CN202611250U - Concreting platform for concrete filled steel tube column - Google Patents

Concreting platform for concrete filled steel tube column Download PDF

Info

Publication number
CN202611250U
CN202611250U CN 201220236736 CN201220236736U CN202611250U CN 202611250 U CN202611250 U CN 202611250U CN 201220236736 CN201220236736 CN 201220236736 CN 201220236736 U CN201220236736 U CN 201220236736U CN 202611250 U CN202611250 U CN 202611250U
Authority
CN
China
Prior art keywords
platform
steel tube
column
concreting
concrete filled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220236736
Other languages
Chinese (zh)
Inventor
田旭东
李和平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN 201220236736 priority Critical patent/CN202611250U/en
Application granted granted Critical
Publication of CN202611250U publication Critical patent/CN202611250U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model specifically discloses a concreting platform for a concrete filled steel tube column and solves the problems that when an existing steel tube column needs to be filled with concrete, a scaffolding platform is erected and a crane is used for concreting, so the operation is time-consuming and labor-consuming, and the construction efficiency is affected. The concreting platform for the concrete filled steel tube column comprises a platform body in a framework structure, wherein a column guiding frame is arranged in the middle of the platform body, an operating deck is fixed at the bottom of the platform body at the left and the right sides of the column guiding frame, a fence fixedly connected with the platform body is arranged above the periphery of the operating deck, a funnel is fixedly arranged above the column guiding frame, and limit plates are hinged with the left and the right side of the column guiding frame. According to the concreting platform for the concrete filled steel tube column, the structural design is reasonable and reliable, the number of scaffolds in use is greatly reduced, the cost is saved, the labor force is saved, meanwhile the mounting and dismounting are convenient, and the concreting platform has the advantages of simple structure, convenience in operation, low cost and rapidness in turning and circulation.

Description

Column concrete filled steel tube perfusion stand
Technical field
The utility model relates to concrete-spouting plant, is specially a kind of column concrete filled steel tube perfusion stand.
Background technology
Extensive application along with rail yard steel work wind and rain canopy; Concrete perfusion also is used as the form of structure of main stressed member in a large number in upright steel pipe column; This structure is wherein a kind of application form of concrete filled steel tube, and concrete filled steel tube is made up of steel pipe and the concrete of filling wherein.
During construction, at first cast-in fixing bolt in concrete foundation is fixed on steel pipe on the pre-buried crab-bolt then, carries out the cushion cap Concrete Construction again, and steel pipe just combines as a whole with concrete foundation like this, at last concrete perfusion in the cavity of steel pipe.
After steel pipe is installed; Utilize preformed hole concrete perfusion in the steel pipe cavity of steel pipe top; Traditional job practices is to set up the steel pipe scaffold job platform around steel pipe, utilizes crane or pump truck to pouring concrete within steel pipe, has the problem that wastes time and energy and influence efficiency of construction.
Summary of the invention
The utility model adopts when having column steel pipe concrete perfusion now in order to solve to be set up the scaffold job platform and utilizes the mode of crane perfusion to have the problem that wastes time and energy and influence efficiency of construction, and a kind of column concrete filled steel tube perfusion stand is provided.
The utility model is to adopt following technical scheme to realize: column concrete filled steel tube perfusion stand; The stand body that comprises cage construction; Stand body middle part is provided with the guide pillar frame, and the stand body bottom of the guide pillar frame left and right sides is fixed with operating platform, and operating platform is provided with the fence with the stand body-fixed all around; Guide pillar frame upper fixed has funnel, and the guide pillar frame left and right sides all is hinged with limiting plate.
During the perfusion operation, utilize crane that the stand body is sling, the height and the orientation of adjustment guide pillar frame lower ending opening; When disposing, slowly put down the stand body, when funnel bottom embeds column top preformed hole with steel pipe top node Board position; Put down the stand body fully, this moment, the artificial operating platform that gets into was opened the both sides limiting plate; And fix with column; Installation can be poured into operation, has overcome to solve to adopt when having column steel pipe concrete perfusion now to set up the scaffold job platform and utilize the mode of crane perfusion to have the problem that wastes time and energy and influence efficiency of construction.
The guide pillar frame is a cone structure, and its effect is that " catching " played guide effect to the column capital more easily, is easy to install when at the column top stand body being installed.
The utility model reasonable in design is reliable, has significantly reduced the scaffold use amount, has practiced thrift cost, and labor savings the time, easy installation and removal has advantage simple in structure, easy to operate, that cost is low and the turnover circulation is fast.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Among the figure: 1-stand body, 2-guide pillar frame, 3-operating platform, 4-fence, 5-funnel, 6-limiting plate.
The specific embodiment
Column concrete filled steel tube perfusion stand; The stand body 1 that comprises cage construction; Stand body 1 middle part is provided with guide pillar frame 2, and stand body 1 bottom of guide pillar frame 2 left and right sides is fixed with operating platform 3, and the top is provided with the fence of fixing with stand body 14 around the operating platform 3; Guide pillar frame 2 upper fixed have funnel 5, and guide pillar frame 2 left and right sides all are hinged with limiting plate 6.
Guide pillar frame 2 is a cone structure.
In the practical implementation process, funnel 5 is fixed through the upright supporting leg of four framves with stand body 1, the side of being, funnel 5 top taper concrete structure, and funnel 5 bottoms are cylindric steel pipe; Limiting plate 6 is the arc structure that falls near column one side; After turning to vertical pillars; Column is snapped in limiting plate 6 arcs, destroy the column lacquer painting, reserve the space about 2cm between limiting plate 6 and column for preventing limiting plate 6; Utilize bolt urgent, stand body 1 upper end is fixed with some suspension ring.

Claims (2)

1. a column concrete filled steel tube pours into stand; It is characterized in that: the stand body (1) that comprises cage construction; Stand body (1) middle part is provided with guide pillar frame (2); Stand body (1) bottom of guide pillar frame (2) left and right sides is fixed with operating platform (3); Operating platform (3) top all around is provided with and the fixing fence (4) of stand body (1), and guide pillar frame (2) upper fixed has funnel (5), and guide pillar frame (2) left and right sides all is hinged with limiting plate (6).
2. column concrete filled steel tube perfusion stand according to claim 1, it is characterized in that: guide pillar frame (2) is a cone structure.
CN 201220236736 2012-05-24 2012-05-24 Concreting platform for concrete filled steel tube column Expired - Fee Related CN202611250U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220236736 CN202611250U (en) 2012-05-24 2012-05-24 Concreting platform for concrete filled steel tube column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220236736 CN202611250U (en) 2012-05-24 2012-05-24 Concreting platform for concrete filled steel tube column

Publications (1)

Publication Number Publication Date
CN202611250U true CN202611250U (en) 2012-12-19

Family

ID=47344960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220236736 Expired - Fee Related CN202611250U (en) 2012-05-24 2012-05-24 Concreting platform for concrete filled steel tube column

Country Status (1)

Country Link
CN (1) CN202611250U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111608184A (en) * 2020-05-08 2020-09-01 五冶集团上海有限公司 Core filling device for tubular pile
CN113529795A (en) * 2021-06-29 2021-10-22 深圳市工勘岩土集团有限公司 Construction method for cast-in-place concrete assembly type platform of steel pipe structure column by foundation pit reverse construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111608184A (en) * 2020-05-08 2020-09-01 五冶集团上海有限公司 Core filling device for tubular pile
CN113529795A (en) * 2021-06-29 2021-10-22 深圳市工勘岩土集团有限公司 Construction method for cast-in-place concrete assembly type platform of steel pipe structure column by foundation pit reverse construction method

Similar Documents

Publication Publication Date Title
CN101619630B (en) Mounting method of steel chimney and implementary jacking device
CN201695681U (en) Integral self-elevating type elevator hoistway tube mold
CN103935911B (en) Tower crane attached wall supporting construction and construction method thereof
CN102535845A (en) Construction method of bearing frame of corridor structure
CN109184189B (en) Construction method for conical shell silo top structure of large-diameter silo
CN201962944U (en) Hydraulic climbing formwork for building construction
CN204644884U (en) High pier over-form construction reinforced bar installs mobile stock
CN102900024A (en) Overturning die plate for large-scale concrete structure and using method for overturning die plate
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN103615111A (en) Silo top construction method
CN207268073U (en) Novel flexible formwork bearing frame
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN205636516U (en) Convertible template system of hollow concrete leaning tower
CN202401769U (en) Detachable concrete cloth machine for self-elevating creeping formwork system
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN203113793U (en) Large formwork installation system of oblique structure
CN202611250U (en) Concreting platform for concrete filled steel tube column
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN103291116A (en) Grid-type formwork supporting and operating platform for construction of water tank on top of inverted-cone water tower
CN203129580U (en) Formwork system
CN203308165U (en) Net rack type formwork supporting operation platform for construction of water tank at top of inverted-cone-shaped water tower
CN102777050A (en) Assembly type jig frame for longspan pipe truss roof girder
CN107351228A (en) A kind of prefabricated wind power tower mould equipment and its construction technology
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN203715115U (en) Supporting point structure for self-hoisting system of portal crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121219

Termination date: 20200524