CN108252218A - A kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device - Google Patents

A kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device Download PDF

Info

Publication number
CN108252218A
CN108252218A CN201711353988.XA CN201711353988A CN108252218A CN 108252218 A CN108252218 A CN 108252218A CN 201711353988 A CN201711353988 A CN 201711353988A CN 108252218 A CN108252218 A CN 108252218A
Authority
CN
China
Prior art keywords
bed die
lagging jack
steel lagging
bottom end
slide device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711353988.XA
Other languages
Chinese (zh)
Inventor
李国华
李明
金健
李利
王海峰
谢小超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Construction Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Construction Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Construction Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201711353988.XA priority Critical patent/CN108252218A/en
Publication of CN108252218A publication Critical patent/CN108252218A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide devices; including upper longitudinal beam, upper beam, sunpender, bottom end rail and lower longeron; upper longitudinal beam and upper beam to form upper frame by being welded to connect; bottom end rail and lower longeron to form lower frame by being welded to connect, and lower frame is hung in upper longitudinal beam by lower longeron by sunpender;The bottom surface of upper beam is equipped with the carriage slided on steel lagging jack;The top surface of bottom end rail is disposed with bed die system and guardrail is respectively equipped in its both sides, and the bottom surface of bottom end rail is equipped with operation cage, and bed die system is equipped with the U-shaped hoop for locking or unclamping on steel lagging jack.The bed die system of the present invention is in place using integral slipping, simple in structure, easy to operate;Entire slide device joins the two sections of a bridge, etc from arch springing to vault paragraph by paragraph, reduces template caused by due to full shop fixtures mould and wastes, saves cost;The input of labour is reduced, improves working efficiency, reduces high-altitude working safety risk.

Description

A kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device
Technical field
The present invention relates to steel arch bridge technical field, especially a kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die The constructing device of system supporting.
Background technology
Large span deck type cable-carried arch bridge is widely used in Southwestern China section weight mountain area area, such as cloud osmanthus railway south disk The works such as river grand bridge, Shanghai Kun Tielubei disks river grand bridge, big auspicious railway Lancang River grand bridge, Chongqing-Guichow Railway night youth river grand bridge Journey.Its structure type use steel pipe truss arch stiff skeleton, Pumping concrete in pipe, arch ring external wrapping concrete structure type for Main arch constructs.
For in such long-span arch bridge arch ring external wrapping concrete work progress, bed die support system is each work order The a great problem of position facing, according to conventional construction method, generally using cable hoisting job platform, a large amount of labours' height Sky dissipates the construction technology spelled, and construction efficiency is extremely low.How construction speed is improved, shortened the construction period, save artificial, reduction hanging device Configuration, it is cost-effective, it has also become bridge urgently solves the problems, such as in the industry.
Invention content
The present invention is in view of the above-mentioned problems, provide a kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die sliding dress It puts.
The purpose of the present invention can be realized by following technical proposals:A kind of large span cable-carried arch bridge steel lagging jack outsourcing mixes Solidifying soil bed die slide device, including upper longitudinal beam, upper beam, sunpender, bottom end rail and lower longeron, upper longitudinal beam and upper beam pass through welding Connection forms upper frame, and bottom end rail and lower longeron to form lower frame by being welded to connect, and lower longeron is by sunpender by lower part Frame is hung in upper longitudinal beam;The bottom surface of upper beam is equipped with the carriage slided on steel lagging jack;The top surface arrangement of bottom end rail Have bed die system and guardrail be respectively equipped in its both sides, the bottom surface of bottom end rail is equipped with operation cage, bed die system be equipped with for The U-shaped hoop locked or unclamped on steel lagging jack.
Further, the middle line front end welding lifting lug of the upper beam.
Further, the carriage includes support base, idler wheel and base track, and support base passes through welding with upper beam Connection, base track are welded at the top of steel lagging jack top boom, and idler wheel is mounted on support base and is slided on base track.
Further, the upper longitudinal beam and lower longeron are mounted on pad plate across boom location.
Further, the top of the sunpender and bottom end are equipped with nut.
Further, the both ends of the U-shaped hoop are equipped with nut.
Compared with prior art, the advantage of the invention is that:1st, bed die system is in place using integral slipping, simple in structure, It is easy to operate;
2nd, entire slide device joins the two sections of a bridge, etc from arch springing to vault paragraph by paragraph, reduces template caused by due to full shop fixtures mould and wastes, saves into This;
3rd, the input of labour is reduced, improves working efficiency, reduces high-altitude working safety risk.
Description of the drawings
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the structure diagram that the present invention is installed on steel lagging jack.
Fig. 3 is traction schematic diagram of the present invention when constructing on steel lagging jack.
Fig. 4 is the front elevation of carriage.
Fig. 5 is the side view of carriage.
It is marked in figure as follows:
1 upper longitudinal beam, 3 carriages, 31 support bases, 32 idler wheels, 33 base tracks, 4 sunpenders, 5 bottom end rails, is indulged for 6 times 2 upper beams Beam, 7 bed die systems, 8 operation cages, 9 U-shaped hoops, 10 guardrails, 11 steel lagging jacks.
Specific embodiment
Below in conjunction with the attached drawing specific embodiment that the present invention will be described in detail, those skilled in the art is made to become apparent from geography How solution puts into practice the present invention.Although describing the present invention with reference to its preferred embodiment, these embodiments are It illustrates rather than limits the scope of the invention.
Referring to Fig. 1 and Fig. 2, large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device, including upper longitudinal beam 1, Upper beam 2, sunpender 4, bottom end rail 5 and lower longeron 6, upper longitudinal beam 1 and upper beam 2 to form upper frame by being welded to connect, lower horizontal stroke Beam 5 and lower longeron 6 to form lower frame by being welded to connect, and lower frame is hung on upper longitudinal beam 1 by lower longeron 6 by sunpender 4 On, form whole hanger;Lifting lug is welded in the front end by 11 main arch span centre side of steel lagging jack of upper beam 2, passes through hauling rope and traction Device connects, and the bottom surface of upper beam 2 is equipped with carriage 3, and referring to Fig. 4 and Fig. 5, carriage 3 includes support base 31, idler wheel 32 With base track 33, for support base 31 with upper beam 2 by being welded to connect, base track 33 is welded in steel when steel lagging jack 11 is processed At the top of 11 top boom of arch rib, idler wheel 32 is mounted on support base 31 and is slided on base track 33;The top surface arrangement of bottom end rail 5 There is bed die system 7 and guardrail 10 is respectively equipped in its both sides, the bottom surface of bottom end rail 5 is equipped with operation cage 8, and bed die system 7 is equipped with U Type hoop 9 is locked on 11 lower boom of steel lagging jack for bed die system 7 or unclamps movement.
Upper longitudinal beam 1 is formed by connecting back-to-back by two channel steels, 40mm gaps is reserved between two channel steels, and across sunpender 4 positions are equipped with pad plate, prevent sunpender 4 from sliding, and pad plate digs milling bevel edge with 40mm steel plates and makes, in open diameter 35mm's Hole is passed through for sunpender 4.
Upper beam 2, using 28a I-steel processing and fabricatings, shape is welded with upper longitudinal beam 1 according to 11 construction profile size of steel lagging jack Into upper frame.
The support base 31 of carriage 3 is that steel plate group welds the steel member to be formed, and mounted on 2 bottom surface of upper beam, idler wheel 32 is Finished product idler wheel 32 is customized, is installed on support base 31, base track 33 is welded by steel plate group to be formed and add in 11 factory of steel lagging jack It is mounted on top boom when work manufactures, and base track 33 is installed in place.
Sunpender 4 is that diameter 32mm fining twisted steels make, and the top and bottom end of sunpender 4 are equipped with nut.
Bottom end rail 5 is assembled back-to-back by two channel steels.
Lower longeron 6 sets identical with upper longitudinal beam 1, is equally to be assembled back-to-back by two channel steels, between two channel steels Reserved 40mm gaps, and pad plate is being installed across 4 position of sunpender, prevent sunpender 4 from sliding, pad plate is dug with 40mm steel plates Milling bevel edge makes, in open the hole of diameter 35mm, passed through for sunpender 4.
Bed die system 7 is finished product custom built forms system, containing panel, back cord etc.;Cage 8 and guardrail 10 are operated by 50 angle steel systems It forms.
U-shaped hoop 9 is that the round steel processing and fabricating of diameter 20mm forms, and the end at both ends processes screw thread and is equipped with nut. After whole hanger slides into designated position, bed die system 7 is hung on 11 lower boom of steel lagging jack by U-shaped hoop 9, forms one The bed die sliding operation of a cycle.
One bed die slide device, each segment concrete are installed respectively referring to Fig. 2 and Fig. 3, at the arch springing at arch bridge both ends End is poured, discharges the nut on U-shaped hoop 9, loosens the nut on 4 top of sunpender so that whole hanger comes to nothing, and is drawn using vault Device is paragraph by paragraph to vault sliding construction, until closure.After sliding in place, the nut on stubborn U-shaped hoop 9 is applied immediately so that whole to hang Frame bears, on 11 lower boom of steel lagging jack, so far to complete the sliding construction of a cycle.
It should be pointed out that for the present invention through absolutely proving, can also have the embodiment of a variety of transformation and remodeling, It is not limited to the specific embodiment of the above embodiment.Above-described embodiment is as just the explanation of the present invention rather than to this The limitation of invention.In short, protection scope of the present invention should be apparent to those skilled in the art including those Transformation or replacement and remodeling, and be determined by the appended claims.

Claims (6)

1. a kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device, which is characterized in that including upper longitudinal beam, on Crossbeam, sunpender, bottom end rail and lower longeron, upper longitudinal beam and upper beam to form upper frame by being welded to connect, bottom end rail and lower vertical Beam to form lower frame by being welded to connect, and lower frame is hung in upper longitudinal beam by lower longeron by sunpender;The bottom of upper beam Face is equipped with the carriage slided on steel lagging jack;The top surface of bottom end rail is disposed with bed die system and is respectively equipped with shield in its both sides Column, the bottom surface of bottom end rail are equipped with operation cage, and bed die system is equipped with the U-shaped hoop for locking or unclamping on steel lagging jack.
2. large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device according to claim 1, feature exist In the middle line front end welding lifting lug of the upper beam.
3. large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device according to claim 1, feature exist Include support base, idler wheel and base track in, the carriage, support base with upper beam by being welded to connect, base track It is welded at the top of steel lagging jack top boom, idler wheel is mounted on support base and is slided on base track.
4. large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device according to claim 1, feature exist In, the upper longitudinal beam and lower longeron pad plate is mounted on across boom location.
5. large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device according to claim 1, feature exist In the top and bottom end of the sunpender are equipped with nut.
6. large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device according to claim 1, feature exist In the both ends of the U-shaped hoop are equipped with nut.
CN201711353988.XA 2017-12-15 2017-12-15 A kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device Pending CN108252218A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711353988.XA CN108252218A (en) 2017-12-15 2017-12-15 A kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711353988.XA CN108252218A (en) 2017-12-15 2017-12-15 A kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device

Publications (1)

Publication Number Publication Date
CN108252218A true CN108252218A (en) 2018-07-06

Family

ID=62722746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711353988.XA Pending CN108252218A (en) 2017-12-15 2017-12-15 A kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device

Country Status (1)

Country Link
CN (1) CN108252218A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112376427A (en) * 2020-09-28 2021-02-19 中铁二局集团有限公司 Installation platform, system and construction method for arch bridge outer concrete bottom die
CN112681141A (en) * 2020-12-17 2021-04-20 招商局重庆交通科研设计院有限公司 Automatic movable hanging basket device for pouring concrete outside steel arch frame
CN117604921A (en) * 2024-01-23 2024-02-27 贵州省公路工程集团有限公司 Cast-in-situ longitudinal moving bracket for middle box bottom plate of steel truss web rod-concrete combined arch bridge

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05195513A (en) * 1992-01-17 1993-08-03 P S Co Ltd Lining work car for arch bridge
JP3763890B2 (en) * 1996-07-03 2006-04-05 大成建設株式会社 Mobile work vehicle structure
JP4219046B2 (en) * 1999-05-24 2009-02-04 大成建設株式会社 Arch bridge upper floor receiving beam
CN202626841U (en) * 2012-06-12 2012-12-26 四川公路桥梁建设集团有限公司 Concrete device for wrapping main arch by hanging method
CN104631333A (en) * 2015-01-29 2015-05-20 中铁港航局集团有限公司 Moving hanger frame and method for small cross beam, small longitudinal beam and bridge deck slab cast-in-situ construction of arch bridge

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05195513A (en) * 1992-01-17 1993-08-03 P S Co Ltd Lining work car for arch bridge
JP3763890B2 (en) * 1996-07-03 2006-04-05 大成建設株式会社 Mobile work vehicle structure
JP4219046B2 (en) * 1999-05-24 2009-02-04 大成建設株式会社 Arch bridge upper floor receiving beam
CN202626841U (en) * 2012-06-12 2012-12-26 四川公路桥梁建设集团有限公司 Concrete device for wrapping main arch by hanging method
CN104631333A (en) * 2015-01-29 2015-05-20 中铁港航局集团有限公司 Moving hanger frame and method for small cross beam, small longitudinal beam and bridge deck slab cast-in-situ construction of arch bridge

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112376427A (en) * 2020-09-28 2021-02-19 中铁二局集团有限公司 Installation platform, system and construction method for arch bridge outer concrete bottom die
CN112681141A (en) * 2020-12-17 2021-04-20 招商局重庆交通科研设计院有限公司 Automatic movable hanging basket device for pouring concrete outside steel arch frame
CN112681141B (en) * 2020-12-17 2021-11-02 招商局重庆交通科研设计院有限公司 Automatic movable hanging basket device for pouring concrete outside steel arch frame
CN117604921A (en) * 2024-01-23 2024-02-27 贵州省公路工程集团有限公司 Cast-in-situ longitudinal moving bracket for middle box bottom plate of steel truss web rod-concrete combined arch bridge
CN117604921B (en) * 2024-01-23 2024-03-29 贵州省公路工程集团有限公司 Cast-in-situ longitudinal moving bracket for middle box bottom plate of steel truss web rod-concrete combined arch bridge

Similar Documents

Publication Publication Date Title
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN101781878B (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN205000974U (en) A tire formula automatic rising equipment rack for tunnel excavation construction
CN206233102U (en) A kind of packaged type faces side operation work platform
CN108252218A (en) A kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device
CN205638490U (en) A portable platform truck that is used for subway station tread wind channel to pour
CN106592962A (en) Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus
CN105239510A (en) Dismounting beam support used for high pier small-radius curve cast-in-situ box beam and construction method
CN203834373U (en) Lifting movement mold carriage trolley for box culvert side wall formwork
CN105952133A (en) Suspended large-span reinforced concrete structure construction steel platform and construction method
CN102190249B (en) Method for hoisting equipment positioned at bottom of multilayer frame platform
CN105018115B (en) Dry quenching primary deduster fragment hoisting method
CN105544406B (en) Bailey beam is sliding to remove device and its method for dismounting
CN206986644U (en) A kind of tunnel track simply removes device
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN202220400U (en) Lap-joint type formwork support beam
CN205295965U (en) Large -span continuous beam bridge strides existing station rotation construction and wraps protective structure entirely with hanging basket
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
CN202705923U (en) Assembling platform installed close to bridge abutment roadbed
CN205804178U (en) Scalable without holder device for the liftable of bridge coping construction
CN202247682U (en) Bridge crane for installing curtain board
CN203938968U (en) The auxiliary hanging basket of installation of continuous beam arch suspension rod bottom anchored end
CN205604089U (en) Whole sideslip system of cast -in -situ box girder gate -type full framing
CN204873485U (en) River course is bridge crane usefulness walking portal frame for pier
CN107217685A (en) A kind of Portable piping lane side wall formwork jumbo

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180706

WD01 Invention patent application deemed withdrawn after publication