CN203654703U - Lifting platform for erecting shear wall module in elevator shaft - Google Patents

Lifting platform for erecting shear wall module in elevator shaft Download PDF

Info

Publication number
CN203654703U
CN203654703U CN201320809678.5U CN201320809678U CN203654703U CN 203654703 U CN203654703 U CN 203654703U CN 201320809678 U CN201320809678 U CN 201320809678U CN 203654703 U CN203654703 U CN 203654703U
Authority
CN
China
Prior art keywords
shear wall
elevator shaft
wall module
platform
lifting platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201320809678.5U
Other languages
Chinese (zh)
Inventor
许业勇
袁良超
卜洪剑
刘志荣
郭金涛
刘月兰
吴先锋
徐惠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Water Resources Development Co Ltd
Original Assignee
Anhui Water Resources Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Water Resources Development Co Ltd filed Critical Anhui Water Resources Development Co Ltd
Priority to CN201320809678.5U priority Critical patent/CN203654703U/en
Application granted granted Critical
Publication of CN203654703U publication Critical patent/CN203654703U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a lifting platform for erecting a shear wall module in an elevator shaft. The lifting platform for erecting the shear wall module in the elevator shaft comprises a work platform and two lifting trusses. The two lifting trusses are vertically fixed at the center of the work platform, and a gap exists between the lifting trusses. Due to the fact that the lifting platform for erecting the shear wall module in the elevator shaft is fixed in the elevator shaft, a builder can stand on the work platform to erect shear wall module components, the shear wall module components can be erected from bottom to top in a segmented mode according to the requirements, after the pouring of a lower segmentation shear wall module component is completed, the lifting platform for erecting the shear wall module in the elevator shaft is lifted by force, the whole device moves in the center line direction of the two lifting trusses, an upper segmentation shear wall module component is erected and the pouring is completed. The lifting platform for erecting the shear wall module in the elevator shaft has the advantages of being simple in structure, convenient to disassemble and assemble, convenient to conduct, and capable of completing the conduction of pouring the shear wall in a segmented mode according to the requirements.

Description

In elevator shaft, set up shear wall mould lifting platform
Technical field
The utility model relates to and in a kind of elevator shaft, sets up shear wall mould lifting platform.
Background technology
Before elevator shaft lift-mounting in building, need to build shear wall structure at the wall of elevator shaft, build before shear wall to set up, and the die assembly of fixing shear wall, conventionally while completing above-mentioned steps, complete by erecting scaffold in elevator shaft, but in construction of lift well, due to limitations, the interior scaffold of in addition setting up in a large number and a large amount of templates of setting up, caused great inconvenience to site operation, and construction safety can not get guarantee, financial resources, material resources waste are seriously.
Utility model content
Technical problem to be solved in the utility model is to provide in a kind of elevator shaft of simple in structure, easy accessibility and sets up shear wall mould lifting platform.
For solving the problems of the technologies described above, the utility model provides and in a kind of elevator shaft, has set up shear wall mould lifting platform, it comprises working platform and two boist truss, and two boist truss are vertically fixed on working platform center, and gapped between boist truss.
Adopt after such structure, in this elevator shaft, setting up shear wall mould lifting platform is fixed in elevator shaft, constructor may stand in the die assembly that sets up shear wall on working platform, and the die assembly of shear wall is set up in segmentation from bottom to top as required, after the die assembly of the shear wall of hypomere completes and builds, promote and in this elevator shaft, set up shear wall mould lifting platform by external force, whole device is moved up along the centerline direction of two boist truss, set up the die assembly of section shear wall and complete and build.
Useful technique effect of the present utility model: simple in structure, easy accessibility, constructability, and also segmentation completes and builds shear wall construction as required.
In order better to understand technology contents of the present utility model, below will in this elevator shaft, set up shear wall mould lifting platform referred to as this platform.
The working platform downside of this platform is fixedly connected with the base of frame construction; Adopt after such structure, the base of frame construction can reach the object of support working platform, and facilitates this platform to be fixed in elevator shaft.
The base side wall of this platform is fixed with the force rod of level; Adopt after such structure, can on elevator shaft sidewall, be preset with fixed pin holes, this platform is vertically put into elevator shaft, slow decreasing, in the time that force rod moves to fixed pin holes top position, steady pin is arranged in fixed pin holes, this platform continues to decline, and force rod is supported on steady pin, reach the object of fixing this platform.
On the boist truss of this platform, there are some locating holes that coordinate with flower basket bolt; Adopt after such structure, while setting up the die assembly of shear wall, one end of flower basket bolt is coordinated with the die assembly of shear wall, the other end of flower basket bolt coordinates with the locating hole on boist truss, regulate flower basket bolt, can finely tune verticality, levelness, the planeness of setting up shear wall die assembly.
Brief description of the drawings
Fig. 1 is the front view of this platform embodiment.
Fig. 2 is the left view of Fig. 1.
Fig. 3 is the top view of Fig. 1.
Detailed description of the invention
As shown in Figures 1 to 3
This platform comprises working platform 1 and two boist truss 2.
Working platform 1 is a rectangular steel plate, working platform 1 centre bit is equipped with the square service aisle 11 that runs through working platform 1 upper and lower end face, working platform 1 downside is welded with the base 12 of steel framed structure, the left and right sidewall outside of base 12 is welded with respectively a force rod 13, base 12 and working platform 1 are rectangular-shaped substantially, form a work chamber 14 between base 12 and working platform 1.
On working platform 1, be vertically provided with two boist truss 2, the lower end of two boist truss 2 is welded on respectively service aisle 11 both sides of working platform 1, between two boist truss 2 gapped 22, the upper end of two truss connects by two connecting rods 21, several locating hole (not shown)s that coordinate with flower basket bolt that are distributed with on vertical direction on each boist truss 2.
When use, on elevator shaft sidewall, be preset with fixed pin holes, build at elevator shaft below the construction location of shear wall the position of fixed pin holes, again by this platform vertically slow decreasing to elevator shaft, in the time that force rod 13 moves to fixed pin holes top position, this platform stops declining, constructor enters in work chamber 14 through the service aisle 11 of working platform 1, and steady pin is installed in fixed pin holes, this platform continues to decline, and steady pin is supported on force rod 13, reach the object of fixing this platform.
After this platform is fixing, constructor may stand in the die assembly that sets up shear wall on working platform 1, the die assembly of shear wall is set up in segmentation from bottom to top as required, die assembly and boist truss 2 by shear wall coordinate with flower basket bolt respectively, the die assembly of shear wall is supported on to truss surrounding by flower basket bolt, reserved fixed pin holes on lower section shear wall, the shear wall of hypomere has been built.
Then, remove the die assembly of lower section shear wall, set up the steel I-beam that supports use at elevator shaft upside, the steel I-beam just in time gap 22 through two boist truss 2 is set up on hoistway wall concrete, and steel I-beam downside is fixed with small-sized crane;
Four jiaos in work chamber 14 arrange suspension ring, with two root steel wire penetrating suspension ring, and steel cable termina is locked with several U-shaped buckle, fasten on two wire rope in work chamber 14 with the electric block hoisting wirerope on steel I-beam, starting minor crane vertically slowly promotes working platform 1, upwards promoting 20 centimeters of places stops, constructor enters work chamber 14, the steady pin being fixed on elevator shaft sidewall is taken out, at startup minor crane, working platform 1 is vertically slowly promoted to elevator shaft epimere, when rising to applicable position, plugs on this platform steady pin, can set up the die assembly of the shear wall of elevator shaft epimere, the shear wall that extremely finally completes elevator shaft epimere is built.
What above-mentioned small-sized crane facility adopted is commercially available electric block.
Above-described is only a kind of embodiment of the present utility model; it should be pointed out that for the person of ordinary skill of the art, do not departing under the prerequisite of the utility model principle; can also make some modification and improvement, these also should be considered as belonging to protection domain of the present utility model.

Claims (4)

1. in elevator shaft, set up a shear wall mould lifting platform, it is characterized in that: it comprises working platform and two boist truss, and two boist truss are vertically fixed on working platform center, and gapped between boist truss.
2. in elevator shaft according to claim 1, set up shear wall mould lifting platform, it is characterized in that: described working platform downside is fixedly connected with the base of frame construction.
3. in elevator shaft according to claim 2, set up shear wall mould lifting platform, it is characterized in that: described base side wall is fixed with the force rod of level.
4. in elevator shaft according to claim 1, set up shear wall mould lifting platform, it is characterized in that: on described boist truss, have some locating holes that coordinate with flower basket bolt.
CN201320809678.5U 2013-12-07 2013-12-07 Lifting platform for erecting shear wall module in elevator shaft Withdrawn - After Issue CN203654703U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320809678.5U CN203654703U (en) 2013-12-07 2013-12-07 Lifting platform for erecting shear wall module in elevator shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320809678.5U CN203654703U (en) 2013-12-07 2013-12-07 Lifting platform for erecting shear wall module in elevator shaft

Publications (1)

Publication Number Publication Date
CN203654703U true CN203654703U (en) 2014-06-18

Family

ID=50921107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320809678.5U Withdrawn - After Issue CN203654703U (en) 2013-12-07 2013-12-07 Lifting platform for erecting shear wall module in elevator shaft

Country Status (1)

Country Link
CN (1) CN203654703U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615104A (en) * 2013-12-07 2014-03-05 安徽水利开发股份有限公司 Lifting platform for arranging shear wall mold in elevator shaft in erected mode
CN117627342A (en) * 2024-01-26 2024-03-01 山西一建集团有限公司 Chimney lining construction mold turning inner formwork construction platform and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615104A (en) * 2013-12-07 2014-03-05 安徽水利开发股份有限公司 Lifting platform for arranging shear wall mold in elevator shaft in erected mode
CN103615104B (en) * 2013-12-07 2016-04-06 安徽水利开发股份有限公司 Erection shear wall mould lifting platform in elevator shaft
CN117627342A (en) * 2024-01-26 2024-03-01 山西一建集团有限公司 Chimney lining construction mold turning inner formwork construction platform and construction method
CN117627342B (en) * 2024-01-26 2024-04-19 山西一建集团有限公司 Chimney lining construction mold turning inner formwork construction platform and construction method

Similar Documents

Publication Publication Date Title
CN101892742B (en) High low building-cross deformation joint low section shear wall construction method
CN202055516U (en) Integral mold board elevating system of vertical shaft
CN205296803U (en) Elevator automatic lifting operation panel
CN103437563A (en) Mounting method for steel skeleton of large steel structure factory building
CN206233546U (en) A kind of elevator hoistways workbench
CN203113793U (en) Large formwork installation system of oblique structure
CN203654703U (en) Lifting platform for erecting shear wall module in elevator shaft
CN104989111A (en) Construction method for steel structure high-rise hoisting
CN103774842A (en) Lifting type square vertical shaft formwork
CN204643757U (en) Anchor ear type vestibule truss Steel Structure lifting bracket
CN104179121A (en) Movable formwork bracket four-stage-lifting self-assembling method
CN203998536U (en) Home lift girder assembly
CN204702474U (en) Inclined-pulling type vestibule truss Steel Structure hoisting hanger
JP3074765U (en) Pillar building construction system equipment
CN203213019U (en) Long cantilever bent cap cast-in-place construction support system
CN204126297U (en) A kind of temporary support of steel truss roof
CN210507161U (en) Novel outer hanging anticollision barrier construction dolly
CN202831628U (en) Combined type bailey frame load-bearing shelving for pouring large span concrete beam
CN203238967U (en) Large steel structure frame whole lifting device
CN103615104B (en) Erection shear wall mould lifting platform in elevator shaft
CN202046833U (en) Lifting jack
CN212176590U (en) Outer frame safety protection structure is exempted from to assembled building
CN203320922U (en) Supporting device for forming of elevator shaft template
CN102733612B (en) Mounting method of electric hoist orbit
CN207847078U (en) Core Walls Structure shear wall converts boom device without wall without creeping formwork seat in the plane at beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140618

Effective date of abandoning: 20160406