CN204310644U - A kind of single suspension centre cage guide installation and maintenance hanging basket - Google Patents
A kind of single suspension centre cage guide installation and maintenance hanging basket Download PDFInfo
- Publication number
- CN204310644U CN204310644U CN201420775780.2U CN201420775780U CN204310644U CN 204310644 U CN204310644 U CN 204310644U CN 201420775780 U CN201420775780 U CN 201420775780U CN 204310644 U CN204310644 U CN 204310644U
- Authority
- CN
- China
- Prior art keywords
- installation
- maintenance
- ceiling
- hoist
- guide rails
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000009434 installation Methods 0.000 title claims abstract description 25
- 238000012423 maintenance Methods 0.000 title claims abstract description 17
- 239000000725 suspension Substances 0.000 title claims description 7
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 claims description 5
- 229910052782 aluminium Inorganic materials 0.000 claims description 5
- 238000003466 welding Methods 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 5
- 238000000034 method Methods 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Landscapes
- Cage And Drive Apparatuses For Elevators (AREA)
Abstract
本实用新型涉及吊篮领域,具体是一种单吊点电梯导轨安装维护吊篮,由底部支架、中间平台和顶棚连接构成,所述的底部支架包括设于两侧的倒三角导向架,连接倒三角导向架的上、下横梁,以及连接上、下横梁的拉杆;所述的中间平台由底板、四片栏杆和四根竖管拼接而成,该中间平台安装在倒三角导向架上,该中间平台上还安装有提升机和安全锁;所述的顶棚安装在中间平台的竖管上,顶棚上设有行程开关。本实用新型的结构设计合理,提高了电梯导轨的安装与维护的安全系数和工作效率,保障了施工人员的安全。
The utility model relates to the field of hanging baskets, in particular to a single hanging point elevator guide rail installation and maintenance hanging basket, which is composed of a bottom bracket, an intermediate platform and a ceiling. The bottom bracket includes inverted triangle guide frames arranged on both sides, connected The upper and lower beams of the inverted triangular guide frame, and the pull rods connecting the upper and lower beams; the intermediate platform is formed by splicing the bottom plate, four railings and four vertical pipes, and the intermediate platform is installed on the inverted triangular guide frame. A hoist and a safety lock are also installed on the intermediate platform; the ceiling is installed on the vertical pipe of the intermediate platform, and a travel switch is arranged on the ceiling. The utility model has a reasonable structural design, improves the safety factor and work efficiency of the installation and maintenance of the elevator guide rail, and ensures the safety of construction personnel.
Description
技术领域 technical field
本实用新型涉及一种吊篮,具体是一种单吊点电梯导轨安装维护吊篮。 The utility model relates to a hanging basket, in particular to a hanging basket for installation and maintenance of elevator guide rails with a single suspension point.
背景技术 Background technique
公知的,电梯导轨的重量大、长度长,所以电梯导轨的安装十分困难。目前,安装电梯导轨的方法主要是利用电梯的轿厢作为动力平台,用脚手架在轿厢上搭建一个双层的平台,双层平台用于承载相关的工作人员、作业工具和电梯导轨等重物。由于用脚手架搭建的平台相对简陋,且无相应的保护措施,在正常作业时存在较大的安全隐患。 As known, the elevator guide rails are heavy and long, so the installation of the elevator guide rails is very difficult. At present, the method of installing elevator guide rails is mainly to use the elevator car as a power platform, and use scaffolding to build a double-layer platform on the car. The double-layer platform is used to carry heavy objects such as relevant staff, work tools and elevator guide rails . Since the platform built with scaffolding is relatively simple and has no corresponding protection measures, there are great potential safety hazards during normal operation.
另外,由于双层平台是搭建在轿厢顶上对,在安装导轨时,平台上所有的重量全部由轿厢承担,且在此过程中对于轿厢本体没有有效的保护措施,所以这种安装方式对轿厢本身会产生了一定的破坏,不符合电梯的安装和使用的规范性,不能保证施工人员的人身安全。 In addition, since the double-deck platform is built on the top of the car, when installing the guide rails, all the weight on the platform is borne by the car, and there are no effective protection measures for the car body during this process, so this installation The method will cause certain damage to the car itself, does not conform to the standardization of the installation and use of the elevator, and cannot guarantee the personal safety of the construction personnel.
发明内容 Contents of the invention
本实用新型的目的是针对背景技术中指出的现有电梯导轨安装平台存在的缺陷,提出了一种单吊点电梯导轨安装维护吊篮,该吊篮能够用于安装和维护电梯导轨,能够保证施工人员的安全,提高了安全系数。 The purpose of this utility model is to aim at the defects of the existing elevator guide rail installation platform pointed out in the background technology, and propose a single-suspension-point elevator guide rail installation and maintenance hanging basket, which can be used for installing and maintaining elevator guide rails, and can ensure The safety of construction personnel has improved the safety factor.
为了解决上述技术问题,本实用新型所采用的技术方案是:一种单吊点电梯导轨安装维护吊篮,由底部支架、中间平台和顶棚连接构成,其特征在于,所述的底部支架包括设于两侧的倒三角导向架,连接倒三角导向架的上、下横梁,以及连接上、下横梁的拉杆;所述的中间平台由底板、四片栏杆和四根竖管拼接而成,该中间平台安装在倒三角导向架上,该中间平台上还安装有提升机和安全锁;所述的顶棚安装在中间平台的竖管上,顶棚上设有行程开关。 In order to solve the above-mentioned technical problems, the technical solution adopted by the utility model is: a hanging basket for installing and maintaining the guide rail of a single-suspended elevator, which is composed of a bottom bracket, an intermediate platform and a ceiling. The inverted triangular guide frame on both sides is connected to the upper and lower beams of the inverted triangular guide frame, and the tie rods connected to the upper and lower beams; the middle platform is spliced by the bottom plate, four railings and four vertical pipes. The intermediate platform is installed on the inverted triangular guide frame, and a hoist and a safety lock are also installed on the intermediate platform; the ceiling is installed on the vertical pipe of the intermediate platform, and a travel switch is arranged on the ceiling.
优选的:所述的底板中间设有缺口,缺口处设有提升机安装架,该提升机安装架通过缺口与上横梁连接,所述的提升机和安全锁均安装在提升机安装架上。 Preferably: there is a gap in the middle of the bottom plate, and a hoist mounting frame is provided at the gap, and the hoist mounting frame is connected to the upper beam through the gap, and the hoist and the safety lock are both installed on the hoist mounting frame.
优选的:所述的安全锁采用离心式安全锁。 Preferably: the safety lock adopts a centrifugal safety lock.
优选的:所述的倒三角导向架上各设有一个锁轨器,该锁轨器通过钢丝绳连接设置在提升机安装架上的锁轨器开关。 Preferably: each of the inverted triangular guide frames is provided with a rail locking device, and the rail locking device is connected to a rail locking device switch arranged on the hoist installation frame through a wire rope.
优选的:所述的倒三角导向架上各设有两对导向轮,该导向轮分别安装在倒三角导向架的中间支柱的两端。 Preferably: the inverted triangular guide frame is provided with two pairs of guide wheels respectively, and the guide wheels are respectively installed at both ends of the middle pillar of the inverted triangular guide frame.
优选的:所述的顶棚为拼装式顶棚,由两片铝焊接件倾斜拼接形成开口向下的倒V型斜坡。 Preferably: the ceiling is an assembled ceiling, and two pieces of aluminum welded parts are spliced obliquely to form an inverted V-shaped slope with an opening downward.
优选的:所述的底板采用两块铝板拼接而成。 Preferably: the bottom plate is formed by splicing two aluminum plates.
本实用新型的有益效果是:该吊篮可通过悬挂机构悬挂于电梯井道中,便于电梯导轨的安装于维护,避免了对轿厢的损坏;单吊点结构也避免了因多个提升机不同步导致平台倾斜的隐患;同时底部支架上的拉杆保证了平台受力的平均性,有效的保护了篮体,且保证了平台上下运行时的稳定性,当吊篮运行至指定位置工作时,通过锁轨器加强了安装导轨时的安全性与稳定性。 The beneficial effects of the utility model are: the hanging basket can be suspended in the elevator shaft through the suspension mechanism, which is convenient for the installation and maintenance of the elevator guide rail, and avoids damage to the car; The hidden danger of platform tilt caused by synchronization; at the same time, the pull rod on the bottom bracket ensures the uniformity of the force on the platform, effectively protects the basket body, and ensures the stability of the platform when it runs up and down. When the hanging basket moves to the designated position, The safety and stability when installing the guide rail is enhanced by the rail lock.
本实用新型的结构设计合理,不仅能够提高电梯导轨的安装效率,便于电梯的维护,而且能够保证施工人员的人身安全,提高安全系数。 The utility model has a reasonable structural design, not only can improve the installation efficiency of the guide rail of the elevator, is convenient for the maintenance of the elevator, but also can ensure the personal safety of construction personnel and improve the safety factor.
附图说明 Description of drawings
图1,本实用新型的主视图; Fig. 1, the front view of the utility model;
图2,本实用新型的侧视图。 Fig. 2, the side view of the utility model.
具体实施方式 Detailed ways
下面结合附图以及优选的方案对本实用新型的具体实施方式作进一步详细的说明。 The specific implementation of the present utility model will be further described in detail below in conjunction with the accompanying drawings and preferred solutions.
结合附图1和图2所示,能够说明本实用新型的具体结构,该单吊点电梯导轨安装维护吊篮由三部分构成,分别是底部支架、中间平台和顶棚。所述的底部支架包括两个倒三角导向架1、上横梁2、下横梁3、两个拉杆4;两个倒三角导向架1通过螺栓连接上横梁2和下横梁3,所述的拉杆4的一端通过螺栓连接下横梁3的端点段,另一端通过螺栓连接上横梁2的中间段,两个拉杆4与上、下横梁连接形成有开口的倒V形结构。所述的中间平台由底板5、四片栏杆6和四根竖管7拼接而成,栏杆6可通过螺栓安装在底板5的四周,竖管7分别安装在栏杆6围成的四个角落,该平台的中间安装有提升机8和安全锁9。所述的顶棚10可通过螺栓与四根竖管7连接,顶棚10上还设有行程开关11。 Shown in conjunction with accompanying drawing 1 and Fig. 2, can illustrate the concrete structure of the present utility model, this single suspension point elevator guide rail installation and maintenance hanging basket is made of three parts, is respectively bottom support, intermediate platform and ceiling. The bottom bracket includes two inverted triangle guide frames 1, an upper beam 2, a lower beam 3, and two pull rods 4; the two inverted triangle guide frames 1 are connected by bolts to the upper beam 2 and the lower beam 3, and the pull rod 4 One end of the upper beam is connected to the end section of the lower beam 3 by bolts, and the other end is connected to the middle section of the upper beam 2 by bolts. Two tie rods 4 are connected with the upper and lower beams to form an inverted V-shaped structure with openings. The middle platform is spliced by base plate 5, four railings 6 and four vertical pipes 7, railings 6 can be installed around the base plate 5 by bolts, and vertical pipes 7 are respectively installed in four corners surrounded by railings 6, Hoist 8 and safety lock 9 are installed in the middle of this platform. The ceiling 10 can be connected with the four vertical pipes 7 by bolts, and the ceiling 10 is also provided with a travel switch 11 .
实施例:本实施例中的中间平台由铝质材料构成,并安装在倒三角导向架1的上支柱上,该平台可由两片底板5、四片栏杆6和四根竖管7拼接而成,底板5的中间开设有缺口,缺口处安装有提升机安装架12,提升机安装架12通过缺口与上横梁2和拉杆4连接,提升机8和安全锁9均安装在提升机安装架12上。 Embodiment: The intermediate platform in this embodiment is made of aluminum material and installed on the upper pillar of the inverted triangle guide frame 1. The platform can be spliced by two bottom plates 5, four railings 6 and four vertical pipes 7. , there is a gap in the middle of the bottom plate 5, a hoist mounting frame 12 is installed at the gap, the hoist mounting frame 12 is connected with the upper beam 2 and the pull rod 4 through the gap, the hoist 8 and the safety lock 9 are all installed on the hoist mounting frame 12 superior.
本实施例中的倒三角导向架1的中间支柱上均设有一个锁轨器13,两个锁轨器13分别通过钢丝绳连接设置在提升机安装架12上岗的锁轨器开关14,所述倒三角导向架1的中间支柱的两端各安装一对导向轮15,共四对导向轮15。所述的顶棚10为拼装式顶棚,由两片钢板倾斜拼接形成开口向下的倒V型斜坡。 A rail lock 13 is provided on the middle pillar of the inverted triangle guide frame 1 in the present embodiment, and two rail locks 13 are respectively connected with the rail lock switch 14 that is installed on the hoist installation frame 12 by wire ropes. A pair of guide wheels 15 are respectively installed at the two ends of the middle pillar of inverted triangle guide frame 1, totally four pairs of guide wheels 15. The ceiling 10 is an assembled ceiling, which is formed by oblique splicing of two steel plates to form an inverted V-shaped slope with an opening downward.
工作原理:将本实用新型的单吊点吊篮通过悬挂机构悬挂于电梯井道中,提升机8的工作钢丝绳和安全锁9的安全钢丝绳由顶棚10的缺口16导入,导向轮15和锁轨器13分别卡在导轨上,有效的保护了导轨,且能够保证中间平台上下运行时的稳定性,当吊篮运行至指定位置工作时,打开锁轨器开关14锁住导轨,进一步加强了安装导轨时的安全性与稳定性。 Working principle: hang the hanging basket of the utility model in the elevator shaft through the suspension mechanism, the working wire rope of the hoist 8 and the safety wire rope of the safety lock 9 are introduced through the gap 16 of the ceiling 10, the guide wheel 15 and the rail lock 13 are respectively stuck on the guide rails, effectively protecting the guide rails, and can ensure the stability of the middle platform when running up and down. When the hanging basket moves to the designated position, open the rail lock switch 14 to lock the guide rails, further strengthening the installation of the guide rails. time security and stability.
本实用新型的结构设计合理,提高了电梯导轨的安装维护的安全系数和工作效率,保障了施工人员的安全;单吊点结构避免了因多个提升机不同步导致平台倾斜的隐患,拉杆4保证了平台受力的平均性。 The structure design of the utility model is reasonable, which improves the safety factor and work efficiency of the installation and maintenance of the elevator guide rail, and ensures the safety of the construction personnel; the single lifting point structure avoids the hidden danger of the platform tilting caused by the asynchronousness of multiple hoists, and the pull rod 4 The uniformity of the force on the platform is guaranteed.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420775780.2U CN204310644U (en) | 2014-12-11 | 2014-12-11 | A kind of single suspension centre cage guide installation and maintenance hanging basket |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420775780.2U CN204310644U (en) | 2014-12-11 | 2014-12-11 | A kind of single suspension centre cage guide installation and maintenance hanging basket |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204310644U true CN204310644U (en) | 2015-05-06 |
Family
ID=53132971
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420775780.2U Expired - Lifetime CN204310644U (en) | 2014-12-11 | 2014-12-11 | A kind of single suspension centre cage guide installation and maintenance hanging basket |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204310644U (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105197733A (en) * | 2015-10-09 | 2015-12-30 | 申锡机械有限公司 | Simple single-lifting-point double-layer elevator hanging basket |
| CN105986663A (en) * | 2015-02-04 | 2016-10-05 | 雄宇集团无锡电梯安装技术有限公司 | Elevator tooling lifting platform |
| CN106430029A (en) * | 2016-08-24 | 2017-02-22 | 无锡科通工程机械制造有限公司 | Single hanging basket |
| CN106429742A (en) * | 2016-10-28 | 2017-02-22 | 中建三局集团有限公司 | Locating device and implementing method for mounting elevator cage of construction elevator |
| CN107352480A (en) * | 2017-08-23 | 2017-11-17 | 雄宇集团无锡电梯安装技术有限公司 | Cage guide hoisting transportation car |
| CN110077934A (en) * | 2019-04-17 | 2019-08-02 | 奥的斯机电电梯有限公司 | A kind of constructing device and its construction method in elevator segmentation hoistway |
| CN111115117A (en) * | 2020-01-08 | 2020-05-08 | 焦作科瑞森重装股份有限公司 | Support for conveyor belt mechanism and cable conveyor belt system |
-
2014
- 2014-12-11 CN CN201420775780.2U patent/CN204310644U/en not_active Expired - Lifetime
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105986663A (en) * | 2015-02-04 | 2016-10-05 | 雄宇集团无锡电梯安装技术有限公司 | Elevator tooling lifting platform |
| CN105986663B (en) * | 2015-02-04 | 2018-08-14 | 雄宇集团无锡电梯安装技术有限公司 | Elevator tooling hoistable platform |
| CN105197733A (en) * | 2015-10-09 | 2015-12-30 | 申锡机械有限公司 | Simple single-lifting-point double-layer elevator hanging basket |
| CN106430029A (en) * | 2016-08-24 | 2017-02-22 | 无锡科通工程机械制造有限公司 | Single hanging basket |
| CN106429742A (en) * | 2016-10-28 | 2017-02-22 | 中建三局集团有限公司 | Locating device and implementing method for mounting elevator cage of construction elevator |
| CN107352480A (en) * | 2017-08-23 | 2017-11-17 | 雄宇集团无锡电梯安装技术有限公司 | Cage guide hoisting transportation car |
| CN110077934A (en) * | 2019-04-17 | 2019-08-02 | 奥的斯机电电梯有限公司 | A kind of constructing device and its construction method in elevator segmentation hoistway |
| CN111115117A (en) * | 2020-01-08 | 2020-05-08 | 焦作科瑞森重装股份有限公司 | Support for conveyor belt mechanism and cable conveyor belt system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104088449B (en) | Safe and fast double-track construction platform of super high-rise curtain wall | |
| CN105888230B (en) | A kind of lowering or hoisting gear and its construction method for building curtain wall construction | |
| CN103352559B (en) | Storage tank keeps in repair special hanging movable job platform | |
| CN201882763U (en) | Special carrying pole type beam of double-machine lifting crane | |
| CN205953370U (en) | Perpendicular transport means of unitized curtain wall | |
| CN205152788U (en) | But telescopic bridge testing platform of antihunting | |
| CN207748760U (en) | A kind of bridge crane of hoisting large-size drainpipe | |
| CN210262742U (en) | Large cantilever bent cap template demolishs device | |
| CN205908031U (en) | A rail mounted lifting device for high -rise building curtain wall construction | |
| CN208122371U (en) | On across the high-speed rail safe guarding shed fast dismounting device of operation line | |
| CN104291222B (en) | The inner hard protection of a kind of high-rise building Core Walls Structure hangs integrated system with row | |
| CN205241189U (en) | A integrated device that is used for handling of guardrail template and installation to demolish | |
| CN204938806U (en) | Preventing lifting hook from falling device | |
| CN103288002A (en) | Simple combination portal upper-air heavy-article hoisting device | |
| CN101402436A (en) | Method and apparatus for disassembling cargo boom of climbing tower crane | |
| CN106144929A (en) | Group hoist device and construction method | |
| CN103879860A (en) | Device special for elevator installation | |
| CN203531352U (en) | Hanging type movable working platform for storage tank maintenance | |
| CN214329956U (en) | Ring rail hoisting device for curtain wall installation | |
| CN210529487U (en) | Bridge and box-shaped bridge inspection device with flange plates | |
| CN211341686U (en) | A hanging basket support system | |
| CN203767802U (en) | Special device for elevator installation | |
| CN103663236A (en) | Heavy-type cover plate lifting device | |
| CN204001751U (en) | Super high steel structure construction overhanging unloading platform | |
| CN106429869A (en) | Horizontal heavy equipment aerial mounting device and mounting method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Elevator guide rail installation and maintenance hanging basket with single hanging point Effective date of registration: 20200226 Granted publication date: 20150506 Pledgee: Agricultural Bank of China Limited by Share Ltd. Wuxi Huishan branch Pledgor: WUXI LITTLE SWAN BUILDING MACHINERY Co.,Ltd. Registration number: Y2020990000137 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| CX01 | Expiry of patent term |
Granted publication date: 20150506 |
|
| CX01 | Expiry of patent term |