CN209568688U - A kind of elevating construction platform - Google Patents

A kind of elevating construction platform Download PDF

Info

Publication number
CN209568688U
CN209568688U CN201920207442.1U CN201920207442U CN209568688U CN 209568688 U CN209568688 U CN 209568688U CN 201920207442 U CN201920207442 U CN 201920207442U CN 209568688 U CN209568688 U CN 209568688U
Authority
CN
China
Prior art keywords
steel pipe
hanging basket
worker
construction
construction platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920207442.1U
Other languages
Chinese (zh)
Inventor
陶鹏
罗宁
莫瑞章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201920207442.1U priority Critical patent/CN209568688U/en
Application granted granted Critical
Publication of CN209568688U publication Critical patent/CN209568688U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a kind of elevating construction platforms, including, at least two arranged side by side, synchronization lifting hanging baskets are provided with the operating platform for taking, constructing for worker between adjacent two hanging baskets.Wherein, since operating platform is horizontally disposed, stationarity is preferable, worker can move between operating platform and each hanging basket, removable space is big, it can construct to the different location of furred ceiling, boundary of works area is wide, venue ceiling construction suitable for large span large spatial structure, improve ceiling construction working efficiency, it avoids simultaneously and sets up full hall scaffold influence furred ceiling substructure construction, shorten the duration, and elevating construction platform structure provided by the utility model is simple, it is spliced and combined using existing hanging basket, convenient disassembly, production cost is low.

Description

A kind of elevating construction platform
Technical field
The utility model relates to technical field of building construction, more specifically to a kind of elevating construction platform.
Background technique
The medium-and-large-sized venue ceiling construction of traditional architecture construction generally uses full hall scaffold or separate unit hanging basket to be operated Construction, but use full hall scaffold to spend manpower, material and machinery expenses higher, and using sky needed for full hall scaffold Between it is larger, will have a direct impact on the construction of furred ceiling substructure, influence the duration, reduce construction efficiency;And due to large stadium The area of furred ceiling is larger, and the region being capable of processing using separate unit hanging basket is smaller, and construction efficiency is low.
In conclusion how to provide a kind of elevating construction platform that construction efficiency is high, be current those skilled in the art urgently Problem to be solved.
Utility model content
In view of this, the purpose of the utility model is to provide a kind of elevating construction platforms that construction efficiency is high.
To achieve the goals above, the utility model provides the following technical solutions:
A kind of elevating construction platform, including, at least two arranged side by side, synchronization lifting hanging baskets, described in adjacent two The operating platform having for taking, constructing for worker is horizontally disposed between hanging basket.
Preferably, the operating platform includes several horizontal Tiles setting and perpendicular to the steel pipe of the hanging basket side, The both ends of the steel pipe are connect with the bottom of the adjacent two hanging basket sides respectively by connector, setting above the steel pipe There is the scaffold board for walking for worker.
Preferably, the length of the steel pipe is 4m~6m, and the spacing between each steel pipe is 100mm~150mm.
Preferably, the two sides of the scaffold board are vertically arranged with for preventing worker from skidding off from the two sides of the scaffold board Foot guard plate.
Preferably, the steel pipe is the round steel pipe of 40~50mm of outer diameter, wall thickness 2mm~3mm.
Preferably, the guard rail for preventing worker from falling is provided with above the scaffold board.
Preferably, the distance of the guard rail to the scaffold board upper surface is 1200~1300mm.
Preferably, the hanging basket is ZLP800 hanging basket.
A kind of elevating construction platform provided by the utility model, including, at least two arranged side by side, synchronization lifting to hang Basket is provided with the operating platform for taking, constructing for worker between adjacent two hanging baskets.
Wherein, since operating platform is horizontally disposed, stationarity is preferable, worker can operating platform and each hanging basket it Between moved, move space it is big, can construct to the different location of furred ceiling, boundary of works area is wide, be suitable for large span The venue ceiling construction of large spatial structure, improves ceiling construction working efficiency, while avoiding and setting up full hall scaffold influence Furred ceiling substructure construction shortens the duration, and elevating construction platform structure provided by the utility model is simple, and utilization is existing Hanging basket spliced and combined, convenient disassembly, production cost is low.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is the embodiments of the present invention, for those of ordinary skill in the art, without creative efforts, also Other attached drawings can be obtained according to the attached drawing of offer.
Fig. 1 is the front view of elevating construction platform provided by the utility model;
Fig. 2 is the top view of elevating construction platform provided by the utility model.
In Fig. 1~2:
1 it is hanging basket, 2 be steel pipe, 3 is guard rail.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The core of the utility model is to provide a kind of elevating construction platform that construction efficiency is high.
Fig. 1~2 is please referred to, Fig. 1 is the front view of elevating construction platform provided by the utility model;Fig. 2 is that this is practical The top view of elevating construction platform provided by novel.
Elevating construction platform provided by the utility model, including, at least two arranged side by side, synchronization lifting hanging baskets 1, the operating platform having for taking, constructing for worker is horizontally disposed between adjacent two hanging baskets 1.
Wherein, hanging basket 1 is generally rectangle, and the long side arranged side by side for specifically referring to each hanging basket 1 of hanging basket 1 is oppositely arranged, There are certain gaps between two adjacent hanging baskets 1, provide space for setting operating platform, worker not only can be in each hanging basket 1 On construct, can also construct on the operating platform between hanging basket 1 to the building of furred ceiling equal-height position, operating platform can To be built by components such as steel plate, plank or steel pipes 2, as long as can be for structure type that worker takes.
It can be arranged on every hanging basket 1 and promote motor, hanging basket 1 and operating platform is driven to carry out by promoting motor Lifting, it should be noted that when adjusting the upright position of elevating construction platform, need to guarantee each 1 synchronization lifting of hanging basket, it is no Then, operating platform run-off the straight may be made, can even be disintegrated due to unbalance stress, the person of worker is seriously affected Safety, it is of course also possible to which setting promotes motor not on every hanging basket 1, for example, only in the hanging basket 1 of the leftmost side and the rightmost side Hanging basket 1 on setting promoted motor, it should be noted that the power of two promotion motors needs to meet elevating construction platform normal Lifting requirement.
Also, since operating platform is horizontally disposed, stationarity is preferable, and worker can be in operating platform and each hanging basket 1 Between moved, move space it is big, can construct to the different location of furred ceiling, boundary of works area is wide, be suitable for greatly across The venue ceiling construction for spending large spatial structure, improves ceiling construction working efficiency, while avoiding and setting up full hall scaffold shadow Furred ceiling substructure construction is rung, shortens the duration, and elevating construction platform structure provided by the utility model is simple, using now Some hanging baskets 1 are spliced and combined, convenient disassembly, and production cost is low.
In a kind of specific embodiment about operating platform, operating platform includes several horizontal Tile settings and hangs down Directly in the steel pipe 2 of 1 side of hanging basket, the both ends of steel pipe 2 are connect with the bottom of 1 side of adjacent two hanging baskets respectively by connector, The scaffold board for walking for worker is provided with above steel pipe 2.
It is understood that steel pipe 2 is used to support scaffold board, a braced frame is provided to place scaffold board, thus, steel Pipe 2 is typically connected to the bottom of hanging basket 1, should not be arranged higher, it has not been convenient to which worker is mobile, the particular number and size of steel pipe 2 Spacing needs the spacing selection according to the actual situation between adjacent two hanging baskets 1, and enough steel pipes 2 is needed to carry out scaffold board Support, and the spacing between each steel pipe 2 should not be too large, and damage to avoid scaffold board unbalance stress.
Wherein, connector is for joint steel pipe 2 and hanging basket 1, can using the components such as bolt or bowl buckle, convenient disassembly, It is of course also possible to use the modes such as welding are attached, the stability of connection is more preferable.
Preferably, the length of steel pipe 2 is 4m~6m, and the spacing between each steel pipe 2 is 100mm~150mm.It is arranged in this way The stability of operating platform is preferable, highly-safe, and certainly, it is special that the spacing between the length of steel pipe 2 and each steel pipe 2 has no It limits, user can select according to the actual situation.
And scaffold board is also known as foot handsheet, is generally laid on scaffold or crosshead, walks above it convenient for worker, It is the construction material being temporarily used in turn for transporting one kind of material and construction operation.Steel, wood, bamboo, aluminium can be used in scaffold board Alloy, plastic or other material production, the quality of monolithic scaffold board are not preferably greater than 30KG.The common scaffold board of construction site has punching Compressed steel scaffold board, wooden scaffold board, bamboo scaffold board, in this application used by scaffold board concrete type and size, user It can be selected according to the actual situation.
On the basis of above-mentioned specific embodiment, the two sides of scaffold board are vertically arranged with for preventing worker from scaffold board The foot guard plate that skids off of two sides.
It is understood that scaffold board is only intended to be laid on the horizontal plate body on steel pipe 2, to avoid worker from scaffold board Side slip and fall, thus foot guard plate is set in the two sides of scaffold board, the effect of foot guard plate is, fall if there is object or Personnel fall down, and when rolling down on scaffold side, foot guard plate can be blocked, and avoid falling from high altitude.Certainly, the height of foot guard plate The foot higher than worker is generally required, aluminum plate or glued board can be used, height is generally 180mm.Certainly, foot guard plate High user can be accounted for according to cost and safety comprehensive, and be not particularly limited.
In a kind of specific embodiment about steel pipe 2, steel pipe 2 is the circle of 40~50mm of outer diameter, wall thickness 2mm~3mm Steel pipe.
Steel pipe 2 needs that there is enough structural strengths to be supported scaffold board, thus the outer diameter of steel pipe 2 and wall thickness can To be selected according to required load capacity, reinforcing company can be carried out by components such as steel wires between round steel pipe and scaffold board It connects.
The protective fence for preventing worker from falling is provided on the basis of above-mentioned specific embodiment, above scaffold board Bar 3.
It is understood that guard rail 3 not only stops worker to fall, additionally it is possible to grasped when moving for worker it is hand steered, Thus, guard rail 3 should not be arranged too low, be not easy to worker's use, can not be arranged excessively high, the effect of blocking is not had, Guard rail 3 can be process using materials such as square steel tube, profiled sheet, iron wires.Preferably, guard rail 3 arrives scaffold board The distance of upper surface is 1200~1300mm.
In a kind of specific embodiment about hanging basket 1, hanging basket is ZLP800 hanging basket.
Wherein, ZLP800 hanging basket is mainly by suspension mechanism, workbench, elevator, safety lock, the parts such as electric control box Composition, suspension mechanism is to be erected at top of building, and the device of workbench is hung by wirerope.And elevator is work The power mechanism of platform, its working principle is that wirerope is " S " type inside it, by rubbing, crop rotation is electronic to climb.Safety lock It is the safety guard of hanging basket 1.It, can automatically quickly when load cable occurs to be broken or be tilted a certain angle suddenly Lock jail safety steel cable, guarantee hanging basket 1 workbench and each hanging basket 1 between operating platform do not fall or continue to incline Tiltedly.The nominal load capacity of ZLP800 hanging basket is 800kg, lifting speed 7-9m/min, can satisfy daily construction use, certainly, Hanging basket 1 is not limited to above-mentioned model, and user can also select the hanging basket 1 of other models, such as ZLP630 according to actual needs Hanging basket.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
Elevating construction platform provided by the utility model is described in detail above.It is used herein specifically a Example is expounded the principles of the present invention and embodiment, this reality that the above embodiments are only used to help understand With novel method and its core concept.It should be pointed out that for those skilled in the art, not departing from this Under the premise of utility model principle, several improvements and modifications can be made to this utility model, these improvement and modification are also fallen Enter in the protection scope of the utility model claims.

Claims (8)

1. a kind of elevating construction platform, which is characterized in that including, at least two arranged side by side, synchronization lifting hanging baskets (1), The operating platform having for taking for worker is horizontally disposed between adjacent two hanging baskets (1).
2. elevating construction platform according to claim 1, which is characterized in that the operating platform include several levels simultaneously Row's setting and perpendicular to the steel pipe (2) of the hanging basket (1) side, the both ends of the steel pipe (2) by connector respectively with it is adjacent The bottom connection of two hanging basket (1) sides, steel pipe (2) top are provided with the scaffold board for walking for worker.
3. elevating construction platform according to claim 2, which is characterized in that the length of the steel pipe (2) is 4m~6m, respectively Spacing between steel pipe described in root (2) is 100mm~150mm.
4. elevating construction platform according to claim 3, which is characterized in that the two sides of the scaffold board are vertically arranged useful In the foot guard plate for preventing worker from skidding off from the two sides of the scaffold board.
5. elevating construction platform according to claim 4, which is characterized in that the steel pipe (2) is 40~50mm of outer diameter, wall The round steel pipe of thick 2mm~3mm.
6. elevating construction platform according to claim 5, which is characterized in that be provided with above the scaffold board for preventing The guard rail (3) that only worker falls.
7. elevating construction platform according to claim 6, which is characterized in that the guard rail (3) arrives the scaffold board The distance of upper surface is 1200~1300mm.
8. elevating construction platform according to any one of claims 1 to 7, which is characterized in that the hanging basket (1) is ZLP800 Hanging basket.
CN201920207442.1U 2019-02-18 2019-02-18 A kind of elevating construction platform Active CN209568688U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920207442.1U CN209568688U (en) 2019-02-18 2019-02-18 A kind of elevating construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920207442.1U CN209568688U (en) 2019-02-18 2019-02-18 A kind of elevating construction platform

Publications (1)

Publication Number Publication Date
CN209568688U true CN209568688U (en) 2019-11-01

Family

ID=68334028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920207442.1U Active CN209568688U (en) 2019-02-18 2019-02-18 A kind of elevating construction platform

Country Status (1)

Country Link
CN (1) CN209568688U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681713A (en) * 2020-12-14 2021-04-20 天长市飞龙金属制品有限公司 Construction platform of wind power tower based on steel grating
CN115450413A (en) * 2022-08-01 2022-12-09 上海二十冶建设有限公司 High altitude furred ceiling roofing construction equipment that encorbelments based on construction hanging flower basket is built

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681713A (en) * 2020-12-14 2021-04-20 天长市飞龙金属制品有限公司 Construction platform of wind power tower based on steel grating
CN115450413A (en) * 2022-08-01 2022-12-09 上海二十冶建设有限公司 High altitude furred ceiling roofing construction equipment that encorbelments based on construction hanging flower basket is built

Similar Documents

Publication Publication Date Title
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN1028556C (en) Building construction system
CN206053274U (en) The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose
CN202324571U (en) Overhanging type double-row scaffold
CN209568688U (en) A kind of elevating construction platform
WO2023208250A1 (en) Curtain wall construction platform
CN111255217A (en) Elevator shaft shaping operation platform and operation method thereof
CN202370234U (en) Tool type elevator hoistway construction platform
CN206467991U (en) The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated
CN209011528U (en) A kind of all steel attachment type raise scaffold
CN104131706B (en) The construction method of the two-layer connection structure of vertical reinforcement of concrete frame structure
CN211923466U (en) Elevator shaft regularization operation platform
CN115306137B (en) Operation platform structure for installing suspended ceiling at bottom of high-altitude corridor and construction method thereof
CN102787717B (en) Self-supporting combined steel template construction method
CN110306784A (en) A kind of aluminum tunnel modular system and its operating method
CN112942789B (en) Water drop type curtain wall construction method
CN201915630U (en) Combined platform of fire control joint gallery form supporting steel beam
CN212406038U (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss
CN114215333A (en) Rapid construction method for outer cornice of high-rise building
CN208220163U (en) Crosshead is used in the maintenance of slope roof type exterior walls of buildings
CN203320922U (en) Supporting device for forming of elevator shaft template
CN105178602A (en) Building construction system
CN206581578U (en) Double-layer basket constructing device for overhanging scaffold
CN204112746U (en) The two-layer connecting structure of vertical reinforcement of concrete frame structure
CN204876576U (en) Building construction system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant