CN102787717B - Self-supporting combined steel template construction method - Google Patents

Self-supporting combined steel template construction method Download PDF

Info

Publication number
CN102787717B
CN102787717B CN201210154191.8A CN201210154191A CN102787717B CN 102787717 B CN102787717 B CN 102787717B CN 201210154191 A CN201210154191 A CN 201210154191A CN 102787717 B CN102787717 B CN 102787717B
Authority
CN
China
Prior art keywords
self
combined steel
construction
type combined
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210154191.8A
Other languages
Chinese (zh)
Other versions
CN102787717A (en
Inventor
金海�
罗浩
朱罗军
费建伟
黄功文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU HENGDA STEEL STRUCTURE CO Ltd
Original Assignee
HANGZHOU HENGDA STEEL STRUCTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU HENGDA STEEL STRUCTURE CO Ltd filed Critical HANGZHOU HENGDA STEEL STRUCTURE CO Ltd
Priority to CN201210154191.8A priority Critical patent/CN102787717B/en
Publication of CN102787717A publication Critical patent/CN102787717A/en
Application granted granted Critical
Publication of CN102787717B publication Critical patent/CN102787717B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to a multi-story and high-rise mixed structure building system construction technology, and aims to provide a self-supporting combined steel template construction method. The method comprises the following steps of: integrally and inversely assembling a self-supporting combined steel template on the ground surface or a platform, and lifting the inverse self-supporting combined steel template to a specified position through a tensioning device; connecting the inverse self-supporting combined steel template with a middle supporting seat though a horizontal connecting rod, and integrally overturning the inverse self-supporting combined steel template into place around a middle supporting seat horizontal connecting rod under the action of self-gravity; realizing connection through a side supporting seat horizontal connecting rod; and during construction of a self-supporting combined steel template of a next independent unit, circularly performing the construction steps. Compared with a construction method for erecting full framing scaffolding, the method has the advantages that the template construction cost is lowered greatly, the construction speed is increased greatly, and the site construction environment is improved remarkably.

