CN102777050A - Assembly type jig frame for longspan pipe truss roof girder - Google Patents
Assembly type jig frame for longspan pipe truss roof girder Download PDFInfo
- Publication number
- CN102777050A CN102777050A CN2012102999815A CN201210299981A CN102777050A CN 102777050 A CN102777050 A CN 102777050A CN 2012102999815 A CN2012102999815 A CN 2012102999815A CN 201210299981 A CN201210299981 A CN 201210299981A CN 102777050 A CN102777050 A CN 102777050A
- Authority
- CN
- China
- Prior art keywords
- roof girder
- pipe truss
- welded
- truss roof
- steel floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to an assembly type jig frame for a longspan pipe truss roof girder. According to the structure, a support pillar is welded on a steel floor; upright posts are respectively welded on the steel floor which is positioned on two sides of the support pillar; inclined struts are respectively arranged on the outer sides of two upright posts; a lower chord positioning baffle plate is welded on the top surface of the support pillar; and upper chord positioning baffle plates are welded on the inner sides of the upright posts. By the assembly type jig frame, the overall assembly of the pipe truss roof girder is carried out on the spot ground, the pipe truss roof girder is hoisted and mounted by using a vertical type normal assembly method, so that the overall geometric dimensionings (including length, chord length, chord height, straightness, perpendicularity and the like) of pipe truss components are controlled; and because of the assembly on the ground, the working efficiency is greatly improved, the expenses of large-scale machines are saved, and the safety risks during the hoisting are also reduced relative to other mounting methods.
Description
Technical field
The present invention relates to a kind of spelling bearing tool of pipe truss roof girder, specifically a kind of spelling moulding bed of large-span pipe truss roof girder.
Background technology
The cross section is that the pipe truss roof girder of del is an arch space truss structure, laterally is two to stride, and span has more than 100 meter, and setting height(from bottom) is at three, 40 meters.During installation, the welding of the two ends of roof girder is supported on the steel column support of triangular-section; Middle span is supported on the capital of concrete support column.Because single article span of pipe truss roof girder is big, weight is big, form of structure is special, so generally be to make factory's sectional making, be transported to the scene then, assembling in the high-altitude.This mounting means makes the bulk of pipe truss roof girder wayward, and the security risk when installing is bigger.
Summary of the invention
The object of the invention just provides a kind of spelling moulding bed of large-span pipe truss roof girder, to overcome many unfavorable factors that large-span pipe truss roof girder high-altitude spelling exists, simplifies the installation of pipe truss roof girder, improves installation accuracy.
The present invention is achieved in that a kind of spelling moulding bed of large-span pipe truss roof girder, comprising:
Steel floor as the basis;
Be welded on the support pier on the said steel floor, its height is identical with the springing height of the pipe truss roof girder at place, this moulding bed arch camber of living in Support Position, and its width is identical with the cross section Breadth Maximum of the pipe truss roof girder at place, this moulding bed arch camber of living in Support Position;
Be positioned at said support pier both sides, be welded on the column on the said steel floor;
Be arranged on the diagonal brace that the said column outside is used to reinforce said column, the upper end of said diagonal brace is welded on the outside of said column, and the lower end of said diagonal brace is welded on the said steel floor;
Be welded on the said support pier, be used for the lower chord tube of pipe truss roof girder is carried out the lower edge positioning baffle of lateral register; And
Be welded on the positioning baffle that winds up that said column is inboard, be used for the pipe that winds up of pipe truss roof girder is carried out the support location.
Spacing between two said columns is exceeded with two on the pipe truss roof girder that can hold place, the arch camber of living in Support Position pipes that wind up.
The invention provides and a kind ofly can carry out the spelling moulding bed that spelling is used large-span pipe truss roof girder.Adopt this spelling moulding bed, can manage the spelling of the whole of truss roof girder or office's section on the ground, and then the lifting lift-off; Install and fix; Can guarantee to manage the dimensional accuracy of trussmember so to greatest extent, and spelling can be increased work efficiency greatly also on the ground, save the big machinery expense; Other mounting methods have also reduced the security risk when lifting relatively.
Description of drawings
Fig. 1 is a spelling moulding bed of the present invention and the structural representation of the pipe truss roof girder that is supported.
Among the figure: 1, steel floor, 2, support pier, 3, column, 4, diagonal brace, 5, roof girder, 6, the lower edge positioning baffle, 7, positioning baffle winds up.
The specific embodiment
As shown in Figure 1, pipe truss roof girder is the space truss structure that the cross section is del, is made up of the some web members that wind up pipe (bar) and be connected between the upper and lower string pipe of a lower chord tube (bar), two equal heights.Spelling moulding bed of the present invention is exactly a ground arch camber bracing frame during as pipe truss roof girder spelling and custom-designed.
