CN204212272U - A kind of concrete column and stiffened steel structure post steel split heads connected node - Google Patents
A kind of concrete column and stiffened steel structure post steel split heads connected node Download PDFInfo
- Publication number
- CN204212272U CN204212272U CN201420649947.0U CN201420649947U CN204212272U CN 204212272 U CN204212272 U CN 204212272U CN 201420649947 U CN201420649947 U CN 201420649947U CN 204212272 U CN204212272 U CN 204212272U
- Authority
- CN
- China
- Prior art keywords
- steel
- stiffened
- column
- split heads
- post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to a kind of concrete column and stiffened steel structure post steel split heads connected node, for stiffened column (3) is connected to concrete column (2), comprise steel split heads (1), steel split heads (1) comprises steel post (9), brace (10), cross bar (11), crossbar (12), wherein, steel post (9) is distributed in periphery, plays main support effect; Brace (10), cross bar (11) adopts angle steel, is fixed on steel post (9), jointly forms a lattice column system with it; Steel split heads (1) is placed on concrete column (2), and stiffened column (3) is fixedly connected with steel split heads (1); Concrete (14) is had at concrete column (2), steel split heads (1) and stiffened column (3) upper.Concrete column can conveniently be connected with stiffened steel structure post by the utility model, improves construction quality.
Description
Art
The utility model relates to the connecting structure of a kind of concrete column and stiffened steel structure post, is applicable to construction field.
Background technology
Conversion beam, for changing the structural configuration of architectural lower floor, is applied very general under construction.Stiffened conversion beam is high because of its bearing capacity, has applied widely at present.Stiffened conversion beam end should have stiffness transition mast to connect, and one is the connection violations problem avoiding shaped steel and column tie-bar, and two is ensure reliable beam-to-column joint and good transmission force property.As there is stiffened conversion beam, transition mast in the building that some floor heights are higher, transition mast that may be shorter just can ensure the connection of stiffness beam column, just there will be stiffened column and be suspended from situation in midair, this brings great difficulty just to the connection of stiffened steel structure and bottom concrete structure.If stiffened column is run through whole floor always, one is the waste of steel, and two is that shaped steel cross section is little, and time fixing, welded reinforcement contact surface is few, situation local stress being brought excessive to substructure; If adopt steel concrete stub to support stiffened column, the process complexity that contacts with shaped steel of formwork, form removal, concreting and concrete is uneconomical on the contrary repeatedly.
Utility model content
The purpose of this utility model is the above-mentioned deficiency overcoming prior art, provides a kind of constructability, the connecting structure of the concrete column reduced costs and stiffened steel structure post.The connected mode that the utility model provides, is convenient to the installation of stiffened column, easy construction, quick, can effectively reduce construction cost, shorten the construction period.Technique effect of the present utility model is as follows:
A kind of concrete column and stiffened steel structure post steel split heads connected node, for stiffened column (3) is connected to concrete column (2), it is characterized in that, described connected node comprises steel split heads (1), and described steel split heads (1) comprises steel post (9), brace (10), cross bar (11), crossbar (12), wherein, steel post (9) is distributed in periphery, plays main support effect; Brace (10), cross bar (11) adopts angle steel, is fixed on steel post (9), jointly forms a lattice column system with it; Steel split heads (1) is placed on concrete column (2), and stiffened column (3) is fixedly connected with steel split heads (1); Concrete (14) is had at concrete column (2), steel split heads (1) and stiffened column (3) upper.
The beneficial effects of the utility model are: the connection of steel split heads is a kind of construction measure of convenient construction, it can complete processing and fabricating in factory, on-the-spot employing welding is connected with steel superstructure, bottom and reinforcement welding are fixed, the most whole stiffness structure is cast in together, can be conveniently connected with stiffened steel structure post by concrete column.Reduce construction cost, accelerate speed of application, improve construction quality.
Accompanying drawing explanation
Fig. 1 is the utility model concrete column and stiffened steel structure post steel split heads connection diagram;
Fig. 2 is steel split heads and top and the bottom anatomical connectivity schematic diagram;
Fig. 3 is steel split heads schematic diagram;
Fig. 4 is stiffened column sectional drawing;
Fig. 5 is concrete column sectional drawing.
In figure, 1: steel split heads, 2: concrete column, 3: stiffened column, 4: stiffened conversion beam, 5: floor, 6: reinforcing bar, 7: beam plays post, 8: hawser, 9: steel post, 10: brace, 11: cross bar, 12: crossbar, 13:H shaped steel, 14: concrete
Detailed description of the invention
In FIG, the connected node of concrete column and stiffened steel structure post constructs and comprises, steel split heads 1, concrete column 2, stiffened column 3.
In fig. 2, when stiffened conversion beam 4, stiffened steel structure post 3 are constructed, first steel split heads 1 and floor 5 are welded and fixed, have the reinforcing bar 6 stretched out around, be integrally formed for concreting.Again the H profile steel 13 flange portions spot welding of top stiffened column is fixed on steel split heads 1, and with hawser 8, H profile steel 13 top and floor 5 is held, ensure its vertical verticality.The installation of stiffened conversion beam 4 can be carried out, the integrated poured connection completing concrete column 2 and stiffened steel structure post 4 of last formwork after H profile steel 13 installation.
In figure 3, steel split heads 1 comprises steel post 9, brace 10, cross bar 11, crossbar 12.Wherein, steel post 9 adopts i shaped cross section, has the corner that 4 are distributed in steel split heads, and construction working face is large, facilitates the fixing of steel split heads 1, plays main support effect.Brace 10, cross bar 11 adopts angle steel, is welded on steel post 9, jointly forms a lattice column system with it.At steel post 9 welded top two crossbars 12, contact area is large, in order to support top H profile steel, and provides stability.Steel split heads 1 top and H profile steel spot welding, bottom and reinforcement welding are fixed.The height of steel split heads and each scantling, according to actual requirement of engineering, are determined as the case may be.
In the diagram, stiffened column 3 comprises H profile steel 13, reinforcing bar 6 and concrete 14.
In Figure 5, concrete column 2 comprises reinforcing bar 6 and concrete 14.
Claims (1)
1. a concrete column and stiffened steel structure post steel split heads connected node, for stiffened column (3) is connected to concrete column (2), it is characterized in that, described connected node comprises steel split heads (1), and described steel split heads (1) comprises steel post (9), brace (10), cross bar (11), crossbar (12), wherein, steel post (9) is distributed in periphery, plays main support effect; Brace (10), cross bar (11) adopts angle steel, is fixed on steel post (9), jointly forms a lattice column system with it; Steel split heads (1) is placed on concrete column (2), and stiffened column (3) is fixedly connected with steel split heads (1); Concrete (14) is had at concrete column (2), steel split heads (1) and stiffened column (3) upper.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420649947.0U CN204212272U (en) | 2014-11-03 | 2014-11-03 | A kind of concrete column and stiffened steel structure post steel split heads connected node |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420649947.0U CN204212272U (en) | 2014-11-03 | 2014-11-03 | A kind of concrete column and stiffened steel structure post steel split heads connected node |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204212272U true CN204212272U (en) | 2015-03-18 |
Family
ID=52980958
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420649947.0U Active CN204212272U (en) | 2014-11-03 | 2014-11-03 | A kind of concrete column and stiffened steel structure post steel split heads connected node |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204212272U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108049500A (en) * | 2017-12-28 | 2018-05-18 | 北京城建集团有限责任公司 | A kind of stable type conversion stiffened steel structure and its method of work |
-
2014
- 2014-11-03 CN CN201420649947.0U patent/CN204212272U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108049500A (en) * | 2017-12-28 | 2018-05-18 | 北京城建集团有限责任公司 | A kind of stable type conversion stiffened steel structure and its method of work |
CN108049500B (en) * | 2017-12-28 | 2023-05-30 | 北京城建集团有限责任公司 | Stable-type stiffness-conversion steel structure and working method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203188121U (en) | Cast-in-place bridge floor suspending mold of half-through or through arch bridge | |
CN103938533B (en) | The construction method of Simply supported non-uniform structure | |
CN109914244B (en) | Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof | |
CN102733606A (en) | Construction method of high large cantilever structure | |
CN104695337A (en) | Self-lifting sliding and turnover construction system and construction method | |
CN103711067A (en) | Transversely assembled corrugated steel web combined box girder with small number of supports and construction method thereof | |
CN103321155B (en) | Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier | |
CN203113793U (en) | Large formwork installation system of oblique structure | |
CN103122691A (en) | Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method | |
CN203834926U (en) | Formwork erecting structure for bare concrete basement exterior wall | |
CN103276894A (en) | Support system of large-cross-section girder transfer floor of hollow floor system and construction technology | |
CN201406844Y (en) | Support of middle flange plate construction formwork of concrete-steel beam | |
CN203213019U (en) | Cast-in-situ construction bracket system of long cantilever bent cap | |
CN201648978U (en) | Tied arch support of bridge location cast-in-situ prestressed concrete continuous beam | |
CN203034799U (en) | Tower hoist standard knot bearing overhead support formwork steel platform structure | |
CN103758347B (en) | Large-span RC girder plated construction late poured band support underpinning construction method | |
CN204212272U (en) | A kind of concrete column and stiffened steel structure post steel split heads connected node | |
CN106284097B (en) | The installation method that pier K is supportted on a kind of tubular arch bridge arch | |
CN102995560B (en) | Thin-wall hollow pier lifting frame and use method thereof | |
CN205329640U (en) | " T " supports symmetrical sliding formwork construction structures | |
CN205024833U (en) | Reinforcing bar concrete combination prefabricated component | |
CN202831628U (en) | Combined type bailey frame load-bearing shelving for pouring large span concrete beam | |
CN115559588A (en) | Construction method for erecting silo top cornice template by using slip form supporting rod | |
CN102454298B (en) | Large-sized reinforced concrete construction of frame beam method | |
CN208717939U (en) | A kind of efficiently molding building hoist foundation structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |