CN206418415U - A kind of bridge and facade wall maintenance device - Google Patents
A kind of bridge and facade wall maintenance device Download PDFInfo
- Publication number
- CN206418415U CN206418415U CN201621476880.0U CN201621476880U CN206418415U CN 206418415 U CN206418415 U CN 206418415U CN 201621476880 U CN201621476880 U CN 201621476880U CN 206418415 U CN206418415 U CN 206418415U
- Authority
- CN
- China
- Prior art keywords
- bridge
- steel
- long stitches
- sew
- guardrail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a kind of bridge and facade wall maintenance device;Its structure includes:Guardrail outer side linkage, the hanging trolley of elevator machine travel and the light section that can pass a bridge sew with long stitches boom device;Facade is overhauled, the hanging trolley of the outer side linkage of guardrail and I elevator machine travel can be installed, detection and maintenance is lifted and move left and right using console;Pass through bridge pier gap bridge:Steel is sew with long stitches into beam opposite side fixing device to unclamp, steel is sew with long stitches suspended travel device II on the outside of beam side rail and moved to avris, mobile carriage walking on nose girder, ensure steel sew with long stitches beam horizontally rotate it is parallel with beam body after, unclamp steel and sew with long stitches beam side and nose girder fastener for connection, opposite side with moving cart haulage cable turn to nose girder it is parallel with beam body after, draw two suspended travel devices and cross after bridge pier, traction nose girder steel pipe and main steel sew with long stitches beam through fixed after beam body, start next across operation.The utility model manufactures easy for installation, highly versatile, using reliable, can meet the modification and service work of many tall and big wall alien invasions.
Description
Technical field
The utility model is related to a kind of maintenance device, and in particular to a kind of bridge and facade wall maintenance dress
Put.
Background technology
Strengthened infrastructure now, under the overall situation for optimizing Regional Development Environment, large foundation is built such as fire such as
, all there are many bricklaying facilities in the bitter edible plant, have concrete structure, also much grout or laid dry in highway, railway, water conservancy, building etc.
Building, or even also prestressed structure, in use, it may appear that the problem of various, over time and
, often there is concrete in the factor of the changes such as external elements or masonry structure is cracking, the problems such as steel bar corrosion is exposed,
Directly harm bridge using safety, so now for wall maintenance more than using the maintenance measures such as built, then make for bridge
With special bridge-checking vehicle, the application of this bridge inspection car substantially improves bridge maintenance situation, but bridge inspection car is used into
This is very big, and bridge inspection car will at least close a runway or more, add potential safety hazard and operation cost.
Utility model content
In order to reduce manufacture and practical operation cost, the purpose of this utility model is to provide a kind of bridge and facade wall is supported
Maintenance unit is protected, for the lateral surface maintenance and inspection such as Bridge guardrail lateral surface and large-size retaining wall, dam body, wall is mainly used in
Top surface has guardrail or the bridge that can be affiliated to, barricade etc., and the utility model cost is low, and highly versatile is good in economic efficiency.
To achieve the above object, the technical scheme that the utility model is used is:A kind of bridge is provided and facade wall is supported
Protect maintenance unit;Its structure includes:Guardrail outer side linkage, the hanging trolley of elevator machine travel and the light section that can pass a bridge sew with long stitches beam
Device.
The outer side linkage structure of the guardrail includes:Crossbeam, vertical supporting bar, scroll wheel, roller shaft, hinge bar, liquid
Press fixed connecting rod, tripod and steady pin;Wherein in one end welding consolidation vertical supporting bar of crossbeam, in vertical supporting bar
Two scroll wheels are designed in side side by side, are easy to moving horizontally for suspension arrangement;A hinge bar, hinge bar are connected in the other end of crossbeam
With being provided with hydraulic pressure fixed connecting rod at the link position of crossbeam, to adjust the connection angle between hinge bar and crossbeam;Crossbeam
Inner side is provided with two roller shafts;It is provided with below the tripod of hanging trolley, hinge bar and is provided with hinge bar centre position
The steady pin of steel wire cable, to fixed hanging trolley and wire rope device;Hoist engine is horizontally arranged with crossbeam, for transverse direction
Haulage cable suspension hook, suspension hook is fixed on end of the bridge or guard rail steel pipe.Pass through the manual control on hanging trolley during use
Platform processed, controllable manipulation device is translated, and is moved left and right.
The hanging trolley by elevator machine travel, its structure includes:Workbench, guardrail, dolly hoist engine and suspention
Dolly;Wherein dolly hoist engine is fixed on the both sides of dolly, and underslung trolley on hinge bar with fixing hanging trolley tripod and steel
Cord device fixes pin connection, and hanging trolley is by both sides wire rope suspensioning, and there be balance rope leveling regulation dolly centre
Above and below balance, the platform control on hanging trolley and move left and right, hanging trolley is fixed on crossbeam by steel wire rope.
The light section of passing a bridge is sew with long stitches boom device and is mainly made up of three parts, including side mounting is moved outside workbench, guardrail
Dynamic device II and nose girder steel pipe device;The workbench is sew with long stitches beam, horizontal chain extension bar by two panels light section and constituted, and wherein two panels is light
Shaped steel sews with long stitches beam and connects welding bench guardrail on the support frame walked under composition bridge under pedal, skeleton by horizontal chain extension bar,
Steel is sew with long stitches into beam by hydraulic pressure fixed connecting rod to be fixed with beam body, it is ensured that steel sews with long stitches stability when running under Liang Qiao.
The structure of suspended travel device II is similar to the outer side linkage I of guardrail, and two on crossbeam on the outside of the guardrail
Side steel wire rope of windlass connects steel and sews with long stitches beam bridge beam offside and nose girder steel pipe device bridge offside respectively, fixed outstanding wherein on hinge bar
Hang 90 ° of fixed angle pulleies of installation and excessive steel on dolly and wire rope device and sew with long stitches boom device.
The nose girder steel pipe device, mainly by being constituted with bridge width identical carbon fiber steel pipe, is connected on the outside of guardrail
Wherein side in suspended travel device, beam one end is sew with long stitches on the contrary, setting fixed steel pipe device, phase under connection end with being connected steel fibre
Toss about to sew with long stitches for fixed steel and moving cart is fixed on boom device, nose girder moved respectively with rope traction in side mounting outside guardrails of both sides
Device II, suspension apparatus can also be done when beam basic skill or training makees.
Facade detects maintenance principle of device:If only overhauling facade, the outer side linkage I of guardrail can be installed and hoist engine is led
The hanging trolley drawn, is lifted and is moved left and right detection and maintenance using console.
Pass through bridge pier gap bridge principle:Run into bridge to descend at bridge pier, steel is sew with long stitches into beam opposite side fixing device and unclamped, steel sews with long stitches beam side
Suspended travel device II is moved to avris on the outside of guardrail, mobile carriage walking on nose girder, it is ensured that steel is sew with long stitches beam and horizontally rotated and beam
After body is parallel, unclamps steel and sew with long stitches beam side and nose girder fastener for connection, opposite side turns to nose girder and beam with moving cart haulage cable
After body is parallel, draws two suspended travel devices and cross after bridge pier, traction nose girder steel pipe sews with long stitches beam through fixed, beginning after beam body with main steel
It is next across operation.
The beneficial effects of the utility model are:The device can be suspended to bridge both sides, and realize upper bottom left by hoist engine
Right movement a, so that bridge need to only install an apparatus for examination and repair and can complete the maintenance of on the outside of whole bridge and beam slab bottom surface
Safeguard;The car manufactures easy for installation, highly versatile, using reliable, can meet the modification and maintenance of many tall and big wall alien invasions
Work;The hydraulic pressure fix bar adjustable-angle of the outer side linkage one of guardrail, convenient use, highly versatile is largely carried
High security;Present apparatus cost is relative to bridge-checking vehicle, and price is very low, and use cost and maintenance cost are also very low, economy effect
It is beneficial obvious, easily to bridge, the maintenance such as retaining wall and ornamenting.
Brief description of the drawings
Fig. 1 is the outer side linkage structure chart of the utility model guardrail;
Fig. 2 is that the utility model hanging trolley is shown in hanging trolley structure chart;
Fig. 3 is that the utility model light section that can pass a bridge sews with long stitches boom device workbench;
Fig. 4 is that the utility model can cross light-duty suspended travel device II on the outside of bridge protective railings;
In figure:1st, crossbeam;2nd, vertical supporting bar;3rd, scroll wheel;4th, the axis of rolling;5th, hinge bar;6th, tripod;7th, hydraulic pressure is solid
Determine connecting rod;8th, hoist engine;9th, steady pin;10th, steel wire cable;11st, hanging trolley;12nd, light steel truss;13rd, laterally link
Bar;14th, support frame;15th, beam body;16th, hydraulic pressure fix bar;17th, workbench guardrail.
Embodiment
The utility model provides a kind of bridge and facade wall maintenance device;Its structure includes:It is outstanding on the outside of guardrail
Hang device I, the hanging trolley of elevator machine travel and the light section that can pass a bridge sew with long stitches boom device.
As shown in figure 1, the outer structure of side linkage I of guardrail includes:Crossbeam 1, vertical supporting bar 2, scroll wheel 3, roller shaft
4th, hinge bar 5, tripod 6, hydraulic pressure fixed connecting rod 7 and steady pin 9;Wherein in one end welding consolidation vertical supporting of crossbeam 1
Bar 2, designs two scroll wheels 3 in the inner side of vertical supporting bar 2, is easy to moving horizontally for suspension arrangement side by side;In the another of crossbeam 1
One hinge bar 5 of end connection, hinge bar 5 at the link position of crossbeam 1 with being provided with hydraulic pressure fixed connecting rod 7, to adjust hinge bar 5
With the connection angle between crossbeam 1;The inner side of crossbeam 1 is provided with two roller shafts 4;The centre position of hinge bar 5 is provided with suspention
The tripod 6 of dolly, the lower section of hinge bar 5 is provided with the steady pin 9 of steel wire cable 10, to fixed hanging trolley and steel wire rope dress
Put;Hoist engine is horizontally arranged with crossbeam, for lateral traction steel wire rope hook, suspension hook is fixed to end of the bridge or guard rail steel pipe
On.By the hand held console on hanging trolley during use, controllable manipulation device is translated, moved left and right.
The hanging trolley of elevator machine travel is illustrated in figure 2, its structure includes:Workbench, guardrail, dolly hoist engine;
Wherein dolly hoist engine is fixed on the both sides of dolly, and underslung trolley 11 on hinge bar 5 with fixing hanging trolley tripod 6 and steel wire
The steady pin 9 of rope 10, hanging trolley 11 is suspended in midair by both sides steel wire cable 10, and centre also has balance rope leveling regulation small
Car is balanced, and above and below console control and is moved left and right on hanging trolley 11, hanging trolley 11 is fixed on horizontal stroke by steel wire cable 10
On beam 1.
As shown in Figure 3,4, the light section that can pass a bridge is sew with long stitches boom device and is mainly made up of three parts, including outside workbench, guardrail
Side mounting mobile device II and nose girder steel pipe device;The workbench sews with long stitches beam 12, horizontal 13 groups of chain extension bar by two panels light section
Into wherein two panels light section sews with long stitches beam 12 and connects the support frame 14 walked under composition bridge under pedal, branch by horizontal chain extension bar 13
Welding bench guardrail 17 on support bone frame 14, sews with long stitches beam 12 by light section by hydraulic pressure fix bar 16 and is fixed with beam body 15, protects
Card steel sews with long stitches stability when being run under Liang Qiao.
The structure of suspended travel device II is similar to the outer side linkage I of guardrail, and the both sides volume on crossbeam on the outside of guardrail
Raise the steel wire rope of machine 8 and connect steel respectively and sew with long stitches beam bridge beam offside and nose girder steel pipe device bridge offside, fixed suspention wherein on hinge bar 5
90 ° of fixed angle pulleies are installed on dolly 11 and the device of steel wire cable 10 and excessive steel sews with long stitches boom device.
The nose girder steel pipe device, mainly by being constituted with bridge width identical carbon fiber steel pipe, is connected on the outside of guardrail
Wherein side in suspended travel device II, beam one end is sew with long stitches on the contrary, setting fixed steel pipe device under connection end with being connected steel fibre,
Opposite side is that fixed steel is sew with long stitches and moving cart is fixed on boom device, nose girder drawn respectively with steel wire rope 10 in side mounting outside guardrails of both sides
Mobile device II, suspension apparatus can also be done when beam basic skill or training makees.
Implement point two parts, a part is used for facade detection, Part II removed facade and can also passed a bridge detection Bridge Beam
Below plate.Detect it is the vertical supporting bar 2 that consolidation is welded by crossbeam 1 and with crossbeam 1 for facade, vertical supporting bar 2 is using interior
The scroll wheel 3 of side two, 1 lower two roller shaft 4 of crossbeam, Gu outside, which is hinged on bar track, hinge bar 5, fixes hanging trolley 11 and steel
Underslung trolley 11 is hanging to guardrail side or alien invasion by the device of wire rope 10, and hydraulic pressure fixed connecting rod 7 can be with adjustment angle, more
Good fixes with guardrail, and horizontal hoist engine 8, laterally drags and draw steel wire cable 10, laterally drag and draw steel wire rope hook, will hang on crossbeam 1
Hook is fixed on end of the bridge or guard rail steel pipe, and hand held console is arranged on hanging trolley, controls manipulation device to do by console
Translation, is moved left and right.Hanging trolley is hanging on suspension arrangement again, including hanging trolley workbench, guardrails of both sides, dolly
Hoist engine 8 is fixed on dolly both sides, underslung trolley 11 and the steady pin that hanging trolley 11 and steel wire cable 11 are fixed on hinge bar 5
9, above and below console control and move left and right on hanging trolley 11, hanging trolley is fixed on crossbeam 1 by steel wire rope, small underbody
Face rotating disk connects scalable steel pipe nose girder and the light section that can pass a bridge sews with long stitches boom device rotary shaft.The level of dolly is controlled by console
And vertical height, observation and detection relevant issues.If it find that problem, hanging trolley is exactly that workbench can be operated and adjusted
It is whole.
Inspection platform is by rotating disk below hanging trolley and rotating shaft carry when needing, by rolling up on the downside of bridge beam slab
The hanging trolley 11 for raising the traction of machine 8 is installed, and is lifted and moved left and right detection and maintenance using console.Run into bridge and descend bridge pier
Place, sews with long stitches beam opposite side fixing device by steel and unclamps, steel is sew with long stitches suspended travel device two on the outside of beam side rail and moved to avris, on nose girder
Moving cart is walked, it is ensured that steel is sew with long stitches beam and horizontally rotated after parallel and beam body, is unclamped steel and is sew with long stitches beam side and nose girder fastener for connection, another
Side with moving cart haulage cable turn to nose girder it is parallel with beam body after, two suspended travel devices of traction are crossed after bridge pier, and upper
The identical traction nose girder steel pipe of reason is passed through to be drawn main steel and sews with long stitches beam through fixed after beam body again after beam body, started next across operation.
Claims (1)
1. a kind of bridge and facade wall maintenance device;Its structure includes:Guardrail outer side linkage, elevator machine travel
Hanging trolley and the light section that can pass a bridge sew with long stitches boom device;It is characterized in that:
The outer side linkage structure of the guardrail includes:Crossbeam, vertical supporting bar, scroll wheel, roller shaft, hinge bar, hydraulic pressure are solid
Determine connecting rod, tripod and steady pin;Wherein in one end welding consolidation vertical supporting bar of crossbeam, on the inside of vertical supporting bar simultaneously
Row's two scroll wheels of design;In the other end one hinge bar of connection of crossbeam, hydraulic pressure is provided with the link position of hinge bar and crossbeam
Fixed connecting rod;Two roller shafts are provided with the inside of crossbeam;Hinge bar centre position is provided with the tripod of hanging trolley,
The steady pin of steel wire cable is provided with below hinge bar;Hoist engine is horizontally arranged with crossbeam, suspension hook is fixed to end of the bridge or shield
On column steel pipe;
The hanging trolley by elevator machine travel, its structure includes:Workbench, guardrail, dolly hoist engine and hanging trolley;
Wherein dolly hoist engine is fixed on the both sides of dolly, and underslung trolley is filled with fixing hanging trolley tripod and steel wire rope on hinge bar
Fixed pin connection is put, hanging trolley is by both sides wire rope suspensioning, and there be balance rope leveling regulation dolly balance centre, hangs
Dolly is hung to be fixed on crossbeam by steel wire rope;
The light section of passing a bridge sews with long stitches boom device, and structure includes:Suspended travel device II and nose girder steel on the outside of workbench, guardrail
Pipe device;Wherein workbench is sew with long stitches beam, horizontal chain extension bar by two panels light section and constituted, and wherein two panels light section sews with long stitches beam and passes through transverse direction
Welding bench guardrail on support frame under chain extension bar connection composition bridge under walking pedal, skeleton, is fixedly connected by hydraulic pressure
Steel is sew with long stitches beam and is fixed with beam body by bar;
The structure of suspended travel device II is similar to the outer side linkage I of guardrail, and both sides elevator on crossbeam on the outside of the guardrail
Machine steel wire rope connects steel and sews with long stitches beam bridge beam offside and nose girder steel pipe device bridge offside respectively, wherein fixes hanging trolley on hinge bar
And 90 ° of fixed angle pulleies of installation and excessive steel sew with long stitches boom device on wire rope device;Wherein nose girder steel pipe device, is connected to guardrail
Wherein side in outside suspended travel device II, beam one end is sew with long stitches on the contrary, setting fixed steel pipe under connection end with being connected steel fibre
Device, opposite side is sew with long stitches for fixed steel fixes moving cart respectively with rope traction on the outside of guardrails of both sides on boom device, nose girder
Suspended travel device II.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621476880.0U CN206418415U (en) | 2016-12-30 | 2016-12-30 | A kind of bridge and facade wall maintenance device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621476880.0U CN206418415U (en) | 2016-12-30 | 2016-12-30 | A kind of bridge and facade wall maintenance device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206418415U true CN206418415U (en) | 2017-08-18 |
Family
ID=59573986
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621476880.0U Active CN206418415U (en) | 2016-12-30 | 2016-12-30 | A kind of bridge and facade wall maintenance device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206418415U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108330827A (en) * | 2018-03-30 | 2018-07-27 | 钦州学院 | A kind of overpass maintenance trolley and its make application method |
CN108423614A (en) * | 2018-03-30 | 2018-08-21 | 钦州学院 | A kind of outboard aerial platform and preparation method thereof based on ship |
CN108589558A (en) * | 2018-02-09 | 2018-09-28 | 安徽兰兮工程技术开发有限公司 | A kind of overpass outer wall facility maintenance holder |
CN108708277A (en) * | 2018-06-29 | 2018-10-26 | 中国葛洲坝集团第工程有限公司 | Overpass bridge bottom wire laying device |
KR20190049208A (en) * | 2017-11-01 | 2019-05-09 | 삼성중공업 주식회사 | Temporary platform |
CN112942647A (en) * | 2021-03-09 | 2021-06-11 | 中国十九冶集团有限公司 | Hollow outer wall decorative plate hanging guide device and hollow outer wall decorative plate installation method |
-
2016
- 2016-12-30 CN CN201621476880.0U patent/CN206418415U/en active Active
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20190049208A (en) * | 2017-11-01 | 2019-05-09 | 삼성중공업 주식회사 | Temporary platform |
KR101994623B1 (en) * | 2017-11-01 | 2019-07-02 | 삼성중공업 주식회사 | Temporary platform |
CN108589558A (en) * | 2018-02-09 | 2018-09-28 | 安徽兰兮工程技术开发有限公司 | A kind of overpass outer wall facility maintenance holder |
CN108330827A (en) * | 2018-03-30 | 2018-07-27 | 钦州学院 | A kind of overpass maintenance trolley and its make application method |
CN108423614A (en) * | 2018-03-30 | 2018-08-21 | 钦州学院 | A kind of outboard aerial platform and preparation method thereof based on ship |
CN108708277A (en) * | 2018-06-29 | 2018-10-26 | 中国葛洲坝集团第工程有限公司 | Overpass bridge bottom wire laying device |
CN112942647A (en) * | 2021-03-09 | 2021-06-11 | 中国十九冶集团有限公司 | Hollow outer wall decorative plate hanging guide device and hollow outer wall decorative plate installation method |
CN112942647B (en) * | 2021-03-09 | 2022-12-02 | 中国十九冶集团有限公司 | Hollow outer wall decorative plate hanging guide device and hollow outer wall decorative plate installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206418415U (en) | A kind of bridge and facade wall maintenance device | |
CN105000482B (en) | Tower crane with walking mechanism | |
CN103711301A (en) | Construction method and device for two-track movable electric basket and lifting hoist | |
WO2014015757A1 (en) | Bridge maintenance vehicle with hinge-connected type hanging bracket and capable of avoiding bridge-side obstacles | |
CN201411900Y (en) | Hydraulic die lifter for chimneys | |
CN208235351U (en) | A kind of bridge combination guardrail Fast Installation plate device | |
CN201825671U (en) | Hoisting trolley for track plate | |
CN203855895U (en) | Mobile jib operation platform for constructing and overhauling bridges | |
CN205653086U (en) | Tower crane who possesses climbing ladder and lift | |
CN206486255U (en) | A kind of thermal power plant boiler burner hearth rail mounted overhauls hoistable platform | |
CN101566005A (en) | Chimney hydraulic mould lifting device | |
CN204625045U (en) | A kind of steel structure hoisting door shaped stent formula hanging apparatus | |
CN104973517A (en) | Electric gantry platform for installing sintering machine head equipment and application method thereof | |
CN109763638A (en) | A kind of high-altitude overhanging facade special type working vehicle and its construction method | |
CN202429923U (en) | Travelling cable crane | |
CN103011031A (en) | Stand column type 360-degree rotary oil tank maintenance platform | |
CN203834369U (en) | Device capable of being rotated by 360 degrees and vertically lifted for bridge | |
CN204474193U (en) | A kind of Pillar-fixing Type Slewing Crane | |
CN106012824A (en) | Movable bridge anti-collision guardrail construction operation trolley | |
CN211498465U (en) | Bridge detects uses mobile device | |
CN204138215U (en) | Large oil tank inwall is safeguarded and is hung ship | |
CN108252218A (en) | A kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device | |
CN109279522A (en) | Movable units body glass curtain wall cantilevered hanging device | |
CN212771963U (en) | Movable suspension operation platform | |
CN104549834A (en) | Dual-cantilever basket assembly for automatically spraying inner wall of oil tank |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |