CN206035507U - Rectangle box culvert and for tunnel construction platform truck - Google Patents

Rectangle box culvert and for tunnel construction platform truck Download PDF

Info

Publication number
CN206035507U
CN206035507U CN201621053001.3U CN201621053001U CN206035507U CN 206035507 U CN206035507 U CN 206035507U CN 201621053001 U CN201621053001 U CN 201621053001U CN 206035507 U CN206035507 U CN 206035507U
Authority
CN
China
Prior art keywords
box culvert
steel bracket
mould
rectangular box
constructing tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621053001.3U
Other languages
Chinese (zh)
Inventor
于松平
李安慧
夏仙桃
杨波
李辉
蒋平文
李纲平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Wuxin Tunnel Intelligent Equipment Co Ltd
Original Assignee
Hunan Wuxin Tunnel Intelligent Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Wuxin Tunnel Intelligent Equipment Co Ltd filed Critical Hunan Wuxin Tunnel Intelligent Equipment Co Ltd
Priority to CN201621053001.3U priority Critical patent/CN206035507U/en
Application granted granted Critical
Publication of CN206035507U publication Critical patent/CN206035507U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a rectangle box culvert and for tunnel construction platform truck, including steel bracket (1) and curb plate mould (3), curb plate mould (3) through side direction vaulting pole (4) with steel bracket (1) connect, the top of steel bracket (1) on be equipped with counter -force balladeur train (6), the one end of sideslip roof beam (5) with curb plate mould (3) connect, the other end inserts counter -force balladeur train (6) in, sideslip roof beam (5) and the top of steel bracket (1) between be equipped with sideslip power device, the bottom of steel bracket (1) be equipped with vertical braces screw rod (2). The utility model has the characteristics of simple structure, easily operation, accommodation is wide, and concrete pouring and forming degree of high quality, general is high, the construction in box culvert, piping lane and the tunnel of the various open cuts of specially adapted.

Description

A kind of Rectangular Box Culvert and constructing tunnel chassis
Technical field
The utility model is related to a kind of construction platform car, more particularly to one kind is used for Rectangular Box Culvert and constructing tunnel platform Car.
Background technology
Traditional large-scale rectangular box culvert and constructing tunnel mainly have two ways, and the whole Rectangular Box Culvert of one and tunnel are adopted With the form of construction work of full framing+wooden model, its two both sides adopts single side wall moulding plate, top board to apply using full framing+wooden model Work mode.Both the above form of construction work all has that concrete formation effect is poor, operating space is limited in work progress, template with The taking of frame tears that process length, labor strength are big, construction cost is high open, low construction efficiency the shortcomings of, applied using single side wall moulding plate In man-hour, built-in fitting need to be also set in concrete, efficiency of construction and concrete formation effect be affected, therefore urgent need one kind can generation The construction of Rectangular Box Culvert and tunnel is met for the new technology of such form of construction work.Patent 201510129751.8 discloses one kind The multi-functional chassis of metro station construction, the chassis include chassis main frame, backform, side form and chassis base, the side form It is fixedly connected by least two row's side form oil cylinders between chassis main frame, the bottom of the side form is installed with for making side The side form hoist cylinder of mould lifting, the backform two ends are hinging rotary axle, and the hinging rotary axle is connected with armpit Angle formwork, institute State armpit Angle formwork to be connected with crossbeam by armpit angle oil cylinder.The formwork erection and knockout course of the side form needs side form hoist cylinder and side form The oil cylinder of the different actions of two kinds of oil cylinder realizing, as two actions of different directions can produce conflict to template, therefore need to be The side form chute corresponding with side form oil cylinder is set on side form vertical direction, thus the run trace to side form bring it is many not Certainty, and operating process is complicated, side form easily supports not in place, produces faulting of slab ends and gap between armpit Angle formwork.The technology Though scheme can meet side wall concrete and concrete roof while pouring, structure is excessively complicated, device fabrication and maintenance cost Height, operation difficulty are big.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of easily operated, simple structure, low cost of manufacture, steady The fixed reliable, Rectangular Box Culvert that concreting Forming Quality is good, general degree is high and constructing tunnel chassis.
For solving above-mentioned technical problem, Rectangular Box Culvert and constructing tunnel chassis that the utility model is provided, including steel Frame and side plate mould, described side plate mould are connected with described steel bracket by side stay, are set on the top of described steel bracket There is counter-force balladeur train, one end of traverse beam is connected with described side plate mould, in the described counter-force balladeur train of other end insertion, described horizontal stroke Moving and traversing power set are provided between beam and the top of described steel bracket, the bottom of described steel bracket is provided with vertical supporting spiral shell Bar.
Walking system is installed on the bottom of described steel bracket, described walking system is walked in orbit.
Described traversing power set are traversing oil cylinder.
Connection between described traverse beam and described side plate mould is to be hinged or affixed.
Power lift is installed on the bottom of described steel bracket.
Vertical power being provided between top board mould and described steel bracket and receiving die device, corner mould is supported on by adjusting screw rod In described traverse beam, described corner mould one end is connected with described side plate mould upper end, and the other end is torn open with described top board mould Unload connection.
Described power lift is jacking cylinder.
It is vertical oil cylinder that described vertical power receives die device.
Connection between described top board mould and described corner mould is bolt connection.
Using the Rectangular Box Culvert and constructing tunnel chassis of above-mentioned technical proposal, the side to Rectangular Box Culvert or tunnel can be used for Wall is individually constructed.When side wall and top board to Rectangular Box Culvert or tunnel is needed while when constructing, by the corner mould above chassis, top Template die and vertical power receipts die device are installed and are capable of achieving.Easily operated, simple structure, stress clearly, have enough operations Space can be transformed big in space, wide accommodation;The chassis concreting Forming Quality is good, general degree is high, is particularly well-suited to The construction in the box culvert of various open cuts, piping lane and tunnel.
Compared with patent 201510129751.8, the advantage of this patent is that the demoulding, formwork erection step are simple, swooping template action rail Mark reliability, processing cost are relatively low.
In sum, the utility model is a kind of easily operated, simple structure, low cost of manufacture, reliable and stable, concrete Pour Forming Quality is good, general degree is high Rectangular Box Culvert and constructing tunnel chassis.
Description of the drawings
Fig. 1 only pours working state figure during side wall for the utility model.
Fig. 2 is utility model works view.
Fig. 3 is the utility model template contraction state figure.
Fig. 4 is the utility model demoulding view.
In figure:1- steel brackets, 2- studdles, 3- side plate moulds, 4- side stays, 5- traverse beams, 6- counter-force balladeur trains, 71- Jacking cylinder, the traversing oil cylinders of 72-, the vertical oil cylinders of 73-, 8- tracks, 9- corner moulds, 10- top board moulds, 11- adjusting screw rods.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples.
As shown in figure 1, the Rectangular Box Culvert and constructing tunnel chassis of the utility model offer, side plate mould 3 is by lateral support Bar 4 is connected with steel bracket 1, and the top of steel bracket 1 is provided with counter-force balladeur train 6, and one end of traverse beam 5 is connected with side plate mould 3, another End is inserted in counter-force balladeur train 6, is provided with traversing power set between the top of traverse beam 5 and steel bracket 1, specifically, traversing power Device is that the bottom of 72 steel bracket 1 of traversing oil cylinder is provided with vertical supporting screw rod 2.Steel bracket 1 is supported in by vertical supporting screw rod 2 On underplate concrete face.
Further, walking system is installed on 1 bottom girder of steel bracket, after chassis entire lowering, can walks on track 8, With vertical shift to subsequent work position.
Further, power lift is installed on the bottom of steel bracket 1.Specifically, power lift is jacking Oil cylinder 71.
Connection between traverse beam 5 and side plate mould 3 is to be hinged or affixed.
As shown in figure 1, the Rectangular Box Culvert and constructing tunnel chassis of the utility model offer, for Rectangular Box Culvert or tunnel The side wall in road is individually constructed, and concrete demoulding step is as follows:
First, remove the side stay 4 between side plate mould 3 and steel bracket 1;
2nd, traversing oil cylinder 72 is shunk, makes traverse beam 5 drive the 3 traversing demoulding of side plate mould;
3rd, adjust vertical supporting screw rod 2 so as to shrink certain length L, L values need to be more than between walking system and track 8 Vertical distance;
4th, jacking cylinder 71 is shunk, chassis is integrally drop on track 8, complete the demoulding;
5th, start walking system, chassis vertical shift is made to subsequent work position.
The Rectangular Box Culvert provided referring to Fig. 2, Fig. 3 and Fig. 4, the utility model and constructing tunnel chassis, side plate mould 3 pass through Side stay 4 is connected with steel bracket 1, and the top of steel bracket 1 is provided with counter-force balladeur train 6, and one end and the side plate mould 3 of traverse beam 5 connect Connect, in other end insertion counter-force balladeur train 6, between the top of traverse beam 5 and steel bracket 1, be provided with traversing power set, steel bracket 1 Bottom is provided with vertical supporting screw rod 2.Vertical power being provided between top board mould 10 and steel bracket 1 and receiving die device, corner mould 9 is by adjusting Section screw rod 11 is supported in traverse beam 5, and 9 one end of corner mould is connected with 3 upper end of side plate mould, and the other end is connected with the dismounting of top board mould 10 Connect;Power lift is installed on the bottom of steel bracket 1.Steel bracket 1 is supported in underplate concrete by vertical supporting screw rod 2 On face.
Traversing power set are traversing oil cylinder 72.Power lift is jacking cylinder 71.Vertical power receives die device Vertical oil cylinder 73.
Specifically, the connection between traverse beam 5 and side plate mould 3 is to be hinged or affixed.
Connection between top board mould 10 and corner mould 9 is bolt connection.
Further, walking system is installed on 1 bottom girder of steel bracket, after chassis entire lowering, can walks on track 8, With vertical shift to subsequent work position.
As shown in figs 2-4, the utility model is provided Rectangular Box Culvert and constructing tunnel chassis, to Rectangular Box Culvert or tunnel When the side wall in road and top are constructed, concrete demoulding step is as follows:
First, unclamp the connection between top board mould 10 and corner mould 9;
2nd, vertical oil cylinder 73 is shunk, makes top board mould 10 decline the demoulding to design attitude;
3rd, remove the side stay 4 between side plate mould 3 and steel bracket 1;
4th, traversing oil cylinder 72 is shunk, make traverse beam 5 side plate mould 3 and corner mould 9 be driven while the traversing demoulding;
5th, adjust vertical supporting screw rod 2 so as to shrink certain length L, L values need to be more than walking system and rail
Vertical distance between road 8;
6th, jacking cylinder 71 is shunk, chassis is integrally drop on track 8, complete the demoulding;
7th, start walking system, chassis vertical shift is made to subsequent work position.
Using the Rectangular Box Culvert and constructing tunnel chassis of above-mentioned technical proposal, the side to Rectangular Box Culvert or tunnel can be used for Wall is individually constructed.When needing side wall and top to Rectangular Box Culvert or tunnel to construct, by the corner mould above chassis, top board mould Die device is received with vertical power and installs all constructions of realization at once.Easily operated, simple structure, stress clearly, have enough Space can be transformed big in operating space, wide accommodation;The chassis concreting Forming Quality is good, general degree is high, especially fits For the construction in the box culvert of various open cuts, piping lane and tunnel.
The utility model applied range, it is adaptable to various construction operating modes, and can be transformed as needed, by two platforms Car carries out spelling to be suitable for the construction with subway station.

Claims (9)

1. a kind of Rectangular Box Culvert and constructing tunnel chassis, including steel bracket (1) and side plate mould (3), it is characterised in that:Described Side plate mould (3) is connected with described steel bracket (1) by side stay (4), and the top of described steel bracket (1) is provided with counter-force Balladeur train (6), one end of traverse beam (5) are connected with described side plate mould (3), in the described counter-force balladeur train (6) of other end insertion, institute It is provided with traversing power set between the traverse beam (5) stated and the top of described steel bracket (1), the bottom of described steel bracket (1) Portion is provided with vertical supporting screw rod (2).
2. Rectangular Box Culvert according to claim 1 and constructing tunnel chassis, it is characterised in that:Described steel bracket (1) Bottom on walking system is installed, described walking system is walked on track (8).
3. Rectangular Box Culvert according to claim 1 and 2 and constructing tunnel chassis, it is characterised in that:Described is traversing dynamic Power apparatus are traversing oil cylinder (72).
4. Rectangular Box Culvert according to claim 1 and 2 and constructing tunnel chassis, it is characterised in that:Described traverse beam (5) with the connection between described side plate mould (3) for being hinged or affixed.
5. Rectangular Box Culvert according to claim 1 and 2 and constructing tunnel chassis, it is characterised in that:Described steel bracket (1) power lift is installed on bottom.
6. Rectangular Box Culvert according to claim 5 and constructing tunnel chassis, it is characterised in that:Described powered lift dress It is set to jacking cylinder (71).
7. Rectangular Box Culvert according to claim 5 and constructing tunnel chassis, it is characterised in that:Top board mould (10) with it is described Steel bracket (1) between be provided with vertical power and receive die device, corner mould (9) is supported on described traversing by adjusting screw rod (11) On beam (5), described corner mould (9) one end is connected with described side plate mould (3) upper end, the other end and described top board mould (10) Dismounting connection.
8. Rectangular Box Culvert according to claim 7 and constructing tunnel chassis, it is characterised in that:Described vertical power is received Die device is vertical oil cylinder (73).
9. Rectangular Box Culvert according to claim 7 and constructing tunnel chassis, it is characterised in that:Described top board mould (10) It is bolt connection with the connection between described corner mould (9).
CN201621053001.3U 2016-09-13 2016-09-13 Rectangle box culvert and for tunnel construction platform truck Withdrawn - After Issue CN206035507U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621053001.3U CN206035507U (en) 2016-09-13 2016-09-13 Rectangle box culvert and for tunnel construction platform truck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621053001.3U CN206035507U (en) 2016-09-13 2016-09-13 Rectangle box culvert and for tunnel construction platform truck

Publications (1)

Publication Number Publication Date
CN206035507U true CN206035507U (en) 2017-03-22

Family

ID=58295464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621053001.3U Withdrawn - After Issue CN206035507U (en) 2016-09-13 2016-09-13 Rectangle box culvert and for tunnel construction platform truck

Country Status (1)

Country Link
CN (1) CN206035507U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107419743A (en) * 2017-05-16 2017-12-01 中国建筑第六工程局有限公司 A kind of new city pipe gallery mobile formwork
CN109322324A (en) * 2017-07-31 2019-02-12 中国二十冶集团有限公司 Fast attaching/detaching apparatus and its application method based on cast-type pipe gallery aluminum alloy pattern plate
CN111676849A (en) * 2020-04-27 2020-09-18 山东省亚欧特重工机械有限公司 Intelligent culvert section laying machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107419743A (en) * 2017-05-16 2017-12-01 中国建筑第六工程局有限公司 A kind of new city pipe gallery mobile formwork
CN109322324A (en) * 2017-07-31 2019-02-12 中国二十冶集团有限公司 Fast attaching/detaching apparatus and its application method based on cast-type pipe gallery aluminum alloy pattern plate
CN111676849A (en) * 2020-04-27 2020-09-18 山东省亚欧特重工机械有限公司 Intelligent culvert section laying machine

Similar Documents

Publication Publication Date Title
CN106194216A (en) A kind of Rectangular Box Culvert and constructing tunnel chassis
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN106089253B (en) A kind of all-hydraulic template system poured for culvert
CN111365035A (en) Rapid linkage construction trolley for pipe gallery diaphragm and pipe gallery diaphragm construction method
CN203768814U (en) High-pier minor-radius curve cast-in-situ box girder novel moving die carrier
CN113235472B (en) Concrete placement platform truck is contained to apron
CN101408019B (en) Low altitude prefabricated case beam internal mold construction method
CN105155423A (en) Upward moving type movable formwork for continuous box girder construction
CN102022123B (en) Integral lining method for tunnel with altered diameter by model board trolley
CN203007849U (en) Movable construction device for cast-in-place concrete crash barriers with hanging eaves
CN108103945B (en) A kind of whole landing mould bases of cast-in-situ box girder
CN206035507U (en) Rectangle box culvert and for tunnel construction platform truck
CN107558378A (en) A kind of Bridge Erector and its bridging method for being used to set up full precast beam
CN109304795A (en) The hydraulic gliding model of T beam and operating method
CN103526697A (en) Self-propelled movable formwork for construction of double-rectangle water conservancy aqueduct
CN211397597U (en) Template trolley and tunnel construction vehicle set
CN102286931B (en) Deck moving support system (MSS) bridge fabrication machine specially for construction of double-T-shaped bridge
CN110158486B (en) Bridge girder erection machine for erecting spliced wide beams and construction method
CN205936645U (en) A full liquid die plate system for culvert is pour
CN214993219U (en) Concrete placement platform truck is contained to apron
WO2022142193A1 (en) Construction method for large-span thin-wall concrete sound barrier pouring trolley
CN207775719U (en) A kind of Bridge Erector for setting up full precast beam
CN203603928U (en) Rubber-tyred walking full-hydraulic lining trolley
CN202164548U (en) Deck type mobile formwork bridge-building machine dedicated to double T type bridge construction
CN205975365U (en) Cast -in -situ box girder combined type moving die carrier

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170322