CN204138215U - Large oil tank inwall is safeguarded and is hung ship - Google Patents
Large oil tank inwall is safeguarded and is hung ship Download PDFInfo
- Publication number
- CN204138215U CN204138215U CN201420558219.9U CN201420558219U CN204138215U CN 204138215 U CN204138215 U CN 204138215U CN 201420558219 U CN201420558219 U CN 201420558219U CN 204138215 U CN204138215 U CN 204138215U
- Authority
- CN
- China
- Prior art keywords
- cantilever beam
- spray gun
- dolly
- oil tank
- guide wheel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000007921 spray Substances 0.000 claims abstract description 53
- 238000012423 maintenance Methods 0.000 claims abstract description 7
- 239000000725 suspension Substances 0.000 claims abstract description 7
- 230000001105 regulatory effect Effects 0.000 claims description 9
- 238000010276 construction Methods 0.000 abstract description 10
- 238000010586 diagram Methods 0.000 description 3
- 238000004140 cleaning Methods 0.000 description 2
- 230000009194 climbing Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
Landscapes
- Revetment (AREA)
Abstract
The utility model relates to the maintenance of a kind of large oil tank inwall and hangs ship.Described large oil tank inwall safeguards that hanging ship comprises strut bar, apical support block, revolving support, left cantilever beam, right cantilever beam, spray gun trolley track, spray gun dolly and single hanging basket etc.; The lower end of described strut bar fixes on the ground, and top is provided with rotation suspension gear, and operation platform can be driven to rotate around strut bar, thus enables the spray gun of left cantilever beam and right cantilever beam front end carry out spary to inner wall of oil tank optional position; Described left and right sides cantilever beam is all equipped with spray gun pulling device for small vehicle, spray gun dolly can be drawn and move along spray gun trolley track, thus realize the spary to oil tank top.The utility model advantage is that described large oil tank inwall is safeguarded and hangs ship and can carry out full automaticity spary to inner wall of oil tank, and without the need to constructor in tank, construction safety is reliable, has structure ingenious, flexibly and reliability high.
Description
Technical field
The utility model belongs to vehicle for construction technical field, relates to a kind of aerial lift device, and specifically a kind of large oil tank inwall is safeguarded and hung ship.
Background technology
Hanging basket is generally made up of hitch, track, Rail climbing device, basket body and safety system.Basket body can be mobile with vertical along track cross level walking, and staff can arrive each facade of building, is mainly used in steamer, building or structures exterior window and the operation such as outside Wall Cleaning, maintenance.Along with the raising of the existing construction requirements in city, require to carry out the operations such as regular cleaning and maintenance to glass of building window, exterior wall etc.In recent years, the application of hanging basket in exterior wall construction operation is more and more extensive, on market, a large amount of interior wall such as oil tank, chimney maintenance repairing, surface spraying are all because of the feature that hanging basket cost is low, structure is simple and easy to use, and adopt hanging basket to carry out construction operation in a large number, thus cause market also increasing to the demand of hanging basket.
Up to the present, the spary work of inner wall of oil tank is adopted mostly and manually carries out spary operation, not only unnecessary actual bodily harm is brought to workmen, and the construction made is neither quick also dangerous; Carry out construction operation according to existing single armed hanging basket, not only will calculate counterweight, and it is poor to install complicated stability, thus research and development large oil tank inwall safeguards that hanging ship has great importance.
Summary of the invention
The utility model object is to overcome above shortcomings in prior art, provides a kind of large oil tank inwall to safeguard and hangs ship.
Technical scheme according to the utility model provides: this large oil tank inwall described safeguards that hanging ship comprises strut bar, apical support block, top adapter plate, revolving support, connecting panel, rotate reducing motor, lifting motor installing frame, hanger, lifting motor, lifting wire rope, lifting wire rope guide wheel, cantilever beam erecting frame, guide frame, hydraulic actuating cylinder, left cantilever beam, right cantilever beam, spray gun dolly traction machine, spray gun trolley track, dolly haulage cable, spray gun dolly, dolly haulage cable guide wheel, regulating plate and single hanging basket, described large oil tank inwall safeguards that hanging ship comprises rotation suspension gear, lifting mechanism, single armed spary structure and top spary structure, described rotation suspension gear (see figure 2) is made up of strut bar, apical support block, top adapter plate, revolving support, connecting panel and rotation reducing motor, described strut bar is formed by connecting by pipe, the lower end of strut bar fixes on the ground, four apical support blocks are symmetrically welded on four sides of post upper, and top adapter plate is fixed on apical support block by bolted splice, and connecting panel is connected with top adapter plate by revolving support, described rotation reducing motor is arranged on the right-hand member of top adapter plate, and rotation reducing motor lower end gear is engaged with revolving support external gear.
As further improvement of the utility model, described lifting mechanism is made up of lifting motor installing frame, hanger, lifting motor, lifting wire rope, lifting wire rope guide wheel, cantilever beam erecting frame and guide frame; The upper end of described lifting motor installing frame and the lower end of connecting panel hinged, be welded with four hangers on the downside of the upper surface of lifting motor installing frame, four hoist installation (see figure 3) on the medial surface of lifting motor installing frame; Described cantilever beam erecting frame upper surface is provided with lifting wire rope guide wheel, and lifting wire rope is through lifting motor and lifting wire rope guide wheel and be fixed on hanger, thus has suspended whole operation platform in midair; Described cantilever beam erecting frame is provided with guide frame, thus ensures that operation platform can better move up and down along strut bar.
As further improvement of the utility model, described single armed spary structure is made up of hydraulic actuating cylinder, left cantilever beam, right cantilever beam, single hanging basket regulating plate and single hanging basket; Described left cantilever beam and right cantilever beam are formed by connecting by standard knot beam; The right-hand member of described left cantilever beam is connected with the left end of cantilever beam erecting frame by two bearing pins, the left end of right cantilever beam is connected with the right-hand member of cantilever beam erecting frame by two bearing pins, and can rotate around upper pin, one end of two hydraulic actuating cylinders is hinged on left cantilever beam and right cantilever beam, and the other end is hinged on guide frame both sides; Described two single hanging basket (see figure 4)s are hinged on the front end of left cantilever beam and right cantilever beam by regulating plate.
As further improvement of the utility model, described top spary structure is made up of spray gun dolly traction machine, spray gun trolley track, dolly haulage cable, spray gun dolly and dolly haulage cable guide wheel; The upper surface of described left cantilever beam and right cantilever beam is all welded with spray gun trolley track, two spray gun dolly traction machines are arranged on the right-hand member of left cantilever beam and the left end of right cantilever beam respectively, and dolly haulage cable guide wheel is arranged on the guide wheel bearing on left cantilever beam and right cantilever beam; One end of described dolly haulage cable is fixed on the right-hand member of spray gun dolly, the other end is fixed on the left end of spray gun dolly after dolly haulage cable guide wheel and spray gun dolly traction machine, thus spray gun dolly can be drawn move along spray gun trolley track, realize oil tank top spary.
The utility model compared with prior art, advantage is: described large oil tank inwall safeguards that hanging ship can carry out full automaticity spary to inner wall of oil tank, spary operation is carried out without the need to workmen, thus make construction become more safe and reliable, have that structure is simple, flexibility and reliability, productive costs are low and reliability high.
Accompanying drawing explanation
Fig. 1 is integral structure schematic diagram of the present utility model;
Fig. 2 is local structure schematic diagram of the present utility model;
Fig. 3 is lifting structure schematic top plan view of the present utility model;
Fig. 4 is local structure schematic diagram of the present utility model.
Description of reference numerals: 1-strut bar, 2-apical support block, 3-top adapter plate, 4-revolving support, 5-connecting panel, 6-rotate reducing motor, 7-lifting motor installing frame, 8-hanger, 9-lifting motor, 10-lifting wire rope, 11-lifting wire rope guide wheel, 12-cantilever beam erecting frame, 13-guide frame, 14-hydraulic actuating cylinder, 15-left cantilever beam, 16-right cantilever beam, 17-spray gun dolly traction machine, 18-spray gun trolley track, 19-dolly haulage cable, 20-spray gun dolly, 21-dolly haulage cable guide wheel, 22-regulating plate, 23-single hanging basket.
Detailed description of the invention
Below in conjunction with concrete drawings and Examples, the utility model is described in further detail.
As shown in Figure 1: the utility model is primarily of strut bar 1, apical support block 2, top adapter plate 3, revolving support 4, connecting panel 5, rotate reducing motor 6, lifting motor installing frame 7, hanger 8, lifting motor 9, lifting wire rope 10, lifting wire rope guide wheel 11, cantilever beam erecting frame 12, guide frame 13, hydraulic actuating cylinder 14, left cantilever beam 15, right cantilever beam 16, spray gun dolly traction machine 17, spray gun trolley track 18, dolly haulage cable 19, spray gun dolly 20, dolly haulage cable guide wheel 21, regulating plate 22 and single hanging basket 23 form, described large oil tank inwall safeguards that hanging ship comprises rotation suspension gear, lifting mechanism, single armed spary structure and top spary structure, described rotation suspension gear (see figure 2) is made up of strut bar 1, apical support block 2, top adapter plate 3, revolving support 4, connecting panel 5 and rotation reducing motor 6, described strut bar 1 is formed by connecting by pipe, the lower end of strut bar 1 fixes on the ground, four apical support blocks 2 are symmetrically welded on four sides of strut bar 1 upper end, top adapter plate 3 is fixed on apical support block 2 by bolted splice, and connecting panel 5 is connected with top adapter plate 3 by revolving support 4, described rotation reducing motor 6 is arranged on the right-hand member of top adapter plate 3, and rotation reducing motor 6 lower end gear is engaged with revolving support 4 external gear, described lifting mechanism is made up of lifting motor installing frame 7, hanger 8, lifting motor 9, lifting wire rope 10, lifting wire rope guide wheel 11, cantilever beam erecting frame 12 and guide frame 13, the upper end of described lifting motor installing frame 7 and the lower end of connecting panel 5 hinged, be welded with (see figure 3) on medial surface that four hangers, 8, four gigs 9 are arranged on lifting motor installing frame 7 on the downside of the upper surface of lifting motor installing frame 7, described cantilever beam erecting frame 12 upper surface is provided with lifting wire rope guide wheel 11, and lifting wire rope 10 is through lifting motor 9 and lifting wire rope guide wheel 11 and be fixed on hanger 8, thus has suspended whole operation platform in midair, described cantilever beam erecting frame 12 is provided with guide frame 13, thus ensures that operation platform can better move up and down along strut bar 1, described single armed spary structure is made up of hydraulic actuating cylinder 14, left cantilever beam 15, right cantilever beam 16, single hanging basket regulating plate 22 and single hanging basket 23, described left cantilever beam 15 and right cantilever beam 16 are formed by connecting by standard knot beam, the right-hand member of described left cantilever beam 15 is connected with the left end of cantilever beam erecting frame 12 by two bearing pins, the left end of right cantilever beam 16 is connected with the right-hand member of cantilever beam erecting frame 12 by two bearing pins, and can rotate around upper pin, one end of two hydraulic actuating cylinders 14 is hinged on left cantilever beam 15 and right cantilever beam 16, and the other end is hinged on guide frame 13 both sides, described two single hanging basket 23(are shown in Fig. 4) front end of left cantilever beam 15 and right cantilever beam 16 is hinged on by regulating plate 22, described top spary structure is made up of spray gun dolly traction machine 17, spray gun trolley track 18, dolly haulage cable 19, spray gun dolly 20 and dolly haulage cable guide wheel 21, the upper surface of described left cantilever beam 15 and right cantilever beam 16 is all welded with spray gun trolley track 18, two spray gun dolly traction machines 17 are arranged on the right-hand member of left cantilever beam 15 and the left end of right cantilever beam 16 respectively, and dolly haulage cable guide wheel 21 is arranged on the guide wheel bearing on left cantilever beam 15 and right cantilever beam 16, one end of described dolly haulage cable 19 is fixed on the right-hand member of spray gun dolly 20, the other end is fixed on the left end of spray gun dolly 20 after dolly haulage cable guide wheel 21 and spray gun dolly traction machine 17, thus spray gun dolly 20 can be drawn move along spray gun trolley track 18, realize oil tank top spary.
During embody rule, as shown in Figures 1 to 4, described large oil tank inwall safeguards that hanging ship is placed in oil tank, the lower end of strut bar 1 fixes on the ground, top adapter plate 3 is hinged on strut bar 1 upper end apical support block 2, lifting motor installing frame 7 is connected with top adapter plate 3 with revolving support 4 by connecting panel 5, and suspended whole operation platform in midair by lifting wire rope 10, the left end of left cantilever beam 15 right-hand member and right cantilever beam 16 is equipped with hydraulic actuating cylinder 14, by the flexible angle adjusting both sides cantilever beam of both sides hydraulic actuating cylinder 14, the front end of left cantilever beam 15 and right cantilever beam 16 is separately installed with single hanging basket 23 and can convenient construction personnel checks spary effect.When hanging basket starts, lifting motor 9 promotes lifting wire rope 10 and realizes hanging basket and move up and down, rotating reducing motor 6 drives left cantilever beam 15 and right cantilever beam 16 to rotate around strut bar 1, thus enables the spray gun of cantilever beam front end, both sides carry out spary to inner wall of oil tank optional position.When needs carry out spary to oil tank top, spray gun dolly 20 is driven to travel along spray gun trolley track 18 by the spray gun dolly traction machine 17 on left cantilever beam 15 and right cantilever beam 16, rotating reducing motor 6 drives left cantilever beam 15 and right cantilever beam 16 to rotate, thus realizes the spary of spray gun to oil tank top.Large oil tank inwall safeguards that hanging ship can by changing the length of cantilever beam to the unloading of left cantilever beam 15 and right cantilever beam 16 front end standard joint, thus make operation platform can carry out construction operation to the oil tank of different radii.
Claims (4)
1. a large oil tank inwall is safeguarded and is hung ship, it is characterized in that: this large oil tank inwall safeguards that hanging ship comprises strut bar (1), apical support block (2), top adapter plate (3), revolving support (4), connecting panel (5), rotate reducing motor (6), lifting motor installing frame (7), hanger (8), lifting motor (9), lifting wire rope (10), lifting wire rope guide wheel (11), cantilever beam erecting frame (12), guide frame (13), hydraulic actuating cylinder (14), left cantilever beam (15), right cantilever beam (16), spray gun dolly traction machine (17), spray gun trolley track (18), dolly haulage cable (19), spray gun dolly (20), dolly haulage cable guide wheel (21), regulating plate (22) and single hanging basket (23), described large oil tank inwall safeguards that hanging ship comprises rotation suspension gear, lifting mechanism, single armed spary structure and top spary structure, described rotation suspension gear is made up of strut bar (1), apical support block (2), top adapter plate (3), revolving support (4), connecting panel (5) and rotation reducing motor (6), described strut bar (1) is formed by connecting by pipe, the lower end of strut bar (1) fixes on the ground, four apical support blocks (2) are symmetrically welded on four sides of strut bar (1) upper end, top adapter plate (3) is fixed on apical support block (2) by bolted splice, and connecting panel (5) is connected with top adapter plate (3) by revolving support (4), described rotation reducing motor (6) is arranged on the right-hand member of top adapter plate (3), and rotation reducing motor (6) lower end gear is engaged with revolving support (4) external gear.
2. ship is hung in the maintenance of large oil tank inwall as claimed in claim 1, it is characterized in that: described lifting mechanism is made up of lifting motor installing frame (7), hanger (8), lifting motor (9), lifting wire rope (10), lifting wire rope guide wheel (11), cantilever beam erecting frame (12) and guide frame (13); The upper end of described lifting motor installing frame (7) and the lower end of connecting panel (5) hinged, be welded with four hangers (8) on the downside of the upper surface of lifting motor installing frame (7), four gigs (9) are arranged on the medial surface of lifting motor installing frame (7); Described cantilever beam erecting frame (12) upper surface is provided with lifting wire rope guide wheel (11), and lifting wire rope (10) is through lifting motor (9) and lifting wire rope guide wheel (11) and be fixed on hanger (8), thus has suspended whole operation platform in midair; Described cantilever beam erecting frame (12) is provided with guide frame (13), thus ensures that operation platform can better move up and down along strut bar (1).
3. ship is hung in the maintenance of large oil tank inwall as claimed in claim 1, it is characterized in that: described single armed spary structure is made up of hydraulic actuating cylinder (14), left cantilever beam (15), right cantilever beam (16), single hanging basket regulating plate (22) and single hanging basket (23); Described left cantilever beam (15) and right cantilever beam (16) are formed by connecting by standard knot beam; The right-hand member of described left cantilever beam (15) is connected with the left end of cantilever beam erecting frame (12) by two bearing pins, the left end of right cantilever beam (16) is connected with the right-hand member of cantilever beam erecting frame (12) by two bearing pins, and can rotate around upper pin, one end of two hydraulic actuating cylinders (14) is hinged on left cantilever beam (15) and right cantilever beam (16), and the other end is hinged on guide frame (13) both sides; Described two single hanging baskets (23) are hinged on the front end of left cantilever beam (15) and right cantilever beam (16) by regulating plate (22).
4. ship is hung in the maintenance of large oil tank inwall as claimed in claim 1, it is characterized in that: described top spary structure is made up of spray gun dolly traction machine (17), spray gun trolley track (18), dolly haulage cable (19), spray gun dolly (20) and dolly haulage cable guide wheel (21); The upper surface of described left cantilever beam (15) and right cantilever beam (16) is all welded with spray gun trolley track (18), two spray gun dolly traction machines (17) are arranged on the right-hand member of left cantilever beam (15) and the left end of right cantilever beam (16) respectively, and dolly haulage cable guide wheel (21) is arranged on the guide wheel bearing on left cantilever beam (15) and right cantilever beam (16); One end of described dolly haulage cable (19) is fixed on the right-hand member of spray gun dolly (20), the other end is fixed on the left end of spray gun dolly (20) after dolly haulage cable guide wheel (21) and spray gun dolly traction machine (17), thus it is mobile along spray gun trolley track (18) to draw spray gun dolly (20), realizes oil tank top spary.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420558219.9U CN204138215U (en) | 2014-09-26 | 2014-09-26 | Large oil tank inwall is safeguarded and is hung ship |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420558219.9U CN204138215U (en) | 2014-09-26 | 2014-09-26 | Large oil tank inwall is safeguarded and is hung ship |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204138215U true CN204138215U (en) | 2015-02-04 |
Family
ID=52414919
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420558219.9U Expired - Lifetime CN204138215U (en) | 2014-09-26 | 2014-09-26 | Large oil tank inwall is safeguarded and is hung ship |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204138215U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105129685A (en) * | 2015-10-01 | 2015-12-09 | 杭州市设备安装有限公司 | In-tank corrosion-resistant operating platform |
CN110067399A (en) * | 2018-01-24 | 2019-07-30 | 北新集团建材股份有限公司 | Cleaning maintenance of equipment for building interior space |
CN115108464A (en) * | 2022-05-31 | 2022-09-27 | 中国化学工程第三建设有限公司 | Double-layer tank inner tank wall plate hoisting assembly device and assembly method |
-
2014
- 2014-09-26 CN CN201420558219.9U patent/CN204138215U/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105129685A (en) * | 2015-10-01 | 2015-12-09 | 杭州市设备安装有限公司 | In-tank corrosion-resistant operating platform |
CN110067399A (en) * | 2018-01-24 | 2019-07-30 | 北新集团建材股份有限公司 | Cleaning maintenance of equipment for building interior space |
CN115108464A (en) * | 2022-05-31 | 2022-09-27 | 中国化学工程第三建设有限公司 | Double-layer tank inner tank wall plate hoisting assembly device and assembly method |
CN115108464B (en) * | 2022-05-31 | 2023-08-04 | 中国化学工程第三建设有限公司 | Double-layer tank inner tank wall plate hoisting assembly device and assembly method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102797222B (en) | Hanging bracket hinge joint type bridge maintenance vehicle capable of avoiding bridge-side obstacles | |
CN105019930B (en) | A kind of mine hydraulic bracket assembly platform | |
CN202751338U (en) | Rail type suspension basket | |
CN206418415U (en) | A kind of bridge and facade wall maintenance device | |
CN106006398A (en) | Track crane for underground coal mines | |
CN204138215U (en) | Large oil tank inwall is safeguarded and is hung ship | |
CN204454402U (en) | Detachable winch hanging apparatus | |
CN205653086U (en) | Tower crane who possesses climbing ladder and lift | |
CN103011031A (en) | Stand column type 360-degree rotary oil tank maintenance platform | |
CN104146651A (en) | Winch type window cleaning machine | |
CN103654610A (en) | Rail type hanging basket | |
CN103663297A (en) | Inner-cone rotating single-arm telescopic hanging basket | |
CN202265369U (en) | Upright post type 360-degree rotary oil tank maintenance platform | |
CN204625045U (en) | A kind of steel structure hoisting door shaped stent formula hanging apparatus | |
CN104549834A (en) | Dual-cantilever basket assembly for automatically spraying inner wall of oil tank | |
CN109763638A (en) | A kind of high-altitude overhanging facade special type working vehicle and its construction method | |
CN203440751U (en) | Self-propelled underbridge construction platform | |
CN202751326U (en) | Telescopic hanging basket of inner cone rotating single arm | |
CN207498824U (en) | A kind of hanger radial type single track bridge inspection car | |
CN109279522A (en) | Movable units body glass curtain wall cantilevered hanging device | |
CN202865749U (en) | Installation equipment of bridge guardrail framework | |
CN203555689U (en) | Electric hanging basket for vertical shaft | |
CN104249963A (en) | Electric lifting basket for large-size lock drainage shaft | |
CN106836109B (en) | Suspended platform device for protecting, repairing and processing bottom of suspended building | |
CN203257106U (en) | Multifunctional power-driven walking type walking system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20150204 |