CN203113793U - Large formwork installation system of oblique structure - Google Patents

Large formwork installation system of oblique structure Download PDF

Info

Publication number
CN203113793U
CN203113793U CN 201320116736 CN201320116736U CN203113793U CN 203113793 U CN203113793 U CN 203113793U CN 201320116736 CN201320116736 CN 201320116736 CN 201320116736 U CN201320116736 U CN 201320116736U CN 203113793 U CN203113793 U CN 203113793U
Authority
CN
China
Prior art keywords
shaped steel
installation system
section steel
oblique
formwork installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320116736
Other languages
Chinese (zh)
Inventor
刘震
吴崑
程望华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyun International Engineering Co ltd
Original Assignee
CAOL INDUSTRIAL ZHENGZHOU DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CAOL INDUSTRIAL ZHENGZHOU DESIGN INSTITUTE Co Ltd filed Critical CAOL INDUSTRIAL ZHENGZHOU DESIGN INSTITUTE Co Ltd
Priority to CN 201320116736 priority Critical patent/CN203113793U/en
Application granted granted Critical
Publication of CN203113793U publication Critical patent/CN203113793U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a large formwork installation system of an oblique structure. The large formwork installation system of the oblique structure can effectively solve the problems that pouring construction difficulty in concrete of an oblique structure is large, and time and labor are wasted in a concrete structure project of a steel rib structure. According to the technical scheme, the large formwork installation system comprises a section steel framework, section steel cantilever beams, a formwork body and a winding engine. The horizontal section steel cantilever beams are uniformly distributed on one side of the section steel framework which is upwards oblique. A fixed pulley is mounted on a section steel cantilever beam on the upper portion of the section steel framework, a steel wire rope is mounted on the fixed pulley, one end of the steel wire rope is connected with the upper portion of the formwork body mounted on the section steel cantilever beams, and the other end of the steel wire rope is connected with the winding engine. The large formwork installation system of the oblique structure is novel and unique in structure, simple, reasonable, complete in function, flexible in using, easy to operate, safe, and reliable, and stands for innovation of formworks.

Description

A kind of incline structure large form installation system
Technical field
The utility model relates to a kind of incline structure large form installation system, specifically is used for the concreting of the introversion at any angle of reinforcing bar structural concrete Structural Engineering, flare structure.
Background technology
In reinforcing bar structural concrete Structural Engineering, it is construction system that the concreting of incline structure has often needed to set up huge scaffold, difficulty of construction is big, bothersome effort, at present, in vertical or subvertical reinforced concrete buildings construction, the technology of using large form is ripe, but the use in incline structure but is a technical difficulty always, as support structure, template lifting, angular transition, safety etc., therefore, its improvement and innovate imperative.
Summary of the invention
At above-mentioned situation, for overcoming the defective of prior art, the purpose of the utility model just provides a kind of incline structure large form installation system, and the concrete pouring construction difficulty that can effectively solve reinforcing bar structural concrete Structural Engineering medium dip structure is big, the problem of bothersome effort.
The technical scheme that the utility model solves is, comprise shaped steel skeleton, shaped steel encorbelment beam, template body and hoist engine, the shaped steel that is evenly equipped with level on acclivitous shaped steel skeleton one side beam of encorbelmenting, the shaped steel on shaped steel skeleton top is encorbelmented and fixed pulley is housed on the beam, steel wire cable is housed on the fixed pulley, one end of steel wire cable be contained in the encorbelment top of the template body on the beam of shaped steel and link to each other, the other end links to each other with hoist engine.
The utility model novel structure uniqueness, advantages of simple, multiple functional, use flexibly, easy to operate, safe and reliable, be the innovation on the template.
Description of drawings
Fig. 1 is front view of the present utility model.
Fig. 2 is use state diagram of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present utility model is described in further detail.
Provided by Fig. 1, the utility model comprises shaped steel skeleton, shaped steel encorbelment beam, template body and hoist engine, the shaped steel that is evenly equipped with level on acclivitous shaped steel skeleton 1 one sides beam 6 of encorbelmenting, the shaped steel on shaped steel skeleton 1 top is encorbelmented and fixed pulley 4 is housed on the beam, steel wire cable 7 is housed on the fixed pulley 4, one end of steel wire cable 7 be contained in the encorbelment top of the template body 2 on the beam of shaped steel and link to each other, the other end links to each other with hoist engine 5.
In order to guarantee result of use, described shaped steel skeleton 1 bottom is evenly equipped with set bolt 3;
The described shaped steel beam 6 of encorbelmenting is contained on the side of shaped steel skeleton 1 through connector 10;
Totally-enclosed guardrail 9 is equipped with at described shaped steel beam 6 rear portions of encorbelmenting;
Described template body 2 is contained in shaped steel through slideway (not providing among the figure) and encorbelments on the beam 6.
The utility model is (as shown in Figure 2) in use, template body 2 is risen to the height that needs concreting, by encorbelment slideway translation template body 2 on the beam 6 of shaped steel, by hold-down nut 8 template body is fixed on the shaped steel skeleton 1, concreting 11, concrete reaches after the demoulding condition by the demoulding of translation template body, continuation promotes by hoist engine 5 and the slideway translation of encorbelmenting on the beam by steel is installed in template body the position that needs concreting, so circulation construction, easy installation and removal, speed of application is fast, and is time saving and energy saving, safe and reliable, good society and economic benefit are arranged.

Claims (5)

1. incline structure large form installation system, comprise shaped steel skeleton, shaped steel encorbelment beam, template body and hoist engine, it is characterized in that, the shaped steel that is evenly equipped with level on acclivitous shaped steel skeleton (1) one side beam (6) of encorbelmenting, the shaped steel on shaped steel skeleton (1) top is encorbelmented and fixed pulley (4) is housed on the beam, steel wire cable (7) is housed on the fixed pulley (4), one end of steel wire cable (7) be contained in the encorbelment top of the template body (2) on the beam of shaped steel and link to each other, the other end links to each other with hoist engine (5).
2. incline structure large form installation system according to claim 1 is characterized in that, described shaped steel skeleton (1) bottom is evenly equipped with set bolt (3).
3. incline structure large form installation system according to claim 1 is characterized in that, the described shaped steel beam (6) of encorbelmenting is contained on the side of shaped steel skeleton (1) through connector (10).
4. incline structure large form installation system according to claim 1 is characterized in that, totally-enclosed guardrail (9) is equipped with at described shaped steel beam (6) rear portion of encorbelmenting.
5. incline structure large form installation system according to claim 1 is characterized in that, described template body (2) is contained in shaped steel through slideway and encorbelments on the beam (6).
CN 201320116736 2013-03-15 2013-03-15 Large formwork installation system of oblique structure Expired - Fee Related CN203113793U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320116736 CN203113793U (en) 2013-03-15 2013-03-15 Large formwork installation system of oblique structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320116736 CN203113793U (en) 2013-03-15 2013-03-15 Large formwork installation system of oblique structure

Publications (1)

Publication Number Publication Date
CN203113793U true CN203113793U (en) 2013-08-07

Family

ID=48894156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320116736 Expired - Fee Related CN203113793U (en) 2013-03-15 2013-03-15 Large formwork installation system of oblique structure

Country Status (1)

Country Link
CN (1) CN203113793U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105298126A (en) * 2015-10-23 2016-02-03 中冶东北建设(沈阳)工程技术有限公司 Method for high-formwork construction of large-diameter oval oblique-cone structure
CN105464216A (en) * 2015-12-23 2016-04-06 杭州江润科技有限公司 Construction method for ultrahigh oblique post with super-large cross section based on integral lifting formwork reinforcing system
CN106567454A (en) * 2016-11-03 2017-04-19 内蒙古兴泰建设集团有限公司 Installation method of inclined steel reinforced concrete composite structure
CN112069583A (en) * 2020-09-08 2020-12-11 中国十七冶集团有限公司 Oblique cantilever safe and intelligent construction system and method for finite element synchronous analysis
CN113445743A (en) * 2021-08-05 2021-09-28 广东中都建筑集团有限公司 Construction method for high-altitude overhanging ascending type concrete structure without jacking formwork

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105298126A (en) * 2015-10-23 2016-02-03 中冶东北建设(沈阳)工程技术有限公司 Method for high-formwork construction of large-diameter oval oblique-cone structure
CN105464216A (en) * 2015-12-23 2016-04-06 杭州江润科技有限公司 Construction method for ultrahigh oblique post with super-large cross section based on integral lifting formwork reinforcing system
CN106567454A (en) * 2016-11-03 2017-04-19 内蒙古兴泰建设集团有限公司 Installation method of inclined steel reinforced concrete composite structure
CN112069583A (en) * 2020-09-08 2020-12-11 中国十七冶集团有限公司 Oblique cantilever safe and intelligent construction system and method for finite element synchronous analysis
CN112069583B (en) * 2020-09-08 2023-10-20 中国十七冶集团有限公司 Finite element synchronous analysis inclined cantilever safe intelligent construction system and method
CN113445743A (en) * 2021-08-05 2021-09-28 广东中都建筑集团有限公司 Construction method for high-altitude overhanging ascending type concrete structure without jacking formwork

Similar Documents

Publication Publication Date Title
CN203113793U (en) Large formwork installation system of oblique structure
CN102661054B (en) Lateral reinforcing structure in whole lifting of plane steel truss and whole lifting method
CN202450774U (en) Shaft template of small-step-pitch self-climbing elevator
CN205134939U (en) Hydraulic pressure creeping formwork system suitable for inboard narrow and small region in space of a core section of thick bamboo
CN102900024B (en) Using method for overturning die plate for large-scale concrete structure and
CN205314542U (en) Construction liquid die plate device that climbs
CN103074871A (en) Arc-shaped slope concrete sliding and lifting template
CN203213019U (en) Long cantilever bent cap cast-in-place construction support system
CN202689496U (en) Moving platform for steel pipe concrete post concrete casing
CN211421171U (en) Cast-in-place utility tunnel movable support platform truck formwork system
CN204983692U (en) Concrete panel's hoist device
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN203891442U (en) High-rise elevator shaft template supporting platform
CN203200719U (en) Hanging type slope pouring template device
CN202689498U (en) Liftable scaffold for simple and easy building outer wall
CN201722937U (en) Sliding platform for installation of net rack
CN204212272U (en) A kind of concrete column and stiffened steel structure post steel split heads connected node
CN203654703U (en) Lifting platform for erecting shear wall module in elevator shaft
CN202611250U (en) Concreting platform for concrete filled steel tube column
CN207484991U (en) A kind of glass curtain wall monorail hoisting structure
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder
CN205224045U (en) Examine and repair gate slot second phase concrete construction device
CN204715723U (en) Light hanging basket
CN205077876U (en) Prestressed steel strand pulling machine and tensioning jack suspension device
CN203271122U (en) Attached template lifting frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 450000 Zhongyuan Road, Zhongyuan District, Henan, Zhengzhou, China, No. 210

Patentee after: ZHONGYUN INTERNATIONAL ENGINEERING CO.,LTD.

Address before: 450007 No. 210 Zhongyuan Road West, Zhongyuan District, Henan, Zhengzhou

Patentee before: ZHENGZHOU DESIGN & RESEARCH INSTITUTE OF COAL INDUSTRY CO.,LTD.

CP03 Change of name, title or address
CP01 Change in the name or title of a patent holder

Address after: 450000 No. 210 Zhongyuan Road, Zhengzhou City, Henan Province

Patentee after: ZHONGYUN INTERNATIONAL ENGINEERING Co.,Ltd.

Address before: 450000 No. 210 Zhongyuan Road, Zhengzhou City, Henan Province

Patentee before: ZHONGYUN INTERNATIONAL ENGINEERING CO.,LTD.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130807

CF01 Termination of patent right due to non-payment of annual fee