CN209040527U - A kind of scaffold cradle structure - Google Patents

A kind of scaffold cradle structure Download PDF

Info

Publication number
CN209040527U
CN209040527U CN201821722673.8U CN201821722673U CN209040527U CN 209040527 U CN209040527 U CN 209040527U CN 201821722673 U CN201821722673 U CN 201821722673U CN 209040527 U CN209040527 U CN 209040527U
Authority
CN
China
Prior art keywords
scaffold
frame body
body unit
bar
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821722673.8U
Other languages
Chinese (zh)
Inventor
祁晓强
宋宁
王光田
刘兵
段旭辉
王斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing No5 Construction Engineering Group Co Ltd
Original Assignee
Beijing No5 Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing No5 Construction Engineering Group Co Ltd filed Critical Beijing No5 Construction Engineering Group Co Ltd
Priority to CN201821722673.8U priority Critical patent/CN209040527U/en
Application granted granted Critical
Publication of CN209040527U publication Critical patent/CN209040527U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of scaffold cradle structure, including being parallel to lighting roof stringer axis direction and riding upon the horizon bar on crossbeam, be set in the frame body unit protruded under daylighting top beam between horizon bar and one end, by the connecting rod of adjacent frame body unit lower part connection and the scaffold board being laid in connecting rod.Staff may stand on the scaffold board of boat scaffold and construct to lighting roof when construction, and boat scaffold has saved a large amount of man power and material during setting up, to reduce construction cost and construction time.

Description

A kind of scaffold cradle structure
Technical field
The utility model relates to the technical fields of architectural engineering, more particularly, to a kind of large atrium architectural lighting roof curtain wall The scaffold cradle structure of construction.
Background technique
Currently, in construction projects, especially the high altitude operation such as lighting roof curtain wall, which generally use, sets up full hall scaffold conduct The method of construction operation platform.
All round victory scaffold building needs to consume a large amount of human and material resources, occupies long period and space, higher cost.Especially The construction operations such as its palace megaron lighting roof decorations and the maintenance of lighting roof serviceability limit stage, dimension Equal job contents are repaired, all round victory scaffold is such as set up and constructs, scaffold job platform sets up the cost of consuming, occupies and set up The time in place and space and construction safety risk may be far longer than the benefit that lighting roof construction generates.
Prior art among the above has the following deficiencies: in large atrium architectural lighting roof curtain wall construction, expires hall Red scaffold is set up than relatively time-consuming, laborious, and occupies very big construction site.
Utility model content
Have the purpose of the utility model is to provide a kind of boat scaffold and saves the excellent of human and material resources and construction time Point.
The above-mentioned purpose of utility model of the utility model has the technical scheme that
A kind of scaffold cradle structure, including being parallel to lighting roof stringer axis direction and riding upon the level on crossbeam Bar is set in the frame body unit protruded under daylighting top beam between horizon bar and one end, connects adjacent frame body unit lower part The connecting rod connect and the scaffold board being laid in connecting rod.
By being arranged scaffold suspension on lighting roof, it is possible to reduce the use of scaffold tube body, with traditional full hall Red scaffold is compared, and a large amount of human and material resources and construction site are saved, while it is short to set up the period, ensure that construction period.
The utility model is further arranged to: the frame body unit is including two upright bars and is respectively and fixedly connected to adjacent upright bar two The fixed link of end, one end of upright bar are consolidated with the horizon bar being arranged on crossbeam, and the other end and connecting rod consolidate.
It by using above-mentioned technical proposal, is interconnected and fixed by each rod piece, keeps frame body unit more firm.
The utility model is further arranged to: boat scaffold includes vertical with adjacent two panels frame body unit diagonal position The fixed link lower part of frame body unit lower end is arranged in the horizontal cross brace of bar consolidation, the horizontal cross brace.
It by using above-mentioned technical proposal, prevents unstable between adjacent frame body unit, opposite swing, scissors occurs The setting of support makes more firm between adjacent frame body unit.
The utility model is further arranged to: the boat scaffold includes setting in frame body unit top limitation frame body Anti- horizontal offset assembly of the unit along the swing in horizon bar direction.
Prevent frame body unit horizontal mobile by the limitation of anti-horizontal offset assembly by using above-mentioned technical proposal.
The utility model is further arranged to: the anti-horizontal offset assembly includes at least two anti-horizontal offset arms and will Adjacent anti-horizontal offset arm consolidation sockets locating rod;It sockets locating rod and is arranged in the same direction with stringer, and be attached to multiple tracks crossbeam Lateral surface;Two anti-horizontal offset arms are connect with frame body unit.
By using above-mentioned technical proposal, anti-horizontal offset arm and socket locating rod formed U-shaped structure be clamped on crossbeam it Between, it prevents frame body unit horizontal mobile, keeps scaffold more stable.
The utility model is further arranged to: safety net being arranged below boat scaffold, is arranged in daylighting top beam and draws Ring is connect, safety net is connect with ring is socketed.
By using above-mentioned technical proposal, the safety of staff in scaffold building and work progress is protected.
The utility model is further arranged to: the scaffold board upper surface is arranged parallel to the flanging bar of connecting rod, flanging Bar and connecting rod consolidate.
By using above-mentioned technical proposal, scaffold board is fixed in flanging bar, prevents the foot hand when standing upper staff Plate one end upwarps, and keeps staff safer.
In conclusion the advantageous effects of the utility model are as follows:
1. being transferred to and being suspended in lighting roof structural beams from ground by scaffold by setting boat scaffold, save Largely rod piece used in scaffold is set up, reduces the project amount for the personnel of setting up, so as to shorten setting up the period, and meanwhile it is less It is used when setting up scaffold to set up personnel;
2. the personnel of setting up and construction personnel can be made more safe by the way that safety net is arranged below scaffold;
3. keeping scaffold more firm by the way that anti-horizontal offset assembly and horizontal cross brace are arranged on scaffold, work Personnel are safer.
Detailed description of the invention
Fig. 1 is boat scaffold structural schematic diagram;
Fig. 2 is boat scaffold bottom substance schematic diagram;
Fig. 3 is frame body cellular construction schematic diagram.
In figure, 1, stringer;2, crossbeam;3, horizon bar;4, frame body unit;41, upright bar;42, fixed link;5, connecting rod;6, Scaffold board;71, ring is socketed;8, anti-horizontal offset assembly;81, anti-horizontal offset arm;82, locating rod is socketed;9, horizontal cross Support;10, flanging bar.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Referring to Fig.1, lighting roof structural beams include stringer 1 and the crossbeam 2 that is arranged between adjacent stringer 1, and crossbeam 2 is along stringer The setting of 1 direction is multiple, and scaffold cradle construction is carried out under the premise of lighting roof structural beams are completed.
It referring to Figures 1 and 2, is a kind of scaffold cradle structure disclosed by the utility model, including being arranged on crossbeam 2 Horizon bar 3 is set in the frame body unit 4 protruded under daylighting top beam 1 between horizon bar 3 and one end, by adjacent frame body list The connecting rod 5 of 4 connection of member and the scaffold board 6 being laid in connecting rod 5.Boat scaffold packet fragmentation rides upon lighting roof knot On structure beam, affixed between above-mentioned rod piece can be right-angle coupler connection and occur later it is affixed can be that right-angle coupler connects It connects;Scaffold passes through the support of daylighting head piece 2, and firm is suspended on lighting roof, and construction personnel is by station in suspension foot hand Operation is carried out on the scaffold board 6 of frame.
Referring to Fig. 3, every horse body unit 4 includes two vertically arranged upright bars 41 and is fixed between adjacent upright bar 41 Fixed link 42, one end of upright bar 41 are consolidated with the horizon bar 3 being arranged on crossbeam 2, upright bar 41 one end and company far from horizon bar 3 Extension bar 5 consolidates.
Referring to Fig. 2, in order to guarantee that scaffold cradle is setting up the safety with staff in work progress, in suspension foot hand It is also provided with safety net (safety net is not drawn into figure) below frame, while fixed safety net is set in 1 lower part of daylighting top beam Ring 71 is socketed, before setting up scaffold, in the arranged beneath safety net for setting up scaffold position, safety net both ends can pass through The ring 71 that sockets on 12# wirerope and daylighting top beam 1 carries out socketing fixation.
Referring to Fig.1, it since the rectangular frame formed between adjacent frame body unit 4 is unstable in the horizontal direction, is easy to happen Relative position is mobile, and boat scaffold moves horizontally in order to prevent, is also provided with limitation boat scaffold and opposite position occurs The anti-horizontal offset assembly 8 moved, anti-horizontal offset assembly 8 include at least two and place anti-level partially along 2 direction of daylighting head piece Moving bar 81(can be two), anti-horizontal offset arm 81 consolidates and is fixedly arranged at adjacent anti-horizontal-shift with 4 upright bar 41 of frame body unit Locating rod 82 is socketed between bar 81.It sockets locating rod 82 and stringer 1 is arranged in the same direction, and be attached to the lateral surface of multiple tracks crossbeam 2. Two anti-horizontal settings of offset arm 81 consolidate, every three horses on scaffold cradle top with 41 upper end of upright bar of frame body unit 4 One of anti-horizontal offset arm 81 of the setting of body unit 4, is in quincuncial arrangement;The adjacent anti-horizontal offset arm 81 of twice is far from upright bar 41 One end is consolidated by socketing locating rod 82, and anti-horizontal offset arm 81 consolidate the U-shaped structure clamping formed with locating rod 82 is socketed Between the crossbeam 2 of lighting roof.
Referring to Fig. 2, horizontal cross brace 9 is also provided in order to increase the stability of boat scaffold.Horizontal cross brace 9 is set It sets below connecting rod 5, the upright bar 41 with adjacent 4 diagonal position of two panels frame body unit consolidates.
Fig. 1 is reviewed, in order to prevent in the construction process, scaffold board 6 is unstable to be caused to upwarp or move, in scaffold board 6 Top surface is horizontally disposed with flanging bar 10, and the connecting rod 5 below flanging bar 10 and scaffold board 6 consolidates, and can use fastener fixing.
Work progress is as follows:
It is determined first before construction according to the size of spacing and construction material between the stringer of lighting roof 1 and crossbeam 2 The spacing in length and breadth and scaffolding height of upright bar 41 are to facilitate the scaffold for setting up completion to can satisfy construction needs.When setting up, first Safety net 7 is arranged in below the region that will be constructed, 7 both ends of safety net pass through the drawing on 12# wirerope and daylighting top beam 1 Buckle sockets.It sets up personnel's wear safety belt then to stand in daylighting top beam 1, by 41 both ends of upright bar vertically placed using admittedly Fixed pole 42 consolidates, and forms frame body unit 4.The lower end of frame body unit upright bar 41 is consolidated with connecting rod 5 first, recycles horizontal cross Support 9 and the upright bar 41 of adjacent 4 diagonal position of two panels frame body unit consolidate, then whole to go deep under lighting roof structural beams.Later will 41 upper end of frame body unit upright bar and horizon bar 3 consolidate, and hang on frame body on daylighting head piece 2 after the completion of setting up, by anti-level Offset arm 81 and 41 upper end of frame body unit upright bar consolidate, together every the setting of three pieces frame body unit 4, the adjacent anti-horizontal-shift of twice The one end of bar 81 far from upright bar 41 is consolidated by socketing locating rod 82, and anti-horizontal offset arm 81 consolidate shape with locating rod 82 is socketed At U-shaped structure be clamped between the crossbeam 2 of lighting roof.Scaffold board 6 is laid in the connecting rod 5 of 4 lower end of frame body unit.? Flanging bar 10 is arranged in 6 top surface of scaffold board, and flanging bar 10 is fixed with the connecting rod 5 below scaffold board 6 using right-angle coupler.It has set up At carrying out construction operation later, sequence is opposite when dismounting.
By utilizing above-mentioned boat scaffold, scaffold is transferred to from ground and is suspended on lighting roof, compared to full The red scaffold of hall has saved a large amount of human and material resources and the less construction area for setting up scaffold occupancy.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (7)

1. a kind of scaffold cradle structure, it is characterised in that: including being parallel to daylighting top beam (1) axis direction and riding upon cross Horizon bar (3) on beam (2) is set between horizon bar (3) and the frame body unit under daylighting top beam (1) is protruded into one end (4), by the connecting rod (5) of adjacent frame body unit (4) lower part connection and the scaffold board (6) being laid on connecting rod (5).
2. a kind of scaffold cradle structure according to claim 1, it is characterised in that: the frame body unit (4) includes two Root upright bar (41) and the fixed link (42) for being respectively and fixedly connected to adjacent upright bar (41) both ends, one end of upright bar (41) and setting are in cross Horizon bar (3) consolidation on beam (2), the other end and connecting rod (5) consolidate.
3. a kind of scaffold cradle structure according to claim 2, it is characterised in that: boat scaffold include with it is adjacent The horizontal cross brace (9) of upright bar (41) consolidation of two panels frame body unit (4) diagonal position, horizontal cross brace (9) setting exist Fixed link (42) lower part of frame body unit (4) lower end.
4. a kind of scaffold cradle structure according to claim 2, it is characterised in that: further include limit frame body unit (4) The anti-horizontal offset assembly (8) moved in the horizontal direction.
5. a kind of scaffold cradle structure according to claim 4, it is characterised in that: the anti-horizontal offset assembly (8) Locating rod (82) are socketed including at least two anti-horizontal offset arms (81) and by adjacent anti-horizontal offset arm (81) consolidation;It sockets Locating rod (82) and stringer (1) are arranged in the same direction, and are attached to the lateral surface of multiple tracks crossbeam (2);Two anti-horizontal offset arms (81) It is connect with frame body unit (4), and is attached to the end side surface of crossbeam.
6. a kind of scaffold cradle structure according to claim 1, it is characterised in that: setting peace below boat scaffold The whole network (7) is arranged in daylighting top beam (1) and sockets ring (71), and safety net (7) is connect with ring (71) is socketed.
7. a kind of scaffold cradle structure according to claim 1, it is characterised in that: scaffold board (6) upper surface is set The flanging bar (10) for being parallel to connecting rod (5) is set, flanging bar (10) and connecting rod (5) consolidate.
CN201821722673.8U 2018-10-24 2018-10-24 A kind of scaffold cradle structure Active CN209040527U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821722673.8U CN209040527U (en) 2018-10-24 2018-10-24 A kind of scaffold cradle structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821722673.8U CN209040527U (en) 2018-10-24 2018-10-24 A kind of scaffold cradle structure

Publications (1)

Publication Number Publication Date
CN209040527U true CN209040527U (en) 2019-06-28

Family

ID=67038876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821722673.8U Active CN209040527U (en) 2018-10-24 2018-10-24 A kind of scaffold cradle structure

Country Status (1)

Country Link
CN (1) CN209040527U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111778882A (en) * 2020-08-17 2020-10-16 保利长大工程有限公司 Method for reinforcing plate arch formed by reforming main arch rib of double-arch bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111778882A (en) * 2020-08-17 2020-10-16 保利长大工程有限公司 Method for reinforcing plate arch formed by reforming main arch rib of double-arch bridge
CN111778882B (en) * 2020-08-17 2021-05-14 保利长大工程有限公司 Method for reinforcing plate arch formed by reforming main arch rib of double-arch bridge

Similar Documents

Publication Publication Date Title
CN203188589U (en) Rigid-frame continuous beam zero block construction bracket supporting system
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN205775852U (en) A kind of active force conversion support for steel structure support moulding bed top
CN209040527U (en) A kind of scaffold cradle structure
CN205822747U (en) Architectural engineering scaffold
CN106368425A (en) Movable operating platform for cantilever structure and construction method
CN204940915U (en) Dish button construction safety cat ladder
CN207267961U (en) A kind of bridge pier shaft pours operating platform
CN203394008U (en) Suspension type hanging bracket used on plane truss
CN105696782A (en) Novel mobile operation platform
CN210195198U (en) Elevartor shaft moving platform
CN211286560U (en) Spherical node suspension adjustable operation platform
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space
CN206158139U (en) A portable operation platform for cantilever structure
CN211622697U (en) Anti-falling device for building construction
CN204212388U (en) Monolithic combined scaffold
CN213563427U (en) Precast beam removes stretch-draw rack
CN210508307U (en) Scaffold for building engineering
CN203269397U (en) Plate paving device for paving steel vault storage tank base plates
CN209538708U (en) A kind of assembled architecture safe construction platform
CN210067399U (en) Operation platform device of attached lifting scaffold
CN111979916B (en) Cable-stayed bridge tower part suspension construction method and suspension operation platform device
CN208220169U (en) Packaged type construction operation platform in a kind of elevator shaft
CN216405142U (en) Along with hanging gliding continuous web's of basket fitment platform structure
CN208135766U (en) Simple electric hoist

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant