CN106401157A - Movable operation platform and high-altitude construction method - Google Patents

Movable operation platform and high-altitude construction method Download PDF

Info

Publication number
CN106401157A
CN106401157A CN201610985897.7A CN201610985897A CN106401157A CN 106401157 A CN106401157 A CN 106401157A CN 201610985897 A CN201610985897 A CN 201610985897A CN 106401157 A CN106401157 A CN 106401157A
Authority
CN
China
Prior art keywords
operating platform
movable operating
installation site
steel truss
chip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610985897.7A
Other languages
Chinese (zh)
Inventor
杨民政
何勇
孙彦军
赵亮
李文科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Group Co Ltd
Original Assignee
Beijing Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Group Co Ltd filed Critical Beijing Urban Construction Group Co Ltd
Priority to CN201610985897.7A priority Critical patent/CN106401157A/en
Publication of CN106401157A publication Critical patent/CN106401157A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a movable operation platform and a high-altitude construction method. The platform is used for being installed on a steel truss and comprises a bottom frame, limiting assemblies and supporting assemblies. The limiting assemblies are perpendicularly installed at the two ends of the bottom frame. The supporting assemblies are installed on the tops of the limiting assemblies. Each supporting assembly comprises a rectangular structure composed of supporting rods, wherein at least two edges perpendicular to each other extend outwards to form the L-shaped supporting rods. Each limiting assembly comprises at least two rows of parallel vertical rods. According to the movable operation platform and the high-altitude construction method, the movable operation platform is directly lifted to the steel truss, the time for building a construction channel and a construction platform during high-altitude construction is directly shortened, the construction progress is accelerated, and the construction efficiency is improved.

Description

A kind of movable operating platform and high-altitude construction method
Technical field
The invention belongs to technical field of building construction, in particular to a kind of movable operating platform and high-altitude construction party Method.
Background technology
At present, high-altitude construction is typically after building truss framework, more separately builds construction passage and operation platform, greatly Extend the engineering time, reduce efficiency of construction.Increased simultaneously and in work progress, build construction passage and operating platform Dangerous.
Content of the invention
For solving the above problems, the invention provides a kind of movable operating platform, by movable operating platform is installed to Shorten the engineering time, thus improving efficiency of construction on steel truss.
The invention provides a kind of movable operating platform, it is used for being arranged on steel truss, including underframe, limit assembly, prop up Support component, limit assembly is vertically mounted on underframe two ends, and support component is arranged on limit assembly top, wherein,
Support component includes the rectangular configuration being made up of pole, and at least orthogonal two sides stretch out for L-shaped Pole;
Limit assembly includes the parallel montant of at least two rows.
Further, in movable operating platform of the present invention, underframe includes at least two supervisors being parallel to each other, secondary Pipe, secondary pipe two ends and supervisor's right angle setting.
Further, in movable operating platform of the present invention, underframe is provided with wooden springboard.
Further, in movable operating platform of the present invention, steel truss is provided with security row fall line.
Present invention also offers a kind of high-altitude construction method, comprise the steps:
Build across chip steel truss, and lay safety net in its bottom, across chip truss arranges at least three layers mounting layer, Each mounting layer includes at least one installation site;
Make underframe, limit assembly, support component, limit assembly is vertically mounted on underframe two ends, and by support component It is arranged on limit assembly and be mounted to movable operating platform;
Using staircase or plus auxiliary truck crane movable operating platform is hung to installation site on across chip steel truss, by activity Operating platform be placed on installation site, and be fixed using steel wire rope.
Further, in the construction method of high-altitude of the present invention, using staircase or plus auxiliary truck crane by activity behaviour As platform be hung to installation site on across chip steel truss when,
Cable rope is reinforced on movable operating platform, controls the swing in movable operating platform uphill process.
Further, in the construction method of high-altitude of the present invention, using staircase or plus auxiliary truck crane by activity behaviour It is hung to installation site on across chip steel truss as platform, movable operating platform is placed on installation site, and utilize steel wire rope After being fixed
Security row fall line is installed on across chip steel truss or movable operating platform.
Further, in the construction method of high-altitude of the present invention, using staircase or plus auxiliary truck crane by activity behaviour It is hung to installation site on across chip steel truss as platform, movable operating platform is placed on installation site, and utilize steel wire rope When being fixed
Hang safety hanging cradle outside across chip steel truss.
Further, in the construction method of high-altitude of the present invention, using staircase or plus auxiliary truck crane by activity behaviour It is hung to installation site on across chip steel truss as platform, movable operating platform is placed on installation site, and utilize steel wire rope In being fixed
Measurement installation site and the size of movable operating platform.
To sum up, the present invention passes through movable operating platform is directly hung on steel truss, directly decreases in the construction of high-altitude and takes Build the time of construction passage and operation platform, accelerate construction progress, improve efficiency of construction.
Brief description
Fig. 1 is the structural representation of one embodiment of movable operating platform of the present invention;
Fig. 2 is the structural representation of one embodiment of underframe in movable operating platform of the present invention;
Fig. 3 is the structural representation of one embodiment of support component in movable operating platform of the present invention.
Specific embodiment
Below by specific embodiment and combine accompanying drawing the present invention is described in further detail.
As Figure 1-3, the invention provides a kind of movable operating platform, be used for being arranged on steel truss, including underframe, Limit assembly, support component, limit assembly is vertically mounted on underframe two ends, and support component is arranged on limit assembly top, wherein,
Support component includes the rectangular configuration being made up of pole, and at least orthogonal two sides stretch out for L-shaped Pole;
Limit assembly includes the parallel montant of at least two rows.
User stands provides construction passage and operating platform to workmen on underframe, and using limit assembly to The operating position during construction at family is defined;And in support component include two extensions L-shaped pole, by L-shaped pole Setting snaps into movable operating platform of the present invention on steel truss, and underframe is then placed on the truss of steel truss, finally Using the fixing L-shaped pole of steel wire rope and underframe, improve the stability of movable operating platform and steel truss.
In the present embodiment, underframe includes at least two supervisors being parallel to each other, secondary pipes, secondary pipe two ends peace vertical with supervisor Dress, when being embodied as, supervisor optionally adopts the square tube of 100*5, and secondary pipe optionally adopts the square tube of 50*3.Limit assembly bag Include the parallel montant of two rows, i.e. 4 montants vertical with underframe, when being embodied as, montant optionally arranges multiple rows of.Therefore spacing group When the montant row of the setting of part is few, the danger that workmen causes because reaching movable operating platform edge in work progress Property will improve, therefore by the setting of limit assembly, the position of underframe is defined, controls fortune on underframe for the workmen Dynamic scope, thus reduce the danger of construction.
Further, in order to improve the balance in workmen's work progress, wooden springboard is optionally set up on underframe.Logical The setting crossing wooden springboard provides a user with walking pedal, and convenient construction personnel pass through.Further, also optional steel truss is installed Security row is had to walk on the rope.After movable operating platform is fixed on steel truss, then security row fall line is installed on steel truss, further The safety of workmen is ensured, prevents workmen from dropping.
Present invention also offers a kind of high-altitude construction method, comprise the steps:
Step A, build across chip steel truss, and lay safety net in its bottom, across chip truss arranges at least three layers Mounting layer, each mounting layer includes at least one installation site;
Step B, making underframe, limit assembly, support component, limit assembly are vertically mounted on underframe two ends, and will prop up Support component is arranged on limit assembly and is mounted to movable operating platform;When being embodied as, support component includes being made up of pole Rectangular configuration, and the pole that at least orthogonal two sides stretch out for L-shaped;It is parallel perpendicular that limit assembly includes at least two rows Bar.
Step C, using staircase or plus auxiliary truck crane movable operating platform is hung to installation site on across chip steel truss, Movable operating platform is placed on installation site, and is fixed using steel wire rope.
Further, using staircase or plus auxiliary truck crane movable operating platform is hung to installation position on across chip steel truss When putting,
Cable rope is reinforced on movable operating platform, controls the swing in movable operating platform uphill process.
Further, using staircase or plus auxiliary truck crane movable operating platform is hung to installation position on across chip steel truss Put, movable operating platform is placed on installation site, and after being fixed using steel wire rope
Security row fall line is installed on across chip steel truss or movable operating platform.
Further, using staircase or plus auxiliary truck crane movable operating platform is hung to installation position on across chip steel truss Put, movable operating platform is placed on installation site, and when being fixed using steel wire rope
Hang safety hanging cradle outside across chip steel truss.
Further, using staircase or plus auxiliary truck crane movable operating platform is hung to installation position on across chip steel truss Put, movable operating platform is placed on installation site, and be fixed using steel wire rope
Measurement installation site and the size of movable operating platform.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, made any repair Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (9)

1. a kind of movable operating platform, is used for being arranged on steel truss it is characterised in that including underframe, limit assembly, support group Part, limit assembly is vertically mounted on underframe two ends, and support component is arranged on limit assembly top, wherein,
Support component includes the rectangular configuration being made up of pole, and at least orthogonal two sides stretch out for L-shaped Bar;
Limit assembly includes the parallel montant of at least two rows.
2. movable operating platform according to claim 1 is it is characterised in that underframe includes at least two masters being parallel to each other Pipe, secondary pipe, secondary pipe two ends and supervisor's right angle setting.
3. movable operating platform according to claim 1 is it is characterised in that be provided with wooden springboard on underframe.
4. movable operating platform according to claim 1 is it is characterised in that be provided with security row fall line on steel truss.
5. a kind of high-altitude construction method is it is characterised in that comprise the steps:
Build across chip steel truss, and lay safety net in its bottom, across chip truss arranges at least three layers mounting layer, each Mounting layer includes at least one installation site;
Make underframe, limit assembly, support component, limit assembly is vertically mounted on underframe two ends, and support component is installed Movable operating platform is mounted on limit assembly;
Using staircase or plus auxiliary truck crane movable operating platform is hung to installation site on across chip steel truss, by activity operations Platform be placed on installation site, and be fixed using steel wire rope.
6. senior engineer's construction method according to claim 5 it is characterised in that using staircase or plus auxiliary truck crane will live When dynamic operating platform is hung to installation site on across chip steel truss,
Cable rope is reinforced on movable operating platform, controls the swing in movable operating platform uphill process.
7. high-altitude according to claim 5 construction method it is characterised in that using staircase or plus auxiliary truck crane will live Dynamic operating platform is hung to installation site on across chip steel truss, and movable operating platform is placed on installation site, and utilizes steel After cord is fixed
Security row fall line is installed on across chip steel truss or movable operating platform.
8. high-altitude according to claim 5 construction method it is characterised in that using staircase or plus auxiliary truck crane will live Dynamic operating platform is hung to installation site on across chip steel truss, and movable operating platform is placed on installation site, and utilizes steel When cord is fixed
Hang safety hanging cradle outside across chip steel truss.
9. high-altitude according to claim 5 construction method it is characterised in that using staircase or plus auxiliary truck crane will live Dynamic operating platform is hung to installation site on across chip steel truss, and movable operating platform is placed on installation site, and utilizes steel During cord is fixed
Measurement installation site and the size of movable operating platform.
CN201610985897.7A 2016-11-09 2016-11-09 Movable operation platform and high-altitude construction method Pending CN106401157A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610985897.7A CN106401157A (en) 2016-11-09 2016-11-09 Movable operation platform and high-altitude construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610985897.7A CN106401157A (en) 2016-11-09 2016-11-09 Movable operation platform and high-altitude construction method

Publications (1)

Publication Number Publication Date
CN106401157A true CN106401157A (en) 2017-02-15

Family

ID=59229833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610985897.7A Pending CN106401157A (en) 2016-11-09 2016-11-09 Movable operation platform and high-altitude construction method

Country Status (1)

Country Link
CN (1) CN106401157A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107419902A (en) * 2017-08-30 2017-12-01 广州市第四建筑工程有限公司 The method of steel-structure factory building crane girder construction roofing
CN110984589A (en) * 2019-11-29 2020-04-10 中国二十二冶集团有限公司 Method for mounting assembly platform of super-long steel beam high altitude

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2459602A1 (en) * 2004-03-02 2005-09-02 John Di Poce Apparatus for improving construction safety
CN201786007U (en) * 2010-06-22 2011-04-06 浙江中南建设集团钢结构有限公司 Aerial operation hanging basket
CN102251666A (en) * 2011-05-04 2011-11-23 河南五建第二建筑安装有限公司 Overhanging type discharging platform
CN202755634U (en) * 2012-08-07 2013-02-27 中建三局建设工程股份有限公司 Suspension type operational platform
CN103615103A (en) * 2013-11-06 2014-03-05 苏州金螳螂建筑装饰股份有限公司 Hanging type assembled movable platform
CN204040435U (en) * 2014-03-31 2014-12-24 中国建筑第八工程局有限公司 High-altitude steel structure welding Hanging Basket
CN204059901U (en) * 2014-08-07 2014-12-31 深圳市宝鹰建设集团股份有限公司 A kind of high-altitude construction operation platform
CN204510767U (en) * 2015-02-22 2015-07-29 福建六建集团有限公司 The basket operating platform of Novel hanging
CN206267512U (en) * 2016-11-09 2017-06-20 北京城建集团有限责任公司 A kind of movable operating platform

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2459602A1 (en) * 2004-03-02 2005-09-02 John Di Poce Apparatus for improving construction safety
CN201786007U (en) * 2010-06-22 2011-04-06 浙江中南建设集团钢结构有限公司 Aerial operation hanging basket
CN102251666A (en) * 2011-05-04 2011-11-23 河南五建第二建筑安装有限公司 Overhanging type discharging platform
CN202755634U (en) * 2012-08-07 2013-02-27 中建三局建设工程股份有限公司 Suspension type operational platform
CN103615103A (en) * 2013-11-06 2014-03-05 苏州金螳螂建筑装饰股份有限公司 Hanging type assembled movable platform
CN204040435U (en) * 2014-03-31 2014-12-24 中国建筑第八工程局有限公司 High-altitude steel structure welding Hanging Basket
CN204059901U (en) * 2014-08-07 2014-12-31 深圳市宝鹰建设集团股份有限公司 A kind of high-altitude construction operation platform
CN204510767U (en) * 2015-02-22 2015-07-29 福建六建集团有限公司 The basket operating platform of Novel hanging
CN206267512U (en) * 2016-11-09 2017-06-20 北京城建集团有限责任公司 A kind of movable operating platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107419902A (en) * 2017-08-30 2017-12-01 广州市第四建筑工程有限公司 The method of steel-structure factory building crane girder construction roofing
CN110984589A (en) * 2019-11-29 2020-04-10 中国二十二冶集团有限公司 Method for mounting assembly platform of super-long steel beam high altitude

Similar Documents

Publication Publication Date Title
CN103206074B (en) Elevator shaft template construction method, platform and support
CN103982040B (en) A kind of construction of super highrise building vertical multi-transportation device
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN106401157A (en) Movable operation platform and high-altitude construction method
CN205934718U (en) Movable hanging basket device for bridge construction
CN105484165B (en) Integrated prestress tensioning frame structure and manufacturing and using methods thereof
CN105839907A (en) Suspension type steel platform scaffold foundation and method for mounting same
CN106567542A (en) Super high-rise double tower building steel structure corridor assembling method
CN202451040U (en) Perpendicular high-altitude crawling ladder
CN205777438U (en) A kind of suspension type steel platform legs hand cradle basis
CN207267961U (en) A kind of bridge pier shaft pours operating platform
CN201635377U (en) Rigid suspended type scaffold provided with large-span steel roof equipment pipeline
CN203547125U (en) Column type overall steel platform hydraulic creeping formwork
CN203475801U (en) Telescopic steel platform for elevator shaft
CN206267512U (en) A kind of movable operating platform
CN204475182U (en) Installation frock of railway pier mound top hanging flower basket
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
CN203430009U (en) Construction hanging basket
CN207063484U (en) Movable operating platform for corridor construction
CN104195954B (en) Overhead column erection without scaffolding platform and erection method thereof
CN207812982U (en) A kind of inner wall of oil tank construction hanging basket
CN208305021U (en) Cantilever type multilayer hanging cage for continuously welding ultrahigh and overlong welding seams
CN207073289U (en) Sliding device of large-span high-section box-shaped steel beam
CN207144440U (en) A kind of integrated Construction of Supporting security platform
CN110748140A (en) Track beam hanging basket special for stepped curtain wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170215