CN104594918B - Split integrated underground passage steel mold plate trolley and construction method thereof - Google Patents

Split integrated underground passage steel mold plate trolley and construction method thereof Download PDF

Info

Publication number
CN104594918B
CN104594918B CN201410852859.5A CN201410852859A CN104594918B CN 104594918 B CN104594918 B CN 104594918B CN 201410852859 A CN201410852859 A CN 201410852859A CN 104594918 B CN104594918 B CN 104594918B
Authority
CN
China
Prior art keywords
plate supporting
supporting device
frame
underpass
mould plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410852859.5A
Other languages
Chinese (zh)
Other versions
CN104594918A (en
Inventor
周铮
黄明强
周蓉峰
顾逸佳
叶王辉
范育铭
徐阿弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Mechanized Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Group Co Ltd filed Critical Shanghai Mechanized Construction Group Co Ltd
Priority to CN201410852859.5A priority Critical patent/CN104594918B/en
Publication of CN104594918A publication Critical patent/CN104594918A/en
Application granted granted Critical
Publication of CN104594918B publication Critical patent/CN104594918B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a slit integrated underground passage steel mold plate trolley and a construction method thereof, relates to the technical field of underground passage building concrete construction, and aims at the problems that the existing underground passage construction equipment is large in occupied area, the construction method is long in curing time, and continuous pouring construction cannot be realized. The steel mold plate trolley comprises at least three frame-type mold plate supporting devices which are connected integrally through detachable box-shaped cross beams, and at least two groups of posterior disassembly top mold plate supporting devices; a traveling mechanism at the lower part of the steel mold plate trolley can drive the frame-type mold plate supporting devices to move along longitudinal tracks; the two frame-type mold plate supporting devices positioned on the outer side can move in the horizontal direction under the operational control of a horizontal hydraulic oil cylinder group; each frame-type mold plate supporting device can lift in the vertical direction under the operational control of a vertical hydraulic oil cylinder group which is mounted on the corresponding frame-type mold plate supporting device; the at least two groups of posterior disassembly top mold plate supporting devices are respectively connected between the two adjacent frame-type mold plate supporting devices by bolts; universal wheels used for travelling are mounted at the bottom parts of the posterior disassembly top mold plate supporting devices.

Description

Split integrated underpass steel formwork trolley and its construction method
Technical field
The present invention relates to underpass building concrete technical field of construction, particularly to one kind and early-dismantling technology phase In conjunction with split integrated underpass steel formwork trolley and its construction method.
Background technology
With the fast development of urban construction, traffic above-ground increasingly congestion, and developing underpass is to solve surface road One of effective means of congestion.For reducing the construction cost of underpass, part underpass adopts open-cut, will entirely Lower channel is divided into the construction cell of several certain lengths, and iterative method is constructed, to reduce the holding time of construction site, and Avoid hindering traffic above-ground.
At present, the construction equipment of employing be a set of gathered monoblock type formwork jumbo and steel pipe type mould plate supporting device be System, the defect of this system is: 1, steel pipe type mould plate supporting device is so that steel pipe and template occupied ground area are greatly and it needs to hang Car is lifted with the cooperation of other big machineries;2nd, two side template cleaning difficulty of monoblock type formwork jumbo are big.It is accordingly applied The defect of work method is: 1, wait concrete reach design strength time longer, the concrete of the next construction cell of impact Pouring construction;2 it cannot be guaranteed that each construction cell continues uninterrupted pouring construction it is impossible to meet rapid construction requirement.
Therefore, how to provide one kind can improve efficiency of construction, shorten the construction period, and realize underpass concrete even The formwork jumbo of continuous pouring construction and its construction method are those skilled in the art's technical problems urgently to be resolved hurrily.
Content of the invention
For existing underpass construction equipment floor space greatly, side template not easy cleaning, and construction method etc. is strong Time length is it is impossible to realize the problem of continuous concreting construction, it is an object of the invention to provide a kind of integrated underground of split Passage steel formwork trolley and its construction method, steel formwork trolley floor space is little and easy to operate, is capable of concrete continuous Pour operation, improve efficiency of construction, shorten the construction period, and ensure that construction quality.
The present invention solves the split integrated underpass steel formwork trolley that its technical problem is adopted, and pours for installing The template group of described underpass concrete, including at least three frame-types being arranged in order along described underpass transverse section Mould plate supporting device, described frame-type mould plate supporting device is connected as one by some detachable box-shaped beams, and described frame The bottom of posture mould plate supporting device is provided with walking mechanism, and described walking mechanism can drive described frame-type shuttering supporting dress Put and move along the long rails parallel to described underpass axis, positioned at the two of the described frame-type mould plate supporting device at middle part Side is provided with transverse hydraulic oil cylinder group, and two described frame-type mould plate supporting devices positioned at outside are in described transverse hydraulic oil cylinder Under the operational control of group, horizontal direction can be made along described underpass transverse section and move, and described frame-type shuttering supporting Device vertically can lift under the operational control of the vertical hydraulic jack group being mounted thereon;Top is torn open after at least two groups Mould plate supporting device, described after tear backform plate supporting device open and be bolted to two neighboring described frame-type shuttering supporting dress respectively Between putting, described after tear open backform plate supporting device bottom be provided with for walking universal wheel.
Preferably, described template group includes top template and the side template that can be closely connected, described top template and side template Can be adapted with the profile of described underpass, described top template is to be spliced by some monomer top templates, described framework Formula mould plate supporting device and described after tear the top of backform plate supporting device open and be respectively fixed with one piece of monomer top template, positioned at both sides The outside of two described frame-type mould plate supporting devices be respectively articulated with one piece of side template.
Preferably, the described frame-type mould plate supporting device positioned at described steel formwork trolley both sides includes:
One framework type base, the outside of described framework type base is provided with the demoulding hydraulic oil being connected respectively with described side template Cylinder group and support screw group;
One π shape bearing support, described π shape bearing support is bolted in described framework type base, described π shape bearing support It is provided with two parallel longerons, described monomer top template is arranged on described longeron, is installed in described framework type base Vertical hydraulic jack group can control described π shape bearing support vertically to lift;
Described longeron is hinged with described side template by side template turnover hinge bearing, and described side template is in described liquid parting Shunk centered on described side template turnover hinge bearing under the control of compressing cylinder group and launch, and adjusted by described support screw group Solidating is fixed.
Preferably, the bottom positioned at the described frame-type mould plate supporting device of described steel formwork trolley both sides is provided with and leads Wheel, is mounted on transverse hydraulic oil cylinder group, the described frame of both sides positioned at the both sides of the described frame-type mould plate supporting device at middle part Posture mould plate supporting device under the control of described transverse hydraulic oil cylinder group, and under the guiding of described guide wheel, can be along hanging down Directly it is arranged at the cross track above described long rails to move to the direction closer or far from described steel formwork trolley axis.
Preferably, tearing backform plate supporting device open after described is the frame structure being formed by connecting by some steel pipe, described after The top tearing backform plate supporting device open is connected with described monomer top template by screw mandrel group one, described after tear backform plate supporting device open Base supported by screw mandrel group two, and the bottom of described base be provided with for walking universal wheel.
Preferably, described walking mechanism includes wheel, motor, decelerator and brake gear, and described wheel is disposed along institute State on the described long rails of underpass axis direction laying, described walking mechanism is by described motor-driven, described electronic Machine is through described decelerator speed governing, and passes through vehicle wheel rotation described in chain-driving so that described wheel can be along described longitudinal rail Road moves.
Preferably, the width of described steel formwork trolley is equal to the width of the described underpass of pre- construction, and can pass through The length changing described box-shaped beam is adjusted, and the height of described steel formwork trolley can be by the liter of described π shape bearing support Fall is adjusted, and described steel formwork trolley is divided into structure identical at least two steel form along the axis direction of described underpass Trolley unit, and bolt connection is integrated, each described steel formwork trolley element length is 12.5m~15m.
In addition, present invention also offers a kind of construction method of split integrated underpass steel formwork trolley, step is such as Under:
Step one: described template group is arranged on described steel formwork trolley, arranges successively along described underpass transverse section Arrange described frame-type mould plate supporting device, and connected by described box-shaped beam, described frame-type mould plate supporting device passes through described After vertical hydraulic jack group is adjusted to calibrated altitude, bolt connection between two adjacent described frame-type mould plate supporting devices Tear backform plate supporting device after described open, make described frame-type mould plate supporting device and described after tear open on backform plate supporting device fixing Described monomer top template be located at same level, and progressively carry out concreting in the construction cell of described underpass Construction;
Step 2: when the concrete of current construction cell reaches some strength, in described transverse hydraulic oil cylinder group and institute State under the control of vertical hydraulic jack group, so that the described monomer top template on described frame-type mould plate supporting device is declined, described Side template shrinks, and the company tearing open between backform plate supporting device and described frame-type mould plate supporting device after unclamping described in two groups Connect, the outer profile size after described frame-type mould plate supporting device shrinks is less than the overall size of described underpass so that institute State frame-type mould plate supporting device and can enter next construction cell through described underpass;
Step 3: after the concrete strength of described current construction cell reaches design requirement, then will be described after tear backform open Plate supporting device moves to next construction cell, is connected with described frame-type mould plate supporting device, forms described steel form again Chassis, carry out next construction cell pours operation.
Preferably, in described step 2, want when the concrete strength of the current construction cell of described underpass reaches design Ask 60%~70% when, so that monomer top template on described frame-type mould plate supporting device and side template is shunk, and pass through institute State underpass and enter next construction cell.
Preferably, when described underpass has bend segmental arc, it is 12.5m that described steel formwork trolley is resolved into length The steel formwork trolley unit of~15m, each described steel formwork trolley unit is by direct for described frame-type mould plate supporting device spiral shell Bolt is formed by connecting.
Effect of the invention is that:
First, the split of the present invention integrated underpass steel formwork trolley, is that one kind is combined with early-dismantling technology, energy Enough make the construction equipment of underpass continuous concreting molding.It includes decomposing and the three frame-type templates combining Backform plate supporting device is torn open, each frame-type mould plate supporting device can be vertical be mounted thereon after support meanss and two groups Vertically lift under the operational control of hydraulic jack group, two frame-type mould plate supporting devices positioned at outside can be in peace It is loaded under the operational control of the transverse hydraulic oil cylinder group on middle frame formula mould plate supporting device, along underpass transverse section side To moving left and right, realize the separation of three frame-type mould plate supporting devices and combination so that being installed on frame-type shuttering supporting The monomer top template of device upper end can vertically lift, and is installed on the side template energy of frame-type mould plate supporting device side Enough make the movement of horizontal direction.Outer profile size after the contraction of frame-type mould plate supporting device is less than the profile chi of underpass Very little, therefore so that segment template group can pass through with frame-type mould plate supporting device pours the underpass unit completing and enter Enter next construction cell.The frame-type mould plate supporting device of the present invention and after tear open backform plate supporting device all can slidably, Floor space is little, and scene dismounting is simple and convenient, participates in construction without hanging device, saves a large amount of manpower and materials;Punching block pallet Car split moves laterally, and can provide working place for side template, be easy in long narrow underpass, side template be carried out Cleaning and coating release agent.
After the reach of frame-type mould plate supporting device, pour to complete to retain two groups in construction cell monomer top template is installed After tear backform plate supporting device open, reach to tear open again after design requirement intensity after concrete and move to next construction cell, in view of coagulation Soil pours 3~5 days its intensity up to 50% about, and later strength rise slow characteristic, after tear backform plate supporting device open Setting can make the monomer top template above it be in short across stress, can make frame-type mould plate supporting device underground lead to When road concrete strength reaches some strength, you can move to next construction cell and continue construction, realize early form removal construction, reduce Construction cost, shortens the construction period.
2nd, the construction method of the split of the present invention integrated underpass steel formwork trolley, first, tears backform open by after two groups Plate supporting device is bolted between adjacent two frame-type mould plate supporting device respectively, forms steel formwork trolley, meets The pouring construction of underpass concrete, whne concrete strength reach necessarily require when, frame-type mould plate supporting device is in hydraulic pressure Shrink in the presence of system so that its can before move up into next construction cell, and recover original extended configuration, after reservation Tear backform plate supporting device open then after underpass concrete reaches design requirement, then remove next construction cell of entrance, with frame Posture mould plate supporting device is assembled into the pouring construction that steel formwork trolley carries out concrete again.By the construction party of the present invention Method, not only can make underpass continuous concreting molding, and due to after tear the presence of backform plate supporting device open, can make Frame-type mould plate supporting device is when underpass concrete strength reaches some strength, you can moves to next construction cell and continues Continuous construction so that steel formwork trolley can do sth. in advance 10~15 heaven-made vertically move, realize morning form removal and construct, decrease construction cost, Shorten the construction period, and ensure that construction quality and improve efficiency of construction.
Brief description
Fig. 1 is the structural representation of split integrated underpass steel formwork trolley in one embodiment of the invention;
Fig. 2 is the structural representation of the frame-type mould plate supporting device being located at right side in one embodiment of the invention;
Fig. 3 is the structural representation being located at middle frame-type mould plate supporting device in one embodiment of the invention;
Fig. 4 is the side view of Fig. 2;
Fig. 5 is the side view of Fig. 3;
Fig. 6 and Fig. 7 be in one embodiment of the invention after tear the structural representation of backform plate supporting device open;
The signal of construction method one embodiment for split of the present invention integrated underpass steel formwork trolley for the Fig. 8 to Figure 10 Figure;
Figure 11 is the schematic diagram of another embodiment of construction method of split of the present invention integrated underpass steel formwork trolley.
Specific embodiment
Below in conjunction with the drawings and specific embodiments to split proposed by the present invention integrated underpass steel formwork trolley and Its construction method is described in further detail.According to description below and claims, advantages and features of the invention will more Clear.Hereinafter accompanying drawing will be combined by cited embodiment, describe technology contents and the feature of the present invention in detail.For narration side Just, described below " on ", D score, "left", "right" consistent with the direction of the upper and lower, left and right of accompanying drawing, but this can not become The restriction of technical solution of the present invention.Need in addition illustrate, accompanying drawing all in the form of very simplification and all using non-accurately Ratio, only in order to purpose that is convenient, lucidly aiding in illustrating the embodiment of the present invention.
Embodiment one: with reference to Fig. 1 to Fig. 8, the split of the present invention integrated underpass steel formwork trolley is described, for pacifying Dress pours the template group of underpass concrete, as shown in figure 1, the steel formwork trolley of the present embodiment includes three along underpass The frame-type mould plate supporting device that transverse section is arranged in order, is followed successively by frame-type mould plate supporting device 1, framework from right to left Formula mould plate supporting device 2 200 and frame-type mould plate supporting device 3 300, three frame-type mould plate supporting devices 100,200, Connected as one by the detachable box-shaped beam 20 of some horizontally sets between 300, and frame-type mould plate supporting device 1 It is mounted on walking mechanism with the bottom of frame-type mould plate supporting device 3 300, above-mentioned walking mechanism being capable of driver framework formula mould Plate supporting device 100,200,300 is mobile along a pair of the long rails 10 parallel to underpass axis.Specifically, frame-type The bottom of mould plate supporting device 100,200,300 is respectively provided with eight wheels, and wherein, the frame-type template positioned at outside is propped up The wheel of support arrangement 1 and frame-type mould plate supporting device 3 300 bottom can slide along long rails 10, the framework of centre The wheel of formula mould plate supporting device 2 200 bottom is contacted with underpass ground, when improving steel formwork trolley forward movement with this Stability.The both sides of frame-type mould plate supporting device 2 200 are provided with transverse hydraulic oil cylinder group 204, frame-type shuttering supporting Device 1 and frame-type mould plate supporting device 3 300, can be along landing under the operational control of transverse hydraulic oil cylinder group 204 Lower channel transverse section is made horizontal direction and is moved, and frame-type mould plate supporting device 100,200,300 can be mounted thereon Vertically lift under the operational control of vertical hydraulic jack group 105,205,305;
As shown in figure 8, the steel formwork trolley of the present embodiment tears backform plate supporting device 400,500 open after also including two groups, from Right-to-left tear open after being followed successively by backform plate supporting device 1 and after tear backform plate supporting device 2 500 open, after tear top template open and support dress Put 1 to be bolted between adjacent frame-type mould plate supporting device 1 and frame-type mould plate supporting device 2 200, Tear that backform plate supporting device 2 500 is bolted to adjacent frame-type mould plate supporting device 2 200 and frame-type template is propped up afterwards open Between support arrangement 3 300, after tear the bottom of backform plate supporting device 400,500 open and be provided with and contact with the ground of underpass 50 Universal wheel 402 for walking.
The split integrated underpass steel formwork trolley of the present invention, is that one kind is combined with early-dismantling technology, can Make the construction equipment of underpass continuous concreting molding.It includes decomposing is propped up with the three frame-type templates combining Backform plate supporting device is torn open, each frame-type mould plate supporting device can be in the vertical liquid being mounted thereon after support arrangement and two groups Vertically lift under the operational control of compressing cylinder group, two frame-type mould plate supporting devices positioned at outside can installed Under the operational control of the transverse hydraulic oil cylinder group on middle frame formula mould plate supporting device, along underpass cross-sectional direction Move left and right, realize the separation of three frame-type mould plate supporting devices and combination fills so that being installed on frame-type shuttering supporting The monomer top template putting upper end can vertically lift, and the side template being installed on frame-type mould plate supporting device side can Make the movement of horizontal direction.Outer profile size after the contraction of frame-type mould plate supporting device is less than the overall size of underpass, Therefore so that segment template group can pass through with frame-type mould plate supporting device pours under the underpass unit that completes enters One construction cell.The frame-type mould plate supporting device of the present invention and after tear open backform plate supporting device all can slidably, take up an area Area is little, and scene dismounting is simple and convenient, participates in construction without hanging device, saves a large amount of manpower and materials;Steel formwork trolley divides Body moves laterally, and can provide working place for side template, be easy in long narrow underpass, side template is carried out And coating release agent.
After the reach of frame-type mould plate supporting device, pour to complete to retain two groups in construction cell monomer top template is installed After tear backform plate supporting device open, reach to tear open again after design requirement intensity after concrete and move to next construction cell, in view of coagulation Soil pours 3~5 days its intensity up to 50% about, and later strength rise slow characteristic, after tear backform plate supporting device open Setting can make the monomer top template above it be in short across stress, can make frame-type mould plate supporting device underground lead to When road concrete strength reaches some strength, you can move to next construction cell and continue construction, realize early form removal construction, reduce Construction cost, shortens the construction period.
Refer to Fig. 1 and Fig. 8, above-mentioned template group includes top template and side template, top template and side template and underpass 50 profile is adapted, and in the present embodiment, the top template of whole underpass divides from right to left along underpass cross-sectional direction For five pieces of monomer top templates 110,410,210,510,310, wherein, on three frame-type mould plate supporting devices 100,200,300 It is separately installed with one piece of monomer top template 110,210,310, tear open after two groups and be separately installed with backform plate supporting device 400,500 One piece of monomer top template 410,510.As shown in figure 1, frame-type mould plate supporting device 100,200,300 is provided with vertical hydraulic oil Cylinder group 105,205,305, can control the monomer top template 110,210,310 of its upper end vertically to lift, frame-type mould The outside of plate supporting device 1 and frame-type mould plate supporting device 3 300 is respectively provided with one piece of side template 111,311, side form Plate 111,311 can be installed on taking off outside frame-type mould plate supporting device 1 and frame-type mould plate supporting device 3 300 Stretching, extension and the contraction of horizontal direction, above-mentioned top template are made in the control lower edge underpass transverse section of mould hydraulic jack group 103,303 Tight with side template 111,311 be connected to constitute pour the template group of underpass 50 concrete.The shape of above-mentioned template group and chi Very little should be determined according to the profile of underpass 50, be not construed as limiting herein.
As shown in Figure 2 and Figure 4, explanation taking the frame-type mould plate supporting device 1 on the right side of steel formwork trolley as a example Its concrete composition and structure, it includes a framework type base 101, and is connected to the π shape bearing support in framework type base 101 Two parallel longerons 107 are connected with 102, π shape bearing supports 102, monomer top template 110 is assembled on longeron 107.This reality Apply in example, longeron 107 is made up of H type steel, the connected mode of above-mentioned each component is bolt connection.Vertical hydraulic jack group 105 Monomer top template 110 is driven vertically to lift by π shape bearing support 102.The upper end of side template 111 be fixed on longeron Turnover hinge bearing 108 pin connection on 107, the right side of frame-type mould plate supporting device 1 be provided with respectively with side template 111 The demoulding hydraulic jack group 103 connecting and support screw group 104.Side template 111 can be in the control of demoulding hydraulic jack group 103 Under make stretching, extension and the contraction of horizontal direction for fulcrum along underpass cross-sectional direction with turnover hinge bearing 108, and by Support wire bar group 104 fixed bearing.In the present embodiment, the lifting of monomer top template 110 is by positioned at frame-type mould plate supporting device one Vertical hydraulic jack group 105 operational control at 100 two ends, and by adjustable screw group 109 fixed bearing.In the present embodiment, vertically Hydraulic jack group 105 is made up of 5 vertical hydraulic jacks, and demoulding hydraulic jack group 103 is made up of 36 hydraulic jacks, supporting wire Bar group 104 is made up of each 22 laterally adjustable support leading screws up and down, and adjustable screw group 109 is made up of 60 adjustable screws.Similar , frame-type mould plate supporting device on the left of steel formwork trolley 3 300 and frame-type mould plate supporting device one described previously 100 composition and structure are identical, and here is omitted.
As shown in Figure 3 and Figure 5, and refer to Fig. 1, the both sides of centrally located frame-type mould plate supporting device 2 200 It is mounted on transverse hydraulic oil cylinder group 204, on frame-type mould plate supporting device 1 and frame-type mould plate supporting device 3 300 Bottom near frame-type mould plate supporting device 2 200 side is provided with guide wheel 106, frame-type mould plate supporting device 1 He Frame-type mould plate supporting device 3 300 can be under the control of transverse hydraulic oil cylinder group 204, and under the guiding of guide wheel 106, edge The cross track being vertically installed in long rails 10 top to the direction closer or far from frame-type mould plate supporting device 2 200 Mobile.Above-mentioned cross track only moves horizontally frame-type mould plate supporting device 1 and frame-type mould plate supporting device three in need Lay when 300 temporarily, remove after the completion of moving horizontally.
Tear backform plate supporting device 400,500 composition after two groups open and structure is identical, tear backform plate supporting device open herein later Describe in detail as a example 400, as shown in Figure 6 and Figure 7, after to tear backform plate supporting device 400 open be by 6 vertical steel pipes and some horizontal strokes To the steel pipe of steel-pipe welding, its cross section is rectangle.Leading screw group one is passed through in the upper end tearing backform plate supporting device 400 afterwards open 404 are connected with monomer top template 410, after tear the base of backform plate supporting device 400 open and supported by screw mandrel group 2 403, and base Bottom is provided with the universal wheel 402 for walking.Leading screw group 1 and leading screw group 2 403 are made up of 6 adjustable screws respectively. When after tear backform plate supporting device 400 open and be bolted to frame-type mould plate supporting device 1 and frame-type mould plate supporting device After between 2 200, after tear backform plate supporting device 400,500 and adjacent π shape bearing support 102,202 open and adopt steel pipe to make laterally Connect.In view of 3~5 days its intensity of concreting is up to 50% about, and later strength rise slow characteristic, after tear backform open The setting of plate supporting device 400,500 can make the monomer top template 410,510 above it be in short across stress, can make Frame-type mould plate supporting device 100,200,300 is when underpass 50 concrete strength reaches some strength, you can move to down One construction cell continue construction so that steel formwork trolley can do sth. in advance 10~15 heaven-made vertically move, realize morning form removal and construct.
Above-mentioned walking mechanism includes wheel, motor, decelerator and brake gear (not shown), and wheel is disposed along ground On the long rails 10 of lower channel 50 axis direction laying, long rails 10 play the effect of load-bearing and guiding.Walking mechanism is by electricity Motivation drives, and motor is through planet pendulum pin type decelerator speed governing, and passes through chain-driving vehicle wheel rotation so that wheel is along longitudinal direction Track 10 is advanced, and brake gear is capable of the direction of effective control wheel advance.
The width of steel formwork trolley is equal to the width of pre- underpass 50 of constructing, and is 25m~30m, and its width can basis The length that job requirements change box-shaped beam 20 carries out appropriate folding and unfolding adjustment.The height of steel formwork trolley can pass through π shape bearing support 102nd, 202,302 lifting is vertically adjusted, and the height of steel formwork trolley reaches as high as 8m.The length of steel formwork trolley is permissible It is adjusted according to job requirements, structure identical at least two steel formwork trolley unit can be divided into, and bolt at the construction field (site) Link into an integrated entity, each steel formwork trolley element length is 12.5m~15m, and whole steel formwork trolley is the longest to reach 30m.
Embodiment two: with reference to Fig. 8 to Figure 10, and referring to figs. 1 to Fig. 7, the split of the present invention integrated underpass steel is described The construction method of formwork jumbo, specifically comprises the following steps that
Step one: template group is arranged on steel formwork trolley, and is arranged in order three frames along underpass 50 transverse section Posture mould plate supporting device 100,200,300, three frame-type mould plate supporting devices 100,200,300 reach assignment position Afterwards, its lengthwise position is connected using detachable box-shaped beam 20 up and down, and is stably and firmly located in underpass 50, framework Formula mould plate supporting device 100,200,300 after vertical hydraulic jack group 105,205,305 is adjusted to calibrated altitude, adjacent Two frame-type mould plate supporting devices 100,200,300 between tear backform plate supporting device 400,500 open after bolt connection, make frame Posture mould plate supporting device 100,200,300 and after tear on backform plate supporting device 400,500 5 pieces of fixing monomer top templates open 110th, 410,210,510,310 it is located at same level, then, progressively carry out concrete in the construction cell of underpass 50 Pouring construction;
Step 2: when the concrete of current construction cell reaches some strength, as shown in figure 9, in transverse hydraulic oil cylinder Under the control of group 204 and vertical hydraulic jack group 105,205,305, make on frame-type mould plate supporting device 100,200,300 Three pieces of monomer top templates 110,210,310 decline, and the side template 111,311 of both sides shrinks, and tear top template open after unclamping two groups and prop up The connection of support arrangement 400,500 and frame-type mould plate supporting device 100,200,300, as shown in Figure 10, frame-type after contraction The outer profile size of mould plate supporting device 100,200,300 is less than the overall size of underpass 50 so that it can be in walking The underpass 50 that is driven through of mechanism enters next construction cell;Now, frame-type mould plate supporting device 100,200,300 Front end leave upper and lower two box-shaped beams 20, to ensure the globality of frame-type mould plate supporting device 100,200,300, and tear open Except the box-shaped beam 20 of other positions is so that when frame-type mould plate supporting device 100,200,300 moves forward, can tear top open after getting around Mould plate supporting device 400,500 is smooth to enter next construction cell.
Step 3: after the concrete strength of current construction cell reaches design requirement, then by after tear open top template support dress Put 400,500 and move to next construction cell, be connected with frame-type mould plate supporting device 100,200,300, form punching block again Pallet car, carry out next construction cell pours operation.Above-mentioned concrete strength design requirement refers to that concrete strength meets The regulation of " concrete structure engineering construction quality accident specification ".
The construction method of the split integrated underpass steel formwork trolley of the present invention, first, tears top template open by after two groups Support meanss are bolted between adjacent two frame-type mould plate supporting device respectively, form steel formwork trolley, contentedly The pouring construction of lower channel concrete, whne concrete strength reach necessarily require when, frame-type mould plate supporting device is in hydraulic pressure system Shrink in the presence of system so that its can before move up into next construction cell, and recover original extended configuration, tear open after reservation Backform plate supporting device is then after underpass concrete reaches design requirement, then removes next construction cell of entrance, with framework Formula mould plate supporting device is assembled into the pouring construction that steel formwork trolley carries out concrete again.By the construction method of the present invention, Not only can make underpass continuous concreting molding, and due to after tear the presence of backform plate supporting device open, frame can be made Posture mould plate supporting device is when underpass concrete strength reaches some strength, you can moves to next construction cell and continues Construction so that steel formwork trolley can do sth. in advance 10~15 heaven-made vertically move, realize early form removal and construct, decrease construction cost, contract The short construction period, and ensure that construction quality and improve efficiency of construction.
Preferably, in above-mentioned steps two, when underpass 50 concrete strength reaches the 60%~70% of design requirement, The top template 110,210,310 on frame-type mould plate supporting device 100,200,300 is made to decline, the side template 111,311 of both sides Shrink, and pass through underpass 50 to enter next construction cell.
Embodiment three: combine Figure 11, and refering to Fig. 1 to Figure 10, the split of the present invention integrated underpass steel form is described The construction method of chassis, from unlike embodiment two, the present embodiment is that have some bend segmental arc situations in underpass 50 Under pouring construction operation, as shown in figure 11, when the bend segmental arc having radius r to reach 400m in underpass, by punching block pallet Car resolves into the steel formwork trolley unit 1 that length l is 12.5m length, and the box-shaped beam 20 on steel formwork trolley is removed, and directly will Three frame-type mould plate supporting device 100,200,300 bolt connections become an entirety so that steel formwork trolley narrowed width, just In moving forward along bend segmental arc in underpass 50, because steel formwork trolley shortens so that underground after concreting The profile of the bend segmental arc of passage 50 can be closer to the arc shape of design requirement.The construction method of the present embodiment, by three frames The direct bolt connection of posture mould plate supporting device, its narrowed width, to meet, there is pouring of bend segmental arc underpass concrete Build construction, flexible operation, can treatment in accordance with local conditions so that the suitability of steel formwork trolley of the present invention is higher.
Foregoing description is only the description to present pre-ferred embodiments, not any restriction to the scope of the invention, this Any change that the those of ordinary skill in bright field does according to the disclosure above content, modification, belong to the protection of claims Scope.

Claims (10)

1. split integrated underpass steel formwork trolley, for installing the template group pouring described underpass concrete, its It is characterised by, comprising:
At least three frame-type mould plate supporting devices being arranged in order along described underpass transverse section, described frame-type template is propped up Support arrangement is connected as one by some detachable box-shaped beams, and the bottom of described frame-type mould plate supporting device is provided with row Walk mechanism, described walking mechanism can drive described frame-type mould plate supporting device along indulging parallel to described underpass axis Move to track, positioned at the both sides of the described frame-type mould plate supporting device at middle part, transverse hydraulic oil cylinder group is installed, positioned at outer Two described frame-type mould plate supporting devices of side, can be along described under the operational control of described transverse hydraulic oil cylinder group Lower channel transverse section is made horizontal direction and is moved, and described frame-type mould plate supporting device can be in the vertical hydraulic pressure being mounted thereon Vertically lift under the operational control of oil cylinder group;
Tear backform plate supporting device after at least two groups open, described after tear backform plate supporting device open and be bolted to two neighboring institute respectively State between frame-type mould plate supporting device, described after tear open backform plate supporting device bottom be provided with for walking universal wheel.
2. the integrated underpass steel formwork trolley of split according to claim 1 it is characterised in that: described template group bag Include the top template that can be closely connected and side template, described top template mutually can be fitted with the profile of described underpass with side template Should, described top template is to be spliced by some monomer top templates, described frame-type mould plate supporting device and described after tear backform open The top of plate supporting device is respectively fixed with one piece of monomer top template, positioned at two described frame-type mould plate supporting devices of both sides Outside be respectively articulated with one piece of side template.
3. the integrated underpass steel formwork trolley of split according to claim 2 is it is characterised in that be located at described punching block The described frame-type mould plate supporting device of pallet car both sides includes:
One framework type base, the outside of described framework type base is provided with the demoulding hydraulic jack group being connected respectively with described side template With support screw group;
One π shape bearing support, described π shape bearing support is bolted in described framework type base, and described π shape bearing support sets There are two parallel longerons, described monomer top template is arranged on described longeron, is installed on vertical in described framework type base Hydraulic jack group can control described π shape bearing support vertically to lift;
Described longeron is hinged with described side template by side template turnover hinge bearing, and described side template is in described demoulding hydraulic oil Shunk centered on described side template turnover hinge bearing under the control of cylinder group and launch, and solid by the adjustment of described support screw group Fixed.
4. the integrated underpass steel formwork trolley of the split according to any one of claims 1 to 3 it is characterised in that: position In the bottom of the described frame-type mould plate supporting device of described steel formwork trolley both sides, guide wheel is installed, positioned at the described frame at middle part The both sides of posture mould plate supporting device are mounted on transverse hydraulic oil cylinder group, and the described frame-type mould plate supporting device of both sides is in institute State under the control of transverse hydraulic oil cylinder group, and under the guiding of described guide wheel, can be along being vertically installed in described long rails The cross track of top moves to the direction closer or far from described steel formwork trolley axis.
5. the integrated underpass steel formwork trolley of the split according to any one of claim 2 to 3 it is characterised in that: institute Tearing backform plate supporting device after stating open is the frame structure being formed by connecting by some steel pipe, described after tear backform plate supporting device open Top is connected with described monomer top template by screw mandrel group one, described after tear the base of backform plate supporting device open by screw mandrel group two Hold, and the bottom of described base is provided with the universal wheel for walking.
6. the integrated underpass steel formwork trolley of the split according to any one of claims 1 to 3 it is characterised in that: institute State walking mechanism and include wheel, motor, decelerator and brake gear, described wheel is disposed along described underpass axis direction Laying described long rails on, described walking mechanism by described motor-driven, described motor through described decelerator speed governing, And by vehicle wheel rotation described in chain-driving so that described wheel can move along described long rails.
7. the integrated underpass steel formwork trolley of split according to claim 3 it is characterised in that: described punching block pallet The width of car is equal to the width of the described underpass of pre- construction, and can be adjusted by changing the length of described box-shaped beam Whole, the height of described steel formwork trolley can be adjusted by the lifting of described π shape bearing support, described steel formwork trolley edge The axis direction of described underpass is divided into structure identical at least two steel formwork trolley unit, and bolt connection is integrated, Each described steel formwork trolley element length is 12.5m~15m.
8. the construction method of the integrated underpass of the split as described in any one of claim 2 to 7 steel formwork trolley, step is such as Under:
Step one: described template group is arranged on described steel formwork trolley, is arranged in order institute along described underpass transverse section State frame-type mould plate supporting device, and connected by described box-shaped beam, described frame-type mould plate supporting device passes through described vertical After hydraulic jack group is adjusted to calibrated altitude, described in bolt connection between two adjacent described frame-type mould plate supporting devices After tear backform plate supporting device open, make described frame-type mould plate supporting device and described after tear on backform plate supporting device fixing institute open State monomer top template and be located at same level, and progressively carry out concreting in the construction cell of described underpass and apply Work;
Step 2: when the concrete of current construction cell reaches some strength, in described transverse hydraulic oil cylinder group and described perpendicular To under the control of hydraulic jack group, the described monomer top template on described frame-type mould plate supporting device is made to decline, described side form Plate shrinks, and the connection tearing open between backform plate supporting device and described frame-type mould plate supporting device after unclamping described in two groups, institute State the outer profile size after frame-type mould plate supporting device shrinks and be less than the overall size of described underpass so that described framework Formula mould plate supporting device can enter next construction cell through described underpass;
Step 3: after the concrete strength of described current construction cell reaches design requirement, then will be described after tear top template open and prop up Support arrangement moves to next construction cell, is connected with described frame-type mould plate supporting device, forms described steel formwork trolley again, Carry out next construction cell pours operation.
9. construction method according to claim 8 it is characterised in that: in described step 2, when described underpass is current When the concrete strength of construction cell reaches the 60%~70% of design requirement, make the list on described frame-type mould plate supporting device Body top template and side template shrink, and enter next construction cell through described underpass.
10. construction method according to claim 8 it is characterised in that: when described underpass has bend segmental arc, will Described steel formwork trolley resolves into the steel formwork trolley unit that length is 12.5m~15m, and each described steel formwork trolley unit is Direct for described frame-type mould plate supporting device bolt connection is formed.
CN201410852859.5A 2014-12-31 2014-12-31 Split integrated underground passage steel mold plate trolley and construction method thereof Active CN104594918B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410852859.5A CN104594918B (en) 2014-12-31 2014-12-31 Split integrated underground passage steel mold plate trolley and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410852859.5A CN104594918B (en) 2014-12-31 2014-12-31 Split integrated underground passage steel mold plate trolley and construction method thereof

Publications (2)

Publication Number Publication Date
CN104594918A CN104594918A (en) 2015-05-06
CN104594918B true CN104594918B (en) 2017-01-18

Family

ID=53120927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410852859.5A Active CN104594918B (en) 2014-12-31 2014-12-31 Split integrated underground passage steel mold plate trolley and construction method thereof

Country Status (1)

Country Link
CN (1) CN104594918B (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105041339B (en) * 2015-07-28 2017-12-26 上海市机械施工集团有限公司 Disengaging type formwork jumbo, chassis component and underpass concrete construction method
CN105216101B (en) * 2015-10-10 2018-08-21 山东铁鹰建设工程有限公司 A kind of self-propelled hydraulic T-type beam prefabricated form device and its release method
CN105401960B (en) * 2015-10-12 2018-03-20 中铁十九局集团第六工程有限公司 A kind of mould bases and its construction method for the construction of railway tunnel inverted arch
CN106437769B (en) * 2016-11-09 2018-06-01 辽宁工程技术大学 The self-propelled hydraulic formwork jumbo poured for Deep Foundation Pit of Metro Stations engineering top plate
CN107165193A (en) * 2017-07-17 2017-09-15 中建三局第三建设工程有限责任公司 A kind of fabricated construction mobile formwork
CN107630463A (en) * 2017-09-19 2018-01-26 洛阳高飞桥隧机械有限公司 A kind of construction technology of underground pipe gallery construction mobile jumbo device
CN107761583A (en) * 2017-10-18 2018-03-06 宁夏宁博通模板有限责任公司 A kind of adjustable box culvert internal model branch tears system open
CN107905818B (en) * 2017-12-11 2019-12-27 李信斌 Tunnel concrete lining construction auxiliary equipment and construction process
CN110682417A (en) * 2018-07-04 2020-01-14 任丘市永基建筑安装工程有限公司 Vertical combined stair board mould equipment
CN109356616A (en) * 2018-11-02 2019-02-19 广州市高速公路有限公司 Subsidence-style tunnel roof plate template trolley device
CN110065148B (en) * 2019-05-31 2024-03-22 中交武汉港湾工程设计研究院有限公司 Novel immersed tube tunnel pipe section prefabricated traffic lane centre form platform truck is walked device
CN110242330B (en) * 2019-07-18 2024-10-01 中铁隧道局集团有限公司 Movable type can Adjustable grouting template
CN112171865A (en) * 2020-09-25 2021-01-05 广东欣龙隧道装备股份有限公司 Trolley convenient for mold erecting and demolding and use method
CN114412516A (en) * 2022-03-11 2022-04-29 中建三局集团有限公司 A kind of equipment and construction method for steel formwork trolley for low headroom air duct plate in underground passage
CN117108005A (en) * 2023-09-08 2023-11-24 巢势科技(上海)有限公司 An intelligent construction trolley for platform canopies

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2139078A (en) * 1935-10-18 1938-12-06 William A Gurtler Concrete form
CN202810870U (en) * 2012-09-06 2013-03-20 成都市新筑路桥机械股份有限公司 Combined type template trolley for box culvert lining
CN103806926A (en) * 2014-03-07 2014-05-21 陕西理工学院 Span-changing and height-changing device of concrete lining steel bench vehicle
CN104234723A (en) * 2014-07-23 2014-12-24 中建三局集团有限公司 Self-propelled mobile template support trolley for open trench tunnel with rectangular cross section

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3316136B2 (en) * 1996-07-02 2002-08-19 株式会社栗本鐵工所 Repair units for existing waterways and their repair methods
JP5619646B2 (en) * 2011-02-04 2014-11-05 大成建設株式会社 Construction method of underground structure and underground structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2139078A (en) * 1935-10-18 1938-12-06 William A Gurtler Concrete form
CN202810870U (en) * 2012-09-06 2013-03-20 成都市新筑路桥机械股份有限公司 Combined type template trolley for box culvert lining
CN103806926A (en) * 2014-03-07 2014-05-21 陕西理工学院 Span-changing and height-changing device of concrete lining steel bench vehicle
CN104234723A (en) * 2014-07-23 2014-12-24 中建三局集团有限公司 Self-propelled mobile template support trolley for open trench tunnel with rectangular cross section

Also Published As

Publication number Publication date
CN104594918A (en) 2015-05-06

Similar Documents

Publication Publication Date Title
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN103015325B (en) Construction method of cast-in-place concrete crash barrier with eaves
CN103452052B (en) Movable mold hanging equipment for closing swivel bridges and closure section construction method
CN106089253B (en) A kind of all-hydraulic template system poured for culvert
CN107338727B (en) Integrally-disassembled and assembled anti-collision wall template and walking type rail hanging and moving system thereof
CN102296971B (en) A lining method for a tunnel emergency avoidance zone and a tunnel lining trolley
CN113235472B (en) A trolley for pouring concrete for slab culvert
CN105155423A (en) Upward moving type movable formwork for continuous box girder construction
CN106120563A (en) Cast-in-situ box girder Combined movable mould bases and construction method thereof
CN107060823B (en) Non-dismantling trolley for tunnel anchor section secondary lining concrete construction
CN105952482A (en) Self-propelled tunnel invert lining trolley
CN207944955U (en) Tunnel widening section second lining trolley
CN109629439B (en) Construction method of single-tower cable-stayed bridge
CN106593469A (en) Trolley for construction of inverted arch
CN103982200B (en) Slide rail Mobile steel mould trolley in tunneling boring
CN212867563U (en) A double-lined trolley with a super large section of a tunnel that can be widened multiple times
CN113882286A (en) Bridge dismantling and building all-in-one machine and spanning method thereof, bridge dismantling method and new building method
CN114575892B (en) Off-wall vault lining trolley and construction method thereof
CN206035507U (en) Rectangle box culvert and for tunnel construction platform truck
CN102660925A (en) Moveable formwork for variable-width curved bridge
CN105970822A (en) A 50m double-width upward mobile formwork and its corresponding beam-making construction method
CN103388305A (en) Railway T-beam cast-in-site bridge deck forming machine
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN105133497B (en) A kind of construction method being inclined cross low clearance active service highway multi-azimuth adjustable cast-in-place box beam bracket system
CN208844612U (en) A kind of stalk vaulted type open trench tunnel main body construction mobile formwork

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant