- CN201598820U CN201598820U CN2010201270151U CN201020127015U CN201598820U CN 201598820 U CN201598820 U CN 201598820U CN 2010201270151 U CN2010201270151 U CN 2010201270151U CN 201020127015 U CN201020127015 U CN 201020127015U CN 201598820 U CN201598820 U CN 201598820U
- Authority
- CN
- China
- Prior art keywords
- wall
- upper chord
- bolt
- pylon
- hanging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000725 suspension Substances 0.000 title abstract description 5
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 19
- 239000010959 steel Substances 0.000 claims abstract description 19
- 239000000463 material Substances 0.000 abstract description 4
- 230000007306 turnover Effects 0.000 abstract description 2
- 230000000149 penetrating effect Effects 0.000 abstract 5
- 238000009435 building construction Methods 0.000 abstract 2
- 238000010276 construction Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 238000000354 decomposition reaction Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 230000003028 elevating effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000011112 process operation Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The single-point suspension outer hanging frame is an outer hanging frame body for building construction, an operation platform is composed of two triangular frame bodies and scaffold boards, the outer side of the operation platform is connected with a guardrail, and the inner side of the operation platform is fixedly connected with a wall body through a wall penetrating bolt. Each triangular truss is formed by fixedly connecting a wall attaching chord member, an upper chord member and an oblique chord member which are made of square steel, the end face of the upper chord member close to the wall attaching is provided with a hanging groove with a downward opening, a notch is formed in the square steel wall below the hanging groove, and a pair of bolt holes are formed in two side walls of the upper chord member respectively. The wall penetrating end of the wall penetrating bolt and the outer wall end are both provided with bolts and gaskets, and the outer wall end of the wall penetrating bolt extends into the hanging groove of the upper chord to be fixed. The bolt penetrates through the bolt hole in the side face of the upper chord and is supported at the bottom of the wall penetrating bolt. The utility model discloses simple structure, convenient to use, safe and reliable can use with other shelf systems such as ordinary stores pylon, cantilever frame cooperation. The standardization degree is high, the turnover is good, manpower and material resources are saved, and the external hanging operation platform is an ideal building construction external hanging operation platform.
Description
Technical field
The utility model belongs to the support body that a kind of building operations is used.
Background technology
At present, required support body when building operations, the general employing set up steel pipe scaffold, tiltedly builder's jack and common pylon.Along with the economic development of China, highrise building is more and more.Traditional support body has following defective: loose and prop up, loose and tear open, globality is not strong, is connected with the body of wall many places, and installation and removal are comparatively complicated, and its intensity and stability are also general, not only influence construction speed, and the wasting manpower and material resources also easily forms potential safety hazard.
Summary of the invention
For accelerating the engineering construction progress, standardization level in the raising work progress is to eliminate the potential safety hazard in traditional form of construction work, the utility model provides a kind of single-point to hang pylon, and not only quick construction is convenient, the standardization level height, safe and reliable, and can arbitrarily assemble according to on-the-spot dimensional requirement, and can wholely promote, simple to operate, time saving and energy saving, practical.
The purpose of this utility model is achieved through the following technical solutions:
Single-point hangs pylon, forms operating platform by two triangle support bodys and scaffold floor, and the outside of operating platform is connected with guardrail, is fixedlyed connected with body of wall by through-wall bolt in the inboard of operating platform.Attached wall chord member, upper chord and inclined chord that each triangular truss is made by square steel are formed by fixedly connecting, described upper chord has the hanging groove of downwardly facing opening at the end face near attached wall, have breach on the square steel wall below hanging groove, have a pair of pin hole on the two side of upper chord.Attached wall chord member bottom is connected with attached wall supporting leg 8.
All there are bolt and pad in the end through walls and the wall outer end of described through-wall bolt, and it is interior fixing that Qi Qiang stretches into the outer end hanging groove of upper chord.
Described latch passes from the pin hole of upper chord side, is supported on the bottom of through-wall bolt.
Have row's hanging hole on the two side of described upper chord, be connected with on the hanging hole and promote hook.
The outside of described upper chord is connected with sleeve pipe, and guardrail is inserted in the sleeve pipe.
Described attached wall chord member is being connected with short tube perpendicular to wall direction, and adjacent operating platform is connected to become a combination operation platform by fastener and steel pipe and short tube.
Described attached wall chord member is being connected with short tube perpendicular to wall direction, and adjacent operating platform is connected to become a combination operation platform by fastener and steel pipe and short tube.
Described short tube is pipe or square tube.
Of particular note, the hole through walls of through-wall bolt is reserved when the body of wall formwork, and walls concrete intensity must not be lower than 10MPa when hanging pylon.
The utility model solved the frame structure globality strong, be connected with body of wall and mount and dismount complicated problems, compared with prior art, simple in structure, easy to use, safe and reliable, and can be used with other shelf systems such as common pylon, the framves of encorbelmenting; And the standardization level height, turnover property is good, uses manpower and material resources sparingly, economical and practical environmental protection, accelerating construction progress is widely used in the plug-in operating platform of building operations greatly.
Description of drawings
The utility model is described in more detail below in conjunction with accompanying drawing.
Fig. 1 hangs pylon overall structure schematic diagram for single-point.
Fig. 2 hangs pylon decomposition texture schematic diagram for single-point.
Fig. 3 hangs pylon embodiment schematic diagram for single-point.
Fig. 4 is the enlarged drawing that A is ordered among Fig. 3, is the hanging groove joint portion detail drawing of through-wall bolt and support body.
Fig. 5 is a Combined shelf body embodiment schematic diagram.
Fig. 6 is another embodiment schematic diagram of Combined shelf body.
Reference numeral: 1-triangle support body, 1.1-attached wall chord member, 1.2-upper chord, 1.3-inclined chord, 1.4-pin hole, 1.5-hanging hole, 1.6-sleeve pipe, 1.7-short tube, 1.8-hanging groove, 1.9-breach, 2-through-wall bolt, 3-latch, 4-promote hook, 5-guardrail, 6-scaffold floor, 7-fastener and steel pipe, 8-attached wall supporting leg.
The specific embodiment
Referring to Fig. 1~shown in Figure 4, a kind of single-point hangs pylon, forms operating platform by two triangle support bodys 1 and scaffold floor 6, and the outside of operating platform is connected with guardrail 5, is fixedlyed connected with body of wall by through-wall bolt 2 in the inboard of operating platform.
Attached wall chord member 1.1, upper chord 1.2 and inclined chord 1.3 that each triangular truss 1 is made by square steel are formed by fixedly connecting, described upper chord 1.2 has the hanging groove 1.8 of downwardly facing opening at the end face near attached wall, have breach 1.9 on the square steel wall below hanging groove 1.8, have a pair of pin hole 1.4 on the two side of upper chord 1.2.Attached wall chord member bottom is connected with attached wall supporting leg 8.
All there are bolt and pad in the end through walls and the wall outer end of described through-wall bolt 2, and it is interior fixing that Qi Qiang stretches into the outer end hanging groove 1.8 of upper chord 1.2.
Described latch 3 passes from the pin hole 1.4 of upper chord 1.2 sides, is supported on the bottom of through-wall bolt 2.
Have row's hanging hole 1.5 on the two side of described upper chord 1.2, be connected with on the hanging hole 1.5 and promote hook 4.
The outside of described upper chord 1.2 is connected with sleeve pipe 1.6, and guardrail 5 is inserted in the sleeve pipe 1.6.
Combination operation platform embodiment consults Fig. 5~shown in Figure 6,
Described attached wall chord member 1.1 is being connected with short tube 1.7 perpendicular to wall direction, adjacent operating platform is connected to become a combination operation platform by fastener and steel pipe 7 with short tube 1.7.
Described attached wall chord member 1.1 is being connected with short tube 1.7 perpendicular to wall direction, adjacent operating platform is connected to become a combination operation platform by fastener and steel pipe 7 with short tube 1.7.
Described short tube 1.7 can be pipe or square tube.
Framework mode that can the whole Combined shelf body that promotes is: support body must not be less than 2 Pin support bodys along the combination of wall length direction in every section Combined shelf body, connect with fastener type steel pipe, and per 2~4 Pin are one section, and every section Combined shelf body can wholely promote.Lay scaffold floor on the Combined shelf body and set up operating platform, guardrail inserts in the sleeve pipe in the support body outside, block by fastener, the guardrail spacing connects with cross bar between the guardrail with the spacing of support body, and the cross bar step pitch should not be greater than 1500mm, in order to strengthen the globality of support body, set up diagonal brace between support body and the guardrail, diagonal brace one end is fixed on the horizontal steel pipe that connects the tripod lower edge, and one section is fixed on the guardrail upper end.
The elevating mechanism of Combined shelf body adopts tower crane, and the lifting cycle is one deck one lifting.During lifting, the drawing up an intensity of position walls concrete and must not be lower than 10MPa of Combined shelf body, and the concrete roof top board that links to each other with body of wall has been built.Remove the connection rod member between adjacent two sections Combined shelf bodies before promoting earlier, connection rod member in the single hop Combined shelf body, guardrail, diagonal brace, scaffold floor must not become flexible, various materials on the operating platform will be removed totally, promote hook and are symmetrical arranged 2 points, utilize a plurality of hanging holes on the support body to regulate lifting hook position with adjustment.After the tower crane suspension hook is fastened, trace lifting earlier, the deadweight of balance support body, the support body load on the removal through-wall bolt, and then the nut of loosening through-wall bolt, and check conscientiously whether the nut of through-wall bolt is all loosening, can lift by crane after the affirmation.Vertical, steady, the slowly lifting of suspension hook in the lifting process, upper and lower in the support body both sides in addition is the cable rope that four roads keep the Combined shelf body balance altogether, lifting process operation personnel stand in the floor left-hand seat and drag cable rope coordination Combined shelf body balance, and auxiliary tower crane is suspended to Combined shelf body on the through-wall bolt of drawing up the position.Through-wall bolt must be adorned together before Combined shelf body was in place, and every through-wall bolt is joined two nuts of a pad.After support body was in place, clamp nut was plucked the tower crane suspension hook after nut is all fastening more immediately.Whether loosening, and with short steel pipes the two neighboring sections support body is connected into integral body if re-recognizing true inspection support body inside connecting rod spare before Combined shelf body uses.Begin to finish from the nut loosening of lower floor's Combined shelf body through-wall bolt to the nut of upper strata through-wall bolt is fastening.
Claims (6)
1. a single-point hangs pylon, forms operating platform by two triangle support bodys (1) and scaffold floor (6), and the outside of operating platform is connected with guardrail (5), and being fixedlyed connected with body of wall by through-wall bolt (2) in the inboard of operating platform, it is characterized in that:
Attached wall chord member (1.1), upper chord (1.2) and inclined chord (1.3) that each triangular truss (1) is made by square steel are formed by fixedly connecting, described upper chord (1.2) has the hanging groove (1.8) of downwardly facing opening at the end face near attached wall, have breach (1.9) on the square steel wall below hanging groove (1.8), have a pair of pin hole (1.4) on the two side of upper chord (1.2); The bottom of described attached wall chord member is connected with attached wall supporting leg (8); All there are bolt and pad in the end through walls and the wall outer end of described through-wall bolt (2), and it is interior fixing that Qi Qiang stretches into the outer end hanging groove (1.8) of upper chord (1.2); Described latch (3) passes from the pin hole (1.4) of upper chord (1.2) side, is supported on the bottom of through-wall bolt (2).
2. single-point according to claim 1 hangs pylon, it is characterized in that: have row's hanging hole (1.5) on the two side of described upper chord (1.2), be connected with on the hanging hole (1.5) and promote hook (4).
3. a kind of single-point according to claim 1 and 2 hangs pylon, and it is characterized in that: the outside of described upper chord (1.2) is connected with sleeve pipe (1.6), and guardrail (5) is inserted in the sleeve pipe (1.6).
4. single-point according to claim 1 and 2 hangs pylon, it is characterized in that: described attached wall chord member (1.1) is being connected with short tube (1.7) perpendicular to wall direction, and adjacent operating platform is connected to become a combination operation platform by fastener and steel pipe (7) with short tube (1.7).
5. single-point according to claim 3 hangs pylon, it is characterized in that: described attached wall chord member (1.1) is being connected with short tube (1.7) perpendicular to wall direction, and adjacent operating platform is connected to become a combination operation platform by fastener and steel pipe (7) with short tube (1.7).
6. single-point according to claim 5 hangs pylon, and it is characterized in that: described short tube (1.7) is pipe or square tube.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010201270151U CN201598820U (en) | 2010-03-10 | 2010-03-10 | Single-point suspension external hanging rack |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010201270151U CN201598820U (en) | 2010-03-10 | 2010-03-10 | Single-point suspension external hanging rack |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201598820U true CN201598820U (en) | 2010-10-06 |
Family
ID=42809873
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2010201270151U Expired - Fee Related CN201598820U (en) | 2010-03-10 | 2010-03-10 | Single-point suspension external hanging rack |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201598820U (en) |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102650148A (en) * | 2011-02-23 | 2012-08-29 | 吴淑环 | Overhang steel truss of wall technology |
| CN104533070A (en) * | 2014-12-29 | 2015-04-22 | 龙信建设集团有限公司 | Semi-automatic climbing type outer wall protection structure |
| CN104863343A (en) * | 2015-06-02 | 2015-08-26 | 江苏南通二建集团有限公司 | Externally hung construction operation frame |
| CN104975707A (en) * | 2014-04-04 | 2015-10-14 | 吴庆豪 | Trellis and its triangular support body |
| CN105113851A (en) * | 2015-09-14 | 2015-12-02 | 上海建工二建集团有限公司 | Multifunctional prefabricated assembled building construction fence and construction method thereof |
| CN106284954A (en) * | 2016-08-12 | 2017-01-04 | 成都毅诚机电工程有限公司 | A kind of air-conditioner mounting rack improving safety |
| CN106836242A (en) * | 2017-03-31 | 2017-06-13 | 湖南省第六工程有限公司 | Deep excavation cable stretching assembled operating platform |
| CN107524284A (en) * | 2017-09-18 | 2017-12-29 | 山东天齐置业集团股份有限公司 | A kind of regularization pylon protection system and installation method |
| CN111828732A (en) * | 2020-07-22 | 2020-10-27 | 中国十七冶集团有限公司 | Pipeline bracket node structure on concrete factory building column |
| CN119177772A (en) * | 2024-11-12 | 2024-12-24 | 广东中联建建筑工程有限公司 | Supporting steel platform structure of large overhanging high-altitude overrun cast-in-situ beam plate and construction method |
-
2010
- 2010-03-10 CN CN2010201270151U patent/CN201598820U/en not_active Expired - Fee Related
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102650148A (en) * | 2011-02-23 | 2012-08-29 | 吴淑环 | Overhang steel truss of wall technology |
| CN104975707A (en) * | 2014-04-04 | 2015-10-14 | 吴庆豪 | Trellis and its triangular support body |
| CN104533070A (en) * | 2014-12-29 | 2015-04-22 | 龙信建设集团有限公司 | Semi-automatic climbing type outer wall protection structure |
| CN104863343A (en) * | 2015-06-02 | 2015-08-26 | 江苏南通二建集团有限公司 | Externally hung construction operation frame |
| CN104863343B (en) * | 2015-06-02 | 2017-05-31 | 江苏南通二建集团有限公司 | Plug-in constructing operation frame |
| CN105113851A (en) * | 2015-09-14 | 2015-12-02 | 上海建工二建集团有限公司 | Multifunctional prefabricated assembled building construction fence and construction method thereof |
| CN105113851B (en) * | 2015-09-14 | 2017-11-28 | 上海建工二建集团有限公司 | A kind of construction fence and its construction method of multifunctional precast assembled architecture |
| CN106284954A (en) * | 2016-08-12 | 2017-01-04 | 成都毅诚机电工程有限公司 | A kind of air-conditioner mounting rack improving safety |
| CN106836242A (en) * | 2017-03-31 | 2017-06-13 | 湖南省第六工程有限公司 | Deep excavation cable stretching assembled operating platform |
| CN107524284A (en) * | 2017-09-18 | 2017-12-29 | 山东天齐置业集团股份有限公司 | A kind of regularization pylon protection system and installation method |
| CN111828732A (en) * | 2020-07-22 | 2020-10-27 | 中国十七冶集团有限公司 | Pipeline bracket node structure on concrete factory building column |
| CN119177772A (en) * | 2024-11-12 | 2024-12-24 | 广东中联建建筑工程有限公司 | Supporting steel platform structure of large overhanging high-altitude overrun cast-in-situ beam plate and construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201598820U (en) | Single-point suspension external hanging rack | |
| CN102661054B (en) | Lateral reinforcing structure in whole lifting of plane steel truss and whole lifting method | |
| CN201546435U (en) | Bolt fixed type inclined pulling overhanging scaffold | |
| CN202882378U (en) | Attached type lifting scaffold | |
| CN101503908B (en) | Construction method for spacing suspension cable structural template support platform | |
| CN211736298U (en) | Double-rod diagonal cantilever scaffold | |
| CN105350760B (en) | A kind of construction method of suspending scaffold | |
| CN106150057B (en) | A kind of split blade type hydraulic pressure lift climbing frame | |
| CN213572943U (en) | A high-altitude working gondola with a high hanging bracket | |
| CN202483154U (en) | High bearing capacity suspending scaffold | |
| CN203487767U (en) | Cross plate scaffold | |
| CN115807532A (en) | Device for attaching suspension bracket and construction method | |
| CN212406038U (en) | Lower hanging construction platform module of high-altitude large-cantilever steel roof truss | |
| CN209741677U (en) | A assembled work platform for high mound construction | |
| CN114876176A (en) | Adjustable long cantilever combined hanging basket and application thereof | |
| CN211173007U (en) | Novel tripod of encorbelmenting | |
| CN201148726Y (en) | Independent climbing frame super large operating platform | |
| CN207296361U (en) | A kind of regularization assembled overhanging protection canopy | |
| CN111764623A (en) | Down-hanging construction platform module and construction method of high-altitude large cantilevered steel roof truss | |
| CN201065638Y (en) | Suspended steel structure lower hanging handling frame | |
| CN105926915B (en) | Grow the construction method for workbench of encorbelmenting in Bailey beam high-altitude | |
| CN101457516B (en) | Hanging method of multilayer horizontal inhaul cable | |
| CN204038917U (en) | Detachable external hanging type operating platform | |
| CN205741935U (en) | The mounting and positioning device of Wavelike steel webplate | |
| CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101006 Termination date: 20130310 |