CN207748760U - A kind of bridge crane of hoisting large-size drainpipe - Google Patents
A kind of bridge crane of hoisting large-size drainpipe Download PDFInfo
- Publication number
- CN207748760U CN207748760U CN201721564752.6U CN201721564752U CN207748760U CN 207748760 U CN207748760 U CN 207748760U CN 201721564752 U CN201721564752 U CN 201721564752U CN 207748760 U CN207748760 U CN 207748760U
- Authority
- CN
- China
- Prior art keywords
- bridge
- hoisting
- mounting plate
- wire rope
- pulley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 19
- 239000010959 steel Substances 0.000 claims abstract description 19
- 230000003014 reinforcing effect Effects 0.000 claims description 8
- 238000009434 installation Methods 0.000 claims description 4
- 238000000034 method Methods 0.000 abstract description 10
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000004804 winding Methods 0.000 description 9
- 230000005484 gravity Effects 0.000 description 5
- 238000003466 welding Methods 0.000 description 4
- 230000005540 biological transmission Effects 0.000 description 3
- 239000000725 suspension Substances 0.000 description 3
- 239000003638 chemical reducing agent Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000002457 bidirectional effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Landscapes
- Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
Abstract
本实用新型公开了一种吊装大型排水管的桥式起重机,涉及起重机技术领域,以解决现有技术起重机起重不稳定的惯性摆动容易造成安全事故的问题;其包括大车、桥梁、端梁、驱动电机、起重电机、卷筒、钢丝绳、挂钩,大车设置在端梁的上并通过驱动电机沿端梁自由移动,桥梁通过螺栓固定在大车上,桥梁上设有电动葫芦和用于安装电动葫芦的安装板,安装板下方设有与桥梁滑动连接的行走轮,卷筒以及驱动卷筒转动的起重电机均设置在安装板的正上方;还包括滑轮组件和用于支撑滑轮组件的支撑组件,支撑组件设置在安装板上,绕卷筒一端输出的钢丝绳经滑轮组件与卷筒的另一端连接。通过实施本技术方案,有利于提高起重机起重过程中的稳定性和安全系数。
The utility model discloses a bridge-type crane for hoisting a large drainage pipe, relates to the technical field of cranes, and solves the problem in the prior art that the inertial swing of the crane which is unstable in lifting is likely to cause safety accidents; the utility model includes a cart, a bridge, and an end girder , driving motor, hoisting motor, reel, wire rope, hook, the cart is set on the end beam and moves freely along the end beam through the drive motor, the bridge is fixed on the cart by bolts, and the bridge is equipped with electric hoists. On the mounting plate where the electric hoist is installed, there is a walking wheel slidingly connected with the bridge under the mounting plate, and the drum and the lifting motor that drives the drum to rotate are all set directly above the mounting plate; it also includes a pulley assembly and a pulley block for supporting The support assembly of the piece, the support assembly is arranged on the mounting plate, and the steel wire rope output around one end of the drum is connected with the other end of the drum through the pulley assembly. By implementing the technical solution, it is beneficial to improve the stability and safety factor in the hoisting process of the crane.
Description
技术领域technical field
本实用新型涉及起重机技术领域,更具体的是涉及一种吊装大型排水管的桥式起重机。The utility model relates to the technical field of cranes, in particular to a bridge crane for hoisting large drainage pipes.
背景技术Background technique
桥式起重机是桥架在高架轨道上运行的一种桥架型起重机,又称天车。桥式起重机的桥架沿铺设在两侧高架上的轨道纵向运行,起重小车沿铺设在桥架上的轨道横向运行,构成一矩形的工作范围,就可以充分利用桥架下面的空间吊运物料,不受地面设备的阻碍。起升机构包括电动机、制动器、减速器、卷筒和滑轮组。电动机通过减速器,带动卷筒转动,使钢丝绳绕上卷筒或从卷筒放下,以升降重物。小车架是支托和安装起升机构和小车运行机构等部件的机架,通常为焊接结构。Bridge crane is a kind of bridge type crane whose bridge frame runs on elevated track, also known as overhead crane. The bridge frame of the bridge crane runs longitudinally along the rails laid on the elevated sides on both sides, and the hoisting trolley runs horizontally along the rails laid on the bridge frame, forming a rectangular working range, which can make full use of the space under the bridge frame for hoisting and transporting materials. Hindered by ground equipment. The lifting mechanism includes a motor, a brake, a reducer, a drum and a pulley block. The motor drives the reel to rotate through the reducer, so that the wire rope is wound on the reel or lowered from the reel to lift the heavy object. The trolley frame is a frame for supporting and installing components such as the lifting mechanism and the trolley running mechanism, and is usually a welded structure.
在焊接排水管时,为了保证焊接质量,需要调整排水管的位置进行焊接,然而焊接大型排水管时由于管道质量较大,调整管道的位置非常困难,就需要一种可以吊装大型排水管的起重器,,现有技术通常采用单独的吊钩对起重物品进行起吊,存在以下不足之处:1、由于大型排水管道不仅体积质量大且具有一定的长度,从而利用桥式起重机起重大型排水管的重心,容易造成起重后倾斜甚至脱落,造成安全事故;2、采用单独的滑轮起重过程中,绕在滑轮两侧相近的两组钢丝绳容易在小车移动过程中惯性摆动,悬挂在空中不稳定的惯性摆动容易对两侧造成撞击,造成安全事故。When welding the drain pipe, in order to ensure the welding quality, the position of the drain pipe needs to be adjusted for welding. However, when welding a large drain pipe, due to the high quality of the pipe, it is very difficult to adjust the position of the pipe, so a hoist that can lift a large drain pipe is needed Heavy equipment, the prior art usually uses a separate hook to lift the lifting item, which has the following disadvantages: 1. Because the large drainage pipe is not only large in volume and quality, but also has a certain length, it is difficult to use a bridge crane to lift large The center of gravity of the drainpipe may easily cause it to tilt or even fall off after lifting, resulting in a safety accident; 2. During the lifting process using a separate pulley, the two sets of wire ropes wound on both sides of the pulley are likely to swing inertially during the movement of the trolley and hang on the The unstable inertial swing in the air is likely to cause impacts on both sides, resulting in safety accidents.
实用新型内容Utility model content
鉴于以上所述现有技术的不足,本实用新型的目的在于提供一种吊装大型排水管的桥式起重机,以解决减小起重大型排水管过程中绕在滑轮两侧的两组钢丝绳的惯性摆动,加强起重过程中的稳定性。In view of the above-mentioned deficiencies in the prior art, the purpose of this utility model is to provide a bridge crane for hoisting large-scale drainage pipes to solve the problem of reducing the inertia of two sets of wire ropes wound on both sides of the pulley in the process of lifting large-scale drainage pipes. Swing to enhance stability during lifting.
本实用新型为了实现上述目的具体采用以下技术方案:The utility model specifically adopts the following technical solutions in order to achieve the above object:
一种吊装大型排水管的桥式起重机,包括大车、桥梁、端梁、驱动电机、起重电机、卷筒、钢丝绳、挂钩,所述端梁为水平设置的工字型钢轨,所述大车设置在端梁上并通过驱动电机沿端梁自由移动,所述桥梁通过螺栓固定在大车上,所述桥梁上设有电动葫芦和用于安装电动葫芦的安装板,所述安装板下方设有与桥梁滑动连接的行走轮,所述卷筒以及驱动卷筒转动的起重电机均设置在安装板的正上方;还包括滑轮组件和用于支撑滑轮组件的支撑组件,绕卷筒一端输出的钢丝绳经滑轮组件与卷筒的另一端连接,所述挂钩设置在滑轮组件下端。An overhead crane for hoisting a large drainage pipe, comprising a cart, a bridge, an end beam, a driving motor, a hoisting motor, a reel, a steel wire rope, and a hook, the end beam is a horizontally arranged I-shaped steel rail, and the large The cart is set on the end beam and moves freely along the end beam by the drive motor. The bridge is fixed on the cart by bolts. The bridge is equipped with an electric hoist and a mounting plate for installing the electric hoist. Below the mounting plate There are walking wheels slidingly connected with the bridge, and the drum and the hoisting motor that drives the drum to rotate are all arranged directly above the installation plate; it also includes a pulley assembly and a support assembly for supporting the pulley assembly, which is wound around one end of the drum The output steel wire rope is connected with the other end of the reel through the pulley assembly, and the hook is arranged at the lower end of the pulley assembly.
本实用新型基础方案的工作原理为:采用上述结构,绕卷筒一端输出的钢丝绳经滑轮组件与卷筒的另一端连接,且滑轮组件与用于支撑滑轮组件的支撑组件均设置在安装板上,避免现有技术中将滑轮直接悬挂在钢丝绳上并随着钢丝绳摆动,且经滑轮组件构成的传动结构可将绕在滑轮组两侧的钢丝绳曲率半径增大,增大钢丝绳作业空间,避免起重大型排水管过程中绕在滑轮两侧相邻较近两组钢丝绳的惯性摆动过大容易对两侧造成撞击的问题,提高起重机结构的稳定性和安全系数。The working principle of the basic scheme of the utility model is: adopting the above structure, the steel wire rope output around one end of the reel is connected to the other end of the reel through the pulley assembly, and the pulley assembly and the supporting assembly for supporting the pulley assembly are all set on the installation plate , to avoid hanging the pulley directly on the wire rope and swinging with the wire rope in the prior art, and the transmission structure formed by the pulley assembly can increase the radius of curvature of the wire rope wound on both sides of the pulley block, increase the working space of the wire rope, and avoid heavy lifting In the process of winding the type drain pipe, the inertial swing of the adjacent two groups of steel wire ropes on both sides of the pulley is too large, which will easily cause impact on both sides, and improve the stability and safety factor of the crane structure.
进一步地,所述滑轮组件包括三个导向滑轮,三个导向滑轮设置在支撑组件上并通过钢丝绳的绕紧下构成三角形机构。利用三角形结构的稳定性可提高支撑滑轮组件的支撑结构的受力强度,且两侧滑轮可直接将钢丝绳的曲率半径增大,增大钢丝绳的作业空间。Further, the pulley assembly includes three guide pulleys, and the three guide pulleys are arranged on the support assembly and form a triangular mechanism by winding the wire rope tightly. Utilizing the stability of the triangular structure can improve the stress strength of the support structure supporting the pulley assembly, and the pulleys on both sides can directly increase the radius of curvature of the wire rope and increase the working space of the wire rope.
进一步地,所述支撑组件包括沿安装板两端对称设置的竖直伸缩杆和与两个竖直伸缩杆下端固定连接的水平横杆。对称设置在安装板两端的竖直伸缩杆随钢丝绳向上移动,一方面可用于支撑滑轮组件,也可避免绕在滑轮组件两侧的两组钢丝绳的惯性摆动,增强结构的稳定性。Further, the support assembly includes vertical telescopic rods arranged symmetrically along both ends of the mounting plate and a horizontal cross rod fixedly connected to the lower ends of the two vertical telescopic rods. The vertical telescoping rods symmetrically arranged at both ends of the mounting plate move upward with the wire ropes. On the one hand, they can be used to support the pulley assembly, and can also avoid the inertial swing of the two sets of wire ropes wound around the two sides of the pulley assembly, thereby enhancing the stability of the structure.
进一步地,所述三个导向滑轮中其中两个滑轮对称设置在两个竖直伸缩杆下端,另一个滑轮设置在水平横杆上。经卷筒一端输出的钢丝绳经对称设置在两个竖直伸缩杆下端的两个滑轮外圆面与卷筒的另一端连接,可有效的增加钢丝绳的曲率半径。Further, two of the three guide pulleys are arranged symmetrically on the lower ends of the two vertical telescopic rods, and the other pulley is arranged on the horizontal cross bar. The wire rope output from one end of the reel is connected to the other end of the reel through two pulley outer circular surfaces symmetrically arranged at the lower ends of the two vertical expansion rods, which can effectively increase the radius of curvature of the wire rope.
进一步地,所述三个导向滑轮分别通过螺栓或开口销与两个竖直伸缩杆和水平横杆固定连接,且在两个竖直伸缩杆上设有支撑螺栓。支撑螺栓用于提高竖直伸缩杆的支撑杆的支撑强度,且方便钢丝绳缠绕,对钢丝绳缠绕起限位作用。Further, the three guide pulleys are respectively fixedly connected to the two vertical telescopic rods and the horizontal cross bar through bolts or cotter pins, and support bolts are provided on the two vertical telescopic rods. The support bolts are used to improve the support strength of the support rods of the vertical telescopic rods, facilitate the winding of the steel wire ropes, and play a limiting role for the winding of the steel wire ropes.
进一步地,设置在两个竖直伸缩杆上的滑轮之间设置有加强杆。加强杆与两个竖直伸缩杆和水平横杆构成的矩形机构可进一步增加支撑滑轮组件的支撑组件的结构稳定性,提高起重安全系数。Further, a reinforcing rod is arranged between the pulleys arranged on the two vertical telescopic rods. The rectangular mechanism formed by the reinforcing rod, two vertical telescopic rods and the horizontal cross rod can further increase the structural stability of the support assembly supporting the pulley assembly and improve the lifting safety factor.
进一步地,所述水平横杆两端设置有滑动杆和支撑环A,所述水平横杆内设有与滑动杆配合的滑槽,所述滑动杆的自由端设有支撑环B。设置在水平横杆上的支撑环A以及设置在滑动杆上的支撑环B能够有效的增加悬挂大型排水管的悬挂点,增加排水管的受力点,避免由于应力集中而排水管的重心未找准造成排水管在起吊过程中倾斜,保证起吊平稳。Further, a sliding rod and a support ring A are provided at both ends of the horizontal bar, a chute cooperating with the sliding bar is provided in the horizontal bar, and a supporting ring B is provided at the free end of the sliding bar. The support ring A set on the horizontal bar and the support ring B set on the sliding bar can effectively increase the suspension points for hanging large drainpipes, increase the stress points of the drainpipes, and avoid the center of gravity of the drainpipes from being unbalanced due to stress concentration. Make sure that the drainage pipe is tilted during the lifting process to ensure stable lifting.
进一步地,挂钩包括挂柱和两个相对挂柱设置的双向挂钩,所述挂柱与挂钩之间设有锁紧环。防止受到重物撞击而吊挂大型排水管的挂绳从挂钩上脱落,造成安全事故,提高安全系数。Further, the hook includes a hanging post and two two-way hooks arranged opposite to the hanging post, and a locking ring is provided between the hanging post and the hook. Prevent the lanyard hanging the large drainage pipe from falling off from the hook due to the impact of heavy objects, causing safety accidents and improving the safety factor.
如上所述,本实用新型的有益效果如下:As mentioned above, the beneficial effects of the utility model are as follows:
1、本实用新型中设置有代替单个滑轮的滑轮组件和用于支撑滑轮组件的支撑组件,绕卷筒一端输出的钢丝绳经设置在支撑组件上的滑轮组件与卷筒的另一端连接,经滑轮组件构成的传动结构可将绕在滑轮组两侧的钢丝绳曲率半径增大,增大钢丝绳作业空间,避免起重大型排水管过程中绕在滑轮两侧相邻较近两组钢丝绳的惯性摆动过大容易对两侧造成撞击的问题,提高起重机结构的稳定性和安全系数。1. The utility model is provided with a pulley assembly instead of a single pulley and a support assembly for supporting the pulley assembly. The steel wire rope output from one end of the reel is connected to the other end of the reel through the pulley assembly arranged on the support assembly. The transmission structure composed of parts can increase the radius of curvature of the wire ropes on both sides of the pulley block, increase the working space of the wire ropes, and avoid excessive inertial swing of the two adjacent groups of wire ropes wound on both sides of the pulley during the process of lifting large drainage pipes It is easy to cause the problem of impact on both sides, and improve the stability and safety factor of the crane structure.
2、本实用新型中滑轮组件包括三个导向滑轮,三个导向滑轮设置在支撑组件上并通过钢丝绳的绕紧下构成三角形机构,利用三角形结构的稳定性可提高支撑滑轮组件的支撑结构的受力强度,且两侧滑轮可直接将钢丝绳的曲率半径增大,增大钢丝绳的作业空间;具体地,对称设置在安装板两端的竖直伸缩杆随钢丝绳向上移动,一方面可用于支撑滑轮组件,也可避免绕在滑轮组件两侧的两组钢丝绳的惯性摆动,增强结构的稳定性。2. The pulley assembly in the utility model includes three guide pulleys, the three guide pulleys are arranged on the support assembly and form a triangular mechanism through the winding of the steel wire rope, and the stability of the triangular structure can be used to improve the support structure of the support pulley assembly. strength, and the pulleys on both sides can directly increase the radius of curvature of the wire rope and increase the working space of the wire rope; specifically, the vertical telescopic rods symmetrically arranged at both ends of the mounting plate move upward with the wire rope, which can be used to support the pulley assembly on the one hand. , It can also avoid the inertial swing of the two sets of steel wire ropes around the two sides of the pulley assembly, and enhance the stability of the structure.
3、本实用新型中,设置在两个竖直伸缩杆上的滑轮之间设置有加强杆,加强杆与两个竖直伸缩杆和水平横杆构成的矩形机构与三角形机构叠加可进一步增加滑轮组件以及支撑滑轮组件的支撑组件的结构稳定性,提高起重安全系数。3. In the utility model, a reinforcing rod is arranged between the pulleys on the two vertical telescopic rods, and the superposition of the rectangular mechanism and the triangular mechanism formed by the reinforcing rod, the two vertical telescopic rods and the horizontal bar can further increase the pulley block The structural stability of the components and the support assembly supporting the pulley assembly improves the lifting safety factor.
4、本实用新型中设置在水平横杆上的支撑环A以及设置在滑动杆上的支撑环B能够有效的增加悬挂大型排水管的悬挂点,增加排水管的受力点,避免由于应力集中而排水管的重心未找准造成排水管在起吊过程中倾斜,达到良好的受力效果,保证起吊平稳性。4. The supporting ring A arranged on the horizontal bar and the supporting ring B arranged on the sliding rod in the utility model can effectively increase the suspension points for hanging large drainage pipes, increase the stress points of the drainage pipes, and avoid the stress concentration due to stress. However, if the center of gravity of the drainpipe is not correctly identified, the drainpipe will be tilted during the lifting process, so as to achieve a good stress effect and ensure the stability of the lifting.
附图说明Description of drawings
图1为本实用新型一种吊装大型排水管的桥式起重机的结构示意图。Fig. 1 is a structural schematic diagram of a bridge crane for hoisting large drainage pipes of the present invention.
附图标记:01-大车、02-桥梁、03-端梁、04-驱动电机、05-起重电机、06-卷筒、07-钢丝绳、08-挂钩、09-电动葫芦、10-安装板、11-行走轮、12-滑轮组件、13-导向滑轮、14-竖直伸缩杆、15-水平横杆、16-支撑螺栓、17-加强杆、18-滑动杆、19-支撑环A、20-支撑环B、21-挂柱、22-锁紧环。Reference signs: 01-cart, 02-bridge, 03-end beam, 04-driving motor, 05-hoisting motor, 06-drum, 07-wire rope, 08-hook, 09-electric hoist, 10-installation Plate, 11-walking wheel, 12-pulley assembly, 13-guide pulley, 14-vertical telescopic rod, 15-horizontal bar, 16-support bolt, 17-strengthening rod, 18-sliding rod, 19-support ring A , 20-support ring B, 21-hanging post, 22-locking ring.
具体实施方式Detailed ways
为了本技术领域的人员更好的理解本实用新型,下面结合附图和以下实施例对本实用新型作进一步详细描述。In order for those skilled in the art to better understand the utility model, the utility model will be further described in detail below in conjunction with the accompanying drawings and the following embodiments.
请参考图1所示,本实施例提供一种吊装大型排水管的桥式起重机,包括大车01、桥梁02、端梁03、驱动电机04、起重电机05、卷筒06、钢丝绳07、挂钩08,端梁03为水平设置的工字型钢轨,大车01设置在端梁03的上并通过驱动电机04沿端梁03自由移动,桥梁02通过螺栓固定在大车01上,桥梁02上设有电动葫芦09和用于安装电动葫芦09的安装板10,安装板10下方设有与桥梁02滑动连接的行走轮11,卷筒06以及驱动卷筒06转动的起重电机05均设置在安装板10的正上方;还包括滑轮组件12和用于支撑滑轮组件12的支撑组件,绕卷筒06一端输出的钢丝绳07经滑轮组件12与卷筒06的另一端连接。Please refer to Fig. 1, the present embodiment provides a kind of overhead crane for hoisting large drainage pipes, including cart 01, bridge 02, end beam 03, drive motor 04, lifting motor 05, reel 06, wire rope 07, The hook 08 and the end beam 03 are I-shaped rails set horizontally. The cart 01 is set on the end beam 03 and moves freely along the end beam 03 through the drive motor 04. The bridge 02 is fixed on the cart 01 by bolts. The bridge 02 An electric hoist 09 and a mounting plate 10 for installing the electric hoist 09 are arranged on the top, a walking wheel 11 slidingly connected with the bridge 02 is provided under the mounting plate 10, and the reel 06 and the lifting motor 05 for driving the reel 06 to rotate are all provided Directly above the mounting plate 10 ; a pulley assembly 12 and a support assembly for supporting the pulley assembly 12 are also included, and the wire rope 07 output around one end of the drum 06 is connected to the other end of the drum 06 through the pulley assembly 12 .
具体地,滑轮组件12包括三个导向滑轮13,三个导向滑轮13设置在支撑组件上并通过钢丝绳07的绕紧下构成三角形机构;利用三角形结构的稳定性可提高支撑滑轮组件12的支撑结构的受力强度,且两侧滑轮可直接将钢丝绳07的曲率半径增大,增大钢丝绳07的作业空间。支撑组件包括沿安装板10两端对称设置的竖直伸缩杆14和与两个竖直伸缩杆14下端固定连接的水平横杆15,对称设置在安装板10两端的竖直伸缩杆14随钢丝绳07向上移动,一方面可用于支撑滑轮组件12,也可避免绕在滑轮组件12两侧的两组钢丝绳07的惯性摆动,增强结构的稳定性。Specifically, the pulley assembly 12 includes three guide pulleys 13, and the three guide pulleys 13 are arranged on the support assembly and form a triangular mechanism under the tight winding of the steel wire rope 07; The strength of the force, and the pulleys on both sides can directly increase the radius of curvature of the wire rope 07, increasing the working space of the wire rope 07. The support assembly includes a vertical telescopic rod 14 symmetrically arranged at both ends of the mounting plate 10 and a horizontal bar 15 fixedly connected to the lower ends of the two vertical telescopic rods 14. The vertical telescopic rod 14 symmetrically arranged at both ends of the mounting plate 10 follows the wire 07 moves upwards, can be used for supporting pulley assembly 12 on the one hand, also can avoid the inertial swing of two groups of wire ropes 07 around pulley assembly 12 both sides, strengthen the stability of structure.
其中,三个导向滑轮13中其中两个滑轮对称设置在两个竖直伸缩杆14下端,另一个滑轮设置在水平横杆15上。具体地,三个导向滑轮13中其中两个滑轮对称设置在两个竖直伸缩杆14下端,另一个滑轮设置在水平横杆15上,竖直伸缩杆14为竖直滑动的相互套接在一起的圆柱形钢管;对称设置在安装板10两端的竖直伸缩杆14随钢丝绳07向上移动,一方面可用于支撑滑轮组件12,也可避免绕在滑轮组件12两侧的两组钢丝绳07的惯性摆动,增强结构的稳定性。与此同时,经卷筒06一端输出的钢丝绳07经对称设置在两个竖直伸缩杆14下端的两个滑轮外圆面与卷筒06的另一端连接,可有效的增加钢丝绳07的曲率半径。Wherein, among the three guide pulleys 13, two pulleys are symmetrically arranged on the lower ends of the two vertical telescopic rods 14, and the other pulley is arranged on the horizontal cross bar 15. Specifically, among the three guide pulleys 13, two of the pulleys are arranged symmetrically on the lower ends of the two vertical telescopic rods 14, and the other pulley is arranged on the horizontal bar 15, and the vertical telescopic rods 14 are vertically slidable and nested on each other. A cylindrical steel pipe together; the vertical telescopic rod 14 symmetrically arranged at both ends of the mounting plate 10 moves upward with the wire rope 07, which can be used to support the pulley assembly 12 on the one hand, and can also avoid the two groups of wire ropes 07 wound around the pulley assembly 12 on both sides. Inertia swings to enhance the stability of the structure. At the same time, the steel wire rope 07 output from one end of the reel 06 is connected to the other end of the reel 06 through two pulley outer circular surfaces symmetrically arranged at the lower ends of the two vertical telescopic rods 14, which can effectively increase the radius of curvature of the wire rope 07 .
进一步地,设置在两个竖直伸缩杆14上的滑轮之间设置有加强杆17。加强杆17与两个竖直伸缩杆14和水平横杆15构成的矩形机构与三角形机构叠加可进一步增加滑轮组件12以及支撑滑轮组件12的支撑组件的结构稳定性,提高起重安全系数。Further, a reinforcing rod 17 is arranged between the pulleys on the two vertical telescopic rods 14 . The superposition of the rectangular mechanism and the triangular mechanism formed by the reinforcing rod 17, the two vertical telescopic rods 14 and the horizontal cross bar 15 can further increase the structural stability of the pulley assembly 12 and the supporting assembly supporting the pulley assembly 12, and improve the lifting safety factor.
此外,三个导向滑轮13分别通过螺栓或开口销与两个竖直伸缩杆14和水平横杆15固定连接,且在两个竖直伸缩杆14上设有支撑螺栓16。支撑螺栓16用于提高竖直伸缩杆14的支撑杆的支撑强度,且方便钢丝绳07缠绕,对钢丝绳07缠绕起限位作用。In addition, the three guide pulleys 13 are respectively fixedly connected to the two vertical telescopic rods 14 and the horizontal cross rod 15 through bolts or cotter pins, and the two vertical telescopic rods 14 are provided with support bolts 16 . The support bolts 16 are used to improve the support strength of the support rods of the vertical telescopic rods 14, facilitate the winding of the steel wire rope 07, and play a position-limiting effect on the winding of the steel wire rope 07.
进一步,水平横杆15两端设置有滑动杆18和支撑环A19,所述水平横杆15内设有与滑动杆18配合的滑槽,滑动杆18的自由端设有支撑环B20。设置在水平横杆15上的支撑环A19以及设置在滑动杆18上的支撑环B20能够有效的增加悬挂大型排水管的悬挂点,增加排水管的受力点,避免由于应力集中而排水管的重心未找准造成排水管在起吊过程中倾斜,保证起吊平稳。Further, two ends of the horizontal bar 15 are provided with a sliding bar 18 and a support ring A19, the horizontal bar 15 is provided with a chute matching with the sliding bar 18, and the free end of the sliding bar 18 is provided with a supporting ring B20. The supporting ring A19 arranged on the horizontal bar 15 and the supporting ring B20 arranged on the sliding bar 18 can effectively increase the suspension points for hanging large drainage pipes, increase the stress points of the drainage pipes, and avoid the damage of the drainage pipes due to stress concentration. The inaccurate center of gravity will cause the drainage pipe to tilt during the lifting process, so as to ensure stable lifting.
此外,挂钩08固定在水平横杆15上滑轮的下端,挂钩08包括挂柱21和两个相对挂柱21设置的双向挂钩08,挂柱21与挂钩08之间设有锁紧环22。防止受到重物撞击而吊挂大型排水管的挂绳从挂钩08上脱落,造成安全事故,提高安全系数。In addition, the hook 08 is fixed on the lower end of the pulley on the horizontal bar 15 . The hook 08 includes a hanging post 21 and two bidirectional hooks 08 opposite to the hanging post 21 . A locking ring 22 is provided between the hanging post 21 and the hook 08 . Prevent the lanyard that hangs the large drainage pipe from falling off from the hook 08 due to the impact of heavy objects, causing safety accidents and improving the safety factor.
本例中,采用上述结构,在吊装大型排水管道的时候,绕卷筒06一端输出的钢丝绳07经支撑组件三个导向滑轮13的外圆面绕紧后与卷筒06的另一端连接,通过挂钩08以及水平横杆15支撑环A19和滑动杆18上的支撑环B20悬挂排水管道的6个端点,增加受力点,避免由于排水管重心未找到造成排水管倾斜造成安全事故;进一步,滑轮组件12与用于支撑滑轮组件12的支撑组件均设置在安装板10上,避免现有技术中将滑轮直接悬挂在钢丝绳07上并随着钢丝绳07摆动,且经滑轮组件12构成的传动结构可将绕在滑轮组两侧的钢丝绳07曲率半径增大,增大钢丝绳07作业空间,避免起重大型排水管过程中绕在滑轮两侧相邻较近两组钢丝绳07的惯性摆动过大容易对两侧造成撞击的问题,提高起重机结构的稳定性和安全系数;此外,三个导向滑轮13设置在支撑组件上并通过钢丝绳07的绕紧下构成三角形机构,利用三角形结构的稳定性可提高支撑滑轮组件12的支撑结构的受力强度,加强杆17与两个竖直伸缩杆14和水平横杆15构成的矩形机构与三角形机构叠加可进一步增加滑轮组件12以及支撑滑轮组件12的支撑组件的结构稳定性,提高起重安全系数,适合推广应用。In this example, the above-mentioned structure is adopted. When hoisting a large-scale drainage pipe, the steel wire rope 07 output from one end of the reel 06 is connected to the other end of the reel 06 after being tightly wound around the outer circular surfaces of the three guide pulleys 13 of the support assembly. The hook 08 and the support ring A19 of the horizontal bar 15 and the support ring B20 on the slide bar 18 hang the 6 end points of the drainage pipe to increase the stress point and avoid the safety accident caused by the tilt of the drain pipe due to the failure of the center of gravity of the drain pipe; further, the pulley block Part 12 and the supporting assembly for supporting the pulley assembly 12 are all arranged on the mounting plate 10, avoiding that the pulley is directly suspended on the wire rope 07 and swinging with the wire rope 07 in the prior art, and the transmission structure formed by the pulley assembly 12 can be Increase the radius of curvature of the wire rope 07 wound on both sides of the pulley block, increase the working space of the wire rope 07, and avoid the excessive inertial swing of the adjacent two groups of wire rope 07 wound on both sides of the pulley in the process of lifting a large drainage pipe, which is easy to damage the two The problem of impact caused by the side can improve the stability and safety factor of the crane structure; in addition, three guide pulleys 13 are arranged on the support assembly and form a triangular mechanism under the tight winding of the steel wire rope 07, and the stability of the triangular structure can be used to improve the stability of the support pulley block. The stress strength of the supporting structure of the piece 12, the superposition of the rectangular mechanism and the triangular mechanism formed by the reinforcing rod 17, the two vertical telescopic rods 14 and the horizontal cross bar 15 can further increase the structure of the pulley assembly 12 and the supporting assembly supporting the pulley assembly 12 Stability, improve lifting safety factor, suitable for popularization and application.
以上所述,仅为本实用新型的较佳实施例,并不用以限制本实用新型,本实用新型的专利保护范围以权利要求书为准,凡是运用本实用新型的说明书及附图内容所作的等同结构变化,同理均应包含在本实用新型的保护范围。The above is only a preferred embodiment of the utility model, and is not intended to limit the utility model. The scope of patent protection of the utility model is subject to the claims. Equivalent structural changes should be included in the protection scope of the present utility model in the same way.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721564752.6U CN207748760U (en) | 2017-11-21 | 2017-11-21 | A kind of bridge crane of hoisting large-size drainpipe |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721564752.6U CN207748760U (en) | 2017-11-21 | 2017-11-21 | A kind of bridge crane of hoisting large-size drainpipe |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207748760U true CN207748760U (en) | 2018-08-21 |
Family
ID=63146403
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721564752.6U Expired - Fee Related CN207748760U (en) | 2017-11-21 | 2017-11-21 | A kind of bridge crane of hoisting large-size drainpipe |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207748760U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109780405A (en) * | 2018-12-25 | 2019-05-21 | 大唐鸡西第二热电有限公司 | A kind of absorption type overhead traveling crane cantilever accessory installation system |
| CN110885010A (en) * | 2019-12-27 | 2020-03-17 | 太原科技大学 | A triple telescopic pole double girder bridge crane and anti-deviation device |
| CN111153325A (en) * | 2020-01-19 | 2020-05-15 | 北京智创赋能技术开发中心(有限合伙) | A roller type truss walking sleeper stacker |
| CN113174994A (en) * | 2021-03-24 | 2021-07-27 | 湖北省路桥集团有限公司 | Construction method of high retaining wall structure with complex steep terrain |
| CN118495347A (en) * | 2024-07-18 | 2024-08-16 | 山东汇丰铸造科技股份有限公司 | Crane with zirconia wear-resistant coating casting reel and preparation method thereof |
-
2017
- 2017-11-21 CN CN201721564752.6U patent/CN207748760U/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109780405A (en) * | 2018-12-25 | 2019-05-21 | 大唐鸡西第二热电有限公司 | A kind of absorption type overhead traveling crane cantilever accessory installation system |
| CN110885010A (en) * | 2019-12-27 | 2020-03-17 | 太原科技大学 | A triple telescopic pole double girder bridge crane and anti-deviation device |
| CN111153325A (en) * | 2020-01-19 | 2020-05-15 | 北京智创赋能技术开发中心(有限合伙) | A roller type truss walking sleeper stacker |
| CN113174994A (en) * | 2021-03-24 | 2021-07-27 | 湖北省路桥集团有限公司 | Construction method of high retaining wall structure with complex steep terrain |
| CN118495347A (en) * | 2024-07-18 | 2024-08-16 | 山东汇丰铸造科技股份有限公司 | Crane with zirconia wear-resistant coating casting reel and preparation method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207748760U (en) | A kind of bridge crane of hoisting large-size drainpipe | |
| CN205387439U (en) | Mast hoisting accessory | |
| CN205953370U (en) | Perpendicular transport means of unitized curtain wall | |
| CN201495044U (en) | Maintaining gantry crane | |
| CN204310644U (en) | A kind of single suspension centre cage guide installation and maintenance hanging basket | |
| CN105621280A (en) | Device and method for mounting and dismounting crane boom | |
| CN107500109A (en) | A kind of overhead crane with electric hoists | |
| CN205312918U (en) | Portal frame changes outfit | |
| CN107399676A (en) | A kind of double girder overhead crane | |
| CN203255914U (en) | Unit-typed curtain wall lifting device | |
| CN203128099U (en) | Slipping type pipeline lifting device | |
| CN204938806U (en) | Preventing lifting hook from falling device | |
| CN203834369U (en) | Device capable of being rotated by 360 degrees and vertically lifted for bridge | |
| CN204057678U (en) | Hoisting crane hook structure | |
| CN207829430U (en) | Lifting type operation platform for suspension operation | |
| CN206705574U (en) | a column crane | |
| CN213085256U (en) | Single-beam portal crane with suspended trolley | |
| CN108016986A (en) | A kind of swing arm underhung crane | |
| CN204897140U (en) | Guide -car's wheel is changed and is used hoisting accessory | |
| CN204958213U (en) | a gantry crane | |
| CN203654191U (en) | Device for stay cable to be lifted on bridge | |
| CN220376298U (en) | Hanging basket lifting device | |
| CN207862788U (en) | It is a kind of to be connected to the outstanding stretch-draw jack hanging apparatus filled on Hanging Basket | |
| CN209038922U (en) | Large-span glass hanging device | |
| CN102923587B (en) | Rope support device, tower crane jib and method for preventing falling of the sling rope, tower crane |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180821 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |