CN103074871A - Arc-shaped slope concrete sliding and lifting template - Google Patents

Arc-shaped slope concrete sliding and lifting template Download PDF

Info

Publication number
CN103074871A
CN103074871A CN2013100345572A CN201310034557A CN103074871A CN 103074871 A CN103074871 A CN 103074871A CN 2013100345572 A CN2013100345572 A CN 2013100345572A CN 201310034557 A CN201310034557 A CN 201310034557A CN 103074871 A CN103074871 A CN 103074871A
Authority
CN
China
Prior art keywords
template
arc
climbing forms
sliding
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100345572A
Other languages
Chinese (zh)
Other versions
CN103074871B (en
Inventor
孙昌忠
詹剑霞
黄家权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN201310034557.2A priority Critical patent/CN103074871B/en
Publication of CN103074871A publication Critical patent/CN103074871A/en
Application granted granted Critical
Publication of CN103074871B publication Critical patent/CN103074871B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to an arc-shaped slope concrete sliding and lifting template which comprises a sliding and lifting template, a rail and a lateral template, wherein a pulling rope is arranged on one side of an upper opening of the sliding and lifting template; the sliding and lifting template is composed of a steel panel, a truss rib plate, idler wheels and a balancing frame; an inner side wall of the steel panel is vertically welded with multiple parallel truss rib plates; the idler wheels matched with the rail are respectively arranged on the two sides of each of the truss rib plates; and the sliding and lifting template can slide and lift along the rail. According to the invention, an arc-shaped rail which is consistent with a slope outline is utilized to control the deflection of a sliding and lifting template panel to change by following the shape of the rail, so that the effect of causing the outline of the poured concrete to be consistent with a designed arc-shaped slope line is achieved; the purposes of once mounting and continuous pouring construction are also achieved; the construction cost is lowered; the promotion for the present quality of the concrete is benefited; and the device provided by the invention is especially suitable for the working condition of a concrete building with a poured arc-shaped slope structure, such as flow surface base plates of the parts of surface holes, central holes, force-eliminating pool tail ridge and other parts of a concrete dam.

Description

A kind of arc slope concrete climbing forms
Technical field
The present invention relates to the concrete blinding field, be specifically related to a kind of climbing forms that is applicable to build the arc slope concrete.
Background technology
In Construction of Hydropower Engineering, the flow-passing surface base plate at the positions such as concrete dam table hole, mesopore and absorption basin tail bank mostly is the domatic shape of arc, common climbing forms commonly used mainly designs for straight slope concreting operating mode at present, its formwork structure is rigid body, intensity is high, weight is large, can't be applicable to the concrete construction of this class arc slope structure.
Therefore, for arc slope concrete works, the job practices that usually adopts placement layer by layer, segmentation to wipe one's face specifically is divided into again two kinds of situations: the one, when the gradient than time slack, adopt that sample hanging frame is built (not shuttering), the mode of wiping one's face by the sample frame is constructed; The 2nd, when the gradient is steeper, then adopt the mode that formwork erection is built, form removal is wiped one's face to construct.The major defect of this class job practices is, because every liter of layer height generally can not surpass 3m, so the division of concrete position in storehouse is more, thereby causes complex procedures, and long in time limit, efficient is low, and construction cost is high.
Summary of the invention
Technical problem to be solved by this invention provides a kind of arc slope concrete climbing forms, can effectively overcome above-mentioned shortcoming of the prior art, its arc line type track consistent with the domatic profile of design by making, the deflection profile that can control the climbing forms panel changes with the shape of track, make the concrete appearance profile effect consistent with design arc line of slope of building thereby reach, and realized once mounting, the purpose of continuous placing construction, not only operation is simple, easy construction, shortened the duration, reduce construction cost, and be conducive to improve concrete apparent mass.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is: a kind of arc slope concrete climbing forms, comprise climbing forms, track, side template, a side suitable for reading of climbing forms is provided with stay cord, climbing forms is comprised of steel facing, truss type gusset, roller and balancing stand, the steel facing medial surface is connected with the truss type gusset vertical welding that many Pin are parallel to each other, the both sides of every truss structure type gusset are respectively arranged with a roller that cooperates with track, described track is arc, the top curve of side template also is arc, and parallel corresponding with the curved line of track.
The supported on both sides of described steel facing is on side template, and top curve and the steel facing of side template are close to.
Be provided with a plurality of lock rail devices on the described track, the lock rail device sleeve bolt interior with being embedded in the storehouse face is fixedly connected with.
Described side template is connected with pre-buried dowel in being arranged on the storehouse face by bearing bar.
Be welded with a plurality of guide piles for being connected with balancing stand on the described truss template muscle, the top of guide pile is provided with pin hole.
Described balancing stand system is comprised of template and the two oblique connecting plates with diagonal brace, is provided with a plurality of grooveds hole with the template of diagonal brace, after guide pile passes the grooved hole, is connected in one with balancing stand; Two ends with the template of diagonal brace are connected with the upper bolt of oblique connecting plate respectively, and tiltedly the bottom of connecting plate is bolted on the medial surface of steel facing.
Described climbing forms below also is provided with operating platform.
Beneficial effect of the present invention is as follows:
1) climbing forms of the present invention is comprised of steel facing and truss type gusset, compare with the common rigidity climbing forms of routine, has certain flexibility, and weight is lighter, draw when sliding at hoist engine, the steel facing shape of climbing forms will constantly change along with the shape of arc line type track, because the arc line type track is consistent with domatic design profile, thereby the concrete appearance profile of building will be consistent with design arc line of slope;
2) the multiple tracks balancing stand that arranges in apparatus of the present invention is connected all truss type gussets, and keeps plumbness with steel facing all the time, and can move up and down in the hole of guide pile on balancing stand, thereby adapts to the deflection deformation of steel facing;
3) adopt apparatus of the present invention to build arc slope concrete works, compare with the job practices that common placement layer by layer, segmentation are wiped one's face, can realize once mounting, continuous placing construction, its operation is simple, easy construction, not only improve efficiency of construction, reduced construction cost, also be conducive to guarantee concrete apparent mass.
Description of drawings
The invention will be further described below in conjunction with drawings and Examples:
Fig. 1 is apparatus of the present invention arc slope concrete climbing forms structural representation;
Fig. 2 is climbing forms lateral view in apparatus of the present invention;
Fig. 3 is the A-A sectional drawing of Fig. 2;
Fig. 4 is a place drawing among Fig. 1;
Fig. 5 is b place drawing among Fig. 2;
Fig. 6 is c place drawing among Fig. 3;
Fig. 7 is balancing stand structure drawing.
The specific embodiment
In Fig. 1~7, a kind of arc slope concrete climbing forms comprises climbing forms 1, track 2, side template 8.A side suitable for reading of climbing forms 1 is provided with stay cord 9, climbing forms 1 is comprised of steel facing 4, truss type gusset 5, roller 6 and balancing stand 7, steel facing 4 medial surfaces are connected with truss type gusset 5 vertical weldings that many Pin are parallel to each other, the both sides of every truss structure type gusset 5 are respectively arranged with a roller 6 that cooperates with track 2, described track 2 is arc, the top curve of side template 3 also is arc, and parallel corresponding with the curved line of track 2.
The supported on both sides of described steel facing 4 is on side template 8, and the top curve of side template 8 and steel facing 4 are close to.
Be provided with a plurality of lock rail devices 21 on the described track 2, lock rail device 21 sleeve bolts 10 interior with being embedded in the storehouse face are fixedly connected with.
Described side template 8 is connected with pre-buried dowel 82 in being arranged on the storehouse face by bearing bar 81.
Be welded with a plurality of guide piles 11 for being connected with balancing stand 7 on the described truss template muscle 5, the top of guide pile 11 is provided with pin hole 12.
Described balancing stand 7 is to be comprised of template 71 and the two oblique connecting plates 72 with diagonal brace, is provided with a plurality of grooveds hole 73 with the template 71 of diagonal brace, after guide pile 11 passes grooved hole 73, is connected in one with balancing stand 7; Two ends with the template 71 of diagonal brace are connected with the upper bolt of oblique connecting plate 72 respectively, and tiltedly the bottom of connecting plate 72 is bolted on the medial surface of steel facing 4.
Described climbing forms 1 below also is provided with operating platform 13.
Embodiment:
1) preparation method
It is that the steel plate materials of 3.5mm is made that the steel facing 4 of climbing forms 1 adopts thickness, and truss type gusset 5 adopts angle steel materials (∠ 50 * 50, ∠ 80 * 50 two kind) to be made; Track 2 employing models are 12.6 channel-section steel material making.It should be noted that during making that the curved line that must strictly control track 2 is consistent with domatic design profile wire shaped, according to actual needs merogenesis processing adopts bolt to connect section by section when construction is used.
2) install
First according to the design size setting-out, hole, bury underground dowel 82 and sleeve bolt 10, adopt the vertical side template 8 of the on-the-spot frame of special steel form in bulk after solidifying, and once push up to the slope from toe is vertical, the local wooden model that adopts is squeegeeed, draw outer support mode in fixing main employing of template, as shown in Figure 3.The top curve that must strictly control side template 8 when it should be noted that formwork erection is consistent with domatic design profile wire shaped, and must not surpass the project organization sideline.
Track 2 is fixed on the sleeve bolt 10 by the lock rail device 21 on it, and the roller 6 of truss type gusset 5 both sides of climbing forms 1 embeds in the gathering sill of track 2, thereby forms reversing wheel.
After climbing forms 1 installation, balancing stand 7 is installed at last, and to pin hole 12 interior insertion spacer pins.
3) concreting
The mode concreting that adopts truck with grout mixer and water tank blanking, chute to put in storage.Before the concrete initial set of building, start two low speed winch 3 on top, slope, climbing forms 1 will be slowly sliding along track 2, stop behind the appropriate location when sliding, again build, sliding ..., so circulation until the top, slope, is finished this storehouse and time is built.
In climbing forms 1 sliding process, deflection deformation occurs in steel facing 4, and in the same way deflection deformation of drive balancing stand 7, this moment, guide pile 11 was the grooved hole of balancing stand 7 73 interior can movements by easy on and off, make all the truss type gussets 5 on the steel facing 4 form whole, and keep plumbness and not run-off the straight with steel facing 4 all the time, be conducive to adapt to steel facing 4 is arc line shaped deflection deformation from rule to same center of circle direction.
When template sliding lifting during to certain altitude, at template end opening fitting operation platform 13, operating platform 13 rises with template.For guaranteeing construction safety, the horizontal guardrail of high approximately 1.0m is set up in the outside of operating platform 13.
4) water piece construction after: in sleeve bolt 10 pre-buried formerly pouring concrete pieces, utilize simultaneously the side of first pouring concrete piece to replace the side template 8 of a side.

Claims (7)

1. arc slope concrete climbing forms, comprise climbing forms (1), track (2), side template (8), it is characterized in that: a side suitable for reading of climbing forms (1) is provided with stay cord (9), climbing forms (1) is by steel facing (4), truss type gusset (5), roller (6) and balancing stand (7) form, steel facing (4) medial surface is connected with truss type gusset (5) vertical welding that many Pin are parallel to each other, the both sides of every truss structure type gusset (5) are respectively arranged with a roller (6) that cooperates with track (2), described track (2) is arc, the top curve of side template (3) also is arc, and parallel corresponding with the curved line of track (2).
2. arc slope concrete climbing forms according to claim 1, it is characterized in that: the supported on both sides of described steel facing (4) is on side template (8), and the top curve of side template (8) and steel facing (4) are close to.
3. arc slope concrete climbing forms according to claim 1 is characterized in that: be provided with a plurality of lock rail devices (21) on the described track (2), lock rail device (21) sleeve bolt (10) interior with being embedded in the storehouse face is fixedly connected with.
4. arc slope concrete climbing forms according to claim 1 is characterized in that: described side template (8) is connected with pre-buried dowel (82) in being arranged on the storehouse face by bearing bar (81).
5. a kind of arc slope concrete climbing forms according to claim 1, it is characterized in that: be welded with a plurality of guide piles (11) for being connected with balancing stand (7) on the described truss template muscle (5), the top of guide pile (11) is provided with pin hole (12).
6. arc slope concrete climbing forms according to claim 1 or 5, it is characterized in that: described balancing stand (7) is to be comprised of a template with diagonal brace (71) and two oblique connecting plates (72), template (71) with diagonal brace is provided with a plurality of grooveds hole (73), after guide pile (11) passes grooved hole (73), be connected in one with balancing stand (7); Two ends with the template (71) of diagonal brace are connected with the upper bolt of oblique connecting plate (72) respectively, and tiltedly the bottom of connecting plate (72) is bolted on the medial surface of steel facing (4).
7. a kind of arc slope concrete climbing forms according to claim 1 is characterized in that: also be provided with operating platform (13) below the described climbing forms (1).
CN201310034557.2A 2013-01-30 2013-01-30 Arc-shaped slope concrete sliding and lifting template Active CN103074871B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310034557.2A CN103074871B (en) 2013-01-30 2013-01-30 Arc-shaped slope concrete sliding and lifting template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310034557.2A CN103074871B (en) 2013-01-30 2013-01-30 Arc-shaped slope concrete sliding and lifting template

Publications (2)

Publication Number Publication Date
CN103074871A true CN103074871A (en) 2013-05-01
CN103074871B CN103074871B (en) 2014-12-24

Family

ID=48151560

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310034557.2A Active CN103074871B (en) 2013-01-30 2013-01-30 Arc-shaped slope concrete sliding and lifting template

Country Status (1)

Country Link
CN (1) CN103074871B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926625A (en) * 2016-05-06 2016-09-07 中国葛洲坝集团第工程有限公司 Die-jacking-free rapid construction method for overflow surface concrete of gate dam
CN110834861A (en) * 2019-09-29 2020-02-25 中国一冶集团有限公司 Chute slope alignment method
CN112095560A (en) * 2020-09-25 2020-12-18 中国水利电力对外有限公司 Large-inclination-angle trash rack one-step forming suspension type slip form and construction method
CN112359779A (en) * 2020-11-10 2021-02-12 中国长江电力股份有限公司 Inclined concrete turnover construction integrated device and construction process thereof
CN114277742A (en) * 2021-12-20 2022-04-05 国网福建省电力有限公司 Slide lifting template for overflow surface construction of overflow dam
CN114481968A (en) * 2021-12-31 2022-05-13 安徽水利开发有限公司 Reinforcing structure of rock block concrete dam and construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2209183Y (en) * 1994-07-22 1995-10-04 陆春江 Wheelless and trackless slide form unit
CN2328738Y (en) * 1998-05-15 1999-07-14 中外合资柳州欧维姆建筑机械有限公司 Hydraulic automatic lifting device for large formwork
RU2229553C1 (en) * 2002-12-03 2004-05-27 Бимбат Давид Залманович Module of bank protection construction
CN1624248A (en) * 2004-11-10 2005-06-08 中国水利水电第一工程局 Steep slope large diameter long glant wall conerete lining sliding mould construction technology
DE20320986U1 (en) * 2002-10-15 2005-08-25 Wagenhuber, Walter, Dr.-Ing. Building module of an auxiliary dike and rolling device for a wound dyke structure
CN1789565A (en) * 2005-12-21 2006-06-21 耿福明 Long slope vibratory slipform shaping mill
CN101525873A (en) * 2009-04-17 2009-09-09 广西方元电力股份有限公司桥巩水电站分公司 Pier hydraulic leveling inner-climbing climbing form and concrete pouring method thereby
CN101638895A (en) * 2009-09-03 2010-02-03 河北省水利工程局 Slope masonry machine with modes of discharging, vibrating and sliding
CN203066033U (en) * 2013-01-30 2013-07-17 中国葛洲坝集团股份有限公司 Curved slope concrete climbing form

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2209183Y (en) * 1994-07-22 1995-10-04 陆春江 Wheelless and trackless slide form unit
CN2328738Y (en) * 1998-05-15 1999-07-14 中外合资柳州欧维姆建筑机械有限公司 Hydraulic automatic lifting device for large formwork
DE20320986U1 (en) * 2002-10-15 2005-08-25 Wagenhuber, Walter, Dr.-Ing. Building module of an auxiliary dike and rolling device for a wound dyke structure
RU2229553C1 (en) * 2002-12-03 2004-05-27 Бимбат Давид Залманович Module of bank protection construction
CN1624248A (en) * 2004-11-10 2005-06-08 中国水利水电第一工程局 Steep slope large diameter long glant wall conerete lining sliding mould construction technology
CN1789565A (en) * 2005-12-21 2006-06-21 耿福明 Long slope vibratory slipform shaping mill
CN101525873A (en) * 2009-04-17 2009-09-09 广西方元电力股份有限公司桥巩水电站分公司 Pier hydraulic leveling inner-climbing climbing form and concrete pouring method thereby
CN101638895A (en) * 2009-09-03 2010-02-03 河北省水利工程局 Slope masonry machine with modes of discharging, vibrating and sliding
CN203066033U (en) * 2013-01-30 2013-07-17 中国葛洲坝集团股份有限公司 Curved slope concrete climbing form

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926625A (en) * 2016-05-06 2016-09-07 中国葛洲坝集团第工程有限公司 Die-jacking-free rapid construction method for overflow surface concrete of gate dam
CN105926625B (en) * 2016-05-06 2018-01-23 中国葛洲坝集团第一工程有限公司 Gate dam overflow surface concrete exempts from backform rapid constructing method
CN110834861A (en) * 2019-09-29 2020-02-25 中国一冶集团有限公司 Chute slope alignment method
CN110834861B (en) * 2019-09-29 2021-10-01 中国一冶集团有限公司 Chute slope alignment method
CN112095560A (en) * 2020-09-25 2020-12-18 中国水利电力对外有限公司 Large-inclination-angle trash rack one-step forming suspension type slip form and construction method
CN112095560B (en) * 2020-09-25 2022-03-18 中国水利电力对外有限公司 Large-inclination-angle trash rack one-step forming suspension type slip form and construction method
CN112359779A (en) * 2020-11-10 2021-02-12 中国长江电力股份有限公司 Inclined concrete turnover construction integrated device and construction process thereof
CN112359779B (en) * 2020-11-10 2022-05-17 中国长江电力股份有限公司 Inclined concrete turnover construction integrated device and construction process thereof
CN114277742A (en) * 2021-12-20 2022-04-05 国网福建省电力有限公司 Slide lifting template for overflow surface construction of overflow dam
CN114481968A (en) * 2021-12-31 2022-05-13 安徽水利开发有限公司 Reinforcing structure of rock block concrete dam and construction method
CN114481968B (en) * 2021-12-31 2023-08-15 安徽水利开发有限公司 Block stone concrete barrage reinforcing structure and construction method

Also Published As

Publication number Publication date
CN103074871B (en) 2014-12-24

Similar Documents

Publication Publication Date Title
CN103967050B (en) Construction system of subway station
CN109538238B (en) Tunnel arch prefabricated segment construction device and control method
CN103074871B (en) Arc-shaped slope concrete sliding and lifting template
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN104895314A (en) Truss platform for high and large space top plate concrete construction
CN108252504A (en) Tube shear wall concrete structure large form hoisting type construction method and constructing device
CN202500567U (en) Multilayer combined hanging scaffold for concrete liner of well wall of vertical well
CN102979038A (en) Cast-in-place box beam mobile bracket with increased width
CN110761191A (en) Concrete guardrail construction device and method thereof
CN210659228U (en) Movable single-side formwork system for subway construction
CN205936645U (en) A full liquid die plate system for culvert is pour
CN202064281U (en) Slip form frame
CN103774841A (en) Track type sliding formwork device
CN203113793U (en) Large formwork installation system of oblique structure
CN202000265U (en) Concrete construction formwork for high pier of bridge
CN102268858A (en) Cradle for suspension pouring of arch-type bridge
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN201507112U (en) Sliding template system
CN202830889U (en) Rail type slip form device
CN202989781U (en) Width widened cast-in-place box beam moving support
CN206035507U (en) Rectangle box culvert and for tunnel construction platform truck
CN202401753U (en) Sliding die device
CN208594572U (en) Single layer double cabin pipe galleries in underground are hydraulic from walking formwork jumbo
CN203066033U (en) Curved slope concrete climbing form

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA GEZHOUBA GROUP THREE GORGES CONSTRUCTION ENG

Free format text: FORMER OWNER: CHINA GEZHOUBA GROUP CO., LTD.;SANXIA UNIVERSITY

Effective date: 20140605

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 443002 YICHANG, HUBEI PROVINCE TO: 443000 YICHANG, HUBEI PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20140605

Address after: 443000 Dongshan Avenue, Hubei, Yichang, No. 11

Applicant after: CHINA GEZHOUBA GROUP THREE GORGES CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: 443002 Hubei province Yichang City Road No. 1

Applicant before: CHINA GEZHOUBA GROUP Co.,Ltd.

ASS Succession or assignment of patent right

Owner name: CHINA GEZHOUBA GROUP THREE GORGES CONSTRUCTION ENG

Effective date: 20141017

Owner name: HEHAI UNIV.

Free format text: FORMER OWNER: CHINA GEZHOUBA GROUP THREE GORGES CONSTRUCTION ENGINEERING CO., LTD.

Effective date: 20141017

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhou Hougui

Inventor after: Wang Bo

Inventor after: Sun Changzhong

Inventor after: Zhan Jianxia

Inventor after: Huang Jiaquan

Inventor before: Sun Changzhong

Inventor before: Zhan Jianxia

Inventor before: Huang Jiaquan

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 443000 YICHANG, HUBEI PROVINCE TO: 210098 NANJING, JIANGSU PROVINCE

Free format text: CORRECT: INVENTOR; FROM: SUN CHANGZHONG ZHAN JIANXIA HUANG JIAQUAN TO: ZHOU HOUGUI WANG BO SUN CHANGZHONG ZHAN JIANXIA HUANG JIAQUAN

TA01 Transfer of patent application right

Effective date of registration: 20141017

Address after: Nanjing City, Jiangsu province 210098 Xikang Road No. 1

Applicant after: HOHAI University

Applicant after: CHINA GEZHOUBA GROUP THREE GORGES CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: 443000 Dongshan Avenue, Hubei, Yichang, No. 11

Applicant before: CHINA GEZHOUBA GROUP THREE GORGES CONSTRUCTION ENGINEERING Co.,Ltd.