CN205777428U - Elevator is from climbing platforms - Google Patents

Elevator is from climbing platforms Download PDF

Info

Publication number
CN205777428U
CN205777428U CN201620454514.9U CN201620454514U CN205777428U CN 205777428 U CN205777428 U CN 205777428U CN 201620454514 U CN201620454514 U CN 201620454514U CN 205777428 U CN205777428 U CN 205777428U
Authority
CN
China
Prior art keywords
heavy frame
brace
montant
elevator
lift
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620454514.9U
Other languages
Chinese (zh)
Inventor
王小磊
张双刚
沈登峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei rentaiiron Hengchang Technology Development Co. Ltd.
Original Assignee
Hubei Rentaiiron Topshon Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Rentaiiron Topshon Technology Development Co Ltd filed Critical Hubei Rentaiiron Topshon Technology Development Co Ltd
Priority to CN201620454514.9U priority Critical patent/CN205777428U/en
Application granted granted Critical
Publication of CN205777428U publication Critical patent/CN205777428U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses a kind of elevator from climbing platforms, including heavy frame, upper stand, lower suspension bracket, Lift-on/Lift-off System;Described heavy frame includes paired heavy frame unit, a pair heavy frame unit upper, connect by transverse connecting rod is fixing respectively between lower two ends, connect by lifting boom is fixing between Zhong Bu, each heavy frame unit includes brace, it is arranged on the cross tube above described brace and upper montant, it is arranged on the sheer pole below described brace and lower montant, montant is stretched out in the lower end of described brace and sheer pole is arranged, the lower end of described brace is provided with for being supported on the localizer on elevator door beam upper surface, described cross tube is provided with crown wall wheel one near one end of structure wall, the length of described sheer pole and lower montant is respectively smaller than cross tube and the length of upper montant, described sheer pole is provided with crown wall wheel two near one end of structure wall.This utility model simple structure, it is not necessary to hole of boxing out on structure wall, easy to use, labor and material saving.

Description

Elevator is from climbing platforms
Technical field
This utility model relates to a kind of construction elevator climbing working platform, particularly relates to a kind of elevator from climbing Rise platform.
Background technology
Elevator is the passage that building building body installs elevator, is typically manually successively to set up scaffold during construction of lift well, Constructing one layer and the most up set up one layer, not only waste material is taken a lot of work, also higher to the skill set requirements of workmen, simultaneously because The quality that steel tube fastener etc. set up material is uneven, and the scaffold quality set up there is also potential safety hazard.Existing in China Stage skyscraper has become the main body of urban architecture, elevator successively set up scaffold can not meet construction safety and Progress demand.
Utility model content
The purpose of this utility model is to provide a kind of elevator from climbing platforms, and it can meet executing of building elevator Work demand.
This utility model solves its technical problem and be the technical scheme is that
A kind of elevator, from climbing platforms, is arranged between structure wall and elevator door beam, should include from climbing platforms Heavy frame, it is arranged on the upper stand above described heavy frame, is arranged on the lower suspension bracket below described heavy frame and lifting System, the lower draw-bar of described Lift-on/Lift-off System is connected with heavy frame, and on it, hook is connected with structure wall;Described heavy frame Including the heavy frame unit be arrangeding in parallel in pairs, respectively by laterally connecting between the upper/lower terminal of a pair heavy frame unit Extension bar is fixing to be connected, and connects by lifting boom is fixing, each heavy frame unit bag between the middle part of a pair heavy frame unit Include downward-sloping arrange in structure wall brace, be arranged on triangle at a right angle with described brace above described brace and set The cross tube put and upper montant, be arranged on sheer pole that below described brace, triangle at a right angle with described brace is arranged and Lower montant, montant is stretched out in the lower end of described brace and sheer pole is arranged, and the lower end of described brace is provided with for supporting Localizer on elevator door beam upper surface, described cross tube is provided with crown wall wheel one near one end of structure wall, The length of described sheer pole and lower montant is respectively smaller than cross tube and the length of upper montant, and described sheer pole is near structural wall One end of body is provided with crown wall wheel two.
By technique scheme, the lower draw-bar of described Lift-on/Lift-off System is connected with the middle part of lifting boom.
By technique scheme, described lifting boom is arranged between brace and lower montant, described lifting boom and brace and under All connect by clamping plate and bolt are fixing between montant.
By technique scheme, described lifting boom and transverse connecting rod are equipped with a row for regulating heavy frame width Digital and analog hole.
By technique scheme, described localizer includes horizontally disposed locating piece and is arranged on the crown wall of brace end Wheel three.
By technique scheme, described localizer also includes the sliding bar being set in described brace lower end, under described brace End is provided with multiple installing hole vertically, and described sliding bar is connected by bolt and one of them installing hole are fixing.
By technique scheme, the height of described upper stand and heavy frame is disposed as a story height, described under hang The height of frame is set to half story height.
This utility model, has the advantages that this utility model simple structure, it is not necessary to hole of boxing out on structure wall, Just can realize climbing, easy to use, labor and material saving.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail, in accompanying drawing:
Fig. 1 is the use side view of the state of this utility model embodiment;
Fig. 2 is the use state top view of this utility model embodiment;
Fig. 3 is that the side of heavy frame in this utility model embodiment is intended to;
Fig. 4 is the top view of heavy frame in this utility model embodiment;
Fig. 5 is the schematic diagram that climbs of this utility model embodiment.
In figure: A-heavy frame;A1-heavy frame unit;The upper stand of B-;Suspension bracket under C-;D-Lift-on/Lift-off System;E-structural wall Body;F-elevator door beam;
1 brace;The upper montant of 2-;3 cross tubes;4 lifting booms;5 localizers;51 locating pieces;52 tops Wall wheel three;53-sliding bar 6-sheer pole;Montant under 7-;8-crown wall wheel one;9-transverse connecting rod;10-crown wall wheel two.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with drawings and Examples, This utility model is further elaborated.Should be appreciated that specific embodiment described herein is only in order to explain this reality With novel, it is not used to limit this utility model.
In preferred embodiment of the present utility model, as shown in Figure 1 and Figure 2, a kind of elevator from climbing platforms, if Put between structure wall E and elevator door beam F, heavy frame A should be included from climbing platforms, be arranged on heavy frame A Top upper stand B, be arranged on the lower suspension bracket C below heavy frame A and the lower extension of Lift-on/Lift-off System D, Lift-on/Lift-off System D Hook is connected with heavy frame A, and on it, hook is connected with structure wall E;As shown in Figure 3, Figure 4, heavy frame A includes The heavy frame unit A1 be arrangeding in parallel in pairs, respectively by laterally between the upper/lower terminal of a pair heavy frame unit A1 Connecting rod 9 is fixing to be connected, and is specially and respectively uses a pair transverse connecting rod, the middle part of a pair heavy frame unit A1 it Between connect by lifting boom 4 is fixing, each heavy frame unit A1 includes the downward-sloping brace arranged in structure wall E 1, it is arranged on cross tube 3 and the upper montant 2 of triangle at a right angle with brace 1 setting above brace 1, is arranged on brace Below 1 triangle at a right angle with brace 1 arrange sheer pole 6 and lower montant 7, montant 2 is stretched out in the lower end of brace 1 Arranging with sheer pole 6, the lower end of brace 1 is provided with for being supported on the localizer 5 on elevator door beam F upper surface, Cross tube 3 is provided with crown wall wheel 1 near one end of structure wall E, and the length of sheer pole 6 and lower montant 7 is respectively Less than cross tube 3 and the length of upper montant 2, sheer pole 6 is provided with crown wall wheel 2 10 near one end of structure wall E.
In preferred embodiment of the present utility model, as shown in Figure 3, Figure 4, the lower draw-bar of Lift-on/Lift-off System D and lifting The middle part of bar 4 connects, so that it is more stable to climb.
In preferred embodiment of the present utility model, as shown in Figure 3, Figure 4, lifting boom 4 be arranged on brace 1 with under Between montant 7, all it is connected by clamping plate and bolt are fixing between lifting boom 4 with brace 1 and lower montant 7.
In preferred embodiment of the present utility model, as shown in Figure 3, Figure 4, in lifting boom 4 and transverse connecting rod 9 It is equipped with a row for regulating the digital and analog hole of heavy frame A width, to be adapted to the width of elevator door beam.
In preferred embodiment of the present utility model, as shown in Figure 3, Figure 4, localizer 5 include horizontally disposed fixed Position block 51 and be arranged on brace 1 end crown wall wheel 3 52.
In preferred embodiment of the present utility model, as it is shown on figure 3, localizer 5 also includes being set in brace 1 lower end Sliding bar 53, brace 1 lower end edge is axially arranged with multiple installing hole, and sliding bar 53 is pacified with one of them by bolt Dress hole is fixing to be connected, by connecting from different installing holes, to be applicable to the height of different floor.
In preferred embodiment of the present utility model, as it is shown in figure 1, the height of upper stand B and heavy frame A is respectively provided with Being a story height, the height of lower suspension bracket C is set to half story height.
As shown in Figure 1 and Figure 2, this utility model climbs when putting in place, and crown wall wheel 1 is placed in structure wall E side, and with knot Structure body of wall touches, and crown wall wheel 3 52 is placed in elevator door beam F limit, and touches with door beam vertical edge, and locating piece 51 is placed in door On beam upper horizontal plane;Lower triangle and upper triangle share brace 1, and lower triangle is less than upper triangle, so that crown wall wheel two Gap is left between 10 and structure wall.
During as it is shown in figure 5, this utility model climbs, Lift-on/Lift-off System being hooked on structure wall, lower draw-bar picks up and hangs The center of bar 4, the movement travel of Lift-on/Lift-off System tightens up chain, elevator more than the height of a floor, Lift-on/Lift-off System after starting Well rotates a low-angle from climbing platforms, and locating piece is deviate from elevator door beam, constantly tightens up the chain of Lift-on/Lift-off System to electricity Stair shaft promotes a floor from climbing platforms.
It should be appreciated that for those of ordinary skills, can be improved according to the above description or be converted, and All these modifications and variations all should belong to the protection domain of this utility model claims.

Claims (7)

1. elevator is from a climbing platforms, is arranged between structure wall (E) and elevator door beam (F), and this climbs flat certainly Platform includes heavy frame (A), the upper stand (B) being arranged on described heavy frame (A) top, is arranged on described heavy frame (A) The lower suspension bracket (C) of lower section and Lift-on/Lift-off System (D), the lower draw-bar of described Lift-on/Lift-off System (D) is with heavy frame (A) even Connecing, on it, hook is connected with structure wall (E);It is characterized in that, described heavy frame (A) includes the most parallel setting The heavy frame unit (A1) put, passes through transverse connecting rod between the upper/lower terminal of a pair heavy frame unit (A1) respectively (9) fixing connection, connects by lifting boom (4) is fixing between the middle part of a pair heavy frame unit (A1), each Heavy frame unit (A1) include downward-sloping arrange in structure wall (E) brace (1), be arranged on described brace (1) Top with described brace (1) triangle at a right angle arrange cross tube (3) and upper montant (2), be arranged on described tiltedly Bar (1) lower section with described brace (1) triangle at a right angle arrange sheer pole (6) and lower montant (7), described tiltedly Montant (2) is stretched out in the lower end of bar (1) and sheer pole (6) is arranged, and the lower end of described brace (1) is provided with use In the localizer (5) being supported on elevator door beam (F) upper surface, described cross tube (3) is near structure wall (E) One end be provided with crown wall wheel one (8), the length of described sheer pole (6) and lower montant (7) is respectively smaller than cross tube (3) and the length of upper montant (2), described sheer pole (6) is provided with crown wall near one end of structure wall (E) Wheel two (10).
Elevator the most according to claim 1 is from climbing platforms, it is characterised in that the lower draw-bar of described Lift-on/Lift-off System (D) It is connected with the middle part of lifting boom (4).
Elevator the most according to claim 1 is from climbing platforms, it is characterised in that described lifting boom (4) is arranged on brace (1) and between lower montant (7), all by folder between described lifting boom (4) and brace (1) and lower montant (7) Plate and the fixing connection of bolt.
Elevator the most according to claim 1 is from climbing platforms, it is characterised in that described lifting boom (4) and lateral connection A row it is equipped with for regulating the digital and analog hole of heavy frame (A) width on bar (9).
Elevator the most according to claim 1 is from climbing platforms, it is characterised in that described localizer (5) includes that level sets The locating piece (51) put and the crown wall being arranged on brace (1) end wheel three (52).
Elevator the most according to claim 5 is from climbing platforms, it is characterised in that described localizer (5) also includes sheathed At the sliding bar (53) of described brace (1) lower end, described brace (1) lower end edge is axially arranged with multiple installing hole, institute State sliding bar (53) to be connected by bolt and one of them installing hole are fixing.
Elevator the most according to claim 1 is from climbing platforms, it is characterised in that described upper stand (B) and heavy frame (A) Height be disposed as a story height, the height of described lower suspension bracket (C) is set to half story height.
CN201620454514.9U 2016-05-18 2016-05-18 Elevator is from climbing platforms Active CN205777428U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620454514.9U CN205777428U (en) 2016-05-18 2016-05-18 Elevator is from climbing platforms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620454514.9U CN205777428U (en) 2016-05-18 2016-05-18 Elevator is from climbing platforms

Publications (1)

Publication Number Publication Date
CN205777428U true CN205777428U (en) 2016-12-07

Family

ID=58118604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620454514.9U Active CN205777428U (en) 2016-05-18 2016-05-18 Elevator is from climbing platforms

Country Status (1)

Country Link
CN (1) CN205777428U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948593A (en) * 2017-02-28 2017-07-14 深圳市特辰科技股份有限公司 A kind of wheeled robot climbing frame
CN107829553A (en) * 2017-10-16 2018-03-23 中国十七冶集团有限公司 A kind of elevator hoistways construction platform system
CN110306776A (en) * 2019-06-25 2019-10-08 王萍 A kind of hoistable platform for construction of elevator shaft in high-rise building

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948593A (en) * 2017-02-28 2017-07-14 深圳市特辰科技股份有限公司 A kind of wheeled robot climbing frame
CN106948593B (en) * 2017-02-28 2019-12-27 深圳市特辰科技股份有限公司 Wheeled robot climbs frame
CN107829553A (en) * 2017-10-16 2018-03-23 中国十七冶集团有限公司 A kind of elevator hoistways construction platform system
CN110306776A (en) * 2019-06-25 2019-10-08 王萍 A kind of hoistable platform for construction of elevator shaft in high-rise building
CN110306776B (en) * 2019-06-25 2020-05-29 湖北勇胜建设工程有限公司 Lifting platform for high-rise building elevator shaft construction

Similar Documents

Publication Publication Date Title
CN103206074B (en) Elevator shaft template construction method, platform and support
CN204958134U (en) Prefabricated floor plate special hoisting bar
CN205777428U (en) Elevator is from climbing platforms
KR20130068880A (en) Construction scaffold safety foothold
CN109826411A (en) A kind of climbing frame and its operation method for building
CN103422662A (en) Integral mobile construction platform for cast-in-place of elevator shaft and method for using same
CN205822747U (en) Architectural engineering scaffold
CN205934718U (en) Movable hanging basket device for bridge construction
CN203128099U (en) Slipping type pipeline lifting device
CN204753397U (en) Temporary mounting hanger for steel box bridge
CN103953187B (en) A kind of sliding-mode platform system of band center vertical tube structure
CN108035530B (en) Oil tank inner wall construction hanging basket
CN203430008U (en) Integrally movable type construction platform for cast-in-situ of elevator shaft
CN206244262U (en) Bearing cap finished product frame pallet
CN204850396U (en) Foldable elevartor shaft construction support
CN204850513U (en) Horizontal protector of elevator well
CN105060124B (en) Intra-frame portal crane system and hoisting use method thereof
CN210342619U (en) Connecting piece of integral lifting scaffold
CN208454407U (en) The fixed attachment device of the wheeled supporting leg of sliding formwork
CN207328748U (en) A kind of quick auxiliary device for realizing transverse bulkhead lifting positioning and construction safety
CN113882701A (en) Hydraulic climbing protective screen device
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space
CN207812982U (en) A kind of inner wall of oil tank construction hanging basket
CN208471484U (en) Suspension arrangement is stretched in aerial work basket
RU2438963C1 (en) Attachment tower crane with tower connections and device to attach crane tower to high-rise building, method of extending crane tower and device to this end

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 430070 Hubei city of Wuhan province Miao Shan Wu Shu Cun, Jiangxia District Office Jinlong Avenue No. 3

Patentee after: Hubei rentaiiron Hengchang Technology Development Co. Ltd.

Address before: 430070 Hubei, Hongshan District, Hongshan street, new village, village committee, building, floor, 4

Patentee before: Hubei rentaiiron topshon Technology Development Co. Ltd.