CN207812982U - A kind of inner wall of oil tank construction hanging basket - Google Patents
A kind of inner wall of oil tank construction hanging basket Download PDFInfo
- Publication number
- CN207812982U CN207812982U CN201721804843.2U CN201721804843U CN207812982U CN 207812982 U CN207812982 U CN 207812982U CN 201721804843 U CN201721804843 U CN 201721804843U CN 207812982 U CN207812982 U CN 207812982U
- Authority
- CN
- China
- Prior art keywords
- large arm
- standard knot
- oil tank
- lower bottom
- bottom base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses a kind of inner wall of oil tank construction hanging baskets, including lower bottom base, main winch, slewing equipment, limit switch, operation platform, catching device and tank deck fixing device, the lower bottom base is fixed on the centre position of oil tank body tank bottom by supporting leg, hoist engine mounting base is provided on the right side of the lower bottom base, the right end on hoist engine mounting base top is equipped with main winch, the top of the lower bottom base is equipped with slewing equipment, the top of the slewing equipment is equipped with column standard knot, large arm connector is installed on the column standard knot, it is mounted on large arm standard knot at left and right sides of the large arm connector.The utility model provides a kind of inner wall of oil tank construction hanging basket, pass through the lower bottom base of setting, main winch, slewing equipment, limit switch, operation platform, catching device and tank deck fixing device, it realizes and freely, flexibly controls construction station, save most construction cost, operation, installation, convenient disassembly are quick, significantly lifting construction efficiency.
Description
Technical field
The present invention relates to aerial work basket field more particularly to a kind of inner wall of oil tank construction hanging baskets.
Background technology
Large oil tank inner wall anti-corrosive, maintenance, construction are a job indispensable in the production of chemical enterprise, but at present
It is all made of traditional scaffold lapping mode when most of inner wall of oil tank constructions, a large amount of scaffold is built into oil tank
" all round victory " pattern forms operation platform.Traditional scaffold lapping construction overlap joint difficulty is big, and effort takes, and it is larger to encounter volume
Oilcan construction when, there are larger security risks for the work such as scaffold lapping, dismounting, section construction, and workload is excessive;And
There are certain drawbacks, worker cannot freely control the position of entire inner wall of oil tank construction surface in construction for scaffold lapping scheme
It sets.
But existing inner wall of oil tank construction equipment has the following deficiencies:
1. existing inner wall of oil tank construction equipment uses traditional scaffold auxiliary construction, scaffold lapping construction overlap joint
Difficulty is big, and effort takes;
2. existing inner wall of oil tank construction equipment, there are certain drawbacks, worker freely to control in construction for scaffold
Make the position of entire inner wall of oil tank construction surface.
Invention content
(One)The technical issues of solution
In view of the deficiencies of the prior art, the present invention provides a kind of inner wall of oil tank construction hanging basket, scaffold lapping is solved
The problem of construction overlap joint difficulty is big, effort takes and worker cannot freely control the position of entire inner wall of oil tank construction surface.
(Two)Technical solution
To achieve the above object, the present invention provides the following technical solutions:A kind of inner wall of oil tank construction hanging basket, including bottom
Seat, main winch, slewing equipment, limit switch, operation platform, catching device and tank deck fixing device, the lower bottom base pass through branch
Leg is fixed on the centre position of oil tank body tank bottom, and hoist engine mounting base, the hoist engine are provided on the right side of the lower bottom base
The right end on mounting base top is equipped with main winch, and the top of the lower bottom base is equipped with slewing equipment, the slewing equipment
Top is equipped with column standard knot, and limit switches are installed at the connecting portion of column standard knot lower part and slewing equipment,
Large arm connector is installed on the column standard knot, large arm standard knot is mounted at left and right sides of the large arm connector,
Guard rail rod is installed on the top of the large arm standard knot, and guardrail steel wire rope is equipped on the guard rail rod, the large arm standard knot
Left end is equipped with operation platform, and the top of the large arm connector is equipped with sliding equipment, the top installation of the sliding equipment
There is catching device, slewing equipment, the slewing equipment top at the top of the column standard knot are installed at the top of the column standard knot
Tank deck fixing device is installed, is equipped at left and right sides of slewing equipment lower part to be mounted at the top of the column standard knot and determine
Pulley blocks, the top center position that the oil tank sees platform is equipped with auxiliary hoist engine, and assists hoist engine by assisting hoist engine
Holder is fixed on oil tank body.
Preferably, supporting leg, the middle position peace of the supporting leg are mounted at the corner location on the lower bottom base top
Equipped with tension leading screw, and the lower end for tensing leading screw is fixed on the bottom of lower bottom base, and sheave is provided on the lower bottom base.
Preferably, it is both provided with large arm at left and right sides of the sliding equipment top and reinforces drawstring, and large arm reinforces drawstring
Upper end be fixed on the drawstring plate of sliding equipment upper end setting, the lower end that the large arm reinforces drawstring is fixed on a sliding equipment left side
The top of right both sides large arm standard knot.
Preferably, the right end of the large arm standard knot is provided with clump weight or operation platform, between the large arm standard knot
It is fixedly connected by fixing bolt.
Preferably, the position that the inside of the sliding equipment is contacted with column standard knot is both provided with movable pulley, and slides
Mechanism is slidably connected with column standard knot by movable pulley, and running block is mounted at left and right sides of the sliding equipment..
Preferably, the tank deck fixing device is provided with peace on the oil tank body of tank deck fixing device position
Dress hole extends to the inside of auxiliary bracket of hoisting machine.
Preferably, the guard rail rod installed on the large arm standard knot is replaced by the steelframe guardrail of welding fabrication.
(Three)Advantageous effect
The present invention provides a kind of inner wall of oil tank construction hanging baskets, have following advantageous effect:
(1)When the present invention installs, first auxiliary bracket of hoisting machine is fixed on oil tank tank deck, auxiliary hoist engine is utilized into spiral shell
Bolt be mounted on auxiliary bracket of hoisting machine on, using suspension hook by column standard knot lift by crane and it is a section be completed, then will
Lower bottom base be mounted on column standard knot bottom, then successively install catching device, supporting leg, tense leading screw, hoist engine mounting base,
Then the attachmentes such as main winch tense the column agency that installation is complete, upper end tank deck fixing device fixation, by skate machine
Structure is mounted on column standard knot, is then symmetrically installed large arm connector, large arm standard successively in the left and right sides of sliding equipment
Section, operation platform, guard rail rod, guardrail steel wire rope, large arm reinforce the attachmentes such as drawstring, and the steel wire rope installed on main winch is passed through
The sheave of lower bottom base up bypasses running block and fixation in fixed pulley group and sliding equipment inside column, until
This, a whole set of inner wall of oil tank construction hanging basket installs, simple in structure to be easily installed and dismantle, and improves the speed and effect of installation
Rate is solved using traditional scaffold auxiliary construction, and scaffold lapping construction overlap joint difficulty is big, the time-consuming problem of effort;
(2)When the present invention is run, operating personnel walk along large arm standard knot and do preparation of construction into operation platform, then control
Main winch processed rises to suitable construction station and carries out constructing operation, and the construction angle of horizontal position is needed replacing in work progress
When spending, controllable slewing equipment is rotated, and large arm is driven to be rotated by large arm standard knot, and large arm is driven by large arm standard knot and constructed
Platform rotates construction location, when needing replacing the height of construction in work progress, control main winch operation winding steel wire rope, and steel
Cord pulls sliding equipment to be moved up and down on column standard knot, by operation platform debugging to suitable height, when equipment is transported
During row after wire cable rupture, catching device runs and locks sliding equipment moment in column when sliding equipment decrease speed is too fast
On standard knot, prevents large arm from integrally falling and cause casualties or equipment, tank body damage, large arm is freely combined by large arm standard knot
It forms, different length can be assembled into a certain range, adapt to the inner wall of oil tank constructing operation of different-diameter, column is by column
Standard knot is freely combined, and can be assembled into different height in a certain range, adapts to the inner wall of oil tank construction of different height
Operation, solving scaffold, there are certain drawbacks, worker cannot freely control entire inner wall of oil tank construction surface in construction
The problem of position.
(3)It, can be by the counterweight of large arm standard knot right end setting when needing the speed for accelerating to construct in operational process of the present invention
Block is replaced with operation platform, and the left and right sides is constructed simultaneously accelerates the speed of construction, by the construction of the left and right sides simultaneously, accelerates to apply
The speed of work shortens the duration of construction.
Description of the drawings
Fig. 1 is the overall structure diagram of the utility model type embodiment;
Fig. 2 is that the utility model type installs supplementary structure schematic diagram;
Fig. 3 is the utility model type safety shield apparatus schematic diagram;
In figure:1 lower bottom base, 2 tense leading screws, 3 supporting legs, 4 large arm connectors, 5 hoist engine mounting bases, 6 main winch, 7 times
Rotary device, 8 limit switches, 9 guard rail rods, 10 large arm standard knots, 11 operation platforms, 12 guardrail steel wire ropes, 13 large arm reinforce drawstring,
14 column standard knots, 15 sliding equipments, 16 catching devices, 17 fixed pulley groups, 18 tank deck fixing devices, 19 oil tank bodies, 20 auxiliary
Hoist engine, 21 auxiliary bracket of hoisting machine.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
The every other embodiment obtained, shall fall within the protection scope of the present invention.
It please refers to Fig.1 shown in -3, a kind of embodiment provided by the utility model;A kind of inner wall of oil tank construction hanging basket, including
Lower bottom base 1, main winch 6, slewing equipment 7, limit switch 8, operation platform 11, catching device 16 and tank deck fixing device 18, institute
The centre position that lower bottom base 1 is fixed on 19 tank bottom of oil tank body by supporting leg 3 is stated, at the corner location on 1 top of lower bottom base
It is mounted on supporting leg 3, the middle position of the supporting leg 3, which is equipped with, tenses leading screw 2, and the lower end for tensing leading screw 2 is fixed on down
The bottom of pedestal 1 is provided with sheave on the lower bottom base 1, and the right side of the lower bottom base 1 is provided with hoist engine mounting base 5, institute
The right end for stating 5 top of hoist engine mounting base is equipped with main winch 6, and the top of the lower bottom base 1 is equipped with slewing equipment 7, institute
The top for stating slewing equipment 7 is equipped with column standard knot 14, the connecting portion of column standard knot 14 lower part and slewing equipment 7
Limit switches 8 are installed at place, and large arm connector 4, the left and right two of the large arm connector 4 are equipped on the column standard knot 14
Side is mounted on large arm standard knot 10, and the top of the large arm standard knot 10 is installed guard rail rod 9, is equipped on the guard rail rod 9
Guardrail steel wire rope 12, the guard rail rod 9 installed on the large arm standard knot 10 also can be replaced into the steelframe guardrail of welding fabrication, described
The left end of large arm standard knot 10 is equipped with operation platform 11, and it is fast that the right end of the large arm standard knot 10 is provided with counterweight, and large arm
At the clump weight position of 10 right end of standard knot setting also can installation platform 11, pass through fixation between the large arm standard knot 10
Bolt is fixedly connected, and the top of the large arm connector 4 is equipped with sliding equipment 15, and the top of the sliding equipment 15 is equipped with
Catching device 16 is both provided with large arm at left and right sides of 15 top of the sliding equipment and reinforces drawstring 13, and large arm reinforces drawstring 13
Upper end be fixed on the drawstring plate of 15 upper end of sliding equipment setting, the lower end that the large arm reinforces drawstring 13 is fixed on skate machine
The top of 15 left and right sides large arm standard knot 10 of structure, the position that the inside of the sliding equipment 15 is contacted with column standard knot 14 are equal
It is provided with movable pulley, and sliding equipment 15 is slidably connected with column standard knot 14 by movable pulley, a left side for the sliding equipment 15
Right both sides are mounted on running block, and the top of the column standard knot 14 is equipped with swing mechanism 7, the column standard knot 14
7 top of swing mechanism at top is equipped with tank deck fixing device 18, and the tank deck fixing device 18 passes through tank deck fixing device 18
The inside that mounting hole extends to auxiliary bracket of hoisting machine 21, the column standard are provided on the oil tank body 19 of position
The top of section 14, which is equipped at left and right sides of 7 lower part of swing mechanism, is mounted on fixed pulley group 17, the top of the oil tank body 19
Portion centre position is equipped with auxiliary hoist engine 20, and assists hoist engine 20 by assisting bracket of hoisting machine 21 to be fixed on oil tank body
On 19.
Operation principle:When the utility model is installed, first auxiliary bracket of hoisting machine 21 is fixed on oil tank tank deck 19, it will be auxiliary
It helps hoist engine 20 to be mounted on auxiliary bracket of hoisting machine 21 using bolt, column standard knot 14 is lifted by crane into a simultaneously section one using suspension hook
Section is completed, then lower bottom base 1 is mounted on to the bottom of column standard knot 14, then installs catching device 16, branch successively
Leg 3 tenses the attachmentes such as leading screw 2, hoist engine mounting base 5, main winch 6, then tenses the column agency that installation is complete, upper end
Sliding equipment 15 is mounted on column standard knot 14, then on a left side for sliding equipment 15 by 18 fixation of tank deck fixing device
Right both sides are symmetrically installed large arm connector 4, large arm standard knot 10, operation platform 11, guard rail rod 9, guardrail steel wire rope 12, big successively
Arm reinforces the equal attachmentes of drawstring 13, by the steel wire rope installed on main winch 6 by the sheave of lower bottom base 1 inside column up
Around the running block in fixed pulley group 17 and sliding equipment 15 and fixation, so far, a whole set of inner wall of oil tank construction hanging basket peace
Install complete, when construction, operating personnel walk along large arm standard knot 10 and do preparation of construction into operation platform 11, then control master file
It raises machine 6 and rises to suitable construction station progress constructing operation, when needing replacing the construction angle of horizontal position in work progress,
Controllable slewing equipment 7 is rotated, and large arm is driven to be rotated by large arm standard knot 10, and large arm is driven by large arm standard knot 10 and constructed
Platform 11 rotates construction location, when needing replacing the height of construction in work progress, the control operation winding steel wire of main winch 6
Rope, steel wire rope pull sliding equipment 15 to be moved up and down on column standard knot 14, by the debugging of operation platform 11 to suitable high
Degree, after wire cable rupture in equipment running process, catching device 16 is run skate machine when 15 decrease speed of sliding equipment is too fast
15 moment of structure locks on column standard knot 14, prevent large arm integrally fall cause casualties or equipment, tank body damage, when need
When accelerating the speed of construction, the clump weight that 10 right end of large arm standard knot is arranged can be replaced with operation platform 11, the left and right sides
It constructs simultaneously and accelerates the speed of construction.
Can to sum up obtain, the utility model by the lower bottom base 1 of setting, main winch 6, slewing equipment 7, limit switch 8, apply
Work platform 11, catching device 16 and tank deck fixing device 18, solving scaffold lapping construction overlap joint, difficulty is big, effort takes and work
People cannot freely control the problem of position of entire inner wall of oil tank construction surface.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (7)
1. a kind of inner wall of oil tank construction hanging basket, including lower bottom base(1), main winch(6), slewing equipment(7), limit switch(8)、
Operation platform(11), catching device(16)With tank deck fixing device(18), it is characterised in that:The lower bottom base(1)Pass through supporting leg(3)
It is fixed on oil tank body(19)The centre position of tank bottom, the lower bottom base(1)Right side be provided with hoist engine mounting base(5), institute
State hoist engine mounting base(5)The right end on top is equipped with main winch(6), the lower bottom base(1)Top be equipped with revolution dress
It sets(7), the slewing equipment(7)Top column standard knot is installed(14), the column standard knot(14)Lower part and revolution
Device(7)Connecting portion at install limit switches(8), the column standard knot(14)On large arm connector is installed(4),
The large arm connector(4)The left and right sides be mounted on large arm standard knot(10), the large arm standard knot(10)Top peace
Fill guard rail rod(9), the guard rail rod(9)On guardrail steel wire rope is installed(12), the large arm standard knot(10)Left end installation
There is operation platform(11), the large arm connector(4)Top sliding equipment is installed(15), the sliding equipment(15)It is upper
Portion is equipped with catching device(16), the column standard knot(14)Top slewing equipment is installed(7), the column standard knot
(14)The slewing equipment at top(7)Top is equipped with tank deck fixing device(18), the column standard knot(14)Top installation
There is slewing equipment(7)Fixed pulley group is mounted at left and right sides of lower part(17), the oil tank body(19)Top center position
It sets and auxiliary hoist engine is installed(20), and assist hoist engine(20)By assisting bracket of hoisting machine(21)It is fixed on oil tank body
(19)On.
2. a kind of inner wall of oil tank construction hanging basket according to claim 1, it is characterised in that:The lower bottom base(1)Top
Supporting leg is mounted at corner location(3), the supporting leg(3)Middle position tension leading screw is installed(2), and tense leading screw
(2)Lower end be fixed on lower bottom base(1)Bottom, the lower bottom base(1)On be provided with sheave.
3. a kind of inner wall of oil tank construction hanging basket according to claim 1, it is characterised in that:The sliding equipment(15)Top
The left and right sides be both provided with large arm reinforce drawstring(13), and large arm reinforces drawstring(13)Upper end be fixed on sliding equipment(15)
On the drawstring plate of upper end setting, the large arm reinforces drawstring(13)Lower end be fixed on sliding equipment(15)Left and right sides large arm mark
Quasi- section(10)Top.
4. a kind of inner wall of oil tank construction hanging basket according to claim 1, it is characterised in that:The large arm standard knot(10)'s
Right end is provided with clump weight or operation platform(11), the large arm standard knot(10)Between be fixedly connected by fixing bolt.
5. a kind of inner wall of oil tank construction hanging basket according to claim 1, it is characterised in that:The sliding equipment(15)It is interior
Side and column standard knot(14)The position of contact is both provided with movable pulley, and sliding equipment(15)With column standard knot(14)Pass through
Movable pulley is slidably connected, the sliding equipment(15)The left and right sides be mounted on running block.
6. a kind of inner wall of oil tank construction hanging basket according to claim 1, it is characterised in that:The tank deck fixing device(18)
Across tank deck fixing device(18)The oil tank body of position(19)On be provided with mounting hole extend to auxiliary hoist engine branch
Frame(21)Inside.
7. a kind of inner wall of oil tank construction hanging basket according to claim 1, it is characterised in that:The large arm standard knot(10)On
The guard rail rod of installation(9)It is replaced by the steelframe guardrail of welding fabrication.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721804843.2U CN207812982U (en) | 2017-12-21 | 2017-12-21 | A kind of inner wall of oil tank construction hanging basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721804843.2U CN207812982U (en) | 2017-12-21 | 2017-12-21 | A kind of inner wall of oil tank construction hanging basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207812982U true CN207812982U (en) | 2018-09-04 |
Family
ID=63329479
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721804843.2U Active CN207812982U (en) | 2017-12-21 | 2017-12-21 | A kind of inner wall of oil tank construction hanging basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207812982U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108035530A (en) * | 2017-12-21 | 2018-05-15 | 新乡市英昊建工机械有限公司 | A kind of inner wall of oil tank construction hanging basket |
-
2017
- 2017-12-21 CN CN201721804843.2U patent/CN207812982U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108035530A (en) * | 2017-12-21 | 2018-05-15 | 新乡市英昊建工机械有限公司 | A kind of inner wall of oil tank construction hanging basket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201433079Y (en) | High-altitude inclined supporting wire lifting device for construction curtain wall | |
CN109399432B (en) | A kind of hoistway job platform that climbs certainly | |
CN207812982U (en) | A kind of inner wall of oil tank construction hanging basket | |
CN203128099U (en) | Slipping type pipeline lifting device | |
CN202379620U (en) | Lifting and operating platform comprehensive equipment | |
CN108035530A (en) | A kind of inner wall of oil tank construction hanging basket | |
CN106144929A (en) | One population hoist device and construction method | |
CN106185618B (en) | One kind is used for Generator Stator hoisting structure and its hanging method | |
CN205802841U (en) | Manual multifunctional ground jack | |
CN205777428U (en) | Elevator is from climbing platforms | |
CN208105827U (en) | A kind of construction scaffolding structure | |
CN202865749U (en) | Installation equipment of bridge guardrail framework | |
CN207144446U (en) | A kind of construction Skidproof hanging cradle | |
CN206521755U (en) | A kind of dismounting device of building foundation pit prestressing force shaped steel combination inner bracing member | |
CN105060124B (en) | Intra-frame portal crane system and hoisting use method thereof | |
CN2878305Y (en) | S-shape self-lifting platform for construction lifter | |
CN210561720U (en) | Pier stud maintenance repair operation platform | |
CN110240063B (en) | Device and method for installing hanging rod nut for large-tonnage bridge girder erection machine | |
CN106760468A (en) | The suspension platform that a kind of construction site uses | |
CN208200206U (en) | A kind of boom hoisting used in culvert pipe | |
CN208166512U (en) | A kind of descending frame for the installation of great diameter and long steel reinforcement cage | |
CN106121254A (en) | Heavy component transportation system and construction method after a kind of contrary sequence method dismounting | |
CN201857225U (en) | Hoisting device for bridge crane frame | |
CN207748760U (en) | A kind of bridge crane of hoisting large-size drainpipe | |
CN103452043B (en) | Maintenance system of cable-stayed bridge solid pylon and application of maintenance system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |