CN203834926U - Formwork erecting structure for bare concrete basement exterior wall - Google Patents

Formwork erecting structure for bare concrete basement exterior wall Download PDF

Info

Publication number
CN203834926U
CN203834926U CN201420236306.2U CN201420236306U CN203834926U CN 203834926 U CN203834926 U CN 203834926U CN 201420236306 U CN201420236306 U CN 201420236306U CN 203834926 U CN203834926 U CN 203834926U
Authority
CN
China
Prior art keywords
formwork
steel pipe
steel
outside
exterior wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420236306.2U
Other languages
Chinese (zh)
Inventor
宋功业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jianzhu Institute
Original Assignee
Jiangsu Jianzhu Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jianzhu Institute filed Critical Jiangsu Jianzhu Institute
Priority to CN201420236306.2U priority Critical patent/CN203834926U/en
Application granted granted Critical
Publication of CN203834926U publication Critical patent/CN203834926U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本实用新型公开了一种清水混凝土地下室外墙模板支模结构,涉及一种建筑施工模板支模结构。它包括分别安装在墙体两端外尺寸线上的组合钢模板、方木、钢管、满堂红脚手架、桁架和对拉螺栓。所述的方木均匀安装在组合钢模板外侧,方木外侧均匀安装有多根钢管竖楞。钢管竖楞外侧均匀安装有多组钢管横楞。在所述的组合钢模板外侧相互对称的两组钢管横楞之间安装对拉螺栓。对拉螺栓垂直穿过组合钢模板,并且中间安装有防水垫片。在所述的左边的钢管横楞外侧安装满堂红脚手架,满堂红脚手架和地面之间安装有多个斜撑。所述的桁架安装在右边的钢管横楞外侧。本实用新型可以保证清水混凝土地下室外墙模板支模可靠,避免施工过程中的模板变形。

The utility model discloses a formwork support structure of a clear-water concrete basement outdoor wall, which relates to a formwork support structure of a building construction formwork. It includes combined steel formwork, square wood, steel pipes, full house scaffolding, trusses and tension bolts installed on the outer dimension lines at both ends of the wall. The square wood is evenly installed on the outside of the combined steel formwork, and a plurality of steel pipes are evenly installed on the outside of the square wood. There are multiple sets of steel pipe horizontal corrugations evenly installed on the outer side of the steel pipe vertical flute. Install tension bolts between two groups of steel pipe horizontal corrugations symmetrical to each other on the outer side of the combined steel formwork. The pull bolts pass through the combined steel formwork vertically, and waterproof gaskets are installed in the middle. A full house scaffolding is installed on the outer side of the horizontal corrugated steel pipe on the left side, and a plurality of diagonal braces are installed between the full house scaffolding and the ground. The truss is installed on the outside of the steel pipe horizontal corrugation on the right. The utility model can ensure reliable support of the formwork for the exterior wall of the fair-faced concrete basement, and avoid deformation of the formwork in the construction process.

Description

清水混凝土地下室外墙模板支模结构Formwork Supporting Structure of Fair-faced Concrete Basement External Wall Formwork

技术领域 technical field

本实用新型涉及一种建筑施工模板支模结构,具体涉及一种清水混凝土地下室外墙模板支模结构。 The utility model relates to a formwork supporting structure of a building construction formwork, in particular to a formwork supporting structure of a clear-water concrete basement exterior wall.

背景技术 Background technique

清水混凝土地下室外墙大多采用钢框竹胶大模板作为模板,这种模板质量轻、强度高、周转次数多,但是如果支模不到位,就可能产生涨模。地下室外墙模板支设的质量对整座建筑物都有很大的影响,因此,处理好地下室外墙大模板支模构造问题非常重要。 Most of the exterior walls of fair-faced concrete basements use large steel-frame bamboo-glue formwork as the formwork. This formwork is light in weight, high in strength, and has many turnover times. However, if the formwork is not properly supported, it may cause mold expansion. The quality of the basement external wall formwork support has a great influence on the whole building. Therefore, it is very important to deal with the problem of the large formwork support structure of the basement external wall.

发明内容 Contents of the invention

为了解决上述技术问题,本实用新型提供一种清水混凝土地下室外墙模板支模结构。 In order to solve the above-mentioned technical problems, the utility model provides a formwork supporting structure for the exterior wall formwork of the fair-faced concrete basement.

本实用新型是采用如下技术方案实现的:一种清水混凝土地下室外墙模板支模结构,它包括分别安装在墙体两端外尺寸线上的组合钢模板、方木、钢管、满堂红脚手架、桁架和对拉螺栓。其特征在于:所述的方木均匀安装在组合钢模板外侧,方木外侧均匀安装有多根钢管竖楞。所述的钢管竖楞外侧均匀安装有多组钢管横楞。在所述的组合钢模板外侧相互对称的两组钢管横楞之间安装对拉螺栓。所述的对拉螺栓垂直穿过组合钢模板,并且中间安装有防水垫片。在所述的左边的钢管横楞外侧安装满堂红脚手架,满堂红脚手架和地面之间安装有多个斜撑。所述的桁架安装在右边的钢管横楞外侧。 The utility model is realized by adopting the following technical scheme: a formwork support structure for the exterior wall of a clear-water concrete basement, which includes combined steel formwork, square wood, steel pipes, full house scaffolding, and trusses respectively installed on the outer dimension lines at both ends of the wall body and pull bolts. It is characterized in that: the square wood is evenly installed on the outside of the combined steel formwork, and a plurality of steel pipes are evenly installed on the outside of the square wood. A plurality of sets of horizontal corrugations of steel pipes are evenly installed on the outside of the vertical corrugations of the steel pipes. Install tension bolts between two groups of steel pipe horizontal corrugations symmetrical to each other on the outer side of the combined steel formwork. The stay bolts vertically pass through the combined steel formwork, and a waterproof gasket is installed in the middle. A full house scaffolding is installed on the outer side of the horizontal corrugated steel pipe on the left side, and a plurality of diagonal braces are installed between the full house scaffolding and the ground. The truss is installed on the outside of the steel pipe horizontal corrugation on the right.

进一步是:所述的对拉螺栓两端通过螺母固定。 Further, the two ends of the pull bolts are fixed by nuts.

所述的斜撑倾斜安装,斜撑上方通过钢管扣件固定安装在满堂红脚手架上,斜撑底部通过地锚固定在地面。 The diagonal braces are installed obliquely, the upper part of the diagonal braces is fixedly installed on the scaffolding by steel pipe fasteners, and the bottom of the diagonal braces is fixed on the ground by ground anchors.

所述的桁架内部设置有剪刀撑,桁架外侧与护壁墙面之间安装有多个支撑钢管。 Scissor braces are arranged inside the truss, and a plurality of supporting steel pipes are installed between the outside of the truss and the wall surface of the retaining wall.

所述的每组钢管横楞都是由两根钢管组成,两根钢管之间通过钢管扣件连接。 Each set of steel pipe horizontal corrugations is composed of two steel pipes, and the two steel pipes are connected by steel pipe fasteners.

本实用新型的有益效果是:结构简单,安装方便;可以保证地下室外墙结构支模可靠,避免施工过程中的构件变形,保证了地下室外墙的浇筑质量。 The utility model has the beneficial effects of simple structure and convenient installation; it can ensure reliable support of the formwork of the basement outer wall structure, avoid component deformation during construction, and ensure the pouring quality of the basement outer wall.

附图说明 Description of drawings

下面结合附图和实施例对本实用新型作进一步说明。 Below in conjunction with accompanying drawing and embodiment the utility model is further described.

图1是本实用新型的结构示意图; Fig. 1 is the structural representation of the utility model;

图2是图1中A处局部放大图。 Fig. 2 is a partially enlarged view of A in Fig. 1 .

图中:1、组合钢模板,2、方木,3、钢管横楞,4、钢管竖楞,5、桁架,6、对拉螺栓,6.1、防水垫片,7、斜撑,8、满堂红脚手架,9、止水带,10、地锚,11、地下室外墙。 In the figure: 1. Combined steel formwork, 2. Square wood, 3. Steel pipe horizontal corrugation, 4. Steel pipe vertical corrugation, 5. Truss, 6. Pull bolts, 6.1. Waterproof gasket, 7. Diagonal brace, 8. Full house Scaffolding, 9. Waterstop, 10. Ground anchor, 11. Basement exterior wall.

具体实施方式 Detailed ways

如图1和图2所示,清水混凝土地下室外墙模板支模结构,它包括分别安装在墙体两端外尺寸线上的组合钢模板1、方木2、钢管、满堂红脚手架8、桁架5和对拉螺栓6;其特征在于:所述的方木2均匀安装在组合钢模板1外侧,作模板加劲肋。方木2外侧均匀安装有多根钢管竖楞4。所述的钢管竖楞4外侧均匀安装有多组钢管横楞3,每组钢管横楞3都是由两根钢管组成,两根钢管之间通过钢管扣件连接。在所述的组合钢模板1外侧相互对称的两组钢管横楞3之间安装对拉螺栓6;所述的对拉螺栓6垂直穿过组合钢模板1,对拉螺栓6两端通过螺母固定,并且中间安装有防水垫片6.1。在所述的左边的钢管横楞3外侧安装满堂红脚手架8,满堂红脚手架8和地面之间安装有多个斜撑7,斜撑7倾斜安装,斜撑7上方通过钢管扣件固定安装在满堂红脚手架8上,斜撑7底部通过地锚10固定在地面。所述的桁架5安装在右边的钢管横楞3外侧,且桁架5内部设置有剪刀撑,桁架5外侧与护壁墙面之间安装有多个支撑钢管。如图1所示,地面和地下室外墙11之间安装有止水带9,防止室内渗水。地下室外墙11的钢筋绑扎完验收合格后,将组合钢模板1用扣件连接好后安装在待施工的地下室外墙11的外尺寸线上,然后依次在组合钢模板1外围安装方木2、钢管竖楞4和钢管横楞3。方木2也可以在组合钢模板1安装前安装在组合钢模板1上。钢管横楞3和钢管竖楞4用以进一步支承和固定模板。再安装对拉螺栓6,对拉螺栓6从钢管横楞3的两根钢管中间穿过。调整模板的水平位置与垂直度,验收合格后紧固对拉螺栓5。然后分别将满堂红脚手架8、斜撑7和桁架5安装固定好即可,满堂红脚手架8、斜撑7和桁架5可以使两侧模板支模更加可靠。 As shown in Figure 1 and Figure 2, the formwork support structure of the exterior wall of the fair-faced concrete basement includes a combined steel formwork 1, square wood 2, steel pipes, full house scaffolding 8, and trusses 5 installed on the outer dimension lines at both ends of the wall. and pull bolts 6; it is characterized in that: the square wood 2 is evenly installed on the outside of the combined steel formwork 1, and is used as a formwork stiffener. A plurality of steel pipe vertical corrugations 4 are evenly installed on the outside of the square timber 2 . The outside of the steel pipe vertical flute 4 is evenly equipped with multiple groups of steel pipe horizontal flute 3, and each group of steel pipe horizontal flute 3 is composed of two steel pipes, and the two steel pipes are connected by steel pipe fasteners. Between the two groups of steel pipe horizontal corrugations 3 that are symmetrical to each other on the outside of the combined steel formwork 1, the pull bolts 6 are installed; the pull bolts 6 pass through the combined steel formwork 1 vertically, and the two ends of the pull bolts 6 are fixed by nuts , and a waterproof gasket 6.1 is installed in the middle. A full house scaffolding 8 is installed on the outer side of the steel pipe horizontal corrugated 3 on the left side, and a plurality of diagonal braces 7 are installed between the full house scaffolding 8 and the ground. 8, the bottom of the diagonal brace 7 is fixed on the ground by ground anchors 10. The truss 5 is installed on the outside of the steel pipe horizontal corrugation 3 on the right, and scissor braces are arranged inside the truss 5 , and a plurality of supporting steel pipes are installed between the outside of the truss 5 and the retaining wall. As shown in Figure 1, a waterstop 9 is installed between the ground and the basement exterior wall 11 to prevent indoor water seepage. After the steel bars of the basement exterior wall 11 are bound and accepted, the composite steel formwork 1 is connected with fasteners and installed on the outer dimension line of the basement exterior wall 11 to be constructed, and then square timber 2 is installed on the periphery of the composite steel formwork 1 in sequence. , Steel pipe vertical flute 4 and steel pipe horizontal flute 3. Square timber 2 also can be installed on the combined steel formwork 1 before the combined steel formwork 1 is installed. Steel pipe horizontal flute 3 and steel pipe vertical flute 4 are used to further support and fix the formwork. Install the pull bolt 6 again, and the pull bolt 6 passes in the middle of the two steel pipes of the steel pipe horizontal corrugated 3. Adjust the horizontal position and verticality of the formwork, and tighten the pull bolts 5 after passing the acceptance check. Then respectively install and fix the full house scaffolding 8, the diagonal braces 7 and the trusses 5. The full house scaffolding 8, the diagonal braces 7 and the trusses 5 can make the formwork support on both sides more reliable.

Claims (5)

1.一种清水混凝土地下室外墙模板支模结构,它包括分别安装在墙体两端外尺寸线上的组合钢模板(1)、方木(2)、钢管、满堂红脚手架(8)、桁架(5)和对拉螺栓(6);其特征在于:所述的方木(2)均匀安装在组合钢模板(1)外侧,方木(2)外侧均匀安装有多根钢管竖楞(4);所述的钢管竖楞(4)外侧均匀安装有多组钢管横楞(3);在所述的组合钢模板(1)外侧相互对称的两组钢管横楞(3)之间安装对拉螺栓(6);所述的对拉螺栓(6)垂直穿过组合钢模板(1),并且中间安装有防水垫片(6.1);在所述的左边的钢管横楞(3)外侧安装满堂红脚手架(8),满堂红脚手架(8)和地面之间安装有多个斜撑(7);所述的桁架(5)安装在右边的钢管横楞(3)外侧。 1. A formwork support structure for the exterior wall of a clear-water concrete basement, which includes combined steel formwork (1), square wood (2), steel pipes, full house scaffolding (8), and trusses installed on the outer dimension lines at both ends of the wall. (5) and pull bolts (6); it is characterized in that: the square wood (2) is evenly installed on the outside of the combined steel formwork (1), and there are multiple steel pipe vertical corrugations (4) evenly installed on the outside of the square wood (2). ); the outer side of the steel pipe vertical flute (4) is evenly installed with multiple groups of steel pipe horizontal flutes (3); between the two groups of steel pipe horizontal flutes (3) that are symmetrical to each other on the outer side of the combined steel formwork (1) Pull bolts (6); the said pull bolts (6) pass through the combined steel formwork (1) vertically, and a waterproof gasket (6.1) is installed in the middle; it is installed on the outside of the steel pipe horizontal flute (3) on the left Full house scaffolding (8), multiple diagonal braces (7) are installed between the full house scaffolding (8) and the ground; the truss (5) is installed on the outside of the steel pipe horizontal corrugated (3) on the right. 2.根据权利要求1所述的清水混凝土地下室外墙模板支模结构,其特征在于:所述的对拉螺栓(6)两端通过螺母固定。 2. The formwork support structure of the fair-faced concrete basement exterior wall according to claim 1, characterized in that: both ends of the tension bolts (6) are fixed by nuts. 3.根据权利要求1所述的清水混凝土地下室外墙模板支模结构,其特征在于:所述的斜撑(7)倾斜安装,斜撑(7)上方通过钢管扣件固定安装在满堂红脚手架(8)上,斜撑(7)底部通过地锚(10)固定在地面。 3. The formwork support structure of the clear-water concrete basement exterior wall formwork according to claim 1, characterized in that: the diagonal brace (7) is installed obliquely, and the upper part of the diagonal brace (7) is fixed and installed on the full house scaffold ( 8), the bottom of the diagonal brace (7) is fixed to the ground through ground anchors (10). 4.根据权利要求1所述的清水混凝土地下室外墙模板支模结构,其特征在于:所述的桁架(5)内部设置有剪刀撑,桁架(5)外侧与护壁墙面之间安装有多个支撑钢管。 4. The formwork supporting structure of the fair-faced concrete basement exterior wall according to claim 1, characterized in that: scissor braces are arranged inside the truss (5), and multiple a supporting steel pipe. 5.根据权利要求1所述的清水混凝土地下室外墙模板支模结构,其特征在于:所述的每组钢管横楞(3)都是由两根钢管组成,两根钢管之间通过钢管扣件连接。 5. The formwork support structure of fair-faced concrete basement exterior wall according to claim 1, characterized in that: each set of steel pipe horizontal corrugations (3) is composed of two steel pipes, and the two steel pipes are connected by steel pipe buckles. file connection.
CN201420236306.2U 2014-05-09 2014-05-09 Formwork erecting structure for bare concrete basement exterior wall Expired - Fee Related CN203834926U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420236306.2U CN203834926U (en) 2014-05-09 2014-05-09 Formwork erecting structure for bare concrete basement exterior wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420236306.2U CN203834926U (en) 2014-05-09 2014-05-09 Formwork erecting structure for bare concrete basement exterior wall

Publications (1)

Publication Number Publication Date
CN203834926U true CN203834926U (en) 2014-09-17

Family

ID=51512786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420236306.2U Expired - Fee Related CN203834926U (en) 2014-05-09 2014-05-09 Formwork erecting structure for bare concrete basement exterior wall

Country Status (1)

Country Link
CN (1) CN203834926U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107179001A (en) * 2017-06-22 2017-09-19 中国五冶集团有限公司 A kind of installation method of industrial coke oven flue side template
CN109372264A (en) * 2018-12-07 2019-02-22 南京科技职业学院 An industrial workshop indoor sewage pool wall pouring system and its construction method
CN111501988A (en) * 2020-04-29 2020-08-07 中铁四局集团第三建设有限公司 Sewage treatment plant pool body pool wall template and modeling method thereof
CN112196092A (en) * 2020-10-12 2021-01-08 福建省锦秋建筑工程有限公司 Basement narrow space outer wall construction structure and construction method thereof
CN114875957A (en) * 2022-06-17 2022-08-09 中铁二十二局集团有限公司 Template installation assembly based on retaining wall and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107179001A (en) * 2017-06-22 2017-09-19 中国五冶集团有限公司 A kind of installation method of industrial coke oven flue side template
CN109372264A (en) * 2018-12-07 2019-02-22 南京科技职业学院 An industrial workshop indoor sewage pool wall pouring system and its construction method
CN111501988A (en) * 2020-04-29 2020-08-07 中铁四局集团第三建设有限公司 Sewage treatment plant pool body pool wall template and modeling method thereof
CN111501988B (en) * 2020-04-29 2021-05-07 中铁四局集团第三建设有限公司 Sewage treatment plant pool body pool wall template and modeling method thereof
CN112196092A (en) * 2020-10-12 2021-01-08 福建省锦秋建筑工程有限公司 Basement narrow space outer wall construction structure and construction method thereof
CN114875957A (en) * 2022-06-17 2022-08-09 中铁二十二局集团有限公司 Template installation assembly based on retaining wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN103912008B (en) Unilateral formwork structure and construction method thereof
CN109162296B (en) Single-side formwork supporting system and construction method for pouring outer wall by utilizing same
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
WO2016077943A1 (en) Building supporting unit and building supporting structure employing same
CN205421616U (en) Assemble integral shear force wall with steel pipe concrete edge member
CN103993753B (en) Tradition stone-made house angle hoop drawknot hardened system and construction technology
CN106812229B (en) Combined Constraint Double Steel Plate Concrete Shear Wall and Its Construction Method
CN103741817A (en) Enhancement method of X-shaped reinforcing bars for improving seismic resistance of special-shaped column nodes
CN110607905A (en) An all-steel support reinforcement formwork system and construction method
CN106968435A (en) A kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction
CN202509765U (en) Overhung platform template
CN204282530U (en) Adopt the industrial premises frame construction of prefabricated concrete column structure
CN108086535A (en) A kind of assembled square steel tube steel plate concrete combined shear wall
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
CN203891462U (en) Form erecting device for fair-faced concrete independent columns
CN206319597U (en) A kind of cantilever steel girder erecting device
CN206495414U (en) A kind of concrete filled steel tube combined special-shaped column of anti-buckling cant timber connection
CN108412231A (en) Assembled is bolted reinforcing steel processing shed and its assemble method entirely
CN101694127A (en) Formwork support system for steel frame structure cast-in-place concrete floorslabs
CN207905389U (en) Assembled is bolted reinforcing steel processing shed entirely
CN203795859U (en) Large formwork supporting structure for bare concrete shear wall
CN207296166U (en) A kind of light steel skeleton prefabricated thermal insulation floor
CN207727978U (en) Girderless floor bolumn cap template reinforcing device
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN102418382A (en) Profile steel space lattice assembly integrated box-type structure for small high-rise energy-saving residential building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140917

Termination date: 20150509

EXPY Termination of patent right or utility model