The bottom of spelling moulding bed of the present invention is the steel floor 1 as brace foundation; On steel floor 1, be welded with support pier 2; The height of support pier 2 is identical with the springing height of the pipe truss roof girder at place, this moulding bed arch camber of living in Support Position, and the cross section Breadth Maximum of the width of support pier 2 and the pipe truss roof girder at place, this moulding bed arch camber of living in Support Position is consistent.Spacing being welded with respectively on the steel floor of support pier 2 both sides between column 3, two root posts 3 is exceeded with two on the pipe truss roof girder that can hold place, the arch camber of living in Support Position pipes that wind up.Be respectively arranged with diagonal brace 4 in the outside of two columns 3, the upper end of diagonal brace 4 is welded on the outside of column 3, and the lower end of diagonal brace 4 is welded on the steel floor 1, and the effect of diagonal brace 4 is that column 3 plays reinforcement effect.
For preventing to manage the skew of truss roof girder on this spelling moulding bed, at two parallel lower edge positioning baffles 6 of end face welding of support pier 2, so that the lower chord tube on the pipe truss roof girder is carried out lateral register; In the inboard of two columns 3, be welded with the positioning baffle 7 that winds up respectively, respectively two pipes that wind up on the pipe truss roof girder are carried out the support location.
Form the spelling moulding bed of some height series of gradual change thus by the requirement of roof girder springing height; In one line; Be arranged on the ground of roof girder erecting bed; Supporting to carrying out whole counterpart spelling by the assembly of making the plurality of sections pipe truss roof girder that factory makes and transport, will manage after truss roof girder assembly is welded into a roof girder integral body, lifting is in place.
Spelling moulding bed of the present invention is behind the whole spelling of the ground of erecting bed enterprising administration-management truss roof girder; Can use vertical upright method of hull section construction that pipe truss roof girder is lifted and installs; The whole geometry size (comprising length, chord length, action, straightness accuracy, verticality etc.) of not only managing trussmember is controlled, and ground spelling improved operating efficiency greatly, has saved the big machinery expense; Other mounting methods have also reduced the security risk when lifting relatively.
Claims (2)
1. the spelling moulding bed of a large-span pipe truss roof girder is characterized in that, comprising:
Steel floor as the basis;
Be welded on the support pier on the said steel floor, its height is identical with the springing height of the pipe truss roof girder at place, this moulding bed arch camber of living in Support Position, and its width is identical with the cross section Breadth Maximum of the pipe truss roof girder at place, this moulding bed arch camber of living in Support Position;
Be positioned at said support pier both sides, be welded on the column on the said steel floor;
Be arranged on the diagonal brace that the said column outside is used to reinforce said column, the upper end of said diagonal brace is welded on the outside of said column, and the lower end of said diagonal brace is welded on the said steel floor;
Be welded on the said support pier, be used for the lower chord tube of pipe truss roof girder is carried out the lower edge positioning baffle of lateral register; And
Be welded on the positioning baffle that winds up that said column is inboard, be used for the pipe that winds up of pipe truss roof girder is carried out the support location.
2. the spelling moulding bed of large-span pipe truss roof girder according to claim 1 is characterized in that, the spacing between two said columns is exceeded with two on the pipe truss roof girder that can hold place, the arch camber of living in Support Position pipes that wind up.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210299981.5A CN102777050B (en) | 2012-08-22 | 2012-08-22 | Assembly type jig frame for longspan pipe truss roof girder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210299981.5A CN102777050B (en) | 2012-08-22 | 2012-08-22 | Assembly type jig frame for longspan pipe truss roof girder |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102777050A true CN102777050A (en) | 2012-11-14 |
CN102777050B CN102777050B (en) | 2015-03-25 |
Family
ID=47122144
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210299981.5A Expired - Fee Related CN102777050B (en) | 2012-08-22 | 2012-08-22 | Assembly type jig frame for longspan pipe truss roof girder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102777050B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103406702A (en) * | 2013-08-21 | 2013-11-27 | 安徽鸿路钢结构(集团)股份有限公司 | Truss main pipe assembling jig frame |
CN105926959A (en) * | 2016-05-06 | 2016-09-07 | 浙江精工钢结构集团有限公司 | All-weather truss splicing bed-jig |
CN108330809A (en) * | 2017-12-27 | 2018-07-27 | 中铁宝桥集团有限公司 | One kind can the economic convenient type plate girder manufacture structure of high accuracy positioning |
CN114029683A (en) * | 2021-11-26 | 2022-02-11 | 中冶(上海)钢结构科技有限公司 | Assembled modular jig frame for giant structure and use method |
CN114439249A (en) * | 2022-04-07 | 2022-05-06 | 中铁建工集团有限公司 | Construction method for lifting large-span triangular truss through air swivel |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001173098A (en) * | 1999-12-15 | 2001-06-26 | Takenaka Komuten Co Ltd | Mobile frame trestle for constructing dome-like roof and construction method |
JP2006348740A (en) * | 2006-06-29 | 2006-12-28 | Takenaka Komuten Co Ltd | Long-sized member assembling method and assembling tool for use in the method |
CN201752827U (en) * | 2009-12-07 | 2011-03-02 | 天津二十冶建设有限公司 | Assembly jig for assembling pipe trusses |
CN102505864A (en) * | 2011-12-29 | 2012-06-20 | 上海市机械施工有限公司 | Method for assembling fixed ends of scaffold of large-volume triangular variable-section tubular truss structure |
CN202299458U (en) * | 2011-09-26 | 2012-07-04 | 上海宝冶集团有限公司 | Jig frame for high-altitude large-span rod piece |
-
2012
- 2012-08-22 CN CN201210299981.5A patent/CN102777050B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001173098A (en) * | 1999-12-15 | 2001-06-26 | Takenaka Komuten Co Ltd | Mobile frame trestle for constructing dome-like roof and construction method |
JP2006348740A (en) * | 2006-06-29 | 2006-12-28 | Takenaka Komuten Co Ltd | Long-sized member assembling method and assembling tool for use in the method |
CN201752827U (en) * | 2009-12-07 | 2011-03-02 | 天津二十冶建设有限公司 | Assembly jig for assembling pipe trusses |
CN202299458U (en) * | 2011-09-26 | 2012-07-04 | 上海宝冶集团有限公司 | Jig frame for high-altitude large-span rod piece |
CN102505864A (en) * | 2011-12-29 | 2012-06-20 | 上海市机械施工有限公司 | Method for assembling fixed ends of scaffold of large-volume triangular variable-section tubular truss structure |
Non-Patent Citations (1)
Title |
---|
章伟松等: "大型体育场菱形桁架钢屋盖安装技术", 《钢结构》, vol. 21, no. 3, 22 June 2006 (2006-06-22) * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103406702A (en) * | 2013-08-21 | 2013-11-27 | 安徽鸿路钢结构(集团)股份有限公司 | Truss main pipe assembling jig frame |
CN105926959A (en) * | 2016-05-06 | 2016-09-07 | 浙江精工钢结构集团有限公司 | All-weather truss splicing bed-jig |
CN108330809A (en) * | 2017-12-27 | 2018-07-27 | 中铁宝桥集团有限公司 | One kind can the economic convenient type plate girder manufacture structure of high accuracy positioning |
CN114029683A (en) * | 2021-11-26 | 2022-02-11 | 中冶(上海)钢结构科技有限公司 | Assembled modular jig frame for giant structure and use method |
CN114439249A (en) * | 2022-04-07 | 2022-05-06 | 中铁建工集团有限公司 | Construction method for lifting large-span triangular truss through air swivel |
Also Published As
Publication number | Publication date |
---|---|
CN102777050B (en) | 2015-03-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102777047B (en) | Assembling and splicing installation method of large-span tube-truss roof beam | |
CN103643800B (en) | The erection & lift system of buckling-restrained bracing member and construction method thereof | |
CN103352428A (en) | Suspension bridge cable bent tower beam non-support construction method | |
CN102777050B (en) | Assembly type jig frame for longspan pipe truss roof girder | |
CN211143305U (en) | Steel structure building | |
CN102605717A (en) | Pier-top longitudinal support scaffolding method | |
CN210066504U (en) | Large-span cantilever truss type bent cap support system | |
CN103233426A (en) | Bailey beam support free of buttress in soft foundation and supporting method thereof | |
CN202125061U (en) | Scaffold of large-space concrete structure | |
CN102691267A (en) | High pier construction method for external whole operation platform | |
CN103921347B (en) | Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases | |
CN204126297U (en) | A kind of temporary support of steel truss roof | |
CN202899639U (en) | Concrete column structure | |
CN203022409U (en) | Iron tower support assembly | |
CN215925689U (en) | Arch bridge steel pipe arch rib installing support | |
CN201943350U (en) | Supporting steel frame for die holder of high-altitude large span overhanging structure | |
CN104594631B (en) | The construction technology of sliding form apparatus traction operation platform construction granulation tower spraying layer | |
CN213476666U (en) | Limiting device for main pier during integral jacking of main bridge steel box girder | |
CN205296206U (en) | Tower cane foundation | |
CN101824918B (en) | Construction method for dividing unit to prefabricate bearing bent frame | |
CN201128882Y (en) | Lifting and supporting brackets integrated construction device for bridge arch rib | |
CN205296173U (en) | Utilize structure of foundation ditch support system bearing tower crane | |
CN103397638A (en) | Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support | |
CN203765784U (en) | Fixed drawing-inserting type installing mould frame for prefabricated T-beam rib plate reinforcing steel bar and pre-stressed pipeline | |
CN114263114A (en) | Construction system and construction method of large-section steel box girder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150325 Termination date: 20170822 |