CN204126237U - A kind of elevator hoistway construction platform - Google Patents

A kind of elevator hoistway construction platform Download PDF

Info

Publication number
CN204126237U
CN204126237U CN201420656863.XU CN201420656863U CN204126237U CN 204126237 U CN204126237 U CN 204126237U CN 201420656863 U CN201420656863 U CN 201420656863U CN 204126237 U CN204126237 U CN 204126237U
Authority
CN
China
Prior art keywords
hoistway
longeron
lift port
elevator
brace summer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420656863.XU
Other languages
Chinese (zh)
Inventor
朱晓东
于科
左京力
黄红喜
包妍
王锡杰
何默
聂红恩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201420656863.XU priority Critical patent/CN204126237U/en
Application granted granted Critical
Publication of CN204126237U publication Critical patent/CN204126237U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a kind of elevator hoistway construction platform, comprise operating platform and support, operating platform comprises rectangular mesh framework, and framework underside is connected with two brace summers in parallel, and brace summer two ends are respectively towards the side that the lift port side of hoistway is relative with lift port; Support comprises the longeron being positioned at lift port side hoistway and being connected with brace summer one end, and the brace summer other end is connected with cant beam, and the lower end of cant beam is connected with longeron respectively; The side that longeron is positioned at lift port is provided with Ka Liang.The crossbeam of framework near hoistway relative elevator mouth side is provided with for holding out against the leading screw that well enclosure diameter is 36mm.The beneficial effect of this programme can be learnt according to describing of such scheme, and structure is simple, reasonable in design, reasonable stress, safe and reliable, improve the safety of elevator hoistways construction, operation convenience, and accelerate speed of application, improve production efficiency, reduce cost.

Description

一种电梯井施工平台An elevator shaft construction platform

技术领域 technical field

本实用新型涉及一种建筑施工安全领域,尤其涉及一种电梯井施工平台。 The utility model relates to the field of building construction safety, in particular to an elevator shaft construction platform.

背景技术 Background technique

随着我国城市化程度的提升,土地资源越来越紧缺,高层建筑物可以更有效的利用、合理分配有限的土地资源,全国各地大量兴建高层、超高层建筑,给人们生活带来了极大的便利。但高层建筑施工难度大、危险系数高,尤其是高层建筑物内部的电梯井道部位,由于上下贯通,危险系数较大,因此,施工人员在进行墙体钢筋绑扎、模板施工、混凝土浇筑、模板拆除等相关施工工作时,必须搭设安全操作平台以方便进行施工,但传统的操作平台搭设工艺操作复杂、难度大,搭设质量不易保证,且搭设过程危险系数较高。授权公告号 CN 202090578 U的专利文件提到了一种专用的电梯井道施工平台,但该专利结构较为复杂,底部宽度和整体高度都较大,在电梯井道里上下吊运和固定安装都较为费劲,影响施工效率。 With the improvement of the degree of urbanization in our country, land resources are becoming more and more scarce. High-rise buildings can be used more effectively and rationally allocate limited land resources. A large number of high-rise and super high-rise buildings have been built all over the country, which has brought great impact to people's lives. convenience. However, the construction of high-rise buildings is difficult and has a high risk factor. Especially the elevator shaft inside the high-rise building has a high risk factor due to its vertical connection. Therefore, construction workers are carrying out wall reinforcement binding, formwork construction, concrete pouring, and formwork removal. For related construction work, a safe operation platform must be set up to facilitate construction. However, the traditional operation platform erection process is complicated and difficult to operate, the erection quality is not easy to guarantee, and the risk factor in the erection process is high. The patent document of the authorized announcement number CN 202090578 U mentions a special elevator shaft construction platform, but the patent structure is relatively complicated, the bottom width and the overall height are large, and it is difficult to lift up and down the elevator shaft and fix it. affect construction efficiency.

实用新型内容 Utility model content

本实用新型是针对现有技术所存在的不足,而提供了一种结构简单、设计合理,安全可靠,吊装方便,提高了生产效率,降低了成本的电梯井施工平台。 The utility model aims at the deficiencies of the prior art, and provides an elevator shaft construction platform with simple structure, reasonable design, safety and reliability, convenient hoisting, improved production efficiency and reduced cost.

为了实现上述目的,本实用新型提供了一种电梯井施工平台,包括操作平台和支架,所述操作平台包括纵横交叉的横梁构成与楼板平行的矩形网格框架,所述框架下侧连接有两根与其平行的支撑梁,所述支撑梁两端分别朝向井道的电梯口一侧和电梯口相对的一侧; In order to achieve the above object, the utility model provides an elevator shaft construction platform, which includes an operating platform and a bracket. The operating platform includes vertically and horizontally crossing beams to form a rectangular grid frame parallel to the floor. A support beam parallel to it, the two ends of the support beam are respectively facing the side of the elevator entrance of the hoistway and the opposite side of the elevator entrance;

所述支架包括位于电梯口一侧井道与所述支撑梁一端连接的纵梁,所述支撑梁另一端连接有斜梁,所述斜梁的下端分别与所述纵梁连接; The support includes a longitudinal beam connected to one end of the support beam located in the shaft on one side of the elevator entrance, the other end of the support beam is connected to a slanted beam, and the lower ends of the slanted beam are respectively connected to the longitudinal beam;

所述纵梁位于电梯口的一侧设置有用于支撑在电梯口楼板上防止所述支架下滑的卡梁。 The side of the longitudinal beam located at the elevator entrance is provided with a card beam for supporting on the floor of the elevator entrance to prevent the support from sliding down.

进一步地,所述框架靠近所述井道相对电梯口一侧的横梁设置有用于顶紧井道壁直径为36mm的丝杠。 Further, the beam of the frame near the side of the hoistway opposite to the elevator entrance is provided with a lead screw with a diameter of 36mm for tightening the hoistway wall.

所述纵梁和斜梁之间设置有加强梁。 A reinforcing beam is arranged between the longitudinal beam and the inclined beam.

所述横梁、支撑梁、纵梁、斜梁、加强梁以及卡梁均为C14b槽钢制作。 The beams, supporting beams, longitudinal beams, inclined beams, reinforcing beams and card beams are all made of C14b channel steel.

使用时,下层电梯井道混凝土浇筑完毕拆除模板后,将本实用新型通过塔吊吊入电梯井道内部,将卡梁支撑在下层结构楼板面上,下部支撑好以后,再将上部丝杠拧紧,从而使操作平台外端与井道紧密相接,方便施工人员在操作平台上进行钢筋绑扎、支设模板、拆除模板、混凝土面层修补等工作,待该层施工结束后,放松丝杠,然后通过塔吊将其吊升至上面一层继续周转使用。 When in use, after the concrete pouring of the elevator shaft on the lower floor is completed and the formwork is removed, the utility model is hoisted into the interior of the elevator shaft by a tower crane, and the card beam is supported on the floor of the lower structure. After the lower part is supported, the upper screw is tightened, so that The outer end of the operation platform is closely connected with the hoistway, which is convenient for construction personnel to perform work such as steel bar binding, formwork support, formwork removal, concrete surface repair, etc. on the operation platform. It is hoisted to the upper floor and continues to be used for turnover.

本方案的有益效果可根据对上述方案的叙述得知,结构简单,设计合理,受力合理,安全可靠,提高了电梯井道施工的安全性、操作方便性,而且加快了施工速度,提高了生产效率,降低了成本。侧面的三角形形状方便在电梯井道中上下吊运,固定安装方便。采用C14b号槽钢焊接成型的技术方案,使用方便。 The beneficial effect of this scheme can be known from the description of the above scheme. It has simple structure, reasonable design, reasonable force, safety and reliability, improves the safety of elevator shaft construction and convenient operation, and speeds up construction and improves production. efficiency and reduce costs. The triangular shape on the side is convenient for lifting up and down in the elevator shaft, and it is convenient for fixed installation. It adopts the technical scheme of welding and forming C14b channel steel, which is convenient to use.

附图说明 Description of drawings

图1为本实用新型具体实施方式的结构示意图; Fig. 1 is the structural representation of the specific embodiment of the utility model;

图2为本实用新型具体实施方式的俯视图; Fig. 2 is the top view of the specific embodiment of the utility model;

图3为本实用新型具体实施方式的右视图; Fig. 3 is the right side view of the specific embodiment of the utility model;

图中,1、操作平台;2、支架;3、横梁;4、支撑梁;5、井道;6、电梯口;7、纵梁;8、斜梁;9、卡梁;10、丝杠;11、加强梁;12、楼板;13、井道壁。 In the figure, 1. Operating platform; 2. Bracket; 3. Beam; 4. Support beam; 5. Well; 6. Elevator entrance; 7. Longitudinal beam; 11. Reinforcing beam; 12. Floor slab; 13. Well wall.

具体实施方式 Detailed ways

为能清楚说明本方案的技术特点,下面通过具体实施方式,对本方案进行阐述。 In order to clearly illustrate the technical features of the solution, the solution will be described below through specific implementation modes.

如图1-3所示,本实用新型是一种电梯井施工平台,包括操作平台1和支架2,操作平台1包括纵横交叉的横梁3构成与楼板平行的矩形网格框架,框架下侧连接有两根与其平行的支撑梁4,支撑梁4两端分别朝向井道5的电梯口6一侧和电梯口6相对的一侧;支架2包括位于电梯口6一侧井道5与支撑梁4一端连接的纵梁7,支撑梁4另一端连接有斜梁8,斜梁8的下端分别与纵梁7连接,纵梁和斜梁之间设置有加强梁11;纵梁7位于电梯口6的一侧设置有用于支撑在电梯口6楼板12上防止支架2下滑的卡梁9。框架靠近井道5相对电梯口6一侧的横梁3设置有用于顶紧井道5壁直径为36mm的丝杠10。横梁3、支撑梁4、纵梁7、斜梁8、加强梁11以及卡梁9均为C14b槽钢制作。 As shown in Figures 1-3, the utility model is a construction platform for an elevator shaft, including an operating platform 1 and a bracket 2. The operating platform 1 includes vertically and horizontally intersecting beams 3 to form a rectangular grid frame parallel to the floor, and the lower side of the frame is connected. There are two supporting beams 4 parallel to it, and the two ends of the supporting beams 4 are respectively facing the side of the elevator entrance 6 of the hoistway 5 and the side opposite to the elevator entrance 6; The longitudinal beam 7 connected at one end, the other end of the supporting beam 4 is connected with the inclined beam 8, the lower ends of the inclined beams 8 are respectively connected with the longitudinal beam 7, and a reinforcing beam 11 is arranged between the longitudinal beam and the inclined beam; the longitudinal beam 7 is located at the elevator entrance 6 One side is provided with the card beam 9 that is used to support on the floor 12 of the elevator entrance 6 to prevent the support 2 from sliding down. The frame is provided with a leading screw 10 that is used to tighten the shaft 5 wall diameter and is 36mm near the crossbeam 3 on the side of the shaft 5 opposite to the elevator entrance 6 . The beam 3, the supporting beam 4, the longitudinal beam 7, the inclined beam 8, the reinforcing beam 11 and the card beam 9 are all made of C14b channel steel.

使用时,下层电梯井道5混凝土浇筑完毕拆除模板后,将本实用新型通过塔吊吊入电梯井道5内部,将卡梁9支撑在下层结构楼板12面上,下部支撑好以后,再将上部丝杠10与井道壁13拧紧,从而使操作平台1外端与井道壁13紧密相接,方便施工人员在操作平台1上进行钢筋绑扎、支设模板、拆除模板、混凝土面层修补等工作,待该层施工结束后,放松丝杠10,然后通过塔吊将其吊升至上面一层继续周转使用。 During use, after the concrete pouring of the lower elevator shaft 5 is completed and the formwork is removed, the utility model is hoisted into the inside of the elevator shaft 5 by a tower crane, and the card beam 9 is supported on the lower structure floor 12. After the lower part is supported, the upper leading screw 10 is tightened with the hoistway wall 13, so that the outer end of the operation platform 1 is closely connected with the hoistway wall 13. After layer construction finishes, loosen lead screw 10, then by tower crane, it is hoisted to the upper layer to continue turnover and use.

本实用新型未经描述的技术特征能够通过或采用现有技术实现,在此不再赘述,当然,上述说明并非是对本实用新型的限制,本实用新型也并不仅限于上述举例,本技术领域的普通技术人员在本实用新型的实质范围内所做出的变化、改型、添加或替换,也应属于本实用新型的保护范围。 The undescribed technical features of the utility model can be realized by or adopting the prior art, and will not be repeated here. Of course, the above description is not a limitation of the utility model, and the utility model is not limited to the above examples. Changes, modifications, additions or substitutions made by ordinary skilled persons within the essential scope of the present utility model shall also belong to the protection scope of the present utility model.

Claims (4)

1. an elevator hoistway construction platform, comprise operating platform and support, it is characterized in that, described operating platform comprises the crossbeam intersected in length and breadth and forms the rectangular mesh framework parallel with floor, described framework underside is connected with two brace summers in parallel, and described brace summer two ends are respectively towards the side that the lift port side of hoistway is relative with lift port;
Described support comprises the longeron being positioned at lift port side hoistway and being connected with described brace summer one end, and the described brace summer other end is connected with cant beam, and the lower end of described cant beam is connected with described longeron respectively;
The side that described longeron is positioned at lift port is provided with for being supported on the Ka Liang that lift port floor prevents described support from gliding.
2. elevator hoistway construction platform according to claim 1, is characterized in that, the crossbeam of described framework near described hoistway relative elevator mouth side is provided with for holding out against the leading screw that well enclosure diameter is 36mm.
3. elevator hoistway construction platform according to claim 1 and 2, is characterized in that, is provided with stiffening girder between described longeron and cant beam.
4. elevator hoistway construction platform according to claim 3, is characterized in that, described crossbeam, brace summer, longeron, cant beam, stiffening girder and Ka Liang are C14b channel-section steel and make.
CN201420656863.XU 2014-11-05 2014-11-05 A kind of elevator hoistway construction platform Expired - Fee Related CN204126237U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420656863.XU CN204126237U (en) 2014-11-05 2014-11-05 A kind of elevator hoistway construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420656863.XU CN204126237U (en) 2014-11-05 2014-11-05 A kind of elevator hoistway construction platform

Publications (1)

Publication Number Publication Date
CN204126237U true CN204126237U (en) 2015-01-28

Family

ID=52382604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420656863.XU Expired - Fee Related CN204126237U (en) 2014-11-05 2014-11-05 A kind of elevator hoistway construction platform

Country Status (1)

Country Link
CN (1) CN204126237U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805258A (en) * 2019-11-18 2020-02-18 广西途辉建筑工程有限公司 Double triangle support elevator shaft operating platform and construction method
CN111362097A (en) * 2020-03-25 2020-07-03 上海菱光电梯配件有限公司 Assembling structure of elevator accessory

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805258A (en) * 2019-11-18 2020-02-18 广西途辉建筑工程有限公司 Double triangle support elevator shaft operating platform and construction method
CN111362097A (en) * 2020-03-25 2020-07-03 上海菱光电梯配件有限公司 Assembling structure of elevator accessory

Similar Documents

Publication Publication Date Title
CN104314304B (en) The comprehensive formwork system of varus is climbed outside aluminium in a kind of outer steel
CN107190964A (en) A kind of construction method of prefabricated hoistway operation platform
CN202509754U (en) High-altitude steel structure node construction working platform
CN203878965U (en) Device for construction of elevator shaft
CN204703534U (en) A kind of large-scale unit plates of curtain wall two-rail hanging apparatus
CN102031862A (en) Constructing method for high-rise building elevator shaft through elevating type safety protection steel platform
CN203113793U (en) Large formwork installation system of oblique structure
CN204126237U (en) A kind of elevator hoistway construction platform
CN205296799U (en) Construction of elevator well and protection platform
CN103074871A (en) Arc-shaped slope concrete sliding and lifting template
CN204280974U (en) A kind of template hoisting device
CN202731276U (en) Independent discharge platform capable of synchronously lifting with external lifting scaffold
CN202882376U (en) Elevator shaft template support platform
CN205421890U (en) Die carrier bearing beam
CN209353734U (en) For installing the double-track device of curtain wall
CN204626965U (en) For the steel stair template of poured up at a time between architectural stair
CN206554485U (en) Hoisting type operating platform in a kind of vertical shaft
CN107268971A (en) Double self-lifting type climbing frame of super high-rise building and application method
CN102154989A (en) Steel-concrete structure hanging box and dismantling method thereof
CN201729631U (en) Truss type platform lifting device for constructing on top portions of tall and big spaces
CN204492173U (en) Elevator shaft integral lifting template operation platform
CN203755677U (en) Lower suspension hoisting type hoisting device for reinforced concrete floor construction
CN104652802B (en) Steel reinforced concrete structure operation platform
CN207073274U (en) A double self-elevating external climbing frame for super high-rise buildings
CN208429787U (en) A self-detachable rotatable telescopic steel structure platform device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150128

Termination date: 20191105

CF01 Termination of patent right due to non-payment of annual fee