CN214326960U - Indoor equipment for existing high-rise building hoisting large-scale device - Google Patents

Indoor equipment for existing high-rise building hoisting large-scale device Download PDF

Info

Publication number
CN214326960U
CN214326960U CN202022911190.6U CN202022911190U CN214326960U CN 214326960 U CN214326960 U CN 214326960U CN 202022911190 U CN202022911190 U CN 202022911190U CN 214326960 U CN214326960 U CN 214326960U
Authority
CN
China
Prior art keywords
bracket
hoist
scale device
existing high
rise building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022911190.6U
Other languages
Chinese (zh)
Inventor
王超迪
金振
李亚龙
邵帅帅
王蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dongyang Third Construction Engineering Co ltd
Original Assignee
Zhejiang Dongyang Third Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dongyang Third Construction Engineering Co ltd filed Critical Zhejiang Dongyang Third Construction Engineering Co ltd
Priority to CN202022911190.6U priority Critical patent/CN214326960U/en
Application granted granted Critical
Publication of CN214326960U publication Critical patent/CN214326960U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉本实用新型属于建筑施工领域,特别涉及既有高层建筑吊装大型装置入室设备。既有高层建筑吊装大型装置入室设备,包括吊车、钢丝绳、电动葫芦、托架、导轨,其特征在于:吊车通过钢丝绳和电动葫芦与托架上的吊耳进行连接,导轨上放置方管用于托架的滑移,以实现大型设备装置在无塔吊情况下吊装到高层建筑室内。

Figure 202022911190

The utility model relates to the field of building construction, in particular to a room-entry equipment for hoisting large-scale devices in existing high-rise buildings. Existing high-rise building hoisting equipment for large installations, including cranes, wire ropes, electric hoists, brackets, and guide rails. It is characterized in that: the cranes are connected to the lifting lugs on the brackets through wire ropes and electric hoists, and square pipes are placed on the guide rails for supporting The sliding of the rack can be used to realize the hoisting of large equipment into the interior of high-rise buildings without a tower crane.

Figure 202022911190

Description

Indoor equipment for existing high-rise building hoisting large-scale device
Technical Field
The utility model belongs to the building construction field, in particular to existing high-rise building hoist and mount large-scale device equipment of entering the room.
Background
After the construction of the main body of the high-rise building is completed, if the large equipment device needs to be transported to the upper part of the building, the hoisting equipment such as a tower crane and the unloading platform are dismantled, the large equipment device cannot be conveyed to a specified floor through the tower crane and the unloading platform, and meanwhile, due to the size problem, the equipment device cannot be conveyed to a target floor through an indoor channel. In addition to the above, the same problem is faced when some built buildings need to transport large objects, and an innovative lifting and transporting is needed to solve the problem.
Disclosure of Invention
The utility model aims at providing an existing high-rise building hoist and mount large-scale device equipment of entering room to it is indoor to realize that the large-scale device hoists the high-rise building under the no tower condition of hanging.
In order to achieve the above purpose, the utility model adopts the following technical scheme to solve:
existing high-rise building hoist and mount large-scale device equipment of entering room, including crane, wire rope, electric block, bracket, guide rail, its characterized in that: the crane is connected with the lifting lug on the bracket through a steel wire rope and an electric block, and the square tube is placed on the guide rail and used for sliding the bracket.
Further, the guide rail divide into the end of encorbelmenting and stiff end, and the end length of encorbelmenting does bracket one-third, stiff end length be the end of encorbelmenting more than 2 times.
Furthermore, the size of the bracket is larger than that of the lifted large-scale device, the bracket is integrally welded by channel steel, six lifting lugs are welded around the bracket, four lifting lugs on two sides are used for vertical lifting, and two lifting lugs on the front end are used for horizontal movement.
Further, the electric hoist is divided into a rope hanging hoist, a horizontal hoist and respective chain blocks, the rope hanging hoist is used for adjusting the balance state of the bracket, and the horizontal hoist is used for horizontally moving the bracket.
Further, the large device should be placed on the bracket in such a way that its center of gravity is lowest.
The utility model discloses possess following characteristics:
1. the problem that large equipment cannot be transported indoors in high-rise buildings under the condition of tower-free hoisting is solved.
2. The lifting process is simple, and is beneficial to the implementation of operators.
3. The bracket is simple and convenient to manufacture and low in cost.
Drawings
Fig. 1 is a schematic plan view of the bracket of the present invention.
Fig. 2 is a schematic view of the lifting of the present invention.
Figure 3 is the utility model discloses hoist and mount and go into the rail schematic diagram.
Figure 4 is the utility model discloses adjustment hoist and mount sketch map.
Fig. 5 is a schematic view of the chain block unhooking of the present invention.
Fig. 6 is a schematic diagram of the hoisting completion of the utility model.
The labels in the figure are: 1. the device comprises a bracket, 2 parts of a large device, 3 parts of a guide rail, 4 parts of a building, 5 parts of a lifting lug, 6 parts of a steel wire rope, 7 parts of an electric hoist, 7-1 parts of a rope hanging hoist, 7-2 parts of a rope hanging chain block, 7-3 parts of a horizontal chain block, 7-4 parts of a horizontal hoist, 8 parts of a crane and 9 parts of a steel pipe.
Detailed Description
The present invention will be described in further detail with reference to the following embodiments.
Preparation work before hoisting: as shown in fig. 1, the bracket (1) is formed by welding channel steel, the specific size is designed according to the size of a large device (2) to be lifted, wherein the length of the bracket (1) is one half longer than that of the large device (2); in order to prevent the large device (2) from shaking and instability during the hoisting, the large device (2) needs to be laid down under necessary conditions, and the large device is placed on the bracket (1) in a mode of lowest gravity center; the guide rail (3) consists of two channel steels, the channel steels are parallel and spaced by 2 meters and are tightly fixed on the structure of the building (4), and when the large-scale device (2) moves horizontally, all the bearing weight is transferred to a frame beam of the building (4) and even to an upright post of a vertical beam through the guide rail (3); before formal lifting, the large-scale device (2) and the bracket (1) are lifted to half a meter above the ground and then suspended, and whether the large-scale device and the bracket are stable or not is checked, and then subsequent operation is carried out.
As shown in figure 2, the large-scale device (2) is placed on the bracket (1) and firmly fixed, two steel wire ropes (6) are hung on the lifting lugs (5) on the two sides of the rear end of the bracket (1), the rope hanging calabashes (7-1) and the rope hanging inverted chains (7-2) are hung on the lifting lugs (5) on the two sides of the middle part and tightened, the large-scale device (2) is not enabled to have an outward inclining condition, the two lifting lugs are identical in length during lifting, are in an isosceles triangle state together with the bracket (1), and are lifted to the position near a target floor of the building (4) by a crane (8).
As shown in figure 3, a horizontal chain block (7-3) is hung from a building (4) by utilizing a lifting lug (5) at the front end of a bracket (1) to tie the bracket (1), the horizontal chain block (7-3) is tightened by a horizontal hoist (7-4) to pull the bracket (1) above the overhanging end of a guide rail (3), at the moment, the front end of the bracket (1) is suspended half meter above the guide rail (3), and a steel pipe (9) is placed on the guide rail (3) at the position.
As shown in figure 4, the horizontal chain block (7-3) is tightened all the time, the rope hanging chain block (7-2) is loosened, the bracket (1) is gradually inclined towards one side of the building (4) until the front end of the bracket (1) is pressed on the steel pipe (9) placed on the guide rail (3), and at the moment, the relative positions of the steel wire rope (6) and the rope hanging chain block (7-2) are gradually changed from an isosceles triangle state to a right triangle state.
As shown in fig. 5, the rope hanging chain block (7-2) is slowly loosened, the horizontal chain block (7-3) is tightened, a new steel pipe (9) is continuously put on the guide rail (3) in the process, the bracket (1) is slowly and completely pressed on the steel pipe (9) until the rope hanging chain block (7-2) is in a completely loose state, the steel wire rope (6) is in a vertical state, two thirds of the large device (2) and the bracket (1) enter the floor of the building (4), and the rope hanging calabash (7-1) and the rope hanging chain block (7-2) can be unhooked from the bracket (1).
As shown in fig. 6, the horizontal chain block (7-3) is continuously tightened, the boom of the crane (8) is operated to release the wire rope (6), the bracket (1) is integrally separated from the overhanging section of the guide rail (3), the wire rope (6) is unloaded, the bracket (1) is moved to the central position of the building (4), and the large-scale device (2) is unloaded from the bracket (1).
And finally, if the large device (2) is in a laid-down state in the hoisting process, after the large device enters the building (4), hanging (2) inverted chains at the top of the building (4), respectively tying one inverted chain at each of two ends of the large device (2), slowly loosening the inverted chains at the bottom end of the large device (2) when hoisting the large device (2) to a certain height, hoisting the inverted chains at the top end of the large device (2), erecting the laid-down large device (2), then supporting the bottom of the large device (2), slowly placing the large device (2) on the ground of the building (4), and finishing hoisting.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (4)

1.既有高层建筑吊装大型装置入室设备,包括吊车、钢丝绳、电动葫芦、托架、导轨,其特征在于:吊车通过钢丝绳和电动胡芦与托架上的吊耳进行连接,导轨上放置方管用于托架的滑移。1. Existing high-rise building hoisting large-scale device entry equipment, including crane, wire rope, electric hoist, bracket, guide rail, it is characterized in that: the crane is connected with the lifting lug on the bracket by the wire rope and the electric reed, and the guide rail is placed on the side. The tube is used for the sliding of the carriage. 2.根据权利要求1所述的既有高层建筑吊装大型装置入室设备,其特征是,所述导轨分为悬挑端和固定端,悬挑端长度为所述托架三分之一,固定端长度为悬挑端的2倍以上。2. The existing high-rise building hoisting large-scale device entry equipment according to claim 1, wherein the guide rail is divided into a cantilever end and a fixed end, and the length of the cantilever end is one third of the bracket, and the fixed The end length is more than twice that of the overhanging end. 3.根据权利要求1所述的既有高层建筑吊装大型装置入室设备,其特征是,所述托架尺寸大于所起吊的大型装置的尺寸,其整体由槽钢焊制,四周焊接有六个吊耳,其中两侧四个吊耳用于垂直起吊,前端两个吊耳用于水平移动。3. The existing high-rise building hoisting large-scale device entry equipment according to claim 1 is characterized in that, the size of the bracket is larger than the size of the hoisted large-scale device, and its whole is welded by channel steel, and there are six welded around it. Lifting ears, of which four lifting ears on both sides are used for vertical lifting, and two lifting ears at the front are used for horizontal movement. 4.根据权利要求1所述的既有高层建筑吊装大型装置入室设备,其特征是,所述电动葫芦分为挂绳葫芦、水平葫芦和各自的倒链,挂绳葫芦用于调整所述托架的平衡状态,水平葫芦用于对所述托架进行水平移动。4. The existing high-rise building hoisting large-scale device entry equipment according to claim 1, characterized in that, the electric hoist is divided into a lanyard hoist, a horizontal hoist and a respective inverted chain, and the lanyard hoist is used to adjust the The balance state of the rack, the horizontal hoist is used to move the bracket horizontally.
CN202022911190.6U 2020-11-30 2020-11-30 Indoor equipment for existing high-rise building hoisting large-scale device Active CN214326960U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022911190.6U CN214326960U (en) 2020-11-30 2020-11-30 Indoor equipment for existing high-rise building hoisting large-scale device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022911190.6U CN214326960U (en) 2020-11-30 2020-11-30 Indoor equipment for existing high-rise building hoisting large-scale device

Publications (1)

Publication Number Publication Date
CN214326960U true CN214326960U (en) 2021-10-01

Family

ID=77898734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022911190.6U Active CN214326960U (en) 2020-11-30 2020-11-30 Indoor equipment for existing high-rise building hoisting large-scale device

Country Status (1)

Country Link
CN (1) CN214326960U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114084824A (en) * 2021-12-08 2022-02-25 邯郸钢铁集团有限责任公司 Blast furnace rail weighbridge quick replacement tool and method thereof
CN114620591A (en) * 2022-03-21 2022-06-14 江苏宏强电气集团有限公司 Switch cabinet hoisting mechanism, hoisting method and switch cabinet
CN115092845A (en) * 2022-06-15 2022-09-23 中建三局安装工程有限公司 Method for hoisting equipment
CN115818418A (en) * 2022-11-28 2023-03-21 中建八局第三建设有限公司 A method for hoisting prefabricated stand boards in confined spaces

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114084824A (en) * 2021-12-08 2022-02-25 邯郸钢铁集团有限责任公司 Blast furnace rail weighbridge quick replacement tool and method thereof
CN114620591A (en) * 2022-03-21 2022-06-14 江苏宏强电气集团有限公司 Switch cabinet hoisting mechanism, hoisting method and switch cabinet
CN114620591B (en) * 2022-03-21 2026-01-27 江苏宏强电气集团有限公司 Switch cabinet lifting mechanism, lifting method and switch cabinet
CN115092845A (en) * 2022-06-15 2022-09-23 中建三局安装工程有限公司 Method for hoisting equipment
CN115092845B (en) * 2022-06-15 2024-05-28 中建三局安装工程有限公司 Method for hoisting equipment
CN115818418A (en) * 2022-11-28 2023-03-21 中建八局第三建设有限公司 A method for hoisting prefabricated stand boards in confined spaces
CN115818418B (en) * 2022-11-28 2024-01-16 中建八局第三建设有限公司 A method for hoisting prefabricated bleacher panels in a limited space

Similar Documents

Publication Publication Date Title
CN205387439U (en) Mast hoisting accessory
CN104016089B (en) Sintering machine large flue slide installation method and track installation mechanism thereof
CN205953370U (en) Perpendicular transport means of unitized curtain wall
CN103848360A (en) Assembled tower type crane with mobile balancing weight system
CN104787690B (en) A kind of single movable-arm floor mast with circulating water Weighting system
CN104016260B (en) Little lattice funnel slide installation method and slippage installing mechanism
CN112064662A (en) Installation method and device for offshore wind power suction cylinder jacket
CN117703041A (en) A method of installation and construction of suspended ceilings for ultra-large-span heavy-duty steel corridors
CN207748760U (en) A kind of bridge crane of hoisting large-size drainpipe
CN104925672A (en) Full-hydraulic self-climbing suspended double-sided tower crane
CN204434116U (en) A kind of hanging device for interior courtyard lifting pipeline
CN104803303A (en) Single-movable-arm grounded derrick with rocking balance arm
CN206680096U (en) One kind is used for restricted clearance hanging apparatus
CN201560066U (en) A new type of door crane for light loading and unloading
CN108773766B (en) Pit-type health maintenance hoisting method and equipment for nodular cast iron pipe
CN203474321U (en) Tower crane used for constructing and erecting electric transmission line iron towers
CN211366784U (en) Integral hoisting system in narrow space
CN103274310A (en) Self-lifting type cableway transporting device
CN215626205U (en) A kind of ALC wall panel installation auxiliary crane device
CN108726358A (en) A kind of towering concrete structure main reinforcement batch hanging apparatus and method
CN211971577U (en) Tower crane system
CN217756625U (en) Existing building roof hoist and mount system
CN210393401U (en) A hoisting and positioning device for a column
CN214653190U (en) Adjustable portable lifting device
CN206693641U (en) The irregular alien invasion glass curtain wall positioning apparatus of high-rise building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Equipment for hoisting large equipment into existing high-rise buildings

Effective date of registration: 20230924

Granted publication date: 20211001

Pledgee: Dongyang Branch of China Construction Bank Co.,Ltd.

Pledgor: ZHEJIANG DONGYANG THIRD CONSTRUCTION ENGINEERING Co.,Ltd.

Registration number: Y2023980058625

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20250820

Granted publication date: 20211001

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20251119

Granted publication date: 20211001

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20251119

Granted publication date: 20211001