CN107829553A - A kind of elevator hoistways construction platform system - Google Patents
A kind of elevator hoistways construction platform system Download PDFInfo
- Publication number
- CN107829553A CN107829553A CN201710958126.3A CN201710958126A CN107829553A CN 107829553 A CN107829553 A CN 107829553A CN 201710958126 A CN201710958126 A CN 201710958126A CN 107829553 A CN107829553 A CN 107829553A
- Authority
- CN
- China
- Prior art keywords
- channel
- section steel
- steel
- section
- elevator hoistways
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/24—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
- E04G3/246—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons following the inside contour of a building
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/22—Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by roofs or ceilings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/004—Storage and transport racks for scaffolding components
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The invention discloses a kind of elevator hoistways construction platform system, belong to technical field of building construction.The present invention includes support body skeleton, and the second channel-section steel is horizontal positioned;The first channel-section steel is connected with second channel-section steel vertical direction;Tilted between the first channel-section steel on the second channel-section steel and vertical direction in horizontal direction and be connected with the 3rd channel-section steel;Two are fixedly installed on second channel-section steel and hangs idol;Platform, which is additionally provided with, on second channel-section steel completely spreads bridging piece;Platform, which is completely spread, is provided with two the 4th parallel channel-section steels in bridging piece;Vertical connection between 4th channel-section steel and the second channel-section steel;Two the 4th parallel channel-section steel vertical direction are provided with bridging piece;Adjustable fixed card slot is made up of round steel, double nut, backing plate and wedge type block;Round steel is tilted and is fixedly connected on backing plate;Double nut is cased with round steel;Wedge type block is installed on backing plate.The present invention is rational in infrastructure, disclosure satisfy that the security needs of job site high-altitude drilling, and can meet that different height drills, and reduces construction cost.
Description
Technical field
The present invention relates to technical field of building construction, more specifically to a kind of elevator hoistways construction platform system.
Background technology
Skyscraper is more and more extensive at present, and elevator hoistways depth is inevitable more and more deeper so that the operation shape in the region
Into new major hazard source, during main structure construction, hoistway inwall wall formwork is one of problem all the time.Tens meters
There is no landing slab in hundreds of meters of high elevator hoistways from bottom to top even, worker gets up not only inconvenient uneasy in construction
Entirely.In reinforcing bar colligation installation, because of the limitation of job position, it can only often ensure the quality of outer wall and look after less than inwall
Quality.Model sheetinstallat operation is even taken the method lifted again after pre-assembly semi-finished product, subsequently added with the accumulation of experience
Gu measure is still essential, although process is improved, the security incident thus brought is not reduced.Build
For engineering premised on keeping the safety in production, high efficiency, the management of high quality are extremely urgent.
The content of the invention
1st, to solve the problems, such as
The problem of existing for prior art and deficiency, the invention provides a kind of elevator hoistways construction platform system, knot
Structure is reasonable, easy for installation, disclosure satisfy that the security needs of job site high-altitude drilling, and can meet that different height drills, drop
Low construction cost.
2nd, technical scheme
To reach above-mentioned purpose, technical scheme provided by the invention is:
A kind of elevator hoistways construction platform system of the present invention, including support body skeleton, described support body skeleton include second
Channel-section steel, the first channel-section steel and the 3rd channel-section steel;The second described channel-section steel is horizontal positioned;It is connected with the second described channel-section steel vertical direction
First channel-section steel;Tilted between the first channel-section steel on the second channel-section steel and vertical direction in described horizontal direction and be connected with the 3rd groove
Steel;Between described the first channel-section steel and the 3rd channel-section steel two steel pipes are connected with horizontal direction;The steel pipe of described top and
Steel pipe is connected with vertically between two channel-section steels;Two, which are fixedly installed, on the second described channel-section steel hangs idol;On the second described channel-section steel
It is additionally provided with platform and completely spreads bridging piece;Described platform completely spreads bridging piece and is made up of the second channel-section steel, the 4th channel-section steel and bridging piece;Described is flat
Platform completely spreads bridging piece side of outer Thursday and is connected in sequence by the second channel-section steel;Described platform completely spread be provided with bridging piece two it is parallel
4th channel-section steel;Vertical connection between the 4th described channel-section steel and the second channel-section steel;Two described the 4th parallel channel-section steel Vertical Squares
To being provided with bridging piece;The lower end of the first described channel-section steel has been bolted adjustable fixed card slot;Described is adjustable solid
Determine neck to be made up of round steel, double nut, backing plate and wedge type block;Described round steel is tilted and is fixedly connected on backing plate;Described circle
Double nut is cased with steel;Wedge type block is installed on described backing plate.
Further, described adjustable fixed card slot, which is stretched into floor, is more than or equal to 500mm.
Further, described double nut is M12 double nuts.
Further, what described platform completely spread bridging piece is shaped as rectangle.
Further, described double nut is threadedly coupled with round steel.
Further, described two are hung and leave distance between idol.
Further, the size of the first described channel-section steel is 200 × 73 × 7, is 20#a channel-section steels, the size of the second channel-section steel is
180 × 68 × 7, it is 18#a channel-section steels.
Further, the size of the 3rd described channel-section steel is 140 × 58 × 6, is 14#a channel-section steels, the size of the 4th channel-section steel is
160 × 63 × 6.5, it is 16#a channel-section steels.
Further, described steel pipe is the steel pipes of Φ 50 × 3.5.
Further, described round steel is the round steel of Φ 22.
3rd, beneficial effect
Compared to prior art, beneficial effects of the present invention are:
(1) a kind of elevator hoistways construction platform system of the invention, convenient material drawing, make simply, it is practical;Bore in high-altitude
Hole aids in without other staff, speeds up the work.
(2) a kind of elevator hoistways construction platform system of the invention, it is not only rational in infrastructure, it is easy for installation, it disclosure satisfy that and apply
The security needs of work scene high-altitude drilling, and can meet that different height drills, reduce construction cost.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the structural representation that platform completely spreads bridging piece in the present invention;
Fig. 3 is the structural representation that fixed card slot is can adjust in the present invention.
In figure:1st, the first channel-section steel;2nd, the second channel-section steel;3rd, the 3rd channel-section steel;4th, steel pipe;5th, it can adjust fixed card slot;6th, idol is hung;
7th, the 4th channel-section steel;8th, bridging piece;9th, round steel;10th, double nut;11st, backing plate;12nd, wedge type block.
Embodiment
The present invention is further described below with reference to specific embodiments and the drawings:
Embodiment 1
As Figure 1-3, a kind of elevator hoistways construction platform system of the present embodiment, including support body skeleton, above-mentioned frame
Body skeleton includes the second channel-section steel 2, the first channel-section steel 1 and the 3rd channel-section steel 3, the second horizontal positioned, above-mentioned groove of the second above-mentioned channel-section steel 2
It is connected with the first channel-section steel 1 in the vertical direction of steel 2, the second channel-section steel 2 in above-mentioned horizontal direction and the first groove in vertical direction
Being tilted between steel 1 and be connected with the 3rd channel-section steel 3, the size of the first above-mentioned channel-section steel 1 is 200 × 73 × 7, is 20#a channel-section steels, second
The size of channel-section steel 2 is 180 × 68 × 7, is 18#a channel-section steels, the size of the 3rd channel-section steel 3 is 140 × 58 × 6, is 14#a channel-section steels.On
Two steel pipes 4, the steel pipe 4 and second of above-mentioned top are connected between the first channel-section steel 1 stated and the 3rd channel-section steel 3 in horizontal direction
Steel pipe 4 is connected between channel-section steel 2 vertically, steel pipe 4 is the steel pipes of Φ 50 × 3.5.Two are fixedly installed on the second above-mentioned channel-section steel 2
Hang even 6, above-mentioned two hang even 6 between leave a certain distance.
A kind of elevator hoistways construction platform system of the present embodiment, platform is additionally provided with the second above-mentioned channel-section steel 2 and is completely spread
Bridging piece, above-mentioned platform completely spread bridging piece and are made up of the second channel-section steel 2, the 4th channel-section steel 7 and bridging piece 8, and platform completely spreads being shaped as bridging piece
Rectangle.Above-mentioned platform completely spreads bridging piece side of outer Thursday and is connected in sequence by the second channel-section steel 2, and above-mentioned platform, which is completely spread in bridging piece, pacifies
Equipped with two the 4th parallel channel-section steels 7, the size of the 4th above-mentioned channel-section steel 7 is 160 × 63 × 6.5, is 16#a channel-section steels, above-mentioned
Vertical connection between 4th channel-section steel 7 and the second channel-section steel 2, above-mentioned two parallel vertical direction of the 4th channel-section steel 7 are provided with bridging piece
8, form Safety operation platform.
A kind of elevator hoistways construction platform system of the present embodiment, the lower end of the first above-mentioned channel-section steel 1 are bolted
There is adjustable fixed card slot 5, above-mentioned adjustable fixed card slot 5 is made up of round steel 9, double nut 10, backing plate 11 and wedge type block 12,
Above-mentioned round steel is the round steel of Φ 22, and above-mentioned round steel 9 is tilted and is fixedly connected on backing plate 11, and double spiral shells are cased with above-mentioned round steel 9
Mother 10, double nut 10 is M12 double nuts, and double nut 10 is threadedly coupled with round steel 9, and wedge type block is provided with above-mentioned backing plate 11
12.Above-mentioned adjustable fixed card slot 5, which is stretched into floor, is more than or equal to 500mm, is to increase safety coefficient, combinations of the above
Turn into elevator hoistways construction platform system afterwards, original hoistway cavity part is become into interim security platform.
A kind of elevator hoistways construction platform system of the present invention, original hoistway cavity part is become into interim security platform,
Worker can not only increase operating efficiency, strengthen quality, even more ensured the people of workmen normally in the region job
Body safety.The invention was both easy, quick, positive effect and cost are cheap safe and reliable, not only increases operating efficiency, strengthens
Quality, has even more ensured the personal safety of workmen, plays practical, feasible effect.
Schematically the present invention and embodiments thereof are described above, this describes no restricted, institute in accompanying drawing
What is shown is also one of embodiments of the present invention, and actual structure is not limited thereto.So if common skill of this area
Art personnel are enlightened by it, without departing from the spirit of the invention, without designing and the technical scheme for creativeness
Similar frame mode and embodiment, protection scope of the present invention all should be belonged to.
Claims (10)
- A kind of 1. elevator hoistways construction platform system, it is characterised in that:Including support body skeleton, described support body skeleton includes second Channel-section steel (2), the first channel-section steel (1) and the 3rd channel-section steel (3);Described the second channel-section steel (2) is horizontal positioned;Described the second channel-section steel (2) The first channel-section steel (1) is connected with vertical direction;The second channel-section steel (2) in described horizontal direction and the first groove in vertical direction Tilted between steel (1) and be connected with the 3rd channel-section steel (3);Connect between described the first channel-section steel (1) and the 3rd channel-section steel (3) in horizontal direction It is connected to two steel pipes (4);Steel pipe (4) is connected with vertically between the steel pipe (4) and the second channel-section steel (2) of described top;Described Two are fixedly installed on second channel-section steel (2) and hangs idol (6);Platform, which is additionally provided with, on described the second channel-section steel (2) completely spreads bridging piece;Institute The platform stated completely spreads bridging piece and is made up of the second channel-section steel (2), the 4th channel-section steel (7) and bridging piece (8);Described platform completely spreads bridging piece periphery Four sides are connected in sequence by the second channel-section steel (2);Described platform, which is completely spread, is provided with two the 4th parallel channel-section steels in bridging piece (7);Vertical connection between the 4th described channel-section steel (7) and the second channel-section steel (2);Two described the 4th parallel channel-section steels (7) hang down Nogata is to being provided with bridging piece (8);The lower end of described the first channel-section steel (1) has been bolted adjustable fixed card slot (5);Institute The adjustable fixed card slot (5) stated is made up of round steel (9), double nut (10), backing plate (11) and wedge type block (12);Described round steel (9) tilt and be fixedly connected on backing plate (11);Double nut (10) is cased with described round steel (9);Pacify on described backing plate (11) Equipped with wedge type block (12).
- A kind of 2. elevator hoistways construction platform system according to claim 1, it is characterised in that:Described adjustable fixation Neck (5), which is stretched into floor, is more than or equal to 500mm.
- A kind of 3. elevator hoistways construction platform system according to claim 1, it is characterised in that:Described double nut (10) For M12 double nuts.
- A kind of 4. elevator hoistways construction platform system according to claim 1, it is characterised in that:Described platform, which is completely spread, to be chosen Plate is shaped as rectangle.
- A kind of 5. elevator hoistways construction platform system according to claim 3, it is characterised in that:Described double nut (10) It is threadedly coupled with round steel (9).
- A kind of 6. elevator hoistways construction platform system according to claim 1, it is characterised in that:Described two hang idol (6) distance is left between.
- A kind of 7. elevator hoistways construction platform system according to claim 1, it is characterised in that:The first described channel-section steel (1) size is 200 × 73 × 7, is 20#a channel-section steels, the size of the second channel-section steel (2) is 180 × 68 × 7, is 18#a channel-section steels.
- A kind of 8. elevator hoistways construction platform system according to claim 1, it is characterised in that:The 3rd described channel-section steel (3) size is 140 × 58 × 6, is 14#a channel-section steels, the size of the 4th channel-section steel (7) is 160 × 63 × 6.5, is 16#a channel-section steels.
- A kind of 9. elevator hoistways construction platform system according to claim 1, it is characterised in that:Described steel pipe (4) is The steel pipes of Φ 50 × 3.5.
- A kind of 10. elevator hoistways construction platform system according to claim 1, it is characterised in that:Described round steel (9) is The round steel of Φ 22.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710958126.3A CN107829553A (en) | 2017-10-16 | 2017-10-16 | A kind of elevator hoistways construction platform system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710958126.3A CN107829553A (en) | 2017-10-16 | 2017-10-16 | A kind of elevator hoistways construction platform system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107829553A true CN107829553A (en) | 2018-03-23 |
Family
ID=61648095
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710958126.3A Pending CN107829553A (en) | 2017-10-16 | 2017-10-16 | A kind of elevator hoistways construction platform system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107829553A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110306777A (en) * | 2019-06-25 | 2019-10-08 | 王萍 | A construction method applied to elevator shaft lifting platform in construction engineering |
CN114000695A (en) * | 2021-10-18 | 2022-02-01 | 西安安德固模架工程有限公司 | Scaffold for supporting multilayer concrete structure and mounting method thereof |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110024231A1 (en) * | 2009-07-30 | 2011-02-03 | Wurth Steven P | Foldable hoistway work deck |
CN202370234U (en) * | 2011-11-14 | 2012-08-08 | 舜元建设(集团)有限公司 | Tool type elevator hoistway construction platform |
CN202391112U (en) * | 2011-12-31 | 2012-08-22 | 河南省第一建筑工程集团有限责任公司 | Pull rod hinging device for profile steel overhang framework platform |
CN202882376U (en) * | 2012-11-12 | 2013-04-17 | 江苏省苏中建设集团股份有限公司 | Elevator shaft template support platform |
CN203334646U (en) * | 2013-05-30 | 2013-12-11 | 江苏省苏中建设集团股份有限公司沈阳分公司 | Operating platform of elevator shaft formwork supports |
CN204186856U (en) * | 2014-10-16 | 2015-03-04 | 浙江华纬弹簧有限公司 | A kind of leaf spring |
CN204326489U (en) * | 2014-12-01 | 2015-05-13 | 江苏邗建集团有限公司 | Construction of lift well operating platform |
CN204850399U (en) * | 2015-07-24 | 2015-12-09 | 中建八局第四建设有限公司 | Well operation platform |
CN205777428U (en) * | 2016-05-18 | 2016-12-07 | 湖北仁泰韬盛科技发展有限公司 | Elevator is from climbing platforms |
CN206189834U (en) * | 2016-09-22 | 2017-05-24 | 中建海峡建设发展有限公司 | Double -deck integrally lift up formula operation platform of elevartor shaft |
CN206513383U (en) * | 2016-12-28 | 2017-09-22 | 中铁第四勘察设计院集团有限公司 | A kind of attachment means of tunnel steelframe and lock pin anchor tube |
CN107190964A (en) * | 2017-06-02 | 2017-09-22 | 北京首钢建设集团有限公司 | A kind of construction method of prefabricated hoistway operation platform |
-
2017
- 2017-10-16 CN CN201710958126.3A patent/CN107829553A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110024231A1 (en) * | 2009-07-30 | 2011-02-03 | Wurth Steven P | Foldable hoistway work deck |
CN202370234U (en) * | 2011-11-14 | 2012-08-08 | 舜元建设(集团)有限公司 | Tool type elevator hoistway construction platform |
CN202391112U (en) * | 2011-12-31 | 2012-08-22 | 河南省第一建筑工程集团有限责任公司 | Pull rod hinging device for profile steel overhang framework platform |
CN202882376U (en) * | 2012-11-12 | 2013-04-17 | 江苏省苏中建设集团股份有限公司 | Elevator shaft template support platform |
CN203334646U (en) * | 2013-05-30 | 2013-12-11 | 江苏省苏中建设集团股份有限公司沈阳分公司 | Operating platform of elevator shaft formwork supports |
CN204186856U (en) * | 2014-10-16 | 2015-03-04 | 浙江华纬弹簧有限公司 | A kind of leaf spring |
CN204326489U (en) * | 2014-12-01 | 2015-05-13 | 江苏邗建集团有限公司 | Construction of lift well operating platform |
CN204850399U (en) * | 2015-07-24 | 2015-12-09 | 中建八局第四建设有限公司 | Well operation platform |
CN205777428U (en) * | 2016-05-18 | 2016-12-07 | 湖北仁泰韬盛科技发展有限公司 | Elevator is from climbing platforms |
CN206189834U (en) * | 2016-09-22 | 2017-05-24 | 中建海峡建设发展有限公司 | Double -deck integrally lift up formula operation platform of elevartor shaft |
CN206513383U (en) * | 2016-12-28 | 2017-09-22 | 中铁第四勘察设计院集团有限公司 | A kind of attachment means of tunnel steelframe and lock pin anchor tube |
CN107190964A (en) * | 2017-06-02 | 2017-09-22 | 北京首钢建设集团有限公司 | A kind of construction method of prefabricated hoistway operation platform |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110306777A (en) * | 2019-06-25 | 2019-10-08 | 王萍 | A construction method applied to elevator shaft lifting platform in construction engineering |
CN110306777B (en) * | 2019-06-25 | 2021-07-09 | 南通居者安建筑科学研究院有限公司 | A construction method applied to elevator shaft lifting platform in construction engineering |
CN114000695A (en) * | 2021-10-18 | 2022-02-01 | 西安安德固模架工程有限公司 | Scaffold for supporting multilayer concrete structure and mounting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201158933Y (en) | High-rise maintaining scaffold device with extruding structure | |
CN205077845U (en) | Hydraulic intelligent climbing operation scaffold for core barrel well of building | |
CN204126230U (en) | Assembly scaffold unit | |
CN107190964A (en) | A kind of construction method of prefabricated hoistway operation platform | |
CN103206074A (en) | Elevator shaft template construction method, platform and support | |
CN207294093U (en) | A kind of large span steel truss integral lifting apparatus | |
CN107178203A (en) | A kind of planar dimension and adjustable for height operating platform | |
CN204781927U (en) | Elevartor shaft formwork and elevartor shaft concrete placement operation platform | |
CN107829553A (en) | A kind of elevator hoistways construction platform system | |
CN205296799U (en) | Construction of elevator well and protection platform | |
CN205206284U (en) | Detachable assembly type elevator shaft operating platform | |
CN107035131A (en) | Elevator shaft integral lifting type construction operation platform and elevator shaft construction method | |
CN102979297A (en) | Hanging type stairwell operating platform mechanism and construction method thereof | |
CN206917244U (en) | Integral lifting type construction operation platform for elevator shaft | |
CN205777531U (en) | Floor slab construction beam string shuttering supporting equipment | |
CN104847108A (en) | Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure | |
CN208363666U (en) | It is a kind of for build face side construction safety protection frame | |
CN203475801U (en) | Telescopic steel platform for elevator shaft | |
CN207144446U (en) | A kind of construction Skidproof hanging cradle | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN206174441U (en) | Elevator shaft operation platform | |
CN205955165U (en) | Elevator shaft operation platform | |
CN205382718U (en) | Sparse passway for escaping of steel platform die carrier system | |
CN211714541U (en) | Special handling frame for installing shear wall template in elevator shaft | |
CN209942195U (en) | Construction operation platform of high-rise hollow area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180323 |