CN204983692U - Concrete panel's hoist device - Google Patents
Concrete panel's hoist device Download PDFInfo
- Publication number
- CN204983692U CN204983692U CN201520561260.6U CN201520561260U CN204983692U CN 204983692 U CN204983692 U CN 204983692U CN 201520561260 U CN201520561260 U CN 201520561260U CN 204983692 U CN204983692 U CN 204983692U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- hoist
- concrete panel
- fixed
- hoist engine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a concrete panel's hoist device, include: install the hoist and mount pulley on concrete floor, the fixed setting in the hoist engine of scaffold bottom, concrete panel is mentioned through driving via the wire rope of hoist and mount pulley to the hoist engine, the hoist and mount pulley is fixed with the top of scaffold. Wire rope in the hoist engine passes the hoist and mount pulley, and is fixed with the wallboard of treating hoist and mount, the hoist and mount pulley promotes the wallboard when the hoist engine contract as the fixed pulley, has replaced the operation process that the wallboard was sticked up to the manpower through the hoist engine, and the messenger operates the simplification to work efficiency has been promoted. When promoting the wallboard, can there be the trend that makes scaffold level and vertical removal to hoist engine and scaffold formation horizontally component with windlass connected's wire rope, can bring serious influence for the production safety, but because the one end fixed connection of hoist and mount pulley and scaffold, therefore avoided the scaffold removal when the promotion, and having improved the stability of scaffold, the hoist and mount process is more safe.
Description
Technical field
The utility model relates to technical field of building construction, particularly relates to a kind of hanging apparatus of concrete panel.
Background technology
Need to adopt a large amount of steam pressure sand aerated concrete wallboards when building some building, traditional construction method is that wallboard is transported to installation region, and instrument such as employing crowbar, flitch etc. is positioned by the method for artificial riser, it is in position to install.For the concrete panel highly more than 4 meters because weight is large, in work progress, location and installation is comparatively difficult, danger coefficient is very high, and required labour is more, cause that construction cost is high, the low and construction quality of efficiency of construction is difficult to control, what is more important cannot control the installation of wallboard well due to traditional construction method, as easy as rolling off a logly causes damage to wallboard, impacts the quality of construction.
Therefore, for a person skilled in the art, how designing a kind of device can installing concrete panel fast, accurately, safely, is those skilled in the art's technical issues that need to address.
Utility model content
For solving the problems of the technologies described above, the utility model provides a kind of hanging apparatus of concrete panel, comprising:
Be installed on the lifting pulley on concrete floor;
Be fixedly installed on the hoist engine bottom scaffold, described hoist engine mentions concrete panel by driving via the wire rope of described lifting pulley; The top of described lifting pulley and described scaffold is fixed.
Preferably, described lifting pulley is removably lifted on bracing frame, and support frame as described above is fixed on concrete floor and is fixedly connected with described scaffold.
Preferably, support frame as described above is inverted triangular structure, is formed by reinforcing bar and steel-pipe welding; Described scaffold is fixed on the bottom apex of triangular structure, and described lifting pulley is hooked in the summit place at support frame as described above top.
Preferably, described hoist engine is fixed on many steel pipes arranging bottom described scaffold.
Preferably, support frame as described above and described scaffold are by dismountable fastener for connection, and described steel pipe is fixedly connected with described scaffold by steel tube fastener.
Preferably, described concrete panel is fixed by wire rope.
Coordinated by the lifting pulley be lifted on concrete floor and the hoist engine be arranged on bottom scaffold and concrete panel is sling, steel wire penetrating lifting pulley in hoist engine, the other end and wallboard to be lifted are fixed, lifting pulley is as fixed pulley, promoted by wallboard when hoist engine shrinks, this operating process can greatly reduce the participation of manpower, instead of by hoist engine the operating process that manpower holds up wallboard, operation is simplified, and improves operating efficiency.When promoting wallboard, the wire rope be connected with hoist engine can form level and vertical component to hoist engine and scaffold, there is the trend that scaffold is moved horizontally, if produce mobile, serious impact can be brought to production safety, but be fixedly connected with one end of scaffold owing to lifting pulley, therefore avoid scaffold when promoting and move, improve the stability of scaffold, hoisting process is safer.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
The structural representation of the concrete panel hanging apparatus that Fig. 1 provides for the utility model.
Wherein:
Lifting pulley 1, scaffold 2, hoist engine 3, wire rope 31, bracing frame 4.
Detailed description of the invention
The purpose of this utility model is the hanging apparatus providing a kind of concrete panel, can install concrete panel more fast, accurately, safely.
In order to make those skilled in the art understand this hanging apparatus better, below in conjunction with accompanying drawing and particularly embodiment the technical solution of the utility model is described in detail.
As shown in Figure 1, be the structural representation of this concrete panel hanging apparatus.Specifically comprise the lifting pulley 1 be arranged on concrete floor, lifting pulley 1 is main load-supporting part, ensure the stability and the firmness that lift pulley 1.In the bottom of scaffold 2, hoist engine 3 is also set, the wire rope 31 that hoist engine 3 is wound around is through lifting pulley 1, the other end and concrete panel are fixed, lifting pulley 1 can be fixed with the top of scaffold 2, to ensure that scaffold can not be moved when the wallboard that lifting weight is very large, guarantee device safety in use, the wire rope be connected with hoist engine can form level and vertical component to hoist engine and scaffold, have and scaffold is moved horizontally and the trend of vertically movement, if produce mobile, serious impact can be brought to production safety.Lifting pulley 1 is as fixed pulley, and promoted by wallboard when hoist engine 3 shrinks, this operating process can greatly reduce the participation of manpower, instead of the operating process that manpower holds up wallboard, operation is simplified, and improves operating efficiency by hoist engine 3.
Concrete floor is fixedly installed bracing frame 4, and lifting pulley 1 is removably lifted on bracing frame 4, and bracing frame 4 is fixedly connected with scaffold 2.Lifting pulley 1 is fixed on bracing frame 4, and bracing frame 4 is fixed with scaffold 2 again, ensure that and can not produce relative sliding between lifting pulley 1 and scaffold 4.Ensure that stability.
Further, the shape of bracing frame 4 can be set to inverted triangle shape structure, in a kind of specific embodiment, bracing frame 4 is formed by steel pipe and reinforcement welding, guarantee that working strength reaches requirement, scaffold 2 is fixed with the bottom apex of triangle support frame 4, and lifts the summit place that pulley 1 is hooked on bracing frame 4 top.Triangle is the most stable one in geometry, adopts triangular structure design also just to ensure that enough stability, improves safety.
In the utility model, hoist engine 3 is arranged on the bottom of scaffold 2, and is fixed with many steel pipes, because during lifting, the weight of wallboard is very large, therefore many steel pipes improve the firmness between hoist engine 3 and scaffold 2.
Connected by a dismountable steel pipe between bracing frame 4 and scaffold 2, top and the bracing frame 4 of steel pipe are fixed, bottom is fixedly connected with scaffold 2 by steel tube fastener, and steel pipe may extend to ground, ensure that the degree of stability of the entirety when promoting better.
When lifting, concrete panel is fixed by the wire rope in hoist engine 3, is bundled in by wire rope on wallboard, and the position of node on the center deviation of wallboard of binding, has the angle of inclination when wallboard is lifted, more laborsaving when erecting wallboard.In addition, also can arrange multiple fixed pulley and movable pulley when lifting, can reduce the imposed load of hoist engine, be also a kind of means improving safety.
In use, be first fixed on concrete floor by triangle support frame 4 limit, scaffold 2 and bracing frame 4 fixed by the steel pipe vertically arranged, to ensure stability when promoting, hoist engine 3 is fixedly installed on the bottom of scaffold 2.After various piece is fixing, steel wire penetrating lifting pulley 1 in hoist engine 3 is bound with concrete panel to be lifted, start hoist engine 3 to shrink, wallboard is promoted, because the position of binding is at top place, the center of wallboard, therefore wallboard can form the angle of inclination, wallboard is holded up the use that can greatly reduce manpower with this, also improves efficiency during work.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the utility model.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein, when not departing from spirit or scope of the present utility model, can realize in other embodiments.Therefore, the utility model can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.
Claims (6)
1. a hanging apparatus for concrete panel, is characterized in that, comprising:
Be installed on the lifting pulley (1) on concrete floor;
Be fixedly installed on the hoist engine (3) of scaffold (2) bottom, described hoist engine (3) mentions concrete panel by driving via the wire rope (31) of described lifting pulley (1); Described lifting pulley (1) is fixed with the top of described scaffold (2).
2. the hanging apparatus of concrete panel according to claim 1, it is characterized in that, described lifting pulley (1) is removably lifted on bracing frame (4), and support frame as described above (4) is fixed on concrete floor and is fixedly connected with described scaffold (2).
3. the hanging apparatus of concrete panel according to claim 2, is characterized in that, support frame as described above (4) is inverted triangular structure, is formed by reinforcing bar and steel-pipe welding; Described scaffold (2) is fixed on the bottom apex of triangular structure, and described lifting pulley (1) is hooked in the summit place at support frame as described above (4) top.
4. the hanging apparatus of concrete panel according to claim 3, is characterized in that, described hoist engine (3) is fixed on many steel pipes of described scaffold (2) bottom setting.
5. the hanging apparatus of concrete panel according to claim 4, it is characterized in that, support frame as described above (4) and described scaffold (2) are by dismountable fastener for connection, and described steel pipe is fixedly connected with described scaffold (2) by steel tube fastener.
6. the hanging apparatus of concrete panel according to claim 5, is characterized in that, described concrete panel is fixed by wire rope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520561260.6U CN204983692U (en) | 2015-07-29 | 2015-07-29 | Concrete panel's hoist device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520561260.6U CN204983692U (en) | 2015-07-29 | 2015-07-29 | Concrete panel's hoist device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204983692U true CN204983692U (en) | 2016-01-20 |
Family
ID=55118074
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520561260.6U Expired - Fee Related CN204983692U (en) | 2015-07-29 | 2015-07-29 | Concrete panel's hoist device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204983692U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108487647A (en) * | 2018-05-31 | 2018-09-04 | 中国二十二冶集团有限公司 | Tall and big wallboard mounting device |
CN108547463A (en) * | 2018-05-31 | 2018-09-18 | 中国二十二冶集团有限公司 | Tall and big autoclaved aerated concrete batten installation equipment and installation method |
CN114988310A (en) * | 2022-06-10 | 2022-09-02 | 中建八局第一建设有限公司 | A system for inverting and transporting steel beams inside a core tube under a climbing formwork and a construction method thereof |
-
2015
- 2015-07-29 CN CN201520561260.6U patent/CN204983692U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108487647A (en) * | 2018-05-31 | 2018-09-04 | 中国二十二冶集团有限公司 | Tall and big wallboard mounting device |
CN108547463A (en) * | 2018-05-31 | 2018-09-18 | 中国二十二冶集团有限公司 | Tall and big autoclaved aerated concrete batten installation equipment and installation method |
CN114988310A (en) * | 2022-06-10 | 2022-09-02 | 中建八局第一建设有限公司 | A system for inverting and transporting steel beams inside a core tube under a climbing formwork and a construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110562868B (en) | Hoisting construction method for unit type glass curtain wall of super high-rise building | |
CN204454402U (en) | Detachable winch hanging apparatus | |
CN102121273A (en) | Hydraulic lifting inversion method for reinforced concrete chimney steel inner cylinder | |
CN110685433A (en) | Chimney construction device and construction method applying hydraulic lifting and rollover technology | |
CN111021749A (en) | Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof | |
CN203654702U (en) | Operating platform for construction of reinforced concrete chimney | |
CN204983692U (en) | Concrete panel's hoist device | |
CN102910532B (en) | Method for butting and hoisting large box type derricks in air | |
CN201703776U (en) | Inverted lifting device of storage tank | |
CN101818563B (en) | Jack-up integral lifting mobile platform and using method | |
CN103422662A (en) | Integral mobile construction platform for cast-in-place of elevator shaft and method for using same | |
CN203113793U (en) | Large formwork installation system of oblique structure | |
CN103132702A (en) | Longspan pipe truss pulling bar lifting and overhead rotating emplacing construction method | |
CN104989111A (en) | Construction method for steel structure high-rise hoisting | |
CN111648585A (en) | Construction method and device of suspended support type steel truss platform | |
CN204401999U (en) | Climbing scaffold with unloading platform | |
CN102677907A (en) | Method for manually installing steel beam at top of silo | |
CN211691536U (en) | Simple lifting mechanism for bare concrete exterior wall cladding | |
CN209702166U (en) | A kind of sound barrier plate simply installs equipment | |
CN110577162A (en) | A method and device for flipping a climbing beam of an internal climbing tower crane | |
CN217378638U (en) | Splicing seam adjusting device for mounting prefabricated box channel and box culvert | |
CN113585860B (en) | Method for assembling and disassembling double-arm holding pole | |
CN205294678U (en) | Hoist and mount of instrument formula and uninstallation device of large -scale truss structure | |
CN211897898U (en) | Sliding type high-pier tie beam formwork support system | |
CN204126237U (en) | A kind of elevator hoistway construction platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160120 Termination date: 20200729 |
|
CF01 | Termination of patent right due to non-payment of annual fee |