CN202865749U - Installation equipment of bridge guardrail framework - Google Patents

Installation equipment of bridge guardrail framework Download PDF

Info

Publication number
CN202865749U
CN202865749U CN 201220543630 CN201220543630U CN202865749U CN 202865749 U CN202865749 U CN 202865749U CN 201220543630 CN201220543630 CN 201220543630 CN 201220543630 U CN201220543630 U CN 201220543630U CN 202865749 U CN202865749 U CN 202865749U
Authority
CN
China
Prior art keywords
chassis
bridge
machinery chassis
steel
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220543630
Other languages
Chinese (zh)
Inventor
肖心太
金满钧
沈建良
李钊林
王灿桥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG GUOFENG GROUP CO Ltd
HANGZHOU MINGHUA MUNICIPAL ENGINEERING Co Ltd
Original Assignee
ZHEJIANG GUOFENG GROUP CO Ltd
HANGZHOU MINGHUA MUNICIPAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG GUOFENG GROUP CO Ltd, HANGZHOU MINGHUA MUNICIPAL ENGINEERING Co Ltd filed Critical ZHEJIANG GUOFENG GROUP CO Ltd
Priority to CN 201220543630 priority Critical patent/CN202865749U/en
Application granted granted Critical
Publication of CN202865749U publication Critical patent/CN202865749U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model belongs to the field of building construction equipment, and particularly relates to installation equipment of a bridge guardrail framework. The installation equipment of the bridge guardrail framework comprises a chassis, a running system, a hoisting system and a hanging system. The mechanical chassis is formed by steel plates and structural steel in a welded mode, the running system comprises idler wheels installed on the lower portion of the chassis, and a U-shaped steel slide laid on a bridge surface, the hoisting system comprises a winch, steel wire ropes and a hoisting support, wherein the winch, the steel wire ropes and the hoisting support are installed on the mechanical chassis, and the hanging system comprises a cantilever support fixed on the chassis, and an installation hanging basket hung on the cantilever support. The cantilever support is made of the structural steel, and the installation hanging basket is formed by the structural steel and the steel plates in the welded mode. The installation equipment of the bridge guardrail framework well solves the problem of personal risks caused by manual installation of bridge outer side guardrail frameworks, and enables installation of the bridge outer side guardrail frameworks to be convenient.

Description

A kind of formwork of bridge rail erection equipment
Technical field
The utility model belongs to the construction implement field, specifically a kind of formwork of bridge rail erection equipment.
Background technology
In the construction of bridge superstructure, because the bridge both sides mostly are greatly vacant state, formwork of bridge rail is manually installed relatively difficulty and dangerous, particularly the template construction in the Bridge guardrail outside at present.
In view of this, the inventor invents a kind of easy formwork of bridge rail erection equipment, and this case produces thus.
Summary of the invention
The purpose of this utility model is to provide a kind of formwork of bridge rail erection equipment, makes formwork of bridge rail that safe ready is installed.
In order to reach above-mentioned purpose, the technical solution of the utility model is:
A kind of formwork of bridge rail erection equipment comprises:
(1) machinery chassis, described machinery chassis is welded by steel plate and shaped steel;
(2) be positioned at running gear under the machinery chassis, this system comprises the roller that is installed under the chassis and is laid on channel-section steel slideway on the bridge floor that described roller is positioned in the channel-section steel slideway;
(3) be installed in tackling system on the described machinery chassis, this system comprises hoist engine, is wrapped in wire rope and hoisting bracket on the hoist engine, described hoisting bracket comprises vertical rod and is articulated in cursor in the vertical rod, cursor is provided with metallic channel, wire rope is derived along vertical rod and cursor from hoist engine and is extended, and its end is provided with suspension hook;
(4) be welded on the suspension of machinery chassis, this system comprises suspension arm and Hanging Basket, and described suspension arm adopts section steel manufacture, and Hanging Basket fixedly hangs on the suspension arm end.
Further, described hoisting bracket vertical rod is reinforced the shaped steel diagonal brace by four and is reinforced, and vertical rod is triangular in shape with reinforcing shaped steel.
Further, four jiaos of montant tops of described Hanging Basket are provided with linkage and are connected with suspension arm;
Further, be provided with a base between described hoist engine and the machinery chassis, base is welded on the machinery chassis, and hoist engine is fixed on the base.
After adopting such scheme, the utility model has well solved the Personal Risk that the outer side rail template of bridge is brought when artificial the installation, and makes the outer side rail template of installation more convenient.
Below in conjunction with drawings and the specific embodiments the utility model is done and to be described in further detail.
Figure of description
Fig. 1 is the utility model structural representation.
Label declaration:
Machinery chassis 1 shaped steel 11 steel plates 12
Running gear 2 channel-section steel slideways 21 rollers 22
Tackling system 3 steel cables 31 hoisting brackets 32 vertical rods 321 cursors 322
Hoist engine 33 bases 331 suspension hooks 34
Reinforce shaped steel 35 suspension 4 suspension arms 41 linkages 411 Hanging Baskets 42
Specific embodiment
As shown in Figure 1, what the utility model disclosed is a kind of formwork of bridge rail erection equipment, comprising: (1) machinery chassis 1, and described machinery chassis 1 is welded by steel plate 12 and shaped steel 11; (2) be positioned at running gear 2 under the machinery chassis 1, this system comprises the roller 22 that is installed under the machinery chassis 1 and is laid on channel-section steel slideway 21 on the bridge floor, is positioned in the channel-section steel slideway 21 during described roller 22 construction; (3) be installed in tackling system 3 on the described machinery chassis 1, this system comprises steel cable 31, hoist engine 33 and hoisting bracket 32, described hoisting bracket comprises vertical rod 321 and the cursor 322 that is articulated on the support bar, cursor 322 is provided with metallic channel, steel cable 31 is derived along vertical rod 321 and cursor 322 from hoist engine 33 and is extended, and its end is provided with suspension hook 34; (4) be welded on the suspension 4 of machinery chassis 1, this system comprises suspension arm 41 and Hanging Basket 42, and described suspension arm 41 usefulness section steel manufactures also stretch out two arms, and Hanging Basket 42 fixedly hangs on suspension arm 41 ends.
Further, the vertical rod 321 of described hoisting bracket 3 is reinforced shaped steel 35 diagonal braces by four and is reinforced, and vertical rod 321 is triangular in shape with reinforcing shaped steel 35.Described Hanging Basket 42 tops are provided with linkage 411, for are connected connection with suspension arm.Be provided with a base 331 between described hoist engine 33 and the machinery chassis 1, base 331 is welded on the machinery chassis 1, and hoist engine 33 is fixed on the base 331.
Wherein, place the counterweight of some on the machinery chassis 1 before the construction, guarantee that this equipment can not topple.
The utility model has well solved the Personal Risk that the outer side rail template of bridge is brought when artificial the installation, and makes the outer side rail template of installation more convenient.
Above-described embodiment and graphic and non-limiting product form of the present utility model and style, any person of an ordinary skill in the technical field all should be considered as not breaking away from patent category of the present utility model to its suitable variation or modification of doing.

Claims (4)

1. formwork of bridge rail erection equipment is characterized in that: comprising:
(1) machinery chassis, described machinery chassis is welded by steel plate and shaped steel;
(2) be positioned at running gear under the machinery chassis, this system comprises the roller that is installed under the chassis and is laid on channel-section steel slideway on the bridge floor that described roller is positioned in the channel-section steel slideway;
(3) be installed in tackling system on the described machinery chassis, this system comprises hoist engine, is wrapped in wire rope and hoisting bracket on the hoist engine, described hoisting bracket comprises vertical rod and is articulated in cursor in the vertical rod, cursor is provided with metallic channel, wire rope is derived along vertical rod and cursor from hoist engine and is extended, and its end is provided with suspension hook;
(4) be welded on the suspension of machinery chassis, this system comprises suspension arm and Hanging Basket, and described suspension arm adopts section steel manufacture, and Hanging Basket fixedly hangs on the suspension arm end.
2. formwork of bridge rail erection equipment according to claim 1 is characterized in that: described hoisting bracket vertical rod is reinforced the shaped steel diagonal braces by four and is reinforced, and vertical rod is with to reinforce shaped steel triangular in shape.
3. formwork of bridge rail erection equipment according to claim 1, it is characterized in that: four jiaos of montant tops of described Hanging Basket are provided with linkage and are connected with suspension arm.
4. formwork of bridge rail erection equipment according to claim 1, it is characterized in that: be provided with a base between described hoist engine and the machinery chassis, base is welded on the machinery chassis, and hoist engine is fixed on the base.
CN 201220543630 2012-10-23 2012-10-23 Installation equipment of bridge guardrail framework Expired - Fee Related CN202865749U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220543630 CN202865749U (en) 2012-10-23 2012-10-23 Installation equipment of bridge guardrail framework

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220543630 CN202865749U (en) 2012-10-23 2012-10-23 Installation equipment of bridge guardrail framework

Publications (1)

Publication Number Publication Date
CN202865749U true CN202865749U (en) 2013-04-10

Family

ID=48032480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220543630 Expired - Fee Related CN202865749U (en) 2012-10-23 2012-10-23 Installation equipment of bridge guardrail framework

Country Status (1)

Country Link
CN (1) CN202865749U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107902583A (en) * 2017-11-09 2018-04-13 曾小真 A kind of road and bridge construction instrument fast lifting equipment
CN110761191A (en) * 2019-10-23 2020-02-07 四川路桥建设集团交通工程有限公司 Concrete guardrail construction device and method thereof
CN111661594A (en) * 2020-06-01 2020-09-15 王斌 Construction is with enclosing fender installation device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107902583A (en) * 2017-11-09 2018-04-13 曾小真 A kind of road and bridge construction instrument fast lifting equipment
CN107902583B (en) * 2017-11-09 2019-10-25 倡创(上海)咨询管理事务所 A kind of road and bridge construction tool fast lifting equipment
CN110761191A (en) * 2019-10-23 2020-02-07 四川路桥建设集团交通工程有限公司 Concrete guardrail construction device and method thereof
CN111661594A (en) * 2020-06-01 2020-09-15 王斌 Construction is with enclosing fender installation device
CN111661594B (en) * 2020-06-01 2021-03-30 广东联创建筑工程有限公司 Construction is with enclosing fender installation device

Similar Documents

Publication Publication Date Title
CN203175023U (en) Counter weight type cantilever hanging basket device
CN201598820U (en) Single-point suspension external hanging rack
CN106150057B (en) A kind of split blade type hydraulic pressure lift climbing frame
CN202865749U (en) Installation equipment of bridge guardrail framework
CN103288002B (en) Simple combination door frame high-altitude weight hanging apparatus
CN103422662A (en) Integral mobile construction platform for cast-in-place of elevator shaft and method for using same
CN202550405U (en) Special ladder for maintenance of strain insulator
CN203255914U (en) Unit-typed curtain wall lifting device
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN105888227A (en) Ultrahigh horn-shaped steel structure exterior facing construction platform, equalizing beam for construction and construction method of ultrahigh horn-shaped steel structure exterior facing construction platform
CN203284126U (en) Simple composite gantry high-altitude weight hoisting device
CN201284551Y (en) Suspension type simple platform for work high above ground
CN205908004U (en) Special hoist and mount fixing device of hanging flower basket
CN203430008U (en) Integrally movable type construction platform for cast-in-situ of elevator shaft
CN204983692U (en) Concrete panel's hoist device
CN204138215U (en) Large oil tank inwall is safeguarded and is hung ship
CN202518943U (en) Creeper-traveler for coating bridge location
CN108035530A (en) A kind of inner wall of oil tank construction hanging basket
CN207812982U (en) A kind of inner wall of oil tank construction hanging basket
CN203439948U (en) Gantry lifting frame for cableway
CN202899720U (en) Steel pole provided with foot treadles and used for high-tension transmission line iron tower
CN203545501U (en) Auxiliary lifting device of inner crawl type tower crane in small space
CN208501491U (en) Overpass bridge bottom wire laying device
CN201850750U (en) Operation platform for slip form construction of tubular structure
CN205257821U (en) Movable hoisting equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130410