CN205934718U - Movable hanging basket device for bridge construction - Google Patents

Movable hanging basket device for bridge construction Download PDF

Info

Publication number
CN205934718U
CN205934718U CN201620865054.9U CN201620865054U CN205934718U CN 205934718 U CN205934718 U CN 205934718U CN 201620865054 U CN201620865054 U CN 201620865054U CN 205934718 U CN205934718 U CN 205934718U
Authority
CN
China
Prior art keywords
support bar
bridge
fixedly connected
bridge floor
basket device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620865054.9U
Other languages
Chinese (zh)
Inventor
夏亮
张道贺
田卫东
曾志能
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bengbu Construction Engineering Co Ltd of China Construction Fifth Engineering Co Ltd
Original Assignee
Bengbu Construction Engineering Co Ltd of China Construction Fifth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bengbu Construction Engineering Co Ltd of China Construction Fifth Engineering Co Ltd filed Critical Bengbu Construction Engineering Co Ltd of China Construction Fifth Engineering Co Ltd
Priority to CN201620865054.9U priority Critical patent/CN205934718U/en
Application granted granted Critical
Publication of CN205934718U publication Critical patent/CN205934718U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model provides a movable hanging basket device for bridge construction; the device comprises a track assembly, a supporting seat, a balancing weight, a working platform and a supporting frame; the counterweight block is placed on the supporting seat, one end of the supporting frame is fixedly connected with the supporting seat, the other end of the supporting frame extends towards the lower part of the outer side of the bridge deck, the other end of the supporting frame is horizontally and fixedly connected with the working platform, and the working platform extends into the lower side of the bottom of the bridge deck; the rail assembly comprises a plurality of sliding rails and a plurality of sliding blocks, the sliding rails are laid at the edge of the bridge floor, the sliding blocks are installed at the bottom of the supporting seat, and the sliding blocks are matched with the sliding rails respectively. The workman can stand and work on work platform, maintains or the maintenance operation bottom the bridge floor to control the supporting seat and remove along guide rail assembly's slide rail direction, and then drive work platform moving as a whole, make whole hanging flower basket device can continuous movement, compare hanging flower basket device among the prior art, improved workman's operation environment, promoted work efficiency, practiced thrift a large amount of construction period.

Description

Bridge construction movable hanging basket device
Technical field
This utility model is related to a kind of nacelle device, particularly to a kind of bridge construction movable hanging basket device.
Background technology
When bridge construction or maintenance, need often to be constructed or upkeep operation in the bridge floor bottom of bridge, at present, tradition Working hanging basket carries rope, and can only be fixed on a position construction, need reorientate when continuous construction, extremely not Just, a large amount of construction periods are affected;And there are a large amount of potential safety hazards in operating personnel.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of easy to use, bridge construction that can continuously construct Use movable hanging basket device.
For solving above-mentioned technical problem, this utility model provides a kind of bridge construction movable hanging basket device;
Including rail assembly, support base, balancing weight, work platformses and bracing frame;
Balancing weight is placed on support base, and bracing frame one end is fixedly connected with support base, and the bracing frame other end is to outside bridge floor Side lower part extends, and the bracing frame other end is fixedly connected with work platformses level, and work platformses stretch on the downside of bridge floor bottom;
Rail assembly includes some slide rails and some slide blocks, and described slide rail is laid on bridge floor marginal position, described slide rail Trend consistent with the length direction of bridge, some slide blocks are arranged on support base bottom, and some slide blocks are joined with some slide rails respectively Close.
After such structure, workman may stand in and works on work platformses, and bridge floor bottom is keeped in repair or maintenance Operation, and manipulate support base along the slide rail direction movement of guide assembly, and then drive work platformses to move integrally, make entirely to hang Basket device can be with continuous moving, middle nacelle device compared to existing technology, improves the working environment of workman, improves work effect Rate, has saved a large amount of construction periods.
For clearer understanding technology contents of the present utility model, below by this bridge construction movable hanging basket device It is referred to as this nacelle device.
The bracing frame of this nacelle device includes some vertical first support bars, the second support bar of some levels and some The 3rd vertical support bar, first support bar, second support bar and the 3rd support bar are one-to-one relationship;
Described first support bar lower end is fixedly connected with support base, described second support bar one end with corresponding first Strut is fixedly connected, and the described second support bar other end is stretched out outside bridge floor and is fixedly connected with corresponding 3rd support bar, The level height of the 3rd described support bar lower end is less than level height and described 3rd support bar lower end and the work of bridge floor bottom Make platform side to fix, work platformses opposite side stretches on the downside of bridge floor bottom.
After such structure, the structure of bracing frame is more reasonable, reduces the impact to whole nacelle device for the bracing frame, Avoid security incident.
Second support bar one end of this nacelle device is fixedly connected with the middle part of corresponding first support bar, described first It is provided with flower basket bolt between strut upper end and corresponding 3rd support bar;After such structure, it is possible to reduce the second support The stress and deformation of bar, increases the stability of bracing frame.
The work platformses of this nacelle device are formed around safety barrier and safety net;After such structure, increase this The safety of nacelle device, prevents workman from falling from work platformses.
Brief description
Fig. 1 is the use state figure of this nacelle device.
Fig. 2 is the axonometric chart of Fig. 1.
Specific embodiment
As shown in Fig. 1 is to 2
This nacelle device includes rail assembly, 2, three pieces of balancing weights 3 of support base, work platformses 5 and bracing frame.
Rail assembly includes two slide rails 11 and eight slide blocks 12, and two slide rails 11 are laid on bridge floor 6 marginal position, every The trend of slide rail 11 is consistent with the length direction of bridge, and eight slide blocks 12 are separately mounted to support base 2 bottom, and each slide block 12 are placed on support base 2 with corresponding slide rail 11 slide fit, three pieces of balancing weights 3.
Bracing frame includes four vertical second support bars 42 of 41, four levels of first support bar and four vertical Three support bars 43, first support bar 41, second support bar 42 and the 3rd support bar 43 are one-to-one relationship, first support bar 41st, second support bar 42 and the 3rd support bar 43 are also all steel structure truss structure;
Four first support bar 41 lower ends are bolted with support base 2 right part, and bracing piece 46 is passed through on support base 2 right side Bolt is fixed and first support bar 41 upper end between.
It is welded and fixed by two connecting rods 44 between four first support bar 41 upper ends, every second support bar 42 left end It is bolted with the middle part of corresponding first support bar 41, second support bar 42 right-hand member stretches out outside bridge floor 6, every second Strut 42 right-hand member is welded and fixed with corresponding 3rd support bar 43 upper end, every first support bar 41 upper end with corresponding 3rd Between strut 43 upper end also by flower basket bolt 45 hinged it is ensured that connecting the two stable connection, the 3rd support bar 43 lower end is downward Side extends, and the level height of the 3rd support bar 43 lower end is less than the level height of bridge floor 6 bottom.
Work platformses 5 are a steel structure platform, the right side of work platformses 5 respectively with four the 3rd support bar 43 lower weld Fixing, work platformses 5 left part stretches on the downside of bridge floor 6 bottom, and exists between work platformses 5 and bridge floor 6 bottom and necessarily supply work The space of people's work, work platformses 5 are formed around safety barrier 51 and airtight safety net (not shown), safety barrier 51 And safety net is airtight ensure that workmen's safety.
During use, workman may stand in and works on work platformses 5, and bridge floor 6 bottom is keeped in repair or maintenance work, and Manipulate support base 2 to move along slide rail 11 direction of guide assembly, and then drive work platformses 5 to move integrally, make whole hanging basket dress Putting can be with continuous moving, and middle nacelle device compared to existing technology improves the working environment of workman, improves work efficiency, section About a large amount of construction periods.
It is additionally provided with special ladder 7, workman is easy to climb up and down, extremely convenient.
Above-described is only a kind of embodiment of the present utility model it is noted that ordinary skill for this area For personnel, on the premise of without departing from this utility model principle, some modifications and improvement can also be made, these also should be regarded as Belong to protection domain of the present utility model.

Claims (4)

1. a kind of bridge construction movable hanging basket device, it is characterized by:
Including rail assembly, support base, balancing weight, work platformses and bracing frame;
Balancing weight is placed on support base, and bracing frame one end is fixedly connected with support base, under the bracing frame other end is to outside bridge floor Portion extends, and the bracing frame other end is fixedly connected with work platformses level, and work platformses stretch on the downside of bridge floor bottom;
Rail assembly includes some slide rails and some slide blocks, and described slide rail is laid on bridge floor marginal position, the walking of described slide rail To consistent with the length direction of bridge, some slide blocks are arranged on support base bottom, and some slide blocks are coordinated with some slide rails respectively.
2. bridge construction according to claim 1 movable hanging basket device, is characterized in that:
Described bracing frame includes some vertical first support bars, the second support bar of some levels and some vertical 3rd Support bar, first support bar, second support bar and the 3rd support bar are one-to-one relationship;
Described first support bar lower end is fixedly connected with support base, described second support bar one end and corresponding first support bar It is fixedly connected, the described second support bar other end is stretched out outside bridge floor and is fixedly connected with corresponding 3rd support bar, described The level height of the 3rd support bar lower end be less than the level height of bridge floor bottom and described 3rd support bar bottom is flat with work Platform side is fixed, and work platformses opposite side stretches on the downside of bridge floor bottom.
3. bridge construction according to claim 2 movable hanging basket device, is characterized in that:
Described second support bar one end is fixedly connected with the middle part of corresponding first support bar, described first support bar upper end with It is provided with flower basket bolt between corresponding 3rd support bar.
4. bridge construction according to claim 1 movable hanging basket device, is characterized in that:
Described work platformses are formed around safety barrier and safety net.
CN201620865054.9U 2016-08-10 2016-08-10 Movable hanging basket device for bridge construction Expired - Fee Related CN205934718U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620865054.9U CN205934718U (en) 2016-08-10 2016-08-10 Movable hanging basket device for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620865054.9U CN205934718U (en) 2016-08-10 2016-08-10 Movable hanging basket device for bridge construction

Publications (1)

Publication Number Publication Date
CN205934718U true CN205934718U (en) 2017-02-08

Family

ID=57922454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620865054.9U Expired - Fee Related CN205934718U (en) 2016-08-10 2016-08-10 Movable hanging basket device for bridge construction

Country Status (1)

Country Link
CN (1) CN205934718U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108373126A (en) * 2018-01-29 2018-08-07 陈细妹 A kind of road and bridge construction tool fast lifting equipment
CN113089477A (en) * 2021-04-06 2021-07-09 四川川交路桥有限责任公司 Hanging basket suspension system
CN113502758A (en) * 2021-08-31 2021-10-15 河南城建学院 Hanging basket hanging device for bridge construction
CN114481862A (en) * 2022-01-06 2022-05-13 中国五冶集团有限公司 Movable truss device and construction process

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108373126A (en) * 2018-01-29 2018-08-07 陈细妹 A kind of road and bridge construction tool fast lifting equipment
CN113089477A (en) * 2021-04-06 2021-07-09 四川川交路桥有限责任公司 Hanging basket suspension system
CN113502758A (en) * 2021-08-31 2021-10-15 河南城建学院 Hanging basket hanging device for bridge construction
CN114481862A (en) * 2022-01-06 2022-05-13 中国五冶集团有限公司 Movable truss device and construction process

Similar Documents

Publication Publication Date Title
CN205934718U (en) Movable hanging basket device for bridge construction
CN100590277C (en) Overhead bridge type suspension scaffold
CN203175023U (en) Counter weight type cantilever hanging basket device
CN206768611U (en) Bridge pier hanging basket mounting operation platform
CN109826411A (en) A kind of climbing frame and its operation method for building
CN204310644U (en) A kind of single suspension centre cage guide installation and maintenance hanging basket
CN211257766U (en) Movable operating platform with anti-overturning supporting legs
CN103011031A (en) Stand column type 360-degree rotary oil tank maintenance platform
CN207958995U (en) A kind of totally-enclosed flap seat of Hanging Basket convenient for adjusting installation
CN205604084U (en) Hanging flower basket device of prefabricated little case roof beam construction usefulness
CN205777428U (en) Elevator is from climbing platforms
CN210529487U (en) Bridge and box-shaped bridge inspection device with flange plates
CN104278830A (en) Integrated combined scaffold
CN210795684U (en) Novel movable lifting platform
CN207862788U (en) It is a kind of to be connected to the outstanding stretch-draw jack hanging apparatus filled on Hanging Basket
CN214713878U (en) Tower crane cat ladder structure
CN104847101B (en) Operation platform for decoration work on long cantilever positions of roofs with steel structures
CN204103309U (en) A kind of composite type inspection platform
CN205693609U (en) Ground photovoltaic bracket and photovoltaic module hanger bracket device are installed
CN204803771U (en) High pier bridge disease of highway inspection punishment facility
CN106401157A (en) Movable operation platform and high-altitude construction method
CN205529939U (en) Bridge testing and maintenance platform of rope type
CN208305021U (en) Cantilever type multilayer hanging cage for continuously welding ultrahigh and overlong welding seams
CN203394008U (en) Suspension type hanging bracket used on plane truss
CN207812982U (en) A kind of inner wall of oil tank construction hanging basket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170208

Termination date: 20170810

CF01 Termination of patent right due to non-payment of annual fee