means of tunnel steelframe and lock pin anchor tube
CN107190964A (en) * 2017-06-02 2017-09-22 北京首钢建设集团有限公司 A kind of construction method of prefabricated hoistway operation platform

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110024231A1 (en) * 2009-07-30 2011-02-03 Wurth Steven P Foldable hoistway work deck
CN202370234U (en) * 2011-11-14 2012-08-08 舜元建设(集团)有限公司 Tool type elevator hoistway construction platform
CN202391112U (en) * 2011-12-31 2012-08-22 河南省第一建筑工程集团有限责任公司 Pull rod hinging device for profile steel overhang framework platform
CN202882376U (en) * 2012-11-12 2013-04-17 江苏省苏中建设集团股份有限公司 Elevator shaft template support platform
CN203334646U (en) * 2013-05-30 2013-12-11 江苏省苏中建设集团股份有限公司沈阳分公司 Operating platform of elevator shaft formwork supports
CN204186856U (en) * 2014-10-16 2015-03-04 浙江华纬弹簧有限公司 A kind of leaf spring
CN204326489U (en) * 2014-12-01 2015-05-13 江苏邗建集团有限公司 Construction of lift well operating platform
CN204850399U (en) * 2015-07-24 2015-12-09 中建八局第四建设有限公司 Well operation platform
CN205777428U (en) * 2016-05-18 2016-12-07 湖北仁泰韬盛科技发展有限公司 Elevator is from climbing platforms
CN206189834U (en) * 2016-09-22 2017-05-24 中建海峡建设发展有限公司 Double -deck integrally lift up formula operation platform of elevartor shaft
CN206513383U (en) * 2016-12-28 2017-09-22 中铁第四勘察设计院集团有限公司 A kind of attachment means of tunnel steelframe and lock pin anchor tube
CN107190964A (en) * 2017-06-02 2017-09-22 北京首钢建设集团有限公司 A kind of construction method of prefabricated hoistway operation platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306777A (en) * 2019-06-25 2019-10-08 王萍 A kind of construction method applied to lifting platform for elevator hoistway in architectural engineering
CN110306777B (en) * 2019-06-25 2021-07-09 南通居者安建筑科学研究院有限公司 Construction method applied to elevator shaft lifting platform in building engineering
CN114000695A (en) * 2021-10-18 2022-02-01 西安安德固模架工程有限公司 Scaffold for supporting multilayer concrete structure and mounting method thereof

Similar Documents

Publication Publication Date Title
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN103206074B (en) Elevator shaft template construction method, platform and support
CN205077845U (en) Hydraulic intelligent climbing operation scaffold for core barrel well of building
CN204126230U (en) Assembly scaffold unit
CN107190964A (en) A kind of construction method of prefabricated hoistway operation platform
CN207294093U (en) A kind of large span steel truss integral lifting apparatus
CN106400691A (en) Integrated construction process for anti-collision wall formwork
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN107829553A (en) A kind of elevator hoistways construction platform system
CN205296799U (en) Construction of elevator well and protection platform
CN205206284U (en) Detachable assembly type elevator shaft operating platform
CN102979297B (en) Hanging type stairwell operating platform mechanism and construction method thereof
CN107035131A (en) Elevator shaft integral lifting type construction operation platform and elevator shaft construction method
CN206917244U (en) Integral lifting type construction operation platform for elevator shaft
CN208363666U (en) It is a kind of for build face side construction safety protection frame
CN203475801U (en) Telescopic steel platform for elevator shaft
CN207144446U (en) A kind of construction Skidproof hanging cradle
CN206174441U (en) Elevator shaft operation platform
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN205955165U (en) Elevator shaft operation platform
CN205189413U (en) Special bearing stores pylon of civil engineering
CN205382718U (en) Sparse passway for escaping of steel platform die carrier system
CN204754150U (en) Dish -type node formula scaffold
CN113605659A (en) Elevator shaft tool type safe operation platform and construction method thereof
CN210195200U (en) Hanging flower basket device of encorbelmenting of high parapet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180323