CN108487647A - Tall and big wallboard mounting device - Google Patents

Tall and big wallboard mounting device Download PDF

Info

Publication number
CN108487647A
CN108487647A CN201810544035.XA CN201810544035A CN108487647A CN 108487647 A CN108487647 A CN 108487647A CN 201810544035 A CN201810544035 A CN 201810544035A CN 108487647 A CN108487647 A CN 108487647A
Authority
CN
China
Prior art keywords
steel plate
wallboard
fixture
fixation steel
spanner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810544035.XA
Other languages
Chinese (zh)
Inventor
王雪峰
樊志鸿
姚东
庞磊
陈贺朝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201810544035.XA priority Critical patent/CN108487647A/en
Publication of CN108487647A publication Critical patent/CN108487647A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
    • E04G21/168Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements used for tilting, e.g. from horizontal to vertical position or vice versa
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements

Abstract

The invention discloses a kind of tall and big wallboard mounting device, including stent system, tackling system, the stent system is equipped with upright bar, cross bar, and the both ends of cross bar are connect with upright bar, the setting of cross bar interval;Tackling system is equipped with motor, pulley, fixture, steel wire rope, and fixture is clamped and connected on wallboard, and one end connection of fixture and steel wire rope, the other end of steel wire rope bypasses the driving axis connection of pulley and motor;Fixture is equipped with left fixation steel plate, right fixation steel plate, and left fixation steel plate is connect with right fixation steel plate by screw rod, and right fixation steel plate is equipped with hanging ring, and fixture is connected by one end of hanging ring and steel wire rope.The device wallboard splices after not having to cutting, and monoblock wallboard can be mounted directly, and lowers labour's input and less waste of material, reduces construction cost.

Description

Tall and big wallboard mounting device
Technical field
The present invention relates to architectural furniture, specifically a kind of tall and big wallboard mounting device.
Background technology
In concrete frame structure, vertical wall mostly uses light weight board.It is not high for floor height at the scene in work progress Floor, wallboard installation generally relies on manpower plank withstood to upper layer beam upwards, the installation method held out against below with scotch block.When When floor height is larger, since monolithic wallboard weight is larger, wallboard standing can not be come only according to manpower, the method for generally use splicing, Will two blocks of short wallboards vertically splice growth wallboard.The connection type of this splicing is needed according to floor height to plate cutting, between plate It needs to clog dedicated mortar, installation is relatively cumbersome, and the globality of board wall receives weakening.
Invention content
The technical problem to be solved in the present invention is to provide a kind of tall and big wallboard mounting devices, after which does not have to cutting Splicing, monoblock wallboard can be mounted directly, and lowered labour's input and less waste of material, reduced construction cost.
In order to solve the above technical problems, the present invention adopts the following technical scheme that:
A kind of tall and big wallboard mounting device, including stent system, tackling system, the stent system is equipped with upright bar, cross bar, horizontal The both ends of bar are connect with upright bar, the setting of cross bar interval;Tackling system is equipped with motor, pulley, fixture, steel wire rope, fixture clamping It is connected on wallboard, the other end of one end connection of fixture and steel wire rope, steel wire rope connects around the drive shaft of pulley and motor It connects;Fixture is equipped with left fixation steel plate, right fixation steel plate, and left fixation steel plate is connect with right fixation steel plate by screw rod, right fixed steel Plate is equipped with hanging ring, and fixture is connected by one end of hanging ring and steel wire rope.
The operation principle and process of the present invention is as follows:
(1)The side of position of wallboards need to be installed by placing the device in.
(2)It will be leaned against on Vierendeel girder at the top of machinery mount, ensure that machinery and ground angle between 60o ~ 75o, ensure to apply Worker person can normally climb operation;
(3)300mm height and positions bore circular hole at the top of wallboard medium spacing.
(4)Wallboard is transported to installation site and the bottom end of wallboard to be mounted will be needed to be disposed close to equipment side.
(5)The circular hole of wallboard is passed through to be connect with right stationary fixture with the screw rod of left stationary fixture.
(6)One end of the hanging ring of right stationary fixture and steel wire rope is connected.
(7)Start motor switch, wallboard is drawn by pulley and suspender and erected come wallboard is revolved around its bottom end by steel wire rope Turn, gradually lifting closes motor vertically to wallboard design position after wallboard lifts and designs position to wallboard.
(8)Wallboard verticality and flatness are manually adjusted to code requirement.
(9)Wallboard fixed frame is installed, fixture is extractd after the processing of gap between wallboard, completes installation.
Using the present invention of above-mentioned technical proposal, compared with prior art, the feature protruded is:
Machinery production is simple, easy to operation, and wallboard speed of application is fast, saves labour, improves construction quality, reduces into This.
Further optimal technical scheme is as follows:
One end of the screw rod is welded to connect with left fixation steel plate, and right fixation steel plate is equipped with connecting hole, and connecting hole connects spiral shell The other end of bar, screw rod are fixed with right fixation steel plate by nut.
By the way that screw rod, connecting hole is arranged, convenient for being connected and fixed left fixation steel plate and right fixation steel plate using screw rod.
The hanging ring is U-shaped ring, and two ends and the right fixation steel plate of U-shaped ring are welded to connect.
It is convenient for connecting with steel wire rope using U-shaped ring by the way that U-shaped ring is arranged.
Anti-skidding timber wedge is equipped between the upright bar bottom end and ground.
By the way that anti-skidding timber wedge is arranged, it can prevent the present apparatus from slipping, cause danger.
Multifunctional wrench is equipped between the wallboard bottom end and ground, multifunctional wrench one end is equipped with spanner support base, Spanner support base is wedge shape, and spanner support base is arranged between wallboard bottom end and ground, one end of spanner support base and spanner handle Connection, spanner handle are obliquely installed, and spanner supporting block is equipped between spanner handle and ground.
By the way that multifunctional wrench is arranged, during the installation process, the fine tuning of position can be carried out to wallboard.Spanner supporting block exists It can be supported after adjusting, keep wallboard more stable.
The thicker one end of the spanner support base is equipped with vertically arranged baffle, and spanner support base passes through baffle and spanner Handle connects.
By the way that baffle is arranged, when carrying out the fine tuning of position to wallboard, baffle can apply lateral force to wallboard, convenient for adjusting Section.
Description of the drawings
Fig. 1 is hoisting process schematic diagram of the embodiment of the present invention;
Fig. 2 is the front view of stent system;
Fig. 3 is the sectional view of fixture;
Fig. 4 is the structural schematic diagram of multifunctional wrench;
Reference sign:1:Upright bar;2:Cross bar;3:Stent system;4:Tackling system;5:Pulley;6:Fixture;7:Left fixed steel Plate;8:Screw rod;9:Right fixation steel plate;10:U-shaped ring;11:Motor;12:Steel wire rope;13:Circular hole;14:Wallboard;15:Non-slip wood Wedge;16:H-type card; 17:Multifunctional wrench;18:Spanner support base;19:Spanner handle;20:Spanner supporting block;21:Baffle.
Specific implementation mode
The present invention is described in detail with reference to the accompanying drawings and embodiments.
Referring to Fig. 1, Fig. 2 and Fig. 3, a kind of tall and big wallboard mounting device is made of stent system 3, tackling system 4;Holder System 3 is equipped with upright bar 1, cross bar 2, and the both ends of cross bar 2 are connect with upright bar 1, the setting of the interval of cross bar 2;Tackling system 4 is equipped with motor 11, pulley 5, fixture 6, steel wire rope 12, fixture 6 are clamped and connected on wallboard 14, and fixture 6 is connect with one end of steel wire rope 12, steel The other end of cord 12 bypasses the driving axis connection of pulley 5 and motor 11;Fixture 6 is equipped with left fixation steel plate 7, right fixation steel plate 9, left fixation steel plate 7 is connect with right fixation steel plate 9 by screw rod 8, and right fixation steel plate 9 is equipped with hanging ring, and fixture 6 passes through hanging ring and steel One end of cord 12 connects.
One end of screw rod 8 is welded to connect with left fixation steel plate 7, and right fixation steel plate 9 is equipped with connecting hole, and connecting hole connects spiral shell The other end of bar 8, screw rod 8 are fixed with right fixation steel plate 9 by nut.
By the way that screw rod 8, connecting hole is arranged, convenient for being connected and fixed left fixation steel plate 7 and right fixation steel plate 9 using screw rod 8.
Hanging ring is U-shaped ring 10, and two ends and the right fixation steel plate 9 of U-shaped ring 10 are welded to connect.
It is convenient for connecting with steel wire rope 12 using U-shaped ring 10 by the way that U-shaped ring 10 is arranged.
Anti-skidding timber wedge 15 is equipped between 1 bottom end of upright bar and ground.
By the way that anti-skidding timber wedge 15 is arranged, it can prevent the present apparatus from slipping, cause danger.
In conjunction with Fig. 1, Fig. 4, multifunctional wrench 17 is equipped between 14 bottom end of wallboard and ground, 17 one end of multifunctional wrench is equipped with Spanner support base 18, spanner support base 18 are wedge shape, and spanner support base 18 is arranged between 14 bottom end of wallboard and ground, spanner branch One end of support seat 18 is connect with spanner handle 19, and spanner handle 19 is obliquely installed, and spanner supporting block is equipped between spanner handle 19 and ground 20。
It is equipped with H-type card 16 between 14 bottom end of wallboard and top surface, wallboard 14 is fixed for jam-packed.
By the way that multifunctional wrench 17 is arranged, during the installation process, the fine tuning of position can be carried out to wallboard 14.Spanner supports Block 20 can support after adjusting, and keep wallboard 14 more stable.
The thicker one end of spanner support base 18 be equipped with vertically arranged baffle 21, spanner support base 18 by baffle 21 with pull Handle 19 connects.
By the way that baffle 21 is arranged, when carrying out the fine tuning of position to wallboard 14, baffle 21 can apply lateral force to wallboard 14, Convenient for adjusting.
The operation principle and process of the present embodiment is as follows:
(1)The side of 14 position of wallboard need to be installed by placing the device in.
(2)It will be leaned against on Vierendeel girder at the top of machinery mount, ensure that machinery and ground angle between 60o ~ 75o, ensure to apply Worker person can normally climb operation;
(3)300mm height and positions bore circular hole 13 at the top of 14 medium spacing of wallboard.
(4)Wallboard 14 is transported to installation site and the bottom end of wallboard 14 to be mounted will be needed to be disposed close to equipment one Side.
(5)The circular hole 13 of wallboard 14 is passed through to be connect with right stationary fixture 6 with the screw rod 8 of left stationary fixture 6.
(6)The hanging ring of right stationary fixture 6 is connect with one end of steel wire rope 12.
(7)Start motor 11 to switch, steel wire rope 12 wallboard 14 is drawn by pulley 5 and suspender erect come, wallboard 14 around Its bottom end rotates, and gradually lifting is closed electronic vertically to 14 design position of wallboard after the lifting of wallboard 14 designs position to wallboard 14 Machine 11.
(8)14 verticality of wallboard and flatness are manually adjusted to code requirement.
(9)14 fixed frame of wallboard is installed, fixture 6 is extractd after the processing of gap between wallboard 14, completes installation.
The present embodiment is simple in structure, easy to make, easy to operation, and 14 speed of application of wallboard is fast, saves labour, improves Construction quality, reduces cost.
The foregoing is merely preferably feasible embodiments of the invention, not thereby limit to the interest field of the present invention, It is all to change with equivalent structure made by description of the invention and accompanying drawing content, it is both contained within the interest field of the present invention.

Claims (6)

1. a kind of tall and big wallboard mounting device, including stent system, tackling system, it is characterised in that:The stent system is set There are upright bar, cross bar, the both ends of cross bar to be connect with upright bar, the setting of cross bar interval;Tackling system is equipped with motor, pulley, fixture, steel Cord, fixture are clamped and connected on wallboard, the connection of one end of fixture and steel wire rope, the other end of steel wire rope around pulley with it is electronic The driving axis connection of machine;Fixture is equipped with left fixation steel plate, right fixation steel plate, and left fixation steel plate is connected with right fixation steel plate by screw rod It connects, right fixation steel plate is equipped with hanging ring, and fixture is connected by one end of hanging ring and steel wire rope.
2. tall and big wallboard mounting device according to claim 1, it is characterised in that:One end of the screw rod and left fixation Steel plate is welded to connect, and right fixation steel plate is equipped with connecting hole, the other end of connecting hole connecting screw, and screw rod leads to right fixation steel plate Nut is crossed to fix.
3. tall and big wallboard mounting device according to claim 1, it is characterised in that:The hanging ring is U-shaped ring, U-shaped ring Two ends be welded to connect with right fixation steel plate.
4. tall and big wallboard mounting device according to claim 1, it is characterised in that:Between the upright bar bottom end and ground Equipped with anti-skidding timber wedge.
5. tall and big wallboard mounting device according to claim 1, it is characterised in that:Between the wallboard bottom end and ground Equipped with multifunctional wrench, multifunctional wrench one end is equipped with spanner support base, and spanner support base is wedge shape, and the setting of spanner support base exists Between wallboard bottom end and ground, one end of spanner support base is connect with spanner handle, and spanner handle is obliquely installed, spanner handle and ground it Between be equipped with spanner supporting block.
6. tall and big wallboard mounting device according to claim 5, it is characterised in that:The spanner support base it is thicker one End is equipped with vertically arranged baffle, and spanner support base is connect by baffle with spanner handle.
CN201810544035.XA 2018-05-31 2018-05-31 Tall and big wallboard mounting device Withdrawn CN108487647A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810544035.XA CN108487647A (en) 2018-05-31 2018-05-31 Tall and big wallboard mounting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810544035.XA CN108487647A (en) 2018-05-31 2018-05-31 Tall and big wallboard mounting device

Publications (1)

Publication Number Publication Date
CN108487647A true CN108487647A (en) 2018-09-04

Family

ID=63351373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810544035.XA Withdrawn CN108487647A (en) 2018-05-31 2018-05-31 Tall and big wallboard mounting device

Country Status (1)

Country Link
CN (1) CN108487647A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323420A (en) * 2021-06-29 2021-08-31 吉林建筑大学 Prefabricated building wallboard pre-positioning device and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000001904A1 (en) * 1998-07-03 2000-01-13 Sarremejeanne Guy Robert Mobile horizontal platform for prefabrication on building site and for successively placing masonry parts
CN204983692U (en) * 2015-07-29 2016-01-20 中建八局第四建设有限公司 Concrete panel's hoist device
CN205151516U (en) * 2015-11-10 2016-04-13 河北晶通建筑科技有限公司 Simple and easy hoist and mount of prefabricated wallboard
CN205873728U (en) * 2016-07-01 2017-01-11 广东省工业设备安装有限公司 Portable jack -up lifting device of superelevation building platform
CN208251658U (en) * 2018-05-31 2018-12-18 中国二十二冶集团有限公司 Tall and big wallboard mounting device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000001904A1 (en) * 1998-07-03 2000-01-13 Sarremejeanne Guy Robert Mobile horizontal platform for prefabrication on building site and for successively placing masonry parts
CN204983692U (en) * 2015-07-29 2016-01-20 中建八局第四建设有限公司 Concrete panel's hoist device
CN205151516U (en) * 2015-11-10 2016-04-13 河北晶通建筑科技有限公司 Simple and easy hoist and mount of prefabricated wallboard
CN205873728U (en) * 2016-07-01 2017-01-11 广东省工业设备安装有限公司 Portable jack -up lifting device of superelevation building platform
CN208251658U (en) * 2018-05-31 2018-12-18 中国二十二冶集团有限公司 Tall and big wallboard mounting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323420A (en) * 2021-06-29 2021-08-31 吉林建筑大学 Prefabricated building wallboard pre-positioning device and method

Similar Documents

Publication Publication Date Title
US7559409B2 (en) Procedure and apparatus for the installation of an elevator
US20060207215A1 (en) Retractable brace
US20070175174A1 (en) Retractable brace
WO2010056202A1 (en) Mobile cantilever platforms and methods of installation thereof
CN211647383U (en) ALC wallboard installation device
CN208251658U (en) Tall and big wallboard mounting device
CN108487647A (en) Tall and big wallboard mounting device
CN109138457B (en) Support system for installing prefabricated building and construction method thereof
CN213328682U (en) Mounting structure suitable for heavy scattered cable saddle
KR20040097542A (en) Carrier for curtain-wall panel establishing use and curtain-wall establishing method using the same
CN112459504B (en) Aerated concrete wallboard installation method
JP2659170B2 (en) Pole column ground assembly equipment
CN214144786U (en) A reinforcement auxiliary device for job site
JP3950800B2 (en) Suspension scaffold
CN105819352B (en) Lifting device for detachable door type mast building and construction method thereof
CN108425634A (en) A kind of anchor cable of adjustable-angle pulls out light rig job platform
CN209618738U (en) The light and small vertical auxiliary stand of heavy-duty hoisting equipment
CN112681732A (en) Supporting system of assembled composite membrane shell beam and construction method thereof
JP3029500B2 (en) All-weather building automatic construction method
CN206033014U (en) Lever apparatus is taken off to anchor clamps formula
CN110054095A (en) Movable curtain wall is sat on the fence hanging device
CN217151322U (en) Detachable and portable guy rope fixing device
CN220150927U (en) Reinforcing apparatus of platform of unloading
CN217676488U (en) Large-size ceramic rod roof hanging bracket
CN212671139U (en) Efficient and labor-saving wall-hung type decoration tool for roof parapet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180904