CN102787717A - Self-supporting combined steel template construction method - Google Patents

Self-supporting combined steel template construction method Download PDF

Info

Publication number
CN102787717A
CN102787717A CN2012101541918A CN201210154191A CN102787717A CN 102787717 A CN102787717 A CN 102787717A CN 2012101541918 A CN2012101541918 A CN 2012101541918A CN 201210154191 A CN201210154191 A CN 201210154191A CN 102787717 A CN102787717 A CN 102787717A
Authority
CN
China
Prior art keywords
self
combined steel
construction
type combined
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101541918A
Other languages
Chinese (zh)
Other versions
CN102787717B (en
Inventor
金海�
罗浩
朱罗军
费建伟
黄功文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU HENGDA STEEL STRUCTURE CO Ltd
Original Assignee
HANGZHOU HENGDA STEEL STRUCTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU HENGDA STEEL STRUCTURE CO Ltd filed Critical HANGZHOU HENGDA STEEL STRUCTURE CO Ltd
Priority to CN201210154191.8A priority Critical patent/CN102787717B/en
Publication of CN102787717A publication Critical patent/CN102787717A/en
Application granted granted Critical
Publication of CN102787717B publication Critical patent/CN102787717B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to a multi-story and high-rise mixed structure building system construction technology, and aims to provide a self-supporting combined steel template construction method. The method comprises the following steps of: integrally and inversely assembling a self-supporting combined steel template on the ground surface or a platform, and lifting the inverse self-supporting combined steel template to a specified position through a tensioning device; connecting the inverse self-supporting combined steel template with a middle supporting seat though a horizontal connecting rod, and integrally overturning the inverse self-supporting combined steel template into place around a middle supporting seat horizontal connecting rod under the action of self-gravity; realizing connection through a side supporting seat horizontal connecting rod; and during construction of a self-supporting combined steel template of a next independent unit, circularly performing the construction steps. Compared with a construction method for erecting full framing scaffolding, the method has the advantages that the template construction cost is lowered greatly, the construction speed is increased greatly, and the site construction environment is improved remarkably.

Description

Self-bearing type combined steel board construction method
Technical field
The invention belongs to many Tall Building Hybrid Structure building system construction field, be specifically related to a kind of self-bearing type combined steel board construction method.
Background technology
In recent years, many Tall Building Hybrid Structure buildings are increasing, and the characteristics of this structural system are: (1) post generally adopts steel column, steel core concrete column or combined steel and concrete column; (2) beam generally adopts the H section steel beam; (3) floor adopts cast-in-place concrete floor or composite floor; (4) flooring is provided with the primary and secondary beam, and floor span is less.
The template of China's cast-in-place concrete floor generally adopts wooden form or combined steel formwork at present; Shortcomings such as wherein wooden form is low because of material turnover, and speed of application is slow, and the timber waste is serious, and receive certain restriction in the use.When the floor engineering construction, the general prior full hall scaffold of setting up is laid template, steel mesh reinforcement on the scaffold, and disturbing concrete again when treating that concrete reaches certain intensity, is removed scaffold and template.This job practices scope of application is more extensive, but need set up full hall scaffold, can not multilayer construct simultaneously, and construction speed is slow, takies a large amount of circulation materials, and construction cost is high.
A kind of in addition job practices is exactly self-supported formwork construction, and the self-supported formwork construction is that the reinforcing bar in the floor is become three-dimensional steel bar girder in factory process, and the three-dimensional sheet material that three-dimensional steel bar girder and galvanized steel plain sheet are welded into one; Be directly installed on during construction on the girder steel, re-lay additional bar after, can bear construction stage concrete deadweight and construction live load, need not to set up scaffold and support; But when this job practices treats that concrete reaches certain intensity, template will be difficult to remove, and generally need galvanized steel plain sheet is used as permanent shuttering; See that from economic angle construction cost is too high; See that from use angle galvanized steel plain sheet is unfavorable for the decoration of floor ceiling as ceiling, As time goes on deepening gradually, corrosion of galvanized steel plain sheet ceiling simultaneously, influence is used.
Summary of the invention
Technical problem to be solved by this invention is, overcomes the deficiency that prior art exists, and a kind of self-bearing type combined steel board construction method of effective reduction construction cost is provided.
For solving the problems of the technologies described above, the technical scheme that the present invention adopted is:
A kind of self-bearing type combined steel board construction method is provided, may further comprise the steps:
(1) panel steel form is down placed on ground or the platform, the placed on it and fixed connection with space truss then forms the inverted self-bearing type combined steel formwork of an integral body separate unit;
(2) on the bottom flange of the H section steel beam of construction floor both sides, a middle bearing and two limit bearings are installed all;
(3) hang suspension hook respectively in the H section steel beam bottom flange of last floor both sides;
(4) between the panel point of inverted self-bearing type combined steel formwork and suspension hook, tensioning equipment is set,, self-bearing type combined steel slab integral is risen to the correspondence position of the H section steel beam of construction floor through tightening up tensioning equipment;
(5) regulate the horizontal brace rod and vertical bar of two middle bearings, the quick connection in the realization between the horizontal brace rod of bearing and the self-bearing type combined steel formwork;
(6) slowly loosen tensioning equipment, make inverted self-bearing type combined steel formwork horizontal brace rod unitary rotation around middle bearing under the deadweight effect, turn over turnback and accomplish in place;
(7) the quick connection between the horizontal brace rod of regulating each limit bearing respectively and vertical bar, the horizontal brace rod of realizing the limit bearing and self-bearing type combined steel formwork;
(8) remove suspension hook, tensioning equipment and middle bearing;
When (9) carrying out the self-bearing type combined steel formwork construction of next separate unit, the above construction sequence of cycling.
Among the present invention; The template construction of each floor area comprises the construction of a plurality of separate unit self-bearing type combined steel formworks; Place reinforcing bar in the zone of accomplishing self-bearing type combined steel formwork construction, fluid concrete then, treat that concrete strength reaches predetermined strength after; Can remove the self-bearing type combined steel formwork, carry out recycling of next regional self-bearing type combined steel formwork construction.
Among the present invention, in step (1) afterwards, can also realize leveling or arch camber requirement through adjustment self-bearing type combined steel formwork physical dimension.
Among the present invention, said in quick connection between horizontal brace rod and the self-bearing type combined steel formwork of bearing and limit bearing, all be to be connected on the truss.
The invention has the beneficial effects as follows:
(1) economic benefit: the present invention has cancelled the use of steel pipe scaffold; The whole inversion assembled self-bearing type combined steel formwork, the inverted self-bearing type combined steel formwork of formation, lifting of inverted self-bearing type combined steel slab integral and the whole construction in place of overturning on employing ground or the platform; Job practices cost of the present invention is compared with setting up full scaffold, traditional self-supported formwork job practices, and the template construction cost declines to a great extent;
(2) duration effect: the present invention is owing to need not set up scaffold; The whole inversion assembled self-bearing type combined steel formwork, the inverted self-bearing type combined steel formwork of formation, the lifting of inverted self-bearing type combined steel slab integral and the whole construction in place of overturning, the influence that does not receive lower-layer concrete intensity and build on employing ground or the platform; High efficiency, template construction speed significantly improves;
(3) practice thrift and environmental protection: the present invention is in implementation process, and the template accessory all adopts standard component, but subdivision recycle, form of structure adopts the self-bearing type combined steel formwork, need not extra interim support; Economical with materials reduces construction noise, and the site operation operating environment obviously improves.
(4) application value: adopt the present invention to solve and set up the difficult problem that finished product increases, the duration increase brings that full hall scaffold causes, and quick construction, safe and reliable, increase work efficiency, reduce engineering cost, have highly application value.
Description of drawings
Fig. 1 is a construction flow chart of the present invention;
Fig. 2 is self-bearing type combined steel formwork work progress sketch map (before the upset, the limit bearing is not connected with horizontal brace rod);
Fig. 3 is the bearing scheme of installation among Fig. 2;
Fig. 4 is a self-bearing type combined steel formwork construction completion status sketch map (having accomplished upset);
Fig. 5 is the bearing scheme of installation among Fig. 4.
The specific embodiment
Below in conjunction with accompanying drawing Fig. 1~5 and specific embodiment the present invention is explained further details;
The job practices of self-bearing type combined steel formwork, comprise assembling steel form and truss, install in bearing with limit bearing, suspension suspension hook, tensioning equipment is installed, promote combined steel formwork, be connected in bearing, around middle bearing overturn steel form, fillet bearing, dismounting tensioning equipment and middle bearing etc.
Concrete steps are:
Assembling steel form 11 and truss 12 on ground or platform, steel form 11 is made up of stiffening rib and panel, and panel places the below of stiffening rib, and steel form 11 last, constitutes inverted self-bearing type combined steel formwork 1 at following truss 12; Self-bearing type combined steel formwork 1 has certain rigidity and intensity; Said inverted self-bearing type combined steel formwork 1 physical dimension is adjustable, through adjustment to inverted self-bearing type combined steel formwork 1 physical dimension, and Rapid Realization leveling or arch camber requirement; On the H of floor both sides section steel beam 2 bottom flanges, bearing 4 and two limit bearings 5 in the installation; Middle bearing 4 comprises horizontal brace rod 41 and vertical bar 42, and limit bearing 5 comprises horizontal brace rod 51 and vertical bar 52; The length of horizontal brace rod 41,51 is adjustable, satisfies the requirement of H section steel beam different in width, and length and horizon bar absolute altitude can be regulated in the two ends up and down of vertical bar 42,52, satisfy the requirement of H section steel beam differing heights; At H section steel beam 3 bottom flanges of last floor both sides suspension suspension hook 6; Between truss 12 and suspension hook 6, tensioning equipment 7 is set; Through tightening up tensioning equipment 7, inverted self-bearing type combined steel formwork 1 integral body is risen to assigned address; Regulate the horizontal brace rod 41 and vertical bar 42 of bearing 4 in the two ends respectively, realize that horizontal brace rod 41 is connected with inverted self-bearing type combined steel formwork 1 fast, inverted self-bearing type combined steel formwork 1 can rotate around horizontal brace rod 41; Slowly loosen tensioning equipment 7, make inverted self-bearing type combined steel formwork 1 horizontal brace rod 41 unitary rotation around middle bearing 4 under the deadweight effect, it is in place to turn over turnback; Regulate the horizontal brace rod 51 and vertical bar 52 of limit, two ends bearing 5 then respectively, realize that horizontal brace rod 51 is connected with the quick of self-bearing type combined steel formwork 1; Remove suspension hook 6, tensioning equipment 7 and middle bearing 4 at last; When carrying out the self-bearing type combined steel formwork construction of next floor, the above construction sequence of cycling.Can improve the material service efficiency, reduce labor strength, reduce construction cost;
The foregoing description explanation only is the self-bearing type combined steel formwork construction of a separate unit, and the width of separate unit can be 600mm, 900mm, 1200mm etc., and the length of separate unit then is floor span.In the self-bearing type combined steel formwork construction on a floor working face, the construction of each zone, each separate unit can be carried out simultaneously.
The foregoing description explanation is not to be limitation of the present invention, and the present invention also is not limited to above-mentioned giving an example, and those skilled in the art make adjustment in essential scope of the present invention, all belong to protection scope of the present invention.

Claims (4)

1. a self-bearing type combined steel board construction method is characterized in that, may further comprise the steps:
(1) panel steel form is down placed on ground or the platform, the placed on it and fixed connection with space truss then forms the inverted self-bearing type combined steel formwork of an integral body separate unit;
(2) on the bottom flange of the H section steel beam of construction floor both sides, a middle bearing and two limit bearings are installed all;
(3) hang suspension hook respectively in the H section steel beam bottom flange of last floor both sides;
(4) between the panel point of inverted self-bearing type combined steel formwork and suspension hook, tensioning equipment is set,, self-bearing type combined steel slab integral is risen to the correspondence position of the H section steel beam of construction floor through tightening up tensioning equipment;
(5) regulate the horizontal brace rod and vertical bar of two middle bearings, the quick connection in the realization between the horizontal brace rod of bearing and the self-bearing type combined steel formwork;
(6) slowly loosen tensioning equipment, make inverted self-bearing type combined steel formwork horizontal brace rod unitary rotation around middle bearing under the deadweight effect, turn over turnback and accomplish in place;
(7) the quick connection between the horizontal brace rod of regulating each limit bearing respectively and vertical bar, the horizontal brace rod of realizing the limit bearing and self-bearing type combined steel formwork;
(8) remove suspension hook, tensioning equipment and middle bearing;
When (9) carrying out the self-bearing type combined steel formwork construction of next unit, the above construction sequence of cycling.
2. job practices according to claim 1; It is characterized in that the template construction of each floor area comprises the construction of the self-bearing type combined steel formwork of a plurality of separate units, place reinforcing bar in the zone of accomplishing the construction of self-bearing type combined steel formwork; Fluid concrete then; After treating that concrete strength reaches predetermined strength, remove the self-bearing type combined steel formwork, carry out recycling of next regional self-bearing type combined steel formwork construction.
3. job practices according to claim 1 is characterized in that, in step (1) afterwards, also through adjustment self-bearing type combined steel formwork physical dimension, realizes leveling or arch camber requirement.
4. job practices according to claim 1 is characterized in that, said in quick connection between horizontal brace rod and the self-bearing type combined steel formwork of bearing and limit bearing, all be to be connected on the truss.
CN201210154191.8A 2012-05-16 2012-05-16 Self-supporting combined steel template construction method Active CN102787717B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210154191.8A CN102787717B (en) 2012-05-16 2012-05-16 Self-supporting combined steel template construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210154191.8A CN102787717B (en) 2012-05-16 2012-05-16 Self-supporting combined steel template construction method

Publications (2)

Publication Number Publication Date
CN102787717A true CN102787717A (en) 2012-11-21
CN102787717B CN102787717B (en) 2014-12-17

Family

ID=47153287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210154191.8A Active CN102787717B (en) 2012-05-16 2012-05-16 Self-supporting combined steel template construction method

Country Status (1)

Country Link
CN (1) CN102787717B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453222A (en) * 2014-11-21 2015-03-25 山东德建集团有限公司 Assembly type truss formwork support
CN106567538A (en) * 2015-10-12 2017-04-19 广西建工集团第四建筑工程有限责任公司 Positioning mold for bathroom concrete flanges
CN114790715A (en) * 2022-05-27 2022-07-26 中交二航局第一工程有限公司 Self-adaptive folding steel formwork device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2012206A6 (en) * 1989-01-03 1990-03-01 Mesple Jose L R Building frame, with light, self-supporting blocks
WO1998057010A1 (en) * 1997-06-11 1998-12-17 Stairform Designs Pty. Ltd. Staircase form
CN201087506Y (en) * 2007-09-06 2008-07-16 杨峰 Self-bearing type mould base of composite truss building roof
KR20090123105A (en) * 2008-05-27 2009-12-02 깨뱉시스템주식회사 Revolving system support
CN201695683U (en) * 2010-07-03 2011-01-05 新疆建工(集团)有限责任公司 Steel beam concrete slab rapid-assembling and disassembling tool type truss

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2012206A6 (en) * 1989-01-03 1990-03-01 Mesple Jose L R Building frame, with light, self-supporting blocks
WO1998057010A1 (en) * 1997-06-11 1998-12-17 Stairform Designs Pty. Ltd. Staircase form
CN201087506Y (en) * 2007-09-06 2008-07-16 杨峰 Self-bearing type mould base of composite truss building roof
KR20090123105A (en) * 2008-05-27 2009-12-02 깨뱉시스템주식회사 Revolving system support
CN201695683U (en) * 2010-07-03 2011-01-05 新疆建工(集团)有限责任公司 Steel beam concrete slab rapid-assembling and disassembling tool type truss

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453222A (en) * 2014-11-21 2015-03-25 山东德建集团有限公司 Assembly type truss formwork support
CN106567538A (en) * 2015-10-12 2017-04-19 广西建工集团第四建筑工程有限责任公司 Positioning mold for bathroom concrete flanges
CN106567538B (en) * 2015-10-12 2019-01-08 广西建工集团第四建筑工程有限责任公司 A kind of positioning mold of toilet concrete flanging
CN114790715A (en) * 2022-05-27 2022-07-26 中交二航局第一工程有限公司 Self-adaptive folding steel formwork device
CN114790715B (en) * 2022-05-27 2024-05-14 中交二航局第一工程有限公司 Self-adaptive folding steel template device

Also Published As

Publication number Publication date
CN102787717B (en) 2014-12-17

Similar Documents

Publication Publication Date Title
CN104453197B (en) High Large Cantilever concrete structural steel shape supports platform
CN101575911B (en) Top-down decreasing-formwork formwork system and construction method
CN202227476U (en) High-altitude large-span overhung corridor-type reinforced concrete structure
CN105649360A (en) Integral assembling type building system and installing method
CN205421616U (en) Assemble integral shear force wall with steel pipe concrete edge member
CN102392536B (en) Construction method for long-span hanging vestibule type template support system
CN102444203A (en) High-altitude long-span overhanging corridor type reinforced concrete structure and construction method
CN106013781A (en) Slab supporting construction method and construction device by reversely suspending template
CN206016309U (en) A kind of overall assembled building system
CN102587659A (en) Construction method for using concrete columns to support structures on both sides of post-pouring strip
CN105569242A (en) Assembling method for composite floor slabs
CN105863253A (en) Integral formwork-supporting type asynchronous casting stairwell wall column formwork supporting system and construction method
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN106065681A (en) Superimposed sheet hoard strip construction method in a kind of overall assembled architecture based on BIM technology
CN202324606U (en) U-shaped force bearing seat
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN108049666B (en) A kind of echelon installation method of super plane multilayer steel truss electronic workshop steel construction
CN203394027U (en) Semi-assembled construction system for frame-shear wall tube structure
CN113338508A (en) PC component installation construction method for fabricated building
CN107401279A (en) Disposable one-piece casting staircase wall ladder combined steel formwork installation construction method
CN102787717B (en) Self-supporting combined steel template construction method
CN103758343A (en) Hanging type construction method and hanging device for reinforced concrete floor
CN203947755U (en) A kind of large Steel Cantilever trussed construction high-altitude construction first floor steel truss erecting device
CN205857697U (en) The anti-form bracing constructing device hanging template
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant