CN205604084U - Hanging flower basket device of prefabricated little case roof beam construction usefulness - Google Patents
Hanging flower basket device of prefabricated little case roof beam construction usefulness Download PDFInfo
- Publication number
- CN205604084U CN205604084U CN201620342010.8U CN201620342010U CN205604084U CN 205604084 U CN205604084 U CN 205604084U CN 201620342010 U CN201620342010 U CN 201620342010U CN 205604084 U CN205604084 U CN 205604084U
- Authority
- CN
- China
- Prior art keywords
- construction
- straight
- step ladder
- bottom plate
- box girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及建筑工程装备技术,尤其涉及一种预制小箱梁施工用的吊篮装置。 The utility model relates to construction engineering equipment technology, in particular to a hanging basket device for prefabricated small box girder construction.
背景技术 Background technique
桥梁等工程中,预制小箱梁之跨内横梁的钢筋焊接等作业需要操作人员进入平台进行,由于工程环境多变、建筑体结构不同,人们采用多种方法来实现这一过程,其中吊篮也是常用装备之一。如专利公开号为CN105197848A,提供的一种建筑吊篮提升机结构,包括底架、底板、支脚垫、提升机安装架、后栏杆、安全锁安装板、支座、前栏杆和连接孔;底架内部安装有底板,并且底架侧壁安装有前栏杆;底架一侧安装有后栏杆,并且后栏杆和底架一端安装有支座;支座顶端安装有提升机安装架。如专利公开号这CN102086694A,设计的一种建筑工程用吊篮,包括平台、围栏,还包括转角台,转角台包括1个中支架、2个连杆和2个调节杆,中支架的外端与2个连杆的一端活动式连接,中支架的内端与2个调节杆的一端活动式连接,2个连杆的另一端分别与1个平台的内侧外端活动式连接,2个调节杆的另一端分别与1个平台的内侧内端活动式连接。平台内侧、连杆、调节杆及中支架组合形成一个可调节角度的四连杆机构;当调整调节杆与平台的连接时,调节杆的长度随之改变,可改变平台相对中支架的角度。再如专利公告号为CN204960275U,一种建筑用吊架吊篮,包括底座,底座的上端固定安装有支撑架,支撑架的内腔设置有滑轨,滑轨的表面活动设置有滑块,滑块与滑杆固定连接,滑杆设置有四组,且每组滑杆通过剪式防护杆相连接,底座的内腔设置有自动平衡装置,自动平衡装置由平衡块、平衡导轨、重力感应器、连接丝杆、平衡块驱动装置和蓄电池组成,平衡块活动安装在平衡导轨的表面,平衡导轨的下端安装有重力感应器,平衡块通过连接丝杆与平衡块驱动装置相连接,平衡驱动装置的上端固定设置有控制器。 In bridges and other projects, operations such as welding the steel bars of the inner cross beams of prefabricated small box girders require operators to enter the platform. Due to the changeable engineering environment and different building structures, people use various methods to achieve this process. Among them, the hanging basket It is also one of the commonly used equipment. For example, the patent publication number is CN105197848A, which provides a construction hanging basket hoist structure, including a chassis, a bottom plate, a foot pad, a hoist mounting frame, a rear railing, a safety lock mounting plate, a support, a front railing and a connecting hole; A bottom plate is installed inside the frame, and a front railing is installed on the side wall of the bottom frame; a rear railing is installed on one side of the bottom frame, and a support is installed on the rear railing and one end of the bottom frame; a hoist installation frame is installed on the top of the support. Such as the patent publication number CN102086694A, a kind of hanging basket designed for construction engineering includes a platform, a fence, and a corner table. The corner table includes 1 middle bracket, 2 connecting rods and 2 adjustment rods, and the outer end of the middle bracket One end of the two connecting rods is movably connected, the inner end of the middle bracket is movably connected with one end of the 2 adjustment rods, the other ends of the 2 connecting rods are movably connected with the inner and outer ends of a platform respectively, and the 2 adjustment rods are movably connected. The other end of the rod is respectively movably connected with the inner inner end of one platform. The inner side of the platform, the connecting rod, the adjusting rod and the middle bracket are combined to form a four-bar linkage mechanism with adjustable angle; when the connection between the adjusting rod and the platform is adjusted, the length of the adjusting rod changes accordingly, which can change the angle of the platform relative to the middle bracket. Another example is that the patent announcement number is CN204960275U, a kind of hanger hanging basket for construction, including a base, the upper end of the base is fixedly equipped with a support frame, the inner cavity of the support frame is provided with a slide rail, and the surface of the slide rail is movable. The block is fixedly connected with the slide bar. There are four sets of slide bars, and each set of slide bars is connected by a scissor-type protective bar. The inner cavity of the base is equipped with an automatic balancing device. , connecting screw, balance weight driving device and battery. The balance weight is movably installed on the surface of the balance guide rail. A gravity sensor is installed at the lower end of the balance guide rail. The balance weight is connected with the balance weight driving device through the connecting screw rod. The balance driving device The upper end is fixedly provided with a controller.
发明内容 Contents of the invention
本实用新型的目的是为了解决预制小箱梁跨内横梁施工时,因环境复杂、空间有限造成操作人员难以安全达到空中操作平台的问题,提供一种结构设计合理,操作简单,随身携带、安装占用空间小的预制小箱梁施工用的吊篮装置。 The purpose of this utility model is to solve the problem that it is difficult for operators to safely reach the aerial operation platform due to the complex environment and limited space during the construction of the inner cross beam of the prefabricated small box girder, and to provide a kind of structure with reasonable design, simple operation, easy to carry and install The hanging basket device used for the construction of prefabricated small box girder with small occupation space.
本实用新型的上述技术问题主要是通过下述技术方案得以解决的:一种预制小箱梁施工用的吊篮装置,包括平台底板,其特征是所述的平台底板两侧边部分别铰接一件竖直步梯,竖直步梯包括两支平行的直杆,两支直杆之间设有横档,直杆的顶部设有吊环。本技术方案由工程中常用的钢筋制成两片工作状态时处于相互平行关系的竖直步梯,并在竖直步梯底部采用钢筋网片形成制成作业平台底板,通过吊环把整个装置挂在箱梁或桥梁平面上,由于竖直步梯和平台底板之间是铰接关系,将平台底板和两边竖直步梯折叠后进行安装,避免伸挂空间小而难以安装问题,且操作速度快。 The above-mentioned technical problems of the utility model are mainly solved by the following technical solutions: a hanging basket device for the construction of a prefabricated small box girder, including a platform bottom plate, which is characterized in that the two sides of the platform bottom plate are respectively hinged to a A vertical step ladder, the vertical step ladder includes two parallel straight rods, a crosspiece is arranged between the two straight rods, and a suspension ring is arranged on the top of the straight rods. The technical solution is to make two pieces of vertical steps parallel to each other when they are in the working state with steel bars commonly used in engineering, and use steel mesh sheets at the bottom of the vertical steps to form the bottom plate of the work platform, and hang the whole device through the lifting ring On the plane of the box girder or bridge, since the vertical step ladder and the platform bottom plate are hinged, the platform bottom plate and the vertical steps on both sides are folded and installed to avoid the problem of small hanging space and difficult installation, and the operation speed is fast .
作为优选,所述的平台底板两端设有铰环,竖直步梯底端设有穿过铰环的横销。安全是本装置的前提条件,两端铰环采用足够强度的钢质材料制成,并单边各设两件以上,单边所有铰环与横销同轴。 As a preference, hinge rings are provided at both ends of the bottom plate of the platform, and horizontal pins passing through the hinge rings are provided at the bottom of the vertical steps. Safety is the prerequisite for this device. The hinge rings at both ends are made of steel with sufficient strength, and more than two pieces are installed on each side, and all hinge rings on one side are coaxial with the horizontal pin.
作为优选,所述的吊环为封闭环结构。吊环是上端承受所有重力的支承部,封闭环结构避免挂杆与吊环脱离,以保证安全。 Preferably, the suspension ring is a closed ring structure. The lifting ring is the supporting part that bears all the gravity on the upper end, and the closed ring structure prevents the hanging rod from being separated from the lifting ring to ensure safety.
作为优选,所述的竖直步梯由若干节中间段连接而成。本装置可以制成多节组装结构,以满足高度不同的吊挂要求。 Preferably, the vertical step ladder is formed by connecting several middle sections. The device can be made into a multi-section assembly structure to meet the hanging requirements of different heights.
作为优选,所述的中间段的一端设有连接套,连接套上设有紧定螺钉。根据实际高度连接安装适量的中间段,携带方便,装配快捷。 Preferably, a connecting sleeve is provided at one end of the middle section, and a set screw is provided on the connecting sleeve. Connect and install an appropriate amount of intermediate sections according to the actual height, which is easy to carry and quick to assemble.
作为优选,所述的中间段的另一端设有与紧定螺钉配合的螺孔或孔槽。中间段与固定段通过插接、螺钉紧固的方式连接,安全高效。 Preferably, the other end of the middle section is provided with screw holes or hole slots for cooperating with set screws. The middle section and the fixed section are connected by plugging and screw fastening, which is safe and efficient.
本实用新型的有益效果是:小巧轻便、易携带易安装,制作简单, 竖直步梯和平台底板之间可折叠,适合桥面位置狭小的施工部位伸挂施工,使用稳定性好,操作性强,安全可靠。 The beneficial effects of the utility model are: small and light, easy to carry and easy to install, simple to manufacture, foldable between the vertical step ladder and the platform bottom plate, suitable for stretching and hanging construction at the construction site where the bridge deck position is narrow, good stability in use, and operability Strong, safe and reliable.
附图说明 Description of drawings
图1是本实用新型的一种结构示意图。 Fig. 1 is a kind of structural representation of the utility model.
图2是本实用新型图1的左视结构示意图。 Fig. 2 is a left view structural diagram of Fig. 1 of the utility model.
图3是本实用新型图2的M处局部放大结构示意图。 Fig. 3 is a schematic diagram of a partially enlarged structure at M in Fig. 2 of the present invention.
图4是本实用新型的一种中间段结构示意图。 Fig. 4 is a structural schematic diagram of a middle section of the utility model.
图中:1. 平台底板,2. 竖直步梯,21. 中间段,3. 吊环,4. 横档,5. 横销,6. 铰环,7. 连接套,8. 紧定螺钉。 In the figure: 1. Platform bottom plate, 2. Vertical step ladder, 21. Middle section, 3. Lifting ring, 4. Cross piece, 5. Cross pin, 6. Hinge ring, 7. Connecting sleeve, 8. Set screw.
具体实施方式 detailed description
下面通过实施例,并结合附图,对本实用新型的技术方案作进一步具体的说明。 The technical solutions of the present utility model will be further specifically described below through the embodiments and in conjunction with the accompanying drawings.
参见图1、图2,本实施例一种预制小箱梁施工用的吊篮装置,设有一块用钢筋制成的网状平台底板1,在保证强度的前提下尽量减轻其重量,在平台底板1两侧边部分别装有两个铰环6,通过铰环6装配两件竖直步梯2。竖直步梯2包括两支平行的直杆,两支直杆之间设有作为爬梯用的横档4,竖直步梯2的底端设有穿过铰环的横销5,如图3所示,在四支直杆的顶部均设有吊环3,吊环3为封闭环结构。 Referring to Fig. 1 and Fig. 2, a hanging basket device for the construction of a prefabricated small box girder in this embodiment is provided with a netted platform bottom plate 1 made of steel bars, and its weight is reduced as much as possible under the premise of ensuring strength. Two hinge rings 6 are equipped with respectively on both sides of base plate 1, and two vertical step ladders 2 are assembled by hinge rings 6. The vertical step ladder 2 comprises two parallel straight rods, between the two straight rods, there is a crosspiece 4 used as a ladder, and the bottom end of the vertical step ladder 2 is provided with a horizontal pin 5 passing through the hinge ring, as shown in the figure As shown in 3, suspension rings 3 are all provided on the tops of the four straight rods, and suspension rings 3 are closed ring structures.
为了使本装置适应高度不同的预制小箱梁的跨内横梁施工,将竖直步梯2设计成通过中间段21连接而成的结构,根据实际施工点的高度进行自由拆装中间段,如图4所示,是一种中间段21的结构示意图,其一端设有连接套7,连接套7上装有紧定螺钉8,当上段钢筋端插入时,旋紧紧定螺钉8即可,而中间段21的另一端设有与紧定螺钉8配合的螺孔,以保证紧定螺钉8旋入后中间段21与上下段连接部位的安全紧固。 In order to make this device adapt to the construction of the inner span beams of prefabricated small box girders with different heights, the vertical step ladder 2 is designed as a structure connected by the middle section 21, and the middle section can be freely disassembled and assembled according to the height of the actual construction point, such as As shown in Fig. 4, it is a structural schematic diagram of a middle section 21, one end of which is provided with a connecting sleeve 7, and a set screw 8 is installed on the connecting sleeve 7, when the end of the upper steel bar is inserted, the set screw 8 can be tightened, and The other end of the middle section 21 is provided with a screw hole cooperating with the set screw 8 to ensure the safe fastening of the connection between the middle section 21 and the upper and lower sections after the set screw 8 is screwed in.
使用时,将本装置从湿接缝处放下并用两根钢管穿入吊环3且固定在梁板上,作业人员系上安全带并从竖直步梯2上下到作业平台进行施工。利用本装置可以进行施工预制小箱梁跨内横梁的钢筋焊接、模板安装、砼浇筑、模板拆除等工作。 During use, the device is put down from the wet joint and penetrates the suspension ring 3 with two steel pipes and is fixed on the beam plate, and the operator fastens the safety belt and goes up and down from the vertical step ladder 2 to the work platform for construction. The device can be used to carry out work such as steel bar welding, formwork installation, concrete pouring, formwork removal and the like for the internal cross beam of the prefabricated small box girder.
上述实施例是对本实用新型的说明,不是对本实用新型的限定,任何对本实用新型的简单变换后的结构均属于本实用新型的保护范围。 The above-mentioned embodiment is an illustration of the utility model, not a limitation of the utility model, and any structure after simple transformation of the utility model belongs to the protection scope of the utility model.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620342010.8U CN205604084U (en) | 2016-04-21 | 2016-04-21 | Hanging flower basket device of prefabricated little case roof beam construction usefulness |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620342010.8U CN205604084U (en) | 2016-04-21 | 2016-04-21 | Hanging flower basket device of prefabricated little case roof beam construction usefulness |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205604084U true CN205604084U (en) | 2016-09-28 |
Family
ID=56970415
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620342010.8U Expired - Fee Related CN205604084U (en) | 2016-04-21 | 2016-04-21 | Hanging flower basket device of prefabricated little case roof beam construction usefulness |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205604084U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106764048A (en) * | 2016-11-23 | 2017-05-31 | 中国冶集团有限公司 | The method that airduct installation is carried out using self-locking type wind pipe suspension bracket |
| CN107858931A (en) * | 2017-11-23 | 2018-03-30 | 中建局集团第五建筑有限公司 | Variable space operation platform for wet joint diaphragm plate of precast beam and manufacturing method thereof |
| CN108589552A (en) * | 2018-06-11 | 2018-09-28 | 交通运输部科学研究院 | A kind of collapsible suspension apparatus |
-
2016
- 2016-04-21 CN CN201620342010.8U patent/CN205604084U/en not_active Expired - Fee Related
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106764048A (en) * | 2016-11-23 | 2017-05-31 | 中国冶集团有限公司 | The method that airduct installation is carried out using self-locking type wind pipe suspension bracket |
| CN106764048B (en) * | 2016-11-23 | 2018-10-23 | 中国一冶集团有限公司 | The method that air hose installation is carried out using self-locking type wind pipe hanger |
| CN107858931A (en) * | 2017-11-23 | 2018-03-30 | 中建局集团第五建筑有限公司 | Variable space operation platform for wet joint diaphragm plate of precast beam and manufacturing method thereof |
| CN107858931B (en) * | 2017-11-23 | 2023-12-12 | 中建一局集团第五建筑有限公司 | Precast beam wet joint diaphragm plate variable space operation platform and manufacturing method thereof |
| CN108589552A (en) * | 2018-06-11 | 2018-09-28 | 交通运输部科学研究院 | A kind of collapsible suspension apparatus |
| CN108589552B (en) * | 2018-06-11 | 2023-07-21 | 交通运输部科学研究院 | A folding suspension device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106629481B (en) | Hydraulic pressure well-repairing well head lifting platform and its application method | |
| CN204455829U (en) | Bridge-collision-avoidance wall construction equipment | |
| CN205476401U (en) | Elevator well type steel protection construction platform | |
| KR102447971B1 (en) | rolling tower | |
| KR20080093514A (en) | Height Adjustable Work Platform | |
| KR20120131896A (en) | Vertical and horizontal type Hydro-crane | |
| CN213951973U (en) | Adjustable construction platform | |
| CN206693595U (en) | A kind of scaffold car for building | |
| CN213802471U (en) | Guardrail is overhauld in construction elevator installation | |
| CN223446621U (en) | High-rise building high-altitude large-span overhanging balcony overhanging type formwork support device | |
| CN207003267U (en) | Mobile operating platform for flower basket type anti-collision barrier construction | |
| CN210337912U (en) | Electrified construction ladder car of adjustable level railway | |
| CN214061294U (en) | Movable becomes section concrete box girder outward appearance and decorates platform | |
| CN108589552B (en) | A folding suspension device | |
| ITTO20100134U1 (en) | ELEVATION PLATFORM FOR THE REVISION OF GAS MILLS | |
| CN209817424U (en) | A mobile adjustable cantilevered operating platform suitable for super-long cantilevered structures | |
| CN206903246U (en) | A kind of structure with oblique member for building | |
| CN213774398U (en) | Elevator shaft operating platform | |
| CN203394008U (en) | Suspension type hanging bracket used on plane truss | |
| CN206957170U (en) | A kind of scaffold for building being easily installed | |
| KR20230063416A (en) | High place operation tower and high place operation tower assembly having the same | |
| CN214462389U (en) | A kind of scaffolding for construction engineering | |
| CN220133460U (en) | Automatic lifting scaffold for building construction | |
| CN206971699U (en) | Combination hanging basket for the construction of wet seam | |
| CN204163369U (en) | A kind of collapsible attaching lifting exterior wall scaffold |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160928 |