Description

Self-bearing type combined steel board construction method
Technical field
The invention belongs to many Tall Building Hybrid Structure building system construction field, be specifically related to a kind of self-bearing type combined steel board construction method.
Background technology
In recent years, many Tall Building Hybrid Structure buildings are increasing, and the feature of this structural system is: (1) post generally adopts steel column, steel core concrete column or combined steel and concrete column; (2) beam generally adopts H section steel beam; (3) floor adopts cast-in-place concrete floor or composite floor; (4) flooring arranges primary-secondary beam, and floor span is less.
The template of China's cast-in-place concrete floor, generally adopts wooden form or combined steel formwork at present; Wherein wooden form because of material turnover low, the shortcoming such as speed of application is slow, and timber waste is serious, and being subject to certain restrictions in the use.When floor project is constructed, the general prior full hall scaffold of setting up, lays template, steel mesh reinforcement on scaffold, then disturbing concrete, when concrete reaches some strength, removes scaffold and template.This construction method scope of application is more extensive, but need to set up full hall scaffold, can not multilayer construct simultaneously, and construction speed is slow, takies a large amount of circulation materials, and construction cost is high.
Another construction method is exactly self-supported formwork construction, and self-supported formwork construction is that the reinforcing bar in floor is become to three-dimensional steel bar girder in factory process, and the three-dimensional sheet material that three-dimensional steel bar girder and galvanized steel plain sheet are welded into one; During construction, be directly installed on girder steel, re-lay after additional bar, can bear construction stage concrete gravity and construction live load, without setting up scaffold support; But this construction method is when concrete reaches some strength, template will be difficult to remove, and generally galvanized steel plain sheet need be used as permanent shuttering; From economic angle, construction cost is too high; From use angle, galvanized steel plain sheet, as ceiling, is unfavorable for the decoration of floor ceiling, As time goes on dimmed, corrosion gradually of galvanized steel plain sheet ceiling simultaneously, and impact is used.
Summary of the invention
Technical problem to be solved by this invention is, overcomes the deficiency that prior art exists, and a kind of self-bearing type combined steel board construction method of effective reduction construction cost is provided.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is:
A kind of self-bearing type combined steel board construction method is provided, comprises the following steps:
(1) panel steel form is down placed on ground or platform, then space truss is placed on it and be fixedly connected with, form the inverted self-bearing type combined steel formwork of an integral body separate unit;
(2), on the bottom flange of the H of construction floor both sides section steel beam, a middle bearing and two limit bearings are all installed;
(3) the H shaped-steel-beam upper wing-edge in upper floor both sides hangs respectively suspension hook;
(4) between the panel point of inverted self-bearing type combined steel formwork and suspension hook, tensioning equipment is set, by tightening up tensioning equipment, the correspondence position by self-bearing type combined steel formwork Integral lifting to the H section steel beam of construction floor;
(5) regulate horizontal brace rod and the vertical bar of two middle bearings, the quick connection in realization between the horizontal brace rod of bearing and self-bearing type combined steel formwork;
(6) slowly loosen tensioning equipment, make inverted self-bearing type combined steel formwork horizontal brace rod unitary rotation around middle bearing under Gravitative Loads, turn over turnback and complete in place;
(7) regulate respectively horizontal brace rod and the vertical bar of each limit bearing, the quick connection between the horizontal brace rod of realizing limit bearing and self-bearing type combined steel formwork;
(8) remove suspension hook, tensioning equipment and middle bearing;
(9) while carrying out the self-bearing type combined steel formwork construction of next separate unit, the above construction sequence of cycling.
In the present invention, the construction that the template construction of each floor area comprises a plurality of separate unit self-bearing type combined steel formworks, in the region that completes the construction of self-bearing type combined steel formwork, place reinforcing bar, then fluid concrete, after concrete strength reaches predetermined strength, can remove self-bearing type combined steel formwork, carry out recycling of next region self-bearing type combined steel formwork construction.
In the present invention, in step (1) afterwards, can also, by adjusting self-bearing type combined steel formwork physical dimension, realize leveling or arch camber requirement.
In the present invention, the quick connection between the horizontal brace rod of described middle bearing and limit bearing and self-bearing type combined steel formwork is to be all connected on truss.
The invention has the beneficial effects as follows:
(1) economic benefit: the present invention has cancelled the use of steel pipe scaffold, adopt whole inversion assembling self-bearing type combined steel formwork on ground or platform, form inverted self-bearing type combined steel formwork, inverted self-bearing type combined steel formwork Integral lifting and integrated overturn construction in place, construction method cost of the present invention with set up full hall scaffold, traditional self-supported formwork construction method is compared, template construction cost declines to a great extent;
(2) duration effect: the present invention is owing to need not setting up scaffold, adopt whole inversion assembling self-bearing type combined steel formwork on ground or platform, form inverted self-bearing type combined steel formwork, inverted self-bearing type combined steel formwork Integral lifting and integrated overturn construction in place, the impact that is not subject to lower-layer concrete intensity and builds; Operating efficiency is high, and template construction speed significantly improves;
(3) saving and environmental protection: the present invention is in implementation process, and template accessory all adopts standard component, can recycle by subdivision, and form of structure adopts self-bearing type combined steel formwork, without extra temporary supporting; Save material, reduce construction noise, Contraction in Site environment obviously improves;
(4) application value: adopt the present invention to solve and set up the difficult problem that finished product increases, duration increase brings that full hall scaffold causes, and quick construction, safe and reliable, increase work efficiency, reduce engineering cost, have highly application value.
Accompanying drawing explanation
Fig. 1 is construction flow chart of the present invention;
Fig. 2 is self-bearing type combined steel formwork work progress schematic diagram (before upset, limit bearing is not connected with horizontal brace rod);
Fig. 3 is the bearing scheme of installation in Fig. 2;
Fig. 4 is self-bearing type combined steel formwork construction completion status schematic diagram (having completed upset);
Fig. 5 is the bearing scheme of installation in Fig. 4.
The specific embodiment
Below in conjunction with accompanying drawing Fig. 1~5 and specific embodiment, the present invention is described in further details;
The construction method of self-bearing type combined steel formwork, comprise assembling steel form and truss, install in bearing with limit bearing, hang suspension hook, tensioning equipment be installed, lifting combined steel formwork, be connected in bearing, around middle bearing overturning steel molding plate, fillet bearing, dismounting tensioning equipment and middle bearing etc.
Concrete steps are:
On ground or platform, assemble steel form 11 and truss 12, steel form 11 is comprised of stiffening rib and panel, and panel is placed in the below of stiffening rib, and steel form 11 upper, forms inverted self-bearing type combined steel formwork 1 at lower truss 12; Self-bearing type combined steel formwork 1 has certain rigidity and intensity; Described inverted self-bearing type combined steel formwork 1 physical dimension is adjustable, by the adjustment to inverted self-bearing type combined steel formwork 1 physical dimension, realizes fast leveling or arch camber requirement; On the H of floor both sides section steel beam 2 bottom flanges, bearing 4 and two limit bearings 5 in installation; Middle bearing 4 comprises horizontal brace rod 41 and vertical bar 42, and limit bearing 5 comprises horizontal brace rod 51 and vertical bar 52; The length of horizontal brace rod 41,51 is adjustable, meets the requirement of H section steel beam different in width, and the two ends up and down of vertical bar 42,52 can regulate length and horizon bar absolute altitude, meet the requirement of H section steel beam differing heights; H section steel beam 3 bottom flanges in upper floor both sides hang suspension hook 6; Between truss 12 and suspension hook 6, tensioning equipment 7 is set; By tightening up tensioning equipment 7, by inverted self-bearing type combined steel formwork 1 Integral lifting to assigned address; Regulate respectively horizontal brace rod 41 and the vertical bar 42 of bearing 4 in two ends, realize horizontal brace rod 41 and be connected fast with inverted self-bearing type combined steel formwork 1, inverted self-bearing type combined steel formwork 1 can rotate around horizontal brace rod 41; Slowly loosen tensioning equipment 7, make inverted self-bearing type combined steel formwork 1 horizontal brace rod 41 unitary rotation around middle bearing 4 under Gravitative Loads, turn over turnback in place; Then regulate respectively horizontal brace rod 51 and the vertical bar 52 of limit, two ends bearing 5, realize horizontal brace rod 51 and be connected with the quick of self-bearing type combined steel formwork 1; Finally remove suspension hook 6, tensioning equipment 7 and middle bearing 4; While carrying out the self-bearing type combined steel formwork construction of next floor, the above construction sequence of cycling.Can improve materials'use efficiency, reduce labor strength, reduce construction cost;
Above-described embodiment explanation is only the self-bearing type combined steel formwork construction of a separate unit, and the width of separate unit can be 600mm, 900mm, 1200mm etc., and the length of separate unit is floor span.In self-bearing type combined steel formwork construction in a floor working face, the construction of each region, each separate unit can be carried out simultaneously.Above-described embodiment explanation is not limitation of the present invention, and the present invention is also not limited to above-mentioned giving an example, and those skilled in the art make adjustment in essential scope of the present invention, all belong to protection scope of the present invention.

Claims (4)

1. a self-bearing type combined steel board construction method, is characterized in that, comprises the following steps:
(1) panel steel form is down placed on ground or platform, then space truss is placed on it and be fixedly connected with, form the inverted self-bearing type combined steel formwork of an integral body separate unit;
(2), on the bottom flange of the H of construction floor both sides section steel beam, a middle bearing and two limit bearings are all installed;
(3) the H shaped-steel-beam upper wing-edge in upper floor both sides hangs respectively suspension hook;
(4) between the panel point of inverted self-bearing type combined steel formwork and suspension hook, tensioning equipment is set, by tightening up tensioning equipment, the correspondence position by self-bearing type combined steel formwork Integral lifting to the H section steel beam of construction floor;
(5) regulate horizontal brace rod and the vertical bar of two middle bearings, the quick connection in realization between the horizontal brace rod of bearing and self-bearing type combined steel formwork;
(6) slowly loosen tensioning equipment, make inverted self-bearing type combined steel formwork horizontal brace rod unitary rotation around middle bearing under Gravitative Loads, turn over turnback and complete in place;
(7) regulate respectively horizontal brace rod and the vertical bar of each limit bearing, the quick connection between the horizontal brace rod of realizing limit bearing and self-bearing type combined steel formwork;
(8) remove suspension hook, tensioning equipment and middle bearing;
(9) while carrying out the self-bearing type combined steel formwork construction of next unit, the above construction sequence of cycling.
2. construction method according to claim 1, it is characterized in that, the construction of the self-bearing type combined steel formwork that the template construction of each floor area comprises a plurality of separate units, in the region that completes the construction of self-bearing type combined steel formwork, place reinforcing bar, then fluid concrete, after concrete strength reaches predetermined strength, remove self-bearing type combined steel formwork, carry out recycling of next region self-bearing type combined steel formwork construction.
3. construction method according to claim 1, is characterized in that, in step (1) afterwards, also by adjusting self-bearing type combined steel formwork physical dimension, realizes leveling or avoids the requirement of arch camber.
4. construction method according to claim 1, is characterized in that, the quick connection between the horizontal brace rod of described middle bearing and limit bearing and self-bearing type combined steel formwork is to be all connected on truss.
CN201210154191.8A 2012-05-16 2012-05-16 Self-supporting combined steel template construction method Active CN102787717B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210154191.8A CN102787717B (en) 2012-05-16 2012-05-16 Self-supporting combined steel template construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210154191.8A CN102787717B (en) 2012-05-16 2012-05-16 Self-supporting combined steel template construction method

Publications (2)

Publication Number Publication Date
CN102787717A CN102787717A (en) 2012-11-21
CN102787717B true CN102787717B (en) 2014-12-17

Family

ID=47153287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210154191.8A Active CN102787717B (en) 2012-05-16 2012-05-16 Self-supporting combined steel template construction method

Country Status (1)

Country Link
CN (1) CN102787717B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453222B (en) * 2014-11-21 2016-01-20 山东德建集团有限公司 Assembly type truss mould plate supports
CN106567538B (en) * 2015-10-12 2019-01-08 广西建工集团第四建筑工程有限责任公司 A kind of positioning mold of toilet concrete flanging
CN114790715B (en) * 2022-05-27 2024-05-14 中交二航局第一工程有限公司 Self-adaptive folding steel template device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2012206A6 (en) * 1989-01-03 1990-03-01 Mesple Jose L R Building frame, with light, self-supporting blocks
WO1998057010A1 (en) * 1997-06-11 1998-12-17 Stairform Designs Pty. Ltd. Staircase form
CN201087506Y (en) * 2007-09-06 2008-07-16 杨峰 Self-bearing type mould base of composite truss building roof
KR20090123105A (en) * 2008-05-27 2009-12-02 깨뱉시스템주식회사 Revolving system support
CN201695683U (en) * 2010-07-03 2011-01-05 新疆建工(集团)有限责任公司 Steel beam concrete slab rapid-assembling and disassembling tool type truss

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2012206A6 (en) * 1989-01-03 1990-03-01 Mesple Jose L R Building frame, with light, self-supporting blocks
WO1998057010A1 (en) * 1997-06-11 1998-12-17 Stairform Designs Pty. Ltd. Staircase form
CN201087506Y (en) * 2007-09-06 2008-07-16 杨峰 Self-bearing type mould base of composite truss building roof
KR20090123105A (en) * 2008-05-27 2009-12-02 깨뱉시스템주식회사 Revolving system support
CN201695683U (en) * 2010-07-03 2011-01-05 新疆建工(集团)有限责任公司 Steel beam concrete slab rapid-assembling and disassembling tool type truss

Also Published As

Publication number Publication date
CN102787717A (en) 2012-11-21

Similar Documents

Publication Publication Date Title
CN103422672B (en) A kind of reinforced concrete precast assembling housing construction construction method
CN103352563B (en) The board-like bar frame gang form of self-supporting and construction method thereof
CN105649360A (en) Integral assembling type building system and installing method
CN104453197A (en) High-altitude large-cantilever concrete structure structural steel supporting platform
CN102392536B (en) Construction method for long-span hanging vestibule type template support system
CN103935911B (en) Tower crane attached wall supporting construction and construction method thereof
CN106013781A (en) Slab supporting construction method and construction device by reversely suspending template
CN205421616U (en) Assemble integral shear force wall with steel pipe concrete edge member
CN204040464U (en) A kind of slab form supporting construction
CN206016309U (en) A kind of overall assembled building system
CN105569242A (en) Assembling method for composite floor slabs
CN106065681A (en) Superimposed sheet hoard strip construction method in a kind of overall assembled architecture based on BIM technology
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN103821361B (en) Stair studding formwork construction method is built in the gradation improved
CN104018656A (en) Scaffold construction method for prefabricated outer wall
CN203394027U (en) Semi-assembled construction system for frame-shear wall tube structure
CN202324606U (en) U-shaped force bearing seat
CN102787717B (en) Self-supporting combined steel template construction method
CN205348761U (en) Basement does not have reinforced structure of no basic lift of installation on back board
CN107514145A (en) A kind of removable steel roofing liner installation construction device and method
CN205857697U (en) The anti-form bracing constructing device hanging template
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN2816164Y (en) Cast-in field steel-bar-concrete air jointing porch
CN209568688U (en) A kind of elevating construction platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant