CN204126237U - A kind of elevator hoistway construction platform - Google Patents
A kind of elevator hoistway construction platform Download PDFInfo
- Publication number
- CN204126237U CN204126237U CN201420656863.XU CN201420656863U CN204126237U CN 204126237 U CN204126237 U CN 204126237U CN 201420656863 U CN201420656863 U CN 201420656863U CN 204126237 U CN204126237 U CN 204126237U
- Authority
- CN
- China
- Prior art keywords
- hoistway
- longeron
- lift port
- brace summer
- elevator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Types And Forms Of Lifts (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The utility model discloses a kind of elevator hoistway construction platform, comprise operating platform and support, operating platform comprises rectangular mesh framework, and framework underside is connected with two brace summers in parallel, and brace summer two ends are respectively towards the side that the lift port side of hoistway is relative with lift port; Support comprises the longeron being positioned at lift port side hoistway and being connected with brace summer one end, and the brace summer other end is connected with cant beam, and the lower end of cant beam is connected with longeron respectively; The side that longeron is positioned at lift port is provided with Ka Liang.The crossbeam of framework near hoistway relative elevator mouth side is provided with for holding out against the leading screw that well enclosure diameter is 36mm.The beneficial effect of this programme can be learnt according to describing of such scheme, and structure is simple, reasonable in design, reasonable stress, safe and reliable, improve the safety of elevator hoistways construction, operation convenience, and accelerate speed of application, improve production efficiency, reduce cost.
Description
Technical field
The utility model relates to a kind of construction safety field, particularly relates to a kind of elevator hoistway construction platform.
Background technology
Along with the lifting of Chinese Urbanization degree, land resources is more and more in short supply, the land resources that high-rise building can more effectively utilize, reasonable distribution is limited, and all parts of the country build high level, super highrise building in a large number, brings great convenience to people's life.But high-building construction difficulty is large, danger coefficient is high, especially the elevator hoistways position of high-rise building inside, due to up/down perforation, danger coefficient is comparatively large, and therefore, constructor is when carrying out the associated construction work such as wall steel bar colligation, template construction, concreting, form removable, safe operation platform must be set up construct to facilitate, but complex operation set up by traditional operating platform, difficulty is large, set up quality and not easily ensure, and it is higher to set up process hazard coefficient.The patent document of Authorization Notice No. CN 202090578 U refer to a kind of special elevator hoistways operation platform, but this patent structure is comparatively complicated, bottom width and whole height are all comparatively large, and in elevator hoistways, upper and lower handling and fixed installation are all comparatively hard, affect efficiency of construction.
Utility model content
The utility model is for the deficiency existing for prior art, and it is simple, reasonable in design to provide a kind of structure, safe and reliable, and lifting is convenient, improves production efficiency, reduces the elevator hoistway construction platform of cost.
To achieve these goals, the utility model provides a kind of elevator hoistway construction platform, comprise operating platform and support, described operating platform comprises the crossbeam intersected in length and breadth and forms the rectangular mesh framework parallel with floor, described framework underside is connected with two brace summers in parallel, and described brace summer two ends are respectively towards the side that the lift port side of hoistway is relative with lift port;
Described support comprises the longeron being positioned at lift port side hoistway and being connected with described brace summer one end, and the described brace summer other end is connected with cant beam, and the lower end of described cant beam is connected with described longeron respectively;
The side that described longeron is positioned at lift port is provided with for being supported on the Ka Liang that lift port floor prevents described support from gliding.
Further, the crossbeam of described framework near described hoistway relative elevator mouth side is provided with for holding out against the leading screw that well enclosure diameter is 36mm.
Stiffening girder is provided with between described longeron and cant beam.
Described crossbeam, brace summer, longeron, cant beam, stiffening girder and Ka Liang are C14b channel-section steel and make.
During use, after the complete stripping of lower floor's elevator hoistways concreting, the utility model is hung in elevator hoistways inside by tower crane, Ka Liang is supported on substructure floor face, after lower support is good, again upper spindle is tightened, thus make operating platform outer end and hoistway close proximity, the work such as convenient construction personnel carry out reinforcing bar binding on the operational platform, install template, stripping, concrete pavement repairing, after this layer of construction terminates, loosen leading screw, then hung by tower crane and rise to the turnover of one deck continuation above use.
The beneficial effect of this programme can be learnt according to describing of such scheme, and structure is simple, reasonable in design, reasonable stress, safe and reliable, improve the safety of elevator hoistways construction, operation convenience, and accelerate speed of application, improve production efficiency, reduce cost.Triangular shaped convenience upper and lower handling in elevator hoistways of side, fixed installation is convenient.Adopt the technical scheme of C14b channel-section steel welding fabrication, easy to use.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model detailed description of the invention;
Fig. 2 is the top view of the utility model detailed description of the invention;
Fig. 3 is the right view of the utility model detailed description of the invention;
In figure, 1, operating platform; 2, support; 3, crossbeam; 4, brace summer; 5, hoistway; 6, lift port; 7, longeron; 8, cant beam; 9, Ka Liang; 10, leading screw; 11, stiffening girder; 12, floor; 13, well enclosure.
Detailed description of the invention
For the technical characterstic of this programme can be clearly demonstrated, below by detailed description of the invention, this programme is set forth.
As Figure 1-3, the utility model is a kind of elevator hoistway construction platform, comprise operating platform 1 and support 2, operating platform 1 comprises the crossbeam 3 intersected in length and breadth and forms the rectangular mesh framework parallel with floor, framework underside is connected with two brace summers 4 in parallel, and brace summer 4 two ends are respectively towards the side that lift port 6 side of hoistway 5 is relative with lift port 6; Support 2 comprises the longeron 7 being positioned at lift port 6 side hoistway 5 and being connected with brace summer 4 one end, and brace summer 4 other end is connected with cant beam 8, and the lower end of cant beam 8 is connected with longeron 7 respectively, is provided with stiffening girder 11 between longeron and cant beam; The side that longeron 7 is positioned at lift port 6 is provided with for being supported on the card beam 9 that lift port 6 floor 12 prevents support 2 from gliding.The crossbeam 3 of framework near hoistway 5 relative elevator mouth 6 side is provided with for holding out against the leading screw 10 that hoistway 5 wall diameter is 36mm.Crossbeam 3, brace summer 4, longeron 7, cant beam 8, stiffening girder 11 and card beam 9 are C14b channel-section steel and make.
During use, after the complete stripping of lower floor's elevator hoistways 5 concreting, the utility model is hung in elevator hoistways 5 by tower crane inner, card beam 9 is supported on 12, substructure floor, after lower support is good, again upper spindle 10 and well enclosure 13 are tightened, thus make operating platform 1 outer end and well enclosure 13 close proximity, convenient construction personnel carry out reinforcing bar binding on operating platform 1, install template, stripping, the work such as concrete pavement repairing, after this layer of construction terminates, loosen leading screw 10, then hung by tower crane and risen to the turnover of one deck continuation above use.
The utility model can pass through without the technical characteristic described or adopt existing techniques in realizing; do not repeat them here; certainly; above-mentioned explanation is not to restriction of the present utility model; the utility model is also not limited in above-mentioned citing; the change that those skilled in the art make in essential scope of the present utility model, remodeling, interpolation or replacement, also should belong to protection domain of the present utility model.
Claims (4)
1. an elevator hoistway construction platform, comprise operating platform and support, it is characterized in that, described operating platform comprises the crossbeam intersected in length and breadth and forms the rectangular mesh framework parallel with floor, described framework underside is connected with two brace summers in parallel, and described brace summer two ends are respectively towards the side that the lift port side of hoistway is relative with lift port;
Described support comprises the longeron being positioned at lift port side hoistway and being connected with described brace summer one end, and the described brace summer other end is connected with cant beam, and the lower end of described cant beam is connected with described longeron respectively;
The side that described longeron is positioned at lift port is provided with for being supported on the Ka Liang that lift port floor prevents described support from gliding.
2. elevator hoistway construction platform according to claim 1, is characterized in that, the crossbeam of described framework near described hoistway relative elevator mouth side is provided with for holding out against the leading screw that well enclosure diameter is 36mm.
3. elevator hoistway construction platform according to claim 1 and 2, is characterized in that, is provided with stiffening girder between described longeron and cant beam.
4. elevator hoistway construction platform according to claim 3, is characterized in that, described crossbeam, brace summer, longeron, cant beam, stiffening girder and Ka Liang are C14b channel-section steel and make.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420656863.XU CN204126237U (en) | 2014-11-05 | 2014-11-05 | A kind of elevator hoistway construction platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420656863.XU CN204126237U (en) | 2014-11-05 | 2014-11-05 | A kind of elevator hoistway construction platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204126237U true CN204126237U (en) | 2015-01-28 |
Family
ID=52382604
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420656863.XU Expired - Fee Related CN204126237U (en) | 2014-11-05 | 2014-11-05 | A kind of elevator hoistway construction platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204126237U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110805258A (en) * | 2019-11-18 | 2020-02-18 | 广西途辉建筑工程有限公司 | Double-triangular-support elevator shaft operating platform and construction method |
CN111362097A (en) * | 2020-03-25 | 2020-07-03 | 上海菱光电梯配件有限公司 | Assembling structure of elevator accessory |
-
2014
- 2014-11-05 CN CN201420656863.XU patent/CN204126237U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110805258A (en) * | 2019-11-18 | 2020-02-18 | 广西途辉建筑工程有限公司 | Double-triangular-support elevator shaft operating platform and construction method |
CN111362097A (en) * | 2020-03-25 | 2020-07-03 | 上海菱光电梯配件有限公司 | Assembling structure of elevator accessory |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204112696U (en) | For the electric hoist elevator shaft platform of main building construction | |
CN203905425U (en) | Elevator shaft construction tool type operation platform and safety protection integrated structure | |
CN204781927U (en) | Elevartor shaft formwork and elevartor shaft concrete placement operation platform | |
CN202370234U (en) | Tool type elevator hoistway construction platform | |
CN206233546U (en) | A kind of elevator hoistways workbench | |
CN205296799U (en) | Construction of elevator well and protection platform | |
CN204126237U (en) | A kind of elevator hoistway construction platform | |
CN203113793U (en) | Large formwork installation system of oblique structure | |
CN204590555U (en) | Assembling elevator hoistway construction platform | |
CN204626998U (en) | A kind of attached lift scaffold discharging platform | |
CN203531352U (en) | Hanging type movable working platform for storage tank maintenance | |
CN206680101U (en) | A kind of simple and convenient guardrail model sheetinstallat chassis | |
CN202882376U (en) | Elevator shaft template support platform | |
CN202441045U (en) | Rail-type electric attached lifting scaffold | |
CN204983692U (en) | Concrete panel's hoist device | |
CN204802839U (en) | Jacking equipment for building | |
CN204059906U (en) | Elevator hoistways Integral lifting type steel scaffold | |
CN209353734U (en) | For installing the double-track device of curtain wall | |
CN206940278U (en) | A kind of O shapes gantry handling apparatus | |
CN201729631U (en) | Truss type platform lifting device for constructing on top portions of tall and big spaces | |
CN203499232U (en) | Attached lifting scaffold | |
CN201863994U (en) | Ship hanging basket suspension mechanism | |
CN204057720U (en) | The multiple little template gig of wall of vertical | |
CN203320922U (en) | Supporting device for forming of elevator shaft template | |
CN204198306U (en) | A kind of device for purlin lifting in building operation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150128 Termination date: 20191105 |
|
CF01 | Termination of patent right due to non-payment of annual fee |