CN203238967U CN 201320073735 CN201320073735U CN203238967U CN 203238967 U CN203238967 U CN 203238967U CN 201320073735 CN201320073735 CN 201320073735 CN 201320073735 U CN201320073735 U CN 201320073735U CN 203238967 U CN203238967 U CN 203238967U
Authority
CN
China
Prior art keywords
jack
frame
steel structure
steel
centre
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320073735
Other languages
Chinese (zh)
Inventor
沈华
胡文婷
王嘉莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI JIANHAO ENGINEERING CONSULTANCY Co Ltd
Original Assignee
SHANGHAI JIANHAO ENGINEERING CONSULTANCY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JIANHAO ENGINEERING CONSULTANCY Co Ltd filed Critical SHANGHAI JIANHAO ENGINEERING CONSULTANCY Co Ltd
Priority to CN 201320073735 priority Critical patent/CN203238967U/en
Application granted granted Critical
Publication of CN203238967U publication Critical patent/CN203238967U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a construction tool for building construction, in particular to a large steel structure frame whole lifting device. Two sets of centre hole jacks (1) and a jack (2) are used as vertical lifting equipment. Two sets of horizontal jacks (7), a jack (8) and a counter-force frame (6) are used as horizontal pushing equipment. The two sets of centre hole jacks (1) and the jack (2) are erected on a steel corbel (3) formed by I-beam in a welding mode. A hanging frame (4) is welded on a steel frame. The upper end of a steel wire rope (5) for lifting penetrates through the centre hole jacks (1), and the lower end of the steel wire rope (5) is fixed on the hanging frame (4) on the steel frame. By in-turn lifting of the two sets of centre hole jacks (1) and the jack (2), the steel structure frame is lifted to the mounting elevation.

Description

A kind of large-scale steel structure framework integral lifting apparatus
Technical field
The utility model relates to the construction tool of building operations, especially a kind of large-scale steel structure framework integral lifting apparatus.
Background technology
Overweight in the building operations, heavy-gauge steel structural framing lifting is a difficult problem always, is subject to the restriction of conventional lifting appliance, and crane capacity and precision control all can not apply to the installation exercise of this special component.As adopt many large-tonnage tower cranes or mobile crane, satisfy crane capacity, but aspect economy then far away not as good as native system.
Because steel structure frame adopts square steel column, beam, four limits all need be welded, as adopting again welding behind steel column, the beam segmented in-position, one side then with just can't welding that structure fits, cause constructional difficulties.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned the deficiencies in the prior art, proposes a kind of large-scale steel structure framework integral lifting apparatus.Concrete technical scheme is:
A kind of large-scale steel structure framework integral lifting apparatus adopts 2 groups of centre-hole jacks 1 and jack 2 as vertical-lift equipment, adopts 2 groups of level jack 7, jack 8 and reaction frame 6 as horizontal incremental launching device.
Described 2 groups of centre-hole jacks 1 and jack 2 are erected on the steel corbel 3 that i iron is welded, at steel frame welding suspension bracket 4, lifting is passed centre-hole jack 1 with wire rope 5 upper ends, the lower end is fixed on the suspension bracket 4 on the steel frame, in turn lifting by two groups of centre-hole jacks 1 and jack 2 is promoted to installed height mark with steel structure frame;
After steel structure frame is promoted to installed height mark, described reaction frame 6, jack 7 and jack 8 are installed, push steel structure frame to structural column, the oil cylinder height of meanwhile finely tuning centre-hole jack 1 and jack 2 is adjusted steel structure frame and is reached accurate installation site, at last steel structure frame and structural column are fixed, finished lifting.
Further, above-mentioned reaction frame 6 is to transmit horizontal thrust, and the level when in place as steel structure frame and the parts of vertically-guided.
Further, above-mentioned 2 groups of jack 7 and jack 8 employings are pushed up in turn the mode of stretching and are pushed steel structure frame to the agent structure post.
This device can lift the Huge Steel Open structural framing safely, efficiently, economically and put in place, and is convenient to the accurate adjustment installation site, can not affect steel structure frame assembly unit quality and intensity, also can not affect the construction that is connected and fixed of steel structure frame and agent structure.
Description of drawings
Fig. 1 is the side elevation of large-scale steel structure framework integral lifting apparatus.
Fig. 2 is the positive facade of large-scale steel structure framework integral lifting apparatus.
Fig. 3 is the top view of large-scale steel structure framework integral lifting apparatus.
The specific embodiment
Such as Fig. 1, Fig. 2 and shown in Figure 3, it is the structural representation of the utility model large-scale steel structure framework integral lifting apparatus.
A kind of large-scale steel structure framework integral lifting apparatus adopts 2 groups of centre-hole jacks 1 and jack 2 as vertical-lift equipment, adopts 2 groups of level jack 7, jack 8 and reaction frame 6 as horizontal incremental launching device.
Above-mentioned 2 groups of centre-hole jacks 1 and jack 2 are erected on the steel corbel 3 that i iron is welded, at steel frame welding suspension bracket 4, lifting is passed centre-hole jack 1 with wire rope 5 upper ends, the lower end is fixed on the suspension bracket 4 on the steel frame, in turn lifting by two groups of centre-hole jacks 1 and jack 2 is promoted to installed height mark with steel structure frame;
After steel structure frame is promoted to installed height mark, described reaction frame 6, jack 7 and jack 8 are installed, push steel structure frame to structural column, the oil cylinder height of meanwhile finely tuning centre-hole jack 1 and jack 2 is adjusted steel structure frame and is reached accurate installation site, at last steel structure frame and structural column are fixed, finished lifting.
Concrete form of construction work is:
1. at structural column steel corbel 3 is installed according to actual weight and the length of hoisting steel structure, and at steel corbel two groups of hydraulic feed-through jacks 1 and jack 2 is installed.
2. the steel structure frame that need lift is finished in installation on ground frame welding assembly unit after transporting the scene to, at the hoisting point position mounting suspension 4 of steel structure frame, can adopt and weld or the bolt connection.
3. hydraulic feed-through jack 1 and jack 2, lower end and suspension bracket 4 fixations are passed in the wire rope upper end.Wire rope quantity and specification are chosen according to actual slinging matter weight.
4. the wire rope that will pass first group of hydraulic feed-through jack 1 is fixed, and the beginning jacking is to the movable height of oil cylinder.In this step, the wire rope of second group of hydraulic feed-through jack 2 should unclamp.
5. the wire rope that will pass second group of hydraulic feed-through jack 2 is fixed, and the beginning jacking is to the movable height of oil cylinder.In this step, the wire rope of first group of hydraulic feed-through jack 1 should unclamp.
6. repeated for the 4th, the 5th step until steel structure frame reaches predetermined absolute altitude.
7. reaction frame 6 and two groups of level jack 7 and 8 are installed.
8. first group of jack 7 jacking, second group of jack 8 keeps motionless.After first group of jack 7 jacking puts in place, between second group of jack 8 and reaction frame, place the power transmission cushion block, second group of jack 8 of subsequently jacking regained the oil cylinder of first group of jack 7 simultaneously.
9. after second group of jack 8 jacking puts in place, place the power transmission cushion block between first group of jack 7 and reaction frame, first group of jack 7 of subsequently jacking regained the oil cylinder of second group of jack 8 simultaneously.
10. repeated for the 8th, the 9th step until steel structure frame is pushed to the installation site.
11. by fine setting hydraulic feed-through jack 1 and jack 2, and level jack 7 and 8, so that the steel work accurate positioning is constructed in order to weld with high-strength bolt.
The utility model device construction is simple, and equipment is easy to buying, and hoisting power is strong, and the correction precision is high, and the Huge Steel Open structural framing lifts by crane after assembly unit is finished on the ground support, has avoided segmental hoisting rear welding procedure in place dead angle.Adopt this scheme can lift by crane 400 tons of gross weights, wide 30 meters, high 35 meters steel frames, as increasing suspension centre and equipment, then can lift by crane the steel member of larger weight and size.

Claims (2)

1. large-scale steel structure framework integral lifting apparatus, it is characterized in that, adopt 2 groups of centre-hole jacks (1) and jack (2) as vertical-lift equipment, adopt 2 groups of level jack (7), jack (8) and reaction frame (6) as horizontal incremental launching device;
Described 2 groups of centre-hole jacks (1) and jack (2) are erected on the steel corbel (3) that i iron is welded, weld suspension bracket (4) at steel frame, lifting is passed centre-hole jack (1) with wire rope (5) upper end, the lower end is fixed on the suspension bracket (4) on the steel frame, in turn lifting by two groups of centre-hole jacks (1) and jack (2) is promoted to installed height mark with steel structure frame.
2. a kind of large-scale steel structure framework integral lifting apparatus according to claim 1 is characterized in that, described reaction frame (6) is to transmit horizontal thrust, the level when in place as steel structure frame and the parts of vertically-guided.
CN 201320073735 2013-02-17 2013-02-17 Large steel structure frame whole lifting device Expired - Fee Related CN203238967U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320073735 CN203238967U (en) 2013-02-17 2013-02-17 Large steel structure frame whole lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320073735 CN203238967U (en) 2013-02-17 2013-02-17 Large steel structure frame whole lifting device

Publications (1)

Publication Number Publication Date
CN203238967U true CN203238967U (en) 2013-10-16

Family

ID=49316277

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320073735 Expired - Fee Related CN203238967U (en) 2013-02-17 2013-02-17 Large steel structure frame whole lifting device

Country Status (1)

Country Link
CN (1) CN203238967U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669887A (en) * 2013-12-20 2014-03-26 上海市机械施工集团有限公司 Temporary supporting frame for annular steel structure installation
CN107892238A (en) * 2017-11-11 2018-04-10 中铁三局集团华东建设有限公司 A kind of lowering equipment and method for Bailey beam
CN112224642A (en) * 2020-09-23 2021-01-15 中国五冶集团有限公司 Device and method for mounting and conveying steel structural member adjusting piece

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669887A (en) * 2013-12-20 2014-03-26 上海市机械施工集团有限公司 Temporary supporting frame for annular steel structure installation
CN107892238A (en) * 2017-11-11 2018-04-10 中铁三局集团华东建设有限公司 A kind of lowering equipment and method for Bailey beam
CN107892238B (en) * 2017-11-11 2019-10-22 中铁三局集团华东建设有限公司 A kind of lowering equipment and method for Bailey beam
CN112224642A (en) * 2020-09-23 2021-01-15 中国五冶集团有限公司 Device and method for mounting and conveying steel structural member adjusting piece

Similar Documents

Publication Publication Date Title
CN203238967U (en) Large steel structure frame whole lifting device
CN206706591U (en) A kind of horizontal splicing apparatus for packaged type bridges precast pier template
CN206873955U (en) A kind of prefabricated stand column perpendicularity and horizontal plane adjusting means
CN204038921U (en) Super High tower crane wall-attaching equipment
CN103434933A (en) Large member hoisting in-position device and in-position method
CN103510517A (en) Large-tonnage anchor rod simple static-pressure-pile pressing frame
CN202689498U (en) Liftable scaffold for simple and easy building outer wall
CN202689489U (en) Frame column construction operation frame
CN102635070A (en) Mutual-pulling type vertical turning construction method for steel towers of cable-stayed bridge
CN102372228A (en) Translational installation method for large-span crane beam
CN205116883U (en) Mast hoisting device of superelevation layer steel construction launching tower
CN203811477U (en) Single-beam bearing force detection load applying system
CN203701552U (en) Attached scaffold for lifted through worm, gear and screw rod
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN203654703U (en) Lifting platform for erecting shear wall module in elevator shaft
CN203361170U (en) Supporting upright column pile for building foundation pit support
CN206539038U (en) A kind of construction jacking apparatus
CN201738563U (en) Hydraulic climbing scaffold for building construction
CN206385540U (en) A kind of pile press machine
CN215626381U (en) Hoisting and positioning tool for ultra-long steel truss
CN104564084B (en) Vertical shaft sliding formwork and grouting platform steel strand wires jack lifting construction equipment
CN215717407U (en) Control structure for adjusting verticality of upright post of light steel structure
CN204959605U (en) Knotted rope hookup
CN217811167U (en) Fixed support bracket capable of adjusting elevation of embedded support leg of tower crane
CN103711299A (en) Liftable scaffold for building outer wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